ML20207G320

From kanterella
Revision as of 02:28, 27 December 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Ack Receipt of Change Notice 98-008 Dtd 980918,which Transmitted Changes to Callaway Plant Ep,Rev 21,under Provisions of 10CFR50,App E,Section V.No NRC Approval Required.No Violations Identified
ML20207G320
Person / Time
Site: Callaway Ameren icon.png
Issue date: 06/07/1999
From: Good G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Randolph G
UNION ELECTRIC CO.
References
NUDOCS 9906110113
Download: ML20207G320 (5)


Text

r' gs,a t'Ar, UNITED STATES

[

5 t

g NUCLEAR REGULATORY COMMISSION

E a REGION IV

,, c 611 RYAN PLAZA DRIVE, sulTE 400 0,,,,, ARLINGTON, TEXAS 76011-8064 June 7,1999 Garry L. Randolph, Vice President and Chief Nuclear Officer Union Electric Company P.O. Box 620 Fulton, Missouri 65251

SUBJECT:

CHANGES TO CALLAWAY PLANT EMERGENCY PLAN, REVISION 21

Dear Mr. Randolph:

9 This letter acknowledges receipt of Change Notice 98-008 dated September 18,1998, which transmitted changes to the Callaway Plant Emergency Plan, Revision 21, under the provisions of 10 CFR Part 50, Appendix E, Section V.

Based on your determination that the changes do not decrease the effectiveness of your emergency plan and that it continues to meet the standards of 10 CFR 50.47(b) and the requirements of Appendix E to 10 CFR Part 50, NRC approvalis not required. We did not identify any violations of 10 CFR 50.54(q) during our review. Implementation of these changes will be subject to inspection to confirm that they have not decreased the effectiveness of your emergency plan, in accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this letter will be placed in the NRC Public Document Room.

Should you have any questions concerning this letter, please contact Mr. Paul J. Elkmann of my staff at (817) 276-6539.

Sincerely, Gail M. Good, Chief l Plant Support Branch Division of Reactor Safety Docket No.: 50-483 I License No.: NPF-30 9906110113 990607 PDR F ADOCK 05000483 PDR

Union Electric Company cc:

Professional Nuclear Consulting, Inc.

19041 Raines Drive Derwood, Maryland 20855 I

John O'Neill, Esq.

Shaw, Pittman, Potts & Trowbridge 2300 N. Street, N.W.

Washington, D.C. 20037 i H. D. Bono, Supervising Engineer Quality Assurance Regulatory Support Union Electric Company P.O. Box 620 Fulton, Missouri 65251 Manager - Electric Department Missouri Public Service Commission 301 W. High P.O. Box 360 Jefferson City, Missouri 65102 i

Ronato A. Kucera, Deputy Director l Department of Natural Resources P.O. Box 176 Jefferson City, Micsouri 65102 ,

Otto L. Maynard, President and Chief Executive Officer Wolf Creek Nuclear Operating Corporation P.O. Box 411 Burlington, Kansas 66839 Dan 1. Bolef, President Kay Drey, Representative Board of Directors Coalition for the Environment 6267 Delmar Boulevard University City, Missouri 63130 Lee Fritz, Presiding Commissioner Callaway County Court House 10 East Fifth Street Fulton, Missouri 65151 1

d Union Electric Company 3-Alan C. Passwater, Manager Licensing and Fuels

~AmerenUE One Ameren Plaza 1901 Chouteau Avenue P.O. Box 66149 -

St. Louis, Missouri 63166-6149 J. V. Laux, Manager -

Quality Assurance Union Electric Company P.O. Box 620 Fulton, Missouri 65251 Jerry Uhlmann, Director State Emergency Management Agency P.O. Box 116 Jefferson City, Missouri 65101 l

l l

Union Electric Company '

4 DISTRIBUTION:

DMB (A045)

Regional Administrator Callaway Resident inspector DRP Director DRS-PSB DRS Director Branch Chief (DRP/B)

Project Engineer (DRP/B)

Branch Chief (DRP/TSS)

MIS System RIV File DRS Action item File (99-E-002)(Hodges) i I

I DOCUMENT NAME: G:\DRSLTRS\EP.MLD\CW R21_L.WPD _ Action item 99-E-002  ;

TAC #XO3474 CW_R21_M.WPD To teceive copy of document, Indicate In L -4: *C" = Copy without enclosures "E" = Copy with enclosures 'N' = No copy l RIV:PSB E C:DRS\PSB l 3 PJElkmann:nh Atr GMGood (26r' 02/ /99 3 /-ft uzt/ww h "

(o/qOFFICIAL RECORD COPY

O Union Electric Company 4

/

DISTRIBUTION:

W oN9 1

Regional Administrator l Callaway Resident inspector DRP Director DRS-PSB DRS Director Branch Chief (DRP/B)

Project Engineer (DRP/B)  ;

Branch Chief (DRP/TSS)

MIS System RIV File DRS Action item File (99-E-002)(Hodges) j l

l i

l 1

i

\ '

11003S D

DOCUMENT NAME: G:\DRSLTRS\EP.MLD\CW_R21_L.WPD Action Item 99-E-002 CW_R21_M.WPD TAC #X03474 To receive copy of document, Indicate in box: "C" = Copy without enclosures *E' = Copy with enclosures *N* = No copy RIV:PSB E C:DRS\PSB PJElkmann:nh Pjf GMGood GV 02/ /99 3-/41 Oz/ /ww ch "

(o/ OFFICIAL RECORD COPY

,