Rev 6 to Procedure OI-24, Evaporator Feed Ion Exchanger Resin Flush & Recharger 1U12A,B&C & 2U12
ML20204H484
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 11/18/1983
From:
WISCONSIN ELECTRIC POWER CO.
To:
Shared Package
ML20204H448 List:
References
OI-24, NUDOCS 8411120302
Download: ML20204H484 (6)


Text

-

Q ' f 's Date 01-24 OPS Supervisor MINOR

( Chem Lab Records Levision 6 Spdated 11-18-83 OPS Office Records Updated EVAPORATOR FEED ION EXCHANGER RESIN FLUSH & RECHARGE 1U12A, B&C & 2U12 1.0 PURPOSE 1.1 'To sluice the spent resin out of the IU12A, B, C and 2U12 ion exchangers.

1.2 To recharge the selected demineralizer with fresh resin.

-2.0 PRECAUTIONS & LIMITATIONS 2.1 Have Health Physics monitor the demineralizer (contact and general area) prior to start of sluice. Monitor the El. 26' & El. 8' level of the auxiliary building after completion of the sluice.

2.2 No unauthorized work near the sluice line during the evolution.

2.3 Resin storage tank T112 relief valve is set at 150 psig. Monitor the cask continuously during flushing operation. .Do not exceed 125 psig on resin storage tank pressure gauge.

2.4 Line up monitor tank pump to reactor makeup water header, throttle pump recirc valve to maintain 125 psig on the reactor makeup water header.

2.5 If resin storage tank T112 pressure increases to 125 psig and holds, back flushing of the resin retention element on the vent line may be required.

-2.6 Do not operate the gas stripper feed pumps during this evolution.

3.0 INITIAL CONDITIONS
3.1 Verify the following:

3.1.1 Verify the storage tank resin inlet and storage tank vent canlock connections are properly mated and securely wired into place.

3.1.2 Camlock female cap installed on the resin storage tank T112 rinse line (center penetration) with padlock installed.

3.1.3 Resin storage tank T112 discharge valve shut (WS-34) and padlock installed.

l

((kD P

0

s o

8 -

OI-24 Page 2 4

3.2 Perform the following valve' lineup on the required ion exchanger / '

Position Initials Record demineralize 'o be flushed 1U12A BS-1190 Inlet . . . . . . . '. . S BS-1193 Outlet . . . . . . . . . S OR 1U12B BS-ll85 Inlet . . . . . . . . . S BS-1196 Outlet . . . . . . . . . S OR 1U12C BS-1165s- Inlet . . . . . . . . S BS-116'6 ' Outlet . . . . . . . . . S OR 2U12 BS-1174 Inlet . . . . . . . . . S BS-ll64 Outlet . . . . . . . . . S WL-1680 Spent resin to storage tank . . . . . . . . . O

( WL-1681 RNW to storage tank vent connection . . . . . S WL-1697 Storage tank vent to WHUT 0 WL-1682 SA to storage tank resin inlet connection . . . S 3.3' Health Physics perform a survey of ion exchanger to be dumped to get initial readings.

c Contact General Area 3.3.1 Permission to sluice resin to storage tank obtained from radioactive waste coordinator who was advised of the above contact reading.

3.3 If the resin being dumped is routed to the resin storage tank via the south dump header, a contact reading of the '

north header should be taken in the overhead of the north passageway before dumping. After dumping, an increased contact reading at this same location is indicative that the north header also naeds flushing due to resin carrying on past resin storage tank.

If dumping via north header, take contact reading on south

/ header as explained above.

k Cpposite dump header contact readings:

Before dumping After dumping

-~ p- -.- - - , - - - - ,--+ - - - y

, ey - --

p, ge -n--- , w---n - -

4 -

, 4 .

OI-24 Page 3

(

4.0 PROCEDURE Initials 4.I' LPressurize the reactor makeup water header (reference Step 2.4).

4.2 Open the resin dump valve on the selected ion exchanger.

, CAUTION: THIS WILL ALLOW " HOT" RESIN TO FALL BY GRAVITY TOWARDS THE RESIN CASK.

1U12A BS-1194 . . . .......... O IU12B BS-1195 . . . .......... 0 IU12C BS-1168 . . . .......... O 2U12 BS-llB4B . . . .......... O 4.3 . Crack open reactor makeup water inlet valve to establish

. reactor makeup water flow into the selected ion exchanger.

. Vary the flow as required to flush the resin into the storage tank. Monitor resin storage tank pressure; do not exceed 125 psig.

IU12A BS-1192 . . . . . . . . . . . . Throttled 4

1U12B BS-1191 . . . .. . . . . . . . Throttled

f IU12C BS-1167 . . . .. . . ... . . Throttled 2U12 BS-1176 . . . . . . . . . Throttled

(. . . .

CAUTION: THE RESIN RETENTION ELEMENT ON THE VENT LINE IS n LOCATED AT THE TOP OF THE RESIN STORAGE TANK PROVIDING A MINIMUM AIR SPACE. USE CAUTION WHILE FLUSHING WITH HIGH FLOW RATES TO PREVENT OVERPRESSURIZATION AND LIFTING THE TANK INTERNAL RELIEF VALVE.

4.4 When Chemistry indicates the U12 bed is empty, shut the reactor makeup water valve and the resin dump valve, then j lock the resin dump valve. Lock #

4.5 Flush the resin dump header. Then survey all resin dump lines to check for any stray resin.
- 4.5.1 If a south U12 demineralizer being dumped at 1U12C, open BS-1167A to flush residual resin out of south dump header. Do not exceed 125 psig on resin storage tank. Then shut and lock BS-1167A.

, Lock #

4.5.2 If a north U12 demineralizer being dumped

, between U3A and U3C, evaporator condensate

{'( demineralizer, check shut BS-1219, 1BS-1221, BS-1235B, and 2BS-1221. Open BS-1218 and BS-1231A to flush residual resin out of north dump header.

Do not exceed 125 psig on resin storage tank.

Then shut them and lock BS-1231A.

i Lock #

, .-,.--,,,....m - ...,.w-,,..r , ..,v---w_m._,..-. . _ . , _ , _ . ~ . . . - ~ . . _ , . .-,,__,-,___,,--__..m._,__._rm, or,-.y..,__,*r-er*'-

s c ,

OI-24 Page 4 s

Initials 4.6 Perform the following valve lineup:

WL-1680 Spent resin to storage tank ... S WL-1697 Storage tank vent to WHUT .... O 4.7 Obtain required resin volume and lot number from Chemistry laboratory.

Volume ft3 Lot #

Chem. Supvr.

4.8 Recharge the demineralizer in the following manner.

Do steps in order indicated.

i 4.8.1 Open the selected demineralizer vent valve: {

a. 1U12A BS-1170A
b. 1U12B BS-1170B
c. IU12C BS-1170C
d. 2U12 BS-1170D 4.8.2 Open the selected demineralizer drain valve:
a. IU12A BS-ll87
b. 1U12B BS-1188
c. IU12C BS-1173 '
d. 2U12 BS-1184A 4.8.3 After approximately 2-3 minutes, open then reclose the selected demineralizer resin fill valve (numbers listed per Step 4.8.5 below).

4.8.4 Remove resin fill connection flange and bolt recharge funnel into place. .

l 4.8.5 When Health Physics is present to take a grab 6 sample and low volume air particulate, open the selected demineralizer fill valve:

a. IU12A BS-Il89A
b. 1U12B BS-1189B
c. IU12C BS-1189C
d. 2U12 BS-1189D Use demineralized water and begin recharging demineralizer.

( CAUTION: ENSURE ALL PERSONNEL INV0VLED IN RECHARGING OPERATIONS HAVE POCKETS TAPED, GLASSES SECURED, ETC.

_ . - _ . - - _ _ . _ _ _ . . _ . _ . . _ _ . _ . ~ .

s

  • ~.

0I-24 Page 5

( ,

Initials 4.8.6 After sluicing approximately two-thirds of the required resin into the demineralizer, shut the drain valve (opened per Step 4.8.2).

4.8.7 Sluice the remaining resin into the demineralizer and then shut the vent valve (opened per Step 4.8.1).

4.8.8 Fill the balance of the demineralizer tank volume from El. 46' until water is visable just above the resin fill valve.

4.8.9 Shut the demineralizer resin fill valve (opened per Step 4.8.5).

4.8.10 Remove the recharge funnel and reinstall the blank flange utilizing a new flexitallic gasket.

4.8.11 Align the demineralizer per instructions of the Duty Shift Superintendent.

( 4.9 Place the reactor makeup water supply to the condition as required by the Duty Shift Superintendent.

,[* , *

. OI-24 Page 6 U3A RMvl RMW ~

( e, j [ BS-Il67 A as-1231A: : 03C *4 8S-17.18j iuizc iul2A a

U6 n

r 9

RMW U3B 1U12B J 6 2012{ , ,

J 6 s 6 u . _ _ _ .!

P f - _

In overhead of 1HX-11B # d In overhead of 2HX-11A RHR heat exchanger RHR heat exchanger cubicle cubicle P ('

Unit 1 boric acid # Unit 2 boric acid evaporator cubicle l } evaporator cubicle

" r 9 r 1r , r 1 1 r J L JL J k J L J L ios IU2A IU9 101A 1U1B 1U2B 1 rW1.1B25 opus o nusa g.372.

J Lmm _ u i(

BA EB40 S I 3C l-390B l-390A 1-390A 2-390B RMY!  :: : --@ p 73g , ooo)nosa l 2.02 209 2VIA 2VlB 20 i

l 9 r 1 r 1 r 9 r 1 r 2 6 J L J L J 6 J k Unit 1 boric acid y 9 Unit 2 boric acid evaporator cubicle g p -

evaporator cubicle Passage to No. 2 Passageway to No. 3 pipeway pipeway Unit I non-regenerative l [ -

Unit 2 non-regencrative heat exchanger cubicle ,

LEAD SHOT SHIELD

. 7y ,. . ,

7,_.  :. wrn ,

..- ,y.g eat exchanger cubicle

-w a _

c.--.....

7.g:.g7 ~~ -~w w.

h. . a . ..y? W?!#.F.>; N RMW SA. ~  : 2M 'a t:I t sh. ~ MSf p i16  ;: -e 81 - i T TO W.H.UT.

1681 1697

[ Hose'JumrER

/

I j

i

.H k- '

T-il 2. ,

SPENT RESIP4 "

i STOR AGE tar 4 K H LJ

[ WS . _ _ _ _ __

_. . _ , . _ _ _ _ _ _ . . _ . . _ , - . _ _ .__ ... .__ . . _ _ _ . . , . _ _ _ . _ _ . . . _ _ _ ,_ ,