Rev 0 to Auxiliary Bldg Sump Sludge Prevention (Regulatory Required)
ML20137F130
Person / Time
Site: Three Mile Island  Constellation icon.png
Issue date: 08/27/1996
From:
GENERAL PUBLIC UTILITIES CORP.
To:
Shared Package
ML20137F120 List:
References
T1-CCD-412680, T1-CCD-412680-0, T1-CCD-412680-001-R0, T1-CCD-412680-1-R, NUDOCS 9703280438
Download: ML20137F130 (8)


Text

.. ._. - . , . . . - . _ . . . . - _ . . . _ . . . - _ . _ _ _ - . . . - - . __

6710-96-2081 ,

, Attachment 6

'02 19-97 15;13 4i

- Page 7 of 14 l Nuclear T1-CCD412680-001 1

4 1

4 1

AUXILIARY BUILDING SUMP

! SLUDGE PREVENTION l

(REGULATORY REQUIRED) i l PREPARATION DATE ,

j ENGINEERING APPROV DATE I~ '

  • l REV 0 4

J l

j 9703280430 970228 9 DR ADOCK 0500 1

s 6710-96-2081 g .' 3 - Attachment 6

' Page 8 of 14 j

- i I .

[

! I i

i T1-CCD-412680-001'

Rev. O j Page 1 of 7 I

[

1.0 Purpose and Scope

i V ,

i 4 This change is part of a larger effort to improve the quality of the water processed by the I

l miscellaneous waste evaporator. The purpose of this configuration change is to install t I

several pieces of equipment and piping which will remove oil and accumulated solids from

the auxiliary building sump which contributed to high sulfur problems in the reactor 4

coolant bleed tanks in the past. The configuration change will also install piping changes to ,

create a path to send several sump drains to the auxiliary building sump instead of directly  !

to the miscellaneous waste storage tank and provide connections for several river water j i- coolers to return river water to the river dunng mamtenance.

! i

! The equipment in the auxiliary building sump will' include an oil skimmer to collect any oil [

j that gets into the sump, A recirculation piping assembly will be installed in the sump to l i agitate solids, so that they can be filtered out, before being sent to the miscellaneous waste - '!

storage tank. The recirculation piping assembly will be installed in a new branch line on j f the 4" discharge line of the existing sump pumps. A filter housing with multiple filter  ;

j elements will be installed inside the sump as part of the recirculation piping assembly to l ollect solids entrained while recirculating the sump water, A hose connection will be  !

!. installed off of the recirculation line to provide a hand-held hose capability for cleaning in '

the sump.  !

l' ,

Some new piping will be installed to allow routing of several sumps' drains to the auxiliary--  !
building sump in addition to the current routing to the miscellaneous waste storage tank.

l These sumps are the Tendon Access Gallery sump, Borated Water Storage Tank sump, j, Heat Exchanger Vault sump and the Spent Fuel Pit Room sump. '

i

[ Quick disconnect fittings will be installed on the Decay Heat Closed Cooling water and j Intermediate Closed Cooling water river water heat exchangers in the heat exchanger i vault. This will allow river water to be returned to the river during heat exchanger i maintenance instead of draining the water to the Heat Exchanger Vault sump.

2.0 Desien Information i 2.1 Fire Hazard Analysis Inout and Status Form i

j- A Fire hazards Analysis lyut and Status Form evaluation is performed by evaluation

FPE-TI-412680-001.

2.2 Waiver of EOIS Form i

' An Environmental Qualification Input and Status Form is not required. A review ofinputs

]

j required for the EQlS form (Tech Functions Procedure EP-031) was completed. This i

4

-, - r ,-- _ _, _ . - y 9- --.-e . g .--r..

6710-96-2081 Attachment 6 Page 9 of 14 T1-CCD-412680-001 Rev. 0 '

Page 2 of 7 configuration change does not include work that may have an impact on existing l environmental conditions resulting from a design basis high energy line break nor does this change involve any electrical work in a harsh environment. l 2.3 Environmental Considerations i

This modification has been reviewed in accordance with GPUN Procedure 1000-ADM-4500.03 and does not create an environmental concern as documented in SE 412680-001.

3.0 References #

The fo!!owing references apply to this corrective change. Where specific revisions of .

references are not stated, the latest revision or edition shall apply.

t 3.1 GPUN SE-412680-001, " Auxiliary Building Sump Sludge Prevention"

. 3.2 GPUN Operational Quality Assurance Plan i 3.3 GPUN Bill of Materials, BOM-TI-412680-201 1

3.4 Pipe Line List and Specifications for TM1-1, SYS LL-TMI-l 35 Engineering Standard ES-001, "GPUN Engineering Classifications" 3.6 Construction drawing 1D-573-22-1000, "WDL Piping Isometric and Details" 3.7 Constmetion drawing 1 E-573-21 1000, "WDL Flow Diagram" 3.8 Construction drawing iD-573-24-1000, " Pipe Support and Core Bore Details"

)

3.9 Construction drawing iD-573-27-1000, " Oil Slimmer Installation" 3.10 Constmetion drawing ID-531-22-1001," River Water Details" l 3.11, GPUN Specification SP-9000-06-003, " Application and Repair of Service Level II and Balance of Plant Coatings".

3 3.12 GPUN Welding Program,1000-ADM-7220.01 l 3.13 AWS Dl.1-1979, "Stmetural Steel Welding Code."  !

l

. 6710-96-2081 I

. Attachment 6 )

Page 10 of 14 i

\

)

T1-CCD-412680-001 I Rev. O l Page 3 of 7 i I

3.14 GPUN Corrective Maintenance Procedure 1420-EL-2, "Preoperational Startup Testing of l Electrical Equipment" 3 15 GPUN Spec. SP 9000-33-003," Installation of Hilti Kwik Bolt II" l

)

3.16 GPUN 302-719, " Sump and Drainage System" l 3.17 GPUN 302-202," Nuclear Services River Water System"

] 3.18 GPUN Specification SP-1101-41-003, " Installation of Electrical Equipment TMI-l."

3.19 ANSI N45.2.1, " Cleaning of Fluid Systems and Associated Components During Constmetion Phase of Nuclear Power Plants."

3.20 ANSI B31.1, Power Piping,1967 3.2i Reg. Guide 1.143," Rad waste" 3 22 Construction drawing 1 A 573-54-1000, Location schedule terminal boxes 3.23 Constmetion drawing IC-573-15 1000, Electrical arrangement 3.24 Construction drawing IC-573-12-1000, Lighting layout 3.25 Construction drawing 1E-573-12-1000, Lighting layout  ;

3.26 Pull / termination sheet CP 1087 3.27 Pull / termination sheet CP 1088 1

3.28 Pull / termination r,heet TV 45 l 4.0 Ouality Assurance Reauirements 4.1 This corrective change is classified as Regulatory Required. The GPUN Operational I Quality Assurance Plan (Ref. 3.2) shall apply to the work as described in the specification Piping in the auxiliary building sump and piping in the Auxiliary building will be seismic class II as shown-on construction drawings.

The river water drains are classified as Other and seismic class III in accordance with Reference 3.17.

l 6710-96-2081 l Attachment 6 Page. I1 of 14 T1-CCD-412680-'001 Rev. O Page 4 of 7 I

The oil skimmer and the receptacle cir.cuit which powers it are classified as Other.

4.2 Painting and coating of exterior carbon steel surfaces shall be classified as "Other". The GPUN OQAP does not apply.

4.3 All new and modified piping components shall be supplied and maintained in a Class C cleanliness condition as defined by ANSI N45.2.1 (Ref. 3.19).

I 50 Dgsian Reauirements 5I All carbon steel structural welding shall be performed in accordance with the GPUN Wel'd Program Manual and AWS Dl.1 (Ref 3.12,3.13). i Welding of stainless steel structural members delineated on drawing 1D-573-27-1000 is i considered non-code, in-scope and shall be performed in accordance with the GPUN Weld

{

Program Manual.

l 5.2 Install supports in accordance with associated constmetion drawings. Drilled-in concrete anchors shall be installed in accordance with approved site procedures except as shown on l the construction drawings. Hilti Kwik bolt 11 installation shall conform to reference 3.15.

5.3 Exterior surfaces of carbon steel components shall be prepared and painted in accordance with SP-9000-06-003 (Ref 3.11). -

5.4 Stmetural steel shall be as specified on the bill of material, Reference 3.3, and shall be traceable to specification and grade via purchase order number.

5.5 The piping installed by this configuration shall meet the design, fabrication, installation and inspection requirements of ANSI B31.1-1967 Reference 3.20 and ES-001, Reference 3.5.

5.6 All pressure boundary material to be welded shall be maintained traceable to PO number, spec and grade.

5.7 Cutting of re bar shall be done in accordance with plant procedure 1440-Y-10.

6.0 Dnignpescription ,

6.1 The current system flow diagrams are shown on Ref 3.16 and 3.17.

6.2 The Piping contains rad waste with a design pressure cf 150 psi and a design temperature of 2007 (Reference 3.4). The piping class is N-3 and seismic class II for the affected

6710-96-2081 Attachment 6 Page 12 of 14 T1-CCD-412680-001 Rev. O Page 5 of 7 radwaste system piping. The river water piping class is C and seismic class III for piping downstream of the drain isolation valves.

6.3 The new equipment will be powered from an existing 120 volt receptacle circuit located in the sump. The existing 20 amp circuit breaker for this circuit will be replaced with a 30 amp breaker, which is presently an installed spare in the breaker panel. The 30 amp breaker will provide adequate protection for this circuit because the existing circuit is

  1. 10AWG wire. A remote switch will be installed outside the sump to provide ON/OFF operation of the skimmer without entry into the sump.

6.4 The fittings installed on the river water drains are Other class and will be installed with threaded joints. The drain valves on these lines represent the system pressure boundary and therefore threaded and Other class are appropriate.

7.0 Installation Soecifications 7.1 The Auxiliary building sump. system will remain in service until the final tie-in of the sump piping. Install the sump recirculation piping and components in accordance with construction drawings. The existing piping in the radwaste system is A316 type 304.

Socket welded ball valves shall be disassembled prior to welding.

Filter elements installed initially will be twelve 30",25 micron polypropylene elements per Keystone Filter Division Bulletin 08FP02 or equivalent.

7.2 New supports shall be installed in accordance with the construction drawings Reference 3.8 and 3.9-7.3 Install the river water drain hose connections in accordance with the construction drawing Reference 3 10.

7.4 Quick disconnect fittings are required at the following river water drain valves: DR-V-12A/B.13 A/B,14A/B, NR-V-26A/B and NR-V-40A/B.

7.5 Mount the equipment box for the river water hoses and pump provided by Operations / Chemistry in the heat exchanger vault as shown on construction drawing, Reference 3.10.

7.6 Install the oil skimmer in accordance with construction drawing Reference 3.9. Perform electricalinstallation as directed in section 7.8 of this document. Cut holes in the sump 1 grating in accordance with construction drawings to allow the skimmer collector tube to 0

l 9

, 6710-96-2081 g , ,

Attachment 6

., Page 13 of 14 ,

T1-CCD-412680-001 i Rev. O Page 6 of 7 move freely. A bucket must be placed under the oil skimmer to catch the oil when the oil skinuner is in operation.  !

7.7 Install the piping to route the Tendon Access Gallery sump, Borated Water Storage Tank sump, Heat Exchanger Vault sump and Spent Fuel Pit sump drains in accordance with construction drawing Reference 3.6. The existing piping in the radwaste system is A316 type 304. .

7.8 Core bores shall be drilled in accordance with construction drawing Reference 3.8. Seal the core bore as a fire barrier in accordance with plant procedures using BOM material item 25 for Reference 3.6. .

7.9 Electrical Installation -

7.9.1 Install a TV camera and coax cable in accordance with pull / term. sheet TV45 and construction drawing Reference 3.24. Field to determine exact location for mounting camera to best observe skimmer operation as directed in Reference 3.24. j The TV monitor outside the sump will be installed by Operations at a later date.  ;

7.9.2 At AC Distribution Panel AB-4, open breaker #6 and interchange it with spare 30 amp breaker #25,in accordance with GPUN drawing IC-573-15-1000, Reference j 3 23. -

i NOTE: Perform the following steps in accordance with GPUN drawing ID-573 1000, Reference 3.24.

i 7.9.3 Replace the receptacle circuit "LB" condulet body, located on the north wall of the j Auxiliary Building sump, with a terminal box with terminal 'strip. i 7.9.4 Install 3/4" flexible conduit from the new terminal box to the oil skimmer terminal box. ,

1 7.9.5 Install three,1/c #10AWG wires from the terminal box to the oil skimmer, and j connect the new equipment and existing receptacle circuit, in accordance with pull / term. sheet CP1088 and manufacturer's instructions.

7 9.6 Install 3/4" conduit, #10AWG wire and an ON/OFF selector switch for remote skimmer operation, in accordance with GPUN drawing 1C-573-12-1000 and pull / term. sheet CP1087. Route the conduit through the 5" core bore hole in which the Tendon Access Gallery sump line runs.

6710-96-2081 l

, Attachment 6 Pace 14 of 14 l

T1-CCD-412680-001  !

Rev. O Page 7 of 7 80 Iestine Reauirements/ Documentation 8.1 Structural welding inspection shall be performed as identified below.

a 8.1. .l All carbon steel structural welds shall be inspected to the provisions of the VWAC standard as contained within the GPUN Weld Program Manual Reference 3.12. ,

8.1.2 All stainless steel structural welds shall be inspected by Site QV to ensure weld size, length and location to the governing weld detail requirements; to ensure thorough fusion, no cracks, and no weld undercut greater than 1/32" and to verify l

the applicable good workmanship requirements contained within the GPUN '

General Welding Standard.

8.2 Perform an inservice leak check of the new river w;ter drains in accordance with ANSI B31.1 Reference 3.20. The threaded joints are outside the system pressure boundary.

8.3 Perform an inservice leak check of the new sump piping components in accordance with ANSI B31.1 Reference 3.20. This piping inside the sump is subject to pressure ofless than 50 psi from the discharge of the installed pumps. The isolation for a hydro would involve diaphram valves and the piping is open at the bottom of the sump which is not accessible for work such as a hydro due to radiological dose conditions.

t 84 The oil skimmer shall bc energized prior to installation to verify operation of electrical components. Following installation the skimmer shall be functionally tested to verify proper operation.

8.5 Perform an inservice leak check of the new sump piping from the Tendon Access Gallery sump, Borated Water Storage Tank sump, Heat Exchanger Vault sump and Spent Fuel Pit sump drains in accordar.ce with ANSI B31.1 Reference 3.20. The system diaphram valves should not be subjected to a hydro to test this work.

8.6 Perform preoperational startup testing of the modified electrical equipment in accordance ,

with Reference 3.14.

i D_ peumentation

)

8.7 New vendor manuals for the oil skimmer and the new filter WDL-F-5 shall be forwarded )

to vendor document control.  !

1 88 Operating procedures 1104-40 and 1107-4 require changes to operation of the sumps and ]

drain system and description of the electrical distribution as a result of this configuration l change.