ML20207L473

From kanterella
Revision as of 20:54, 22 December 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Industrial Pretreatment Quarterly Self-Monitoring Results, for Dec 1998, for Pnpp
ML20207L473
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 12/31/1998
From: Brown P, Myers L
CENTERIOR ENERGY
To:
Shared Package
ML20207L461 List:
References
NUDOCS 9903180149
Download: ML20207L473 (1)


Text

.

INDUSTRIAL PRETREATMENT {

QUARTERLY SELF-MONITORING RESULTS Perry Nuclear Power Plant Permit No.: 1004911 10 Center Rd. Report Date: 1/07/99 Perry, Ohio 44081 Laboratory: Electro Analytical Date of Sample: 12/16 to 12/17/98 Time of sample: 10:00 Sample Location: Sewage Pump Station Name of Sampler: P. Brown Laboratory Address: 7118 Industrial Park Blvd.

Mentor, Ohio 44060-5314 l Date of Analysis: 12/17 to 12/23/98 l Flow: 42,800 gpd  !

i PARAMETER SAMPLE EPA ANALYSIS DISCHARGE ANALYSIS TYPE METIIOD DATE LIMIT RESULT 1 I

COD Composite 410.4 12/18/98 n/a 220 mg/l l

BOD Composite 405.1 12/23/98 n/a 540 mg/l l TSS Composite 160.2 12/18/98 n/a 610 mg/l Silver Composite 200.7 12/21/98 n/a <.050 mg/l Mercury Composite 245.2 12/23/98 2 ug/l <0.50 ug/l pH Composite 150.1 12/17/98 5.5 tol2 s.u. 8.3s.u. j Oil / Grease Grab 1664 12/22/98 50 mg/l 47.0 mg/l l

1 certify under penalty oflaw that I have personally examined and I am familiar with the information in this report and that, based on my inquiry of those persons immediately responsible for obtaining the information contained in this report, I believe that the information is true, accurate, and complete. I am aware that there are significant penalties for submitting false information including the possibility of fine and imprisonment.

M/49 Vice President - Nuclear Sigliature [ Date Title i

9903180149 990311 PDR ADOCK 050004 0 R

Ch J e % W G 4 0'1 _,_ __ _ _ _ _ _ _

_