SAFETYANALYSIS SA No. 4710-3221-08-01 Rev. No. 1 Page 1 of 28 TITLE SAFETY EVALUATION REPORT FOR COMPLETION 0F LOWER CORE SUPPORT ASSEMBLY AND LOWER HEAD DEFUELING
/
Originator Date g /fr / [
0
!!O Ab K CONCURRENCE P
Lead Engineer # [ -
Date
- . [SRG,h,hb d-4fJlateb)S3 RTR Cs./ nd',_ Date(/>ryW
/ ' '
g W
zant Engineer M d k Date 6/u/99 '
Rad C X/@
Q YQ l fi /
APPROVAL l . Section Date 2h8T e
((f. Date[r'dbN
(/
. j
~ No.
Nualear c 10 3221 88 01 Title Safety Evaluation Report for Completion of Page 2 of 28 Lower Core Support Assembly and Lower Head Defueling Rev.
SUMMARY
OF CHANGE Approval Da te i
\
0 Initial submittal. , 6/88 l
1 Updated Section 5.0 concerning the expected occupationa 6/88 exposure to ccmplete Reactor Vessel defueling and the jobhours and person-rem expended to date for defueling g/M activities.
l
=
0 7
2 ,
R t
4 s
e
4710-3221-88-01 TABLE OF CONTENTS SECTION PAGE 1.0 PURPOSE AND SCOPE 4.0 1.1 Purpose 4.0 1.2 Scope 4.0 2.0 MAJOR ACTIVITIES AND EQUIPMENT 5.0 2.1 Activities 5.0 2.2 Equipment 6.0 2.0 COMPONENTS AND SYSTEMS AFFECTED 6.0 4.0 SAFETY CONCERNS 6.0 4.1 General 6.0 4.2 RCS Criticality Control 7.0 4.3 Boron Dilution 7.0 .
4.4 Hydrogen Evolution 7.0 4.5 Pyrophoricity 7.0 4.6 Submerged Combustion 7.0 4.7 Fire Protection 8.0 4.8 Decay Heat Removal 8.0 4.9 Instrument Interference 8.0 4.10 Release of P.adioactivity 8.0 4.11 Reactor Vessel Integrity 8.0 4.12 Burning / Cutting Operations 16.0 4.13 Heavy Load Drops 17.0 4.14 Reactor Building Basement 18.0 5.0 RADIOLOGICAL CONSIDERATIONS 18.0 6.0 IMPACT ON PLANT ACTIVITIES 20.0 7.0 10 CFR 50.59 EVALUATION 20.0 8.0 ENVIRONMENTAL ASSESSMENT 22.0
9.0 CONCLUSION
S 22.0
10.0 REFERENCES
23.0 TABLES 25.0 APPENDIX A - EVALUATION OF LOAD DROPS OVER THE REACTOR VESSEL A-1.0 l
3.0 0253P/Rev. 1 l
e- .-u -
---y, ,,,-g, ww -r---y - - - -y w e- - e -- -
4710-3221-88-01 accordance with approved procedures for such activities including 4000-PLN-3891.02, "TMI-2 Lifting and Handling Program." Each specific load handling activity is controlled by a Unit Hork Instruction or procedure. Load handling activities will be performed by personnel who have been trained and qualified for these activities.
4.14 Reactor Building Basement The potential for a criticality event in the Reactor Building basement was previously addressed in References 2 and 25.
The controls discussed in Section 4.13 of Reference 2 to ensure subcriticality of potential leakage into the cavity of the RV will continue to be maintained during LCSA/LH defueling. Therefore, criticality is precluded.
5.0 RADIOLOGICAL CONSIDERATIONS Based on a comparison of activities associated with Reference 1 to those associated with LCSA/LH defueling, it is concluded that the radiological considerations associated with LCSA/LH defueling are bounded by Section 5 of Reference 1. However special precautions will be taken to prevent exposure of operating personnel during transport of radioactive and contaminated pieces of the LCSA from the RV to their storage location within the Reactor Seliding. Although these pieces of the LCSA will be inspected to ensure there is no visible fuel debris, all pieces are radioactive due to Co-60 activation and surface contamination by soluble fission products.
The sections of the LCSA to be removed under the scope of this SER are less radioactive than the lower grid rib assembly. The measured radiation level of a 5'x5' section of the lover grid rib assembly removed from the LCSA was 80 rer;/hr within one (1) foot of the surface. At distance of 30 feet, the radiation level was less than 1 rem /hr following removal. This plate was rigged, moved, and unrigged remotely. Since the sections of the LCSA to be removed from the RV within the scope of this document will represent less of a radiation hazard, the adequacy of the personnel exposure control practices have been demonstrated by the lower grid rib assenibly section removal.
An update of the jobhours and person-rem expended to date for all defueling activities is provided in Table 5.1. The overall estimated occupational exposure to complete Reactor Vessel defueling is approximately 1580 person-rem.
I l
1 18.0 0253P/Rev. I
- i
.4710-3221-88-01'
= TABLE 5.1 JOBHOURS AND PERSCN-REM EXPENDED THROUGH MAY 31, 1988
. Activity- Jobhours Person-Rem Preparation and Installation 5,120 120
. Operation 43,534 423 Defueling~. Support 28,793 440
-Maintenance 970 45 Decon and Removal
- 0- 0 Totals 78,417 1028
- No activity associated with final decontamination and removal of defueling equipment has currently been performed, thus, r.o jobhours and' person-rem are given. Note, decontamination maintenance in the Reactor Building is not-considered _part of this activity.
l-l l
19.0 0253P/Rev. 1
. = - . .
4710-3221-88-01 6.0 IMPACT ON PLANT ACTIVITIES The major potential impact of LCSA/LH defueling on plant activities is the effect of fuel movement in Unit 2 on operations in Unit 1. Based on the evaluation provided in Reference I and the similarity of the activities considered in Reference 1 to those activities within the scope of this SER, it is concluded that the LCSA/LH defueling operations in
. Unit 2 will not affect personnel in Unit 1.
7.0 10 CFR 50.59 EVALUATION 10 CFR 50, Paragraph 50.59, permits the holder of an operating license to make changes to the facility or perform a test or experiment, provided the change, test, or experiment is determined not to be an unrevic-ed safety question and does not involve a modification of the plant technical specifications.
10 CFR 50, Paragraph 50.59, states a proposed change involves an unreviewed safety question if:
- a. The probability of occurrence or the consequence of an accident or
-malfunction of equipment important to safety previously evaluated in the safety analysis report may be increased; or
- b. The possibility for an accident or malfunction of a different type than any evaluated previously in the safety analysis report may be created; or
- c. The margin of safety, as defined in the basis for any technical specification, is reduced.
Although there are notable differences between the proposed defueling activities for THI-2 and routine activities described in the FSAR, the consequences of postulated accidents are not different and as demonstrated in Reference 1, are sufficiently similar to be compared.
Reference 1 compared two (2) potential events during defueling, a canister drop accident and a Krypton 85 release, with two (2) events described in the FSAR, a fuel handling accident and a waste ;as decay tank failure. The comparison demonstrated that, on a worst case basis, the consequences of the FSAR events bound the consequences of any defueling-related event.
A variety of postulated events were analyzed in this SER for LCSA/LH defueling. The analysis of these events provided in Section 4 results in the cenclusion that the postulated events are bounded by previous evaluations and/or do not result in an unanalyzed condition.
To determine if LCSA/LH defueling activities involve an unreviewed safety question, the following questions must be evaluated.
20.0 0253P/Rev. I
4710-3221-88-01 Has 'the probability of occurrence or the consequences of an accident or malfunction of equipment important to safety previously evaluated in the safety analysis report been increased?
A variety of events were analyzed in Reference 1. It was demonstrated that these events were bounded by comparable events analyzed in the FSAR. It was shown that the potential consequences from these events were substantially less than the potential consequences of comparable events analyzed in the FSAR. Reference 2 evaluates the consequences of potential events during LCSA/LH disassembly and defueling and demonstrates that LCSA/LH defueling can be performed safely.
This SER demonstrates that there is a high probability that the incore nozzles have maintained their original integrity; thus, the potential for a leak due to a load drop is not increased. Additionally, because a RV leak is not likely, the potential for fuel fines from the RV to migrate to the cavity beneath the RV in the Reactor Building basement due to an incore nozzle failure is remote. Further, Reference 2 demonstrates that a basement criticality event external to the vessel due to the presence of this fuel is prevented because of the boron concentration that will be present in the cavity.
By considering postulated events and reviewing various safety mechanisms (i.e., fire protection and decay heat removal), it has been demonstrated that LCSA defueling activities will not adversely effect equipment classified as important to safety (ITS). Consequently, It is concluded that the probability of a maifunction of ITS equipment or the consequences of a malfunction of ITS equipment has not been increased.
Therefore, it is concluded that the proposed activities associated with LCSA defueling do not increase the probability of occurrence or the consequences of an accident or malfunction of equipment important to safety previously evaluated in the safety analysis report.
Has the possibility for ar, accident or malfunction of a different type j than any evaluated previously in the safety analysis report been created?
The variety of postulated events analyzed in References 1 and 2 considered a spectrum of event types which potentially could occur as a result of the defueling process. A comparison of those events with comparable events in the FSAR demonstrated that the event types postulated for the defueling process are similar and bounded by the FSAR. In addition, no new event type was identified which was different than those previously analyzed in the FSAR or other SERs previously approved by the NRC. Section 4 of this SER evaluates events postulated for LCSA/LH defueling. These type of events have been previously l
evaluated and, therefore, do not represent a different type of accident l or malfunction.
l l
21.0 0253P/Rev. 1 l
4710-3221-88-01
, Has'the margin of safety, as defined in the basis for any technical specification, been reduced?
Technical Specification safety margins at TMI-2 are concerned with criticality control and prevention of further core damage due to overheating. Technical Specification safety margins will be maintained throaghout the LSSA/LH defueling process. Subcriticality is ensured by establishing the RCS bo'on concentration at greater than 4350 ppm or equivalent and ensuring that this concentration is maintained by monitoring the boron concentration and inventory levels and by isolating potential deboration pathways. Systems will remain in place to add borated cooling water to the core in the event of an unisolable leak from the RV to prevent overheating and potential criticality. Additional borated water has been added to the cavity beneath the RV to bring the boron concentration above 3500 ppm as specified in Reference 2. This action ensures that a criticality event external to the vessel is not credible. The introduction of unborated water from the torch cooling system will not create the potential for a criticality because no more than three (3) gallons of unborated water can be inadvertently drainea into the RV (Reference 6).
No Technical Specification changes are required to ccriduct the activities bounded by this SER.
In conclusion, the LCSA defueling activities do not; o Increase the probability of occurrence or the consecuences of an accident or nalfunction of equipment important to safety previously evaluated in the safety analysis report, or o Create the possibility for an accident on malfunction of a different type than any evaluated previous'y in the safety analysis report, or o Reduce the margin of safety as defined in the basis for any Technical Specification.
Therefore, the LCSA defueling activities do not constitute an unreviewed safety question.
8.0 ENVI'40NMENTAL ASSESSMENT Based on Section 8.0 of Referenc? I and noting the simliarities between the activities considered in Reference I to those activities within the scope of this SER, it can be concluded that the proposed LCSA/LH defueling activities can be performed with no significant environmental impact.
9.0 CONClySIONS, Activities associated with LCSA/LH defueling have been described 'nd evaluated. The evaluations have shown that the radioactivity releases to the environment that will result from the planned activities will not 22.0 0253P/Rev. I
'54- ,
4710-3221-88 , exce~ed allowable limits. (Reference 1 providet 'he specific offsite dose analysis.) It has been demonstrated that the m .auences of postulated accidents with respect to potential core disturbances will not compromise plant safety. The evaluations have also shown that the tasks and tooling
_ employed follow the continued commitment to maintain radiation exposure levels AI ARA. -Therefore, it is concluded that LC5a/LH derueling activitle; can be performed without presenting undue risk to the health and safety of the public.
10.0 REFERENCES
- 1. Safety Evaluation Report for Defueling the TMI-2 Reactor Vessel, Revision 10, 15737-G07-108, May 1986.
- 2. Safety Evaluation Report for Lower Core Support Assembly Defueling, Revision 2, 4710-3221-86-011, January 1988.
- 3. NRC Letter dated April 1, 1988, Lower Core Support Assembly Defueling.
- 4. Criticality. Report for the Reactor Coolant System, Revision 0, 15737-2-N09-001, October 1984.
- 5. Report on Limits of Foreign Materials Allowed in the TMI-2 Reactor Coolant System During Defueling Activities, Revision 1, 15737-2-N09-002, September 1985.
- 6. Criticality Safety Assessment for Using the Plasma Arc Torch to Cut the LCSA, 15737-2-N09-004, November 1987.
- 7. GPU Nuclear letter 4410-88-L-0067 dated April 29, 1988, "Plasma Arc Torch Coolant System."
- 8. GPU Nuclear letter 4410-88-L-0026, cated February 26, 1988, "Response to NRC Comments on the Criticality Safety Assessment for Using the Plasra Arc Torch to Cut the LCSA."
- 9. Hazards Analysis: Potential for Boron Dilution of Reactor Coolant System, Revision 2.
- 10. Safety Evaluation Report for Core Stratification Sample
- Acquisition, Revision 4, 15737-2-G07-109, July 3, 1986.
- 11. GPU TP0/TMI-127, Revision 0, "Technical Plan for Pyrophoricity,"
December 1984.
- 12. EG&G Plasma Arc Test Report, LCSA-4, April 30, 1986.
- 13. Evaluation of the Structural Integrity of the TMI-2 Reactor Vessel Lower Head - Final Report, June 1985, B&W 77-1154826-00.
I
- 14. EG&G-TMI-7784, August 1987, "TMI-2 Reactor Vessel Lower Head Heatup Calculations."
23.0 0253P/Rev. 1
r< ,
4710-3221-88-01
- 15. GPU TP0/THI-175, Revision 6. "Analysis of Gamma Scanning of Incore Detector No. L-11 in Lower Reactor Vessel Head," June 1985.
- 16. EG&G-THI-7811, September 1987, "Thermal Interaction of Core Melt Debris With The TMI-2 Baffle, Core Former and Lower Head Structures."
- 17. GPU Nuclear letter 4410-87-L-0189, dated December 28, 1987, "Use of Core Bore Machine for Dismantling the Lower Core Support Assembly,"
to Document Control Desk from F. R. Standerfer.
- 18. NRC Letter-NRC/TMI-88-003, dated January 8, 1988, to F. R.
Standerfer from H. D. Travers.
- 19. GPU Nuclear letter 4410-86-L-0162, dated September 19, 1986, "Core Bore Operations," to H. D. Travers from F. R. Standerfer.
- 20. NRC Letter NRC/TMI-86-101, dated October 16, 1986, "Core Bore Operations," to F. R. Standerfer from H. D. Travers.
- 21. GPU Nuclear Technical Bulletin 88-02, Revision 0, dated April ,
1988
- 22. GEND-INF-031 Volume II, April 1984, "THI-2 Incore Instrument Damage
- An Update."
- 23. GPU Nuclear Tech'ical Bulletin 88-05, Revision 0, dated April ,
1988.
- 24. Safety Evaluation Report for Core Support Assembly and Lower Head Defueling, Revision 0, 4710-3221-86-011, February 1987.
- 25. Safety Evaluation Report for Reactor Building Sump Criticality, Revision 2, 4550-3254-85-02, January 1986.
I 1
l' l
24.0 0253P/Rev. 1 l
- 4710-3221-88-01 TABLE 1 THERM 0COUPl.E LENGTHS Length
~
Original Calculated From -
Length Reduction in Rea: tor in Reactor Length Base Assembly Grid
- Number Location (ft) (ft) (ft)
- 21.00 17.04 3.96 1 H8 20.97 6.91 14.06 2 M9 1.99 69 20.93 18.93 3 19.70 1.16 4 F8 20.86 20.64 17.31 3.33 5 E9 1.24 F7 20.82 19.58 6 0.88 E7 20.64 19.75 7
20.82 20.04 0.78 8 G6 20.64 20.27 0.37 9 G5 20.W3 16.65 4.02 -
10 H5 20.64 6.93 13.71 11 K5 20.71 8.95 11.76 12 L6 20.64 10.77 9.87
. 13 M7 9.84 10.57 14 N8 20.41 20.37 16.93 3.44 15 N9 l
20.64 19.97 0.66 I
16 M9 20.53 18.13 2 40 17 M10 5 l 7.96 12.56 l
18 Lil 20.53 19.92 0.72 19 K11 20.64
-- -- e 20 K12 20.37 --
21 H13 20.06 20.02 13.49 6.53 22 G13 --
23 F13 19.89 20.26 6.63 13.63 24 F12 --
25 Gil 20.64 20.33 20.33 0.00 26 E11 20.26 19.20 1.06 27 D10 19.89 10.77 9.12 28 C10 20.02 9.46 10.56 29 C9 19.59 9.52 10.08 30 88 11.48 87 19.55 8.07 31 11.48 C6 19.89 8.42 32 8.44 11.62 33 DS 20.06 --
r 34 E4 20.06 --
35 F3 19.89 19.55 8.92 10.63 36 G2 19.00 7.30 11.70 37 H1 19.42 10.41 9.01 38 L2 19.89 10.48 9.42 39 L3 --
1 40 M3 19.68 19.77 7.81 11.96 41 N4 i
19.68 10.15 9.53 42 05 --
43 06 19.89 --
44 P6 19.42
- These measurements have an uncertainty of + 1.25 feet. ,
--Indicates open circuits.
Rev.1/0253P
~
25.0
p.; . . . . .. . . . . ._
~
4710-3221-88-01 TABLE I THERMOCOUPLE LENGTHS Length-Original Calculated From Length Reduction in Reactor Erid in Reactor Length , Base .
Asses 61y Number Location (ft) (ft) (ft)
- R7 18.95 16.93 2.01 45 R10 18.80 6.58 12.22 46 ..
47 010 19.89 --
012 19.37 8.41 10.96.
48 M14 19.19 13.72 5.47 -
49 --
50 L13 19.89 --
D14 18.85 4.49 14.35 '
51 C13 18.95 8.37 10.58 l 52 i
l .
l l
l 1
l
- These measurements have an uncertainty of + 1.25 feet.
--Indicates open circuits.
26.0 Rev.1/0253P
4710-3221-88-01 i!
TABLE 2 ,
CATEGORIZATION OF INCORE DETECTOR OBSERVATIONS .
CALCULATED NUMBER & LOCATION OF AGREEMENT BETWEEN 'l CATE- NUMBER LOCATION OF DETECTOR SEPARATION THERMOCOUPLE - .i' GORY OF BASED ON VIDEO DATA REDUCTION DATA Ap :l .
INCORES THERMOCOUPLE VIDEO DATA. :r ,
JUNCTION RELATIVE (ABOVE/BELOW LOWER GRID RIB SECTION)
~
lll TO LOWER GRID % ii RIB SECTION (a) 1 ,
87 % ,L ,
23 ABOVE LOWER GRID 20-ABOVE LOWER GRID A jt 2-BELOW LOWEn GRID
- l 1-UNKNOWN
- 8 11-BELOW LOWER GRID 69 % -
B 16 BELOW LOWER GRID r 5-ABOVE LOWER GRID , (;
100 %
C 2 AT LOWER GRID (b) 2-ABOVE LOWER GRID .
h 80% (f
- 41 SUBTOTAL 33 OUTOF41 AGREE I; 11-ABOVE LOWER GRID N/A D 11 OPEN JUNCTION ~
I
! 80 %
OVERALL 38-ABOVE LOWER GRID l
! ALL ,52 (33 out of 41) 13-BELGW LOWER GRID j l 1-UNKNOWN I
1 .
{ (a) BASED ON GEND-INF-031 Vol.II, April-84.
(b) MEASUREMENTS INCORPORATE AN UNCERTAINTY OF +/- 1.25 ft. -
- 27.0 Rev.1 /0253P