ML20196J950

From kanterella
Revision as of 22:01, 15 December 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Ack Receipt of Plant Ep,Rev 22,received on 981207 & Submitted Under Provision of 10CFR50,App E,Section V.Changes Does Not Decrease Effectiveness of EP & Continues to Meet Stds of 10CFR50.47(b).NRC Approval Not Required
ML20196J950
Person / Time
Site: Callaway Ameren icon.png
Issue date: 07/02/1999
From: Good G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Randolph G
UNION ELECTRIC CO.
References
NUDOCS 9907080091
Download: ML20196J950 (5)


Text

L *

[ "W g$

UNITED STATES NUCLEAR REGULATORY COMMISSION f

e REGloN IV 4,g f[ 611 RYAN PLAZA drive, sulTE 400 ARUNGToN, TEXAS 76011-8064 July 2, 1999 -

Garry L. Randolph, Vice President and .

Chief Nuclear Officer '

Union Electric Company P.O. Box 620 Fulton, Missouri 65251

SUBJECT:

CHANGES TO CALLAWAY PLANT EMERGENCY PLAN, REVISION 22

Dear Mr. Randolph:

This letter acknowledges receipt of the Callaway Plant Emergency Plan, Revision 22, received on December 7,1998, submitted under the provisions of 10 CFR Part 50, Appendix E, Section V.

Based on your determination that the changes do not decrease the effectiveness of your emergency plan and that it continues to meet the standards of 10 CFR 50.47(b) and the requirements of Appendix E to 10 CFR Part 50, NRC approva!is not required. implementation of these changes will be subject to inspection to confirm that they have not decreased the effectiveness of your emergency plan, in accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this letter will be placed in the NRC Public Document Room.

Should you have any questions concerning this letter, please contact Mr. Paul J. Elkmann of my staff at (817) 276-6539.

Sincerely, Y

Gail M. Good, Chief Plant Support Branch Division of Reactor Safety Docket No.: 50-483 License No.: NPF-30 9907000091 990702 PDR ADOCK 05000483 F PDR

s. .

4 Union Electric Company cc:

- Professional Nuclear Consulting, Inc.

19041 Raines Drive Derwood, Maryland 20855 John O'Neill, Esq.

Shaw, Pittman, Potts & Trowbridge 2300 N. Street, N.W.

Washington, D.C. 20037 .

H. D. Bono, Supervising Engineer

- Quality Assurance Regulatory Support Union Electric Company P.O. Box 620 Fulton, Missouri 65251 - i Manager - Electric Department Missouri Public Service Commission 301 W. High P.O. Box 360 Jefferson City, Missouri 65102 Ronald A. Kucera, Deputy Director Department of Natural Resources P.O. Box 176 Jefferson City, Missouri 65102 Otto L. Maynard, President and  !

Chief Executive Officer Wolf Creek Nuclear Operating Corporation P.O. Box 411 i Durling*.on, Kansas 66839.' l l

Dan 1. Bolef, President  !

Kay Drey, Representative Board of Directors Coalition for the Environment 6267 Delmar Boulevard University City, Missouri 63130 .

- Lee Fritz, Presiding Commissioner

- Callaway County Court House 10 East Fifth Street ,

Fulton, Missouri 65151 -

r:;g .

.# , . s n

Union Electric Company Alan C. Passwater, Manager Ucensing and Fuels

. AmerenUE One Ameren Plaza 1901 Chouteau Avenue P.O. Box 66149 St. Louis, Missouri 63166-6149 e

J. V. Laux, Manager' .

Quality Assurance Union Electric Company P.O. Box 620

~ Fulton, Missouri 65251 -

- Jerry Uhlmann, Director

- State Emergency Management Agency P.O. Box 116 Jefferson City, Missouri 65101-l

. 4 . .

Union Electric Company DISTRIBUT40N./,

35 f

DMB (AjMS) a/

Regional Administrator Callaway Resident inspector DRP Director DRS-PSB DRS Director Branch Chief (DRP/B) e Project Engineer (DRP/B)

Branch Chief (DRP/TSS)

MIS System RIV File DRS Action item File (99-E-003)(Hodges)

\ f DOCUMENT NAME: G:\DRSLTRS\EP.MLD\CW R22_L.WPD _ Action item 99-E-003 CW._R22_M.WPD TAC #XO3475 To receive copy of document, Indicete in box: 'C' = Copy without enclosures *E' = Copy with enclosures 'N' = No copy RIV:PSB - E C:DRS\PSB l l PJElkmann:nh 68 GMGood foW H ').t-91 MH99 ~7/> AR OFFICIAL RECORD COPY 080001

.o , , .-

a ,

'4 .

Union Electric Company 4 DISTRIBUTION:

DMB (A045)-' ..

Regional Administrator. j Callaway Resident Inspector ' i

' DRP Director i DRS-PSB j DRS DirectorJ Branch Chief (DRP/B)

Project Engineer (DRP/B)

Branch Chief (DRP/TSS)

MlS System  !

RIV File DRS Action item File (99-E-003)(Hodges)-

I I

i i

l 1

DOCUMENT NAME: G:\DRSLTRS\EP.MLD\CW_R22_L.WPD Action item 99-E-003 CW R22_M.WPD '

_ TAC #X03475 To receive copy of clocument, Indicate in box: "C" = Copy without enclosures "E" - Copy with enclosures "N" = No copy

_ l RIV:PSB E C:DRS\PSB lPJElkmann:nh @ GMGood foW lN '7 /-T f 46H99 ~7/l ACl OFFICIAL RECORD COPY