MONTHYEARML20211H4441999-08-27027 August 1999 Notification of Significant Meeting with Util on 990916 & 17 in Arlington,Tx to Improve Utility & NRC Understanding of Industry & Regulatory Perspectives on Current Issues ML20209G2421999-07-14014 July 1999 Notification of 990722 Meeting with License in Rockville, MD to Discuss Changes in EOI Licensing Organization Including Division of Responsibilities within New EOI Corporate Licensing Group ML20203J5931999-02-17017 February 1999 Notification of Significant Licensee Meeting with Util on 990329 Re NRC Plant Performance Review Summary Meeting ML20203A5081999-02-0505 February 1999 Notification of 980226 Meeting with Texas Utils Electric Co, Southern California Edison & NPPD Re Control of Hazard Barrier Tr, .Agenda Encl ML20195H9221998-11-17017 November 1998 Forwards Exam Repts 50-445/98-301 & 50-446/98-301 Conducted on 980619-26 with as Given Written Exams Encl,Designated for Distribution ML20153B0331998-09-18018 September 1998 Notification of 980929 Meeting with Texas Utilities Electric Co in Rockville,Md to Discuss Licensee Proposed App K Exemption Request & Topical Rept Submitted in Support of Exemption Request ML20236G8291998-07-0202 July 1998 Notification of 980720 Meeting W/Util in CPSES Nuclear Operations Support Facility Lab Annex to Discuss Midloop Operations During Last Refueling Outage ML20236F7611998-06-29029 June 1998 Notification of 980714 Meeting W/Util in Rockville,Md to Discuss Methods of ECCS Analyses & Licensing Submittals Required for Proposing Exemption to Appendix K & Power Uprate License Amend ML20217M9351998-04-0606 April 1998 Notification of Licensee Meeting W/Util on 980407 in Arlington,Tx Re Status of Licensee Actions in Response to GL 96-01 ML20202E6791997-12-0202 December 1997 Notification of 971209 Meeting W/Texas Utilities Electric Co in Rockville,Maryland to Discuss risk-informed Inservice Testing Request for Addl Info Responses, ML20202B1421997-11-26026 November 1997 Notification of 971115 Meeting W/Util in Arlington,Texas to Discuss Recent Unit 2 Refueling/Maint Outage at TU Electric Comanche Peak Plant ML20212G3921997-10-27027 October 1997 Notification of 971112 Meeting W/Util to Discuss Util 970228 Responses to Remaining Three Open Items Listed in NRC Safety Evaluation on Cable Functionality, .Reissued Due to Change of Cc:List ML20203C1181997-10-24024 October 1997 Discusses OI Rept 4-97-027 Re Falsification of Thermolag Matl Insp Records.Allegation Not Substantiated Therefore Enforcement Action Not Appropriate ML20212B7261997-10-16016 October 1997 Notification of 971031 Meeting W/Util in Arlington,Tx Re Predecisional Enforcement Conference ML20206E3401997-09-19019 September 1997 Requests That NRR Conduct Review of Licensee Backfit Claim to Determine of plant-specific Backfit Exists & Submits Recommended Actions to Be Taken If One Does Exists ML20217R1561997-08-28028 August 1997 Informs That GL 96-04 Did Not Require Response for Licensee That Did Not Have Boraflex in Sf Racks ML20237B9901997-07-0303 July 1997 Informs That on 970529-30,NRC Team Attended Severe Accident Mgt Implementation Demonstration at Comanche Peak Steam Electric Station,In Granbury,Tx ML20137C9201997-03-20020 March 1997 Forwards Documentation of Meeting Conducted in Region 4 Office on 970225 to Discuss NRC Enforcement Policy as Applied to Nonescalated Enforcement ML20134N2911996-11-22022 November 1996 Notification of 961205 Meeting W/Util in Arlington,Tx to Discuss Responses to Open Items Listed in NRCs Safety Evaluation on Cable Functionality at Plant, ML20134L9821996-11-19019 November 1996 Notification of Licensee Meeting W/Util on 961204 to Discuss Revision 25 to Emergency Plan ML20128P3011996-10-10010 October 1996 Forwards Analysis of Financial Qualifications & Antitrust Reviews & Input to SER on Proposal to NRC by Tuec for Tx Utilities Corp ML20129E9031996-10-0101 October 1996 Notification of 961002 Meeting W/Util in Rockville,Md Re License Amend Request 96-005,inverters & Battery Chargers Mod ML20135A2801996-04-10010 April 1996 Discusses Director'S Decision Re Actions Requested by Petitioners W/Regard to Use of Thermo-Lag by Reactor Licensees.Petitioners Requested Immediate Shutdown of Reactors Using Thermo-Lag ML20078H7831994-11-0707 November 1994 Forwards Rev 11 to CPSES ODCM & Receipt Acknowledgement Sheet ML20059K5261994-01-21021 January 1994 Notification of 940203 Meeting W/Util in Arlington,Tx to Discuss Realignment of Nuclear Overview Functions ML20059K4921994-01-21021 January 1994 Notification of 940204 Meeting W/Util in Glen Rose,Tx to Discuss Unit 1 Outage Related Activities ML20058C5451993-11-22022 November 1993 Notification of 931202 Enforcement Conference Re Reactor Coolant Spill Inside Containment on 931026 ML20058N1471993-10-0505 October 1993 Notification of 931006 Meeting W/Util in Rockville,Md to Discuss Implementation of Std TSs for Both Units ML20057C9801993-09-27027 September 1993 Discusses 930927 Press Conference Re J O'Connor Announcement That Util Settled Six Rate Matters & Appeals Before Illinois Courts & Commerce Commission by Agreeing to Refund Listed Amount to Customers Over Next 12 Months ML20057A8271993-09-13013 September 1993 Notification of 930920 Meeting W/Util in Rockville,Md to Discuss Fire Barrier Testing & Implementation on Unit 1 ML20056H2941993-09-0101 September 1993 Notification of 930916 Meeting W/Util in Comanche Peak Steam Electric Station to Discuss Safe Shutdown Risk & Other Issues Associated W/Scheduled Oct 1993 Refueling Outage ML20056E4571993-08-0505 August 1993 Forwards Technical Review Rept Re, Tardy Licensee Actions Initiated Because of Delayed Replacement of Batteries in Uninterruptible Power Supplies at Plant ML20128F3531993-02-0202 February 1993 Discusses Emergency Motion to Stay Issuance of low-power Ol.Motion Requested That Commission Issue Order Staying Issuance of Low Power License & Grant Petitioners Chance to Review Withheld Documentation Re Settlement Agreements ML20128D5741993-01-27027 January 1993 Forwards Sworn Joint Affidavit of I Barnes & Ft Grubelich ML20127L9121993-01-26026 January 1993 Forwards NRC Staff Reply to Cfur Request for Publication of Proposed Action Re Licensing of Unit 2.Sworn & Executed Affidavits of I Barnes & Ft Grubelich Will Be Filed as Soon as Possible ML20127H4811993-01-18018 January 1993 Notification of 930121 Meeting W/Util in Rockville,Md to Discuss Fire Protection issues,Thermo-lag Installation Issues & Test Reports ML20127D6951993-01-13013 January 1993 Notification of Significant Licensee Meeting W/Util on on 930122 to Discuss Results of ORAT Insp ML20127C4861993-01-11011 January 1993 Notification of 920115 Public Mgt Meeting W/Util in Region IV Ofc to Discuss CPSES Temporary Mod Program ML20126H3491992-12-29029 December 1992 Notification of Significant Licensee Meeting W/Util on 930107 to Discuss Plant Monthly Status of Const & Licensing Activities ML20126K7681992-12-24024 December 1992 Forwards Part of Earlier Submittal by TU Electric for Distribution as Was Done for Previous Submittal Re ME215 Sapcas Computer Code.Proprietary Abstract Also Encl.Abstract Withheld ML20126F4161992-12-18018 December 1992 Notification of 930107 Meeting W/Util in Rockville,Md to Discuss Design & Operability of Alternate Min Recirculation Path in Highhead Pressure Safety Injection Sys ML20126D9061992-12-14014 December 1992 Notification of 921217 Meeting W/Util in Rockville,Md to Discuss Fire Protection Issues at Plant ML20057C9921992-10-26026 October 1992 Partially Withheld Memo Discussing Rape Allegation at Plant ML20127F5051992-10-21021 October 1992 Discusses 921020 Telcon W/R Feldman of Thermal Science,Inc (TSI) Re 921018 Rept Made by Util That Less than 10 of 2,000 Conduit Sections Provided by TSI Showed Signs of Delamination & Some Had Occluded Porosity in Cross Sections IR 05000445/19920181992-07-0606 July 1992 Discusses Allegation RIV-92-A-0016 Reviewed During Insp Repts 50-445/92-18 & 50-446/92-18 Re Disposal of Radioactive Matl in Landfill Located on Licensee Property ML20057B4601992-05-15015 May 1992 Discusses Telcon W/Rm Dow Re Plant ML20057B1881991-04-18018 April 1991 Discusses 910405 Telcon W/Alleger Re Security Sys at Plant ML20029A4071991-02-13013 February 1991 Forwards Correspondence sign-off Sheet for LER 90-036-01. Suppl Acceptable for Submittal to NRC ML20057B1781991-02-0505 February 1991 Discusses Allegations Made by M Dow Re Scores of Security, Safety Violations & Allegation of Sexual Harassment at Plant ML20065K0251990-11-0707 November 1990 Forwards Amend 2 to Tech Specs,Modifying Tables 2.2-1 & 3.3-3 Re Neutron Flux Meter Setpoints 1999-08-27
[Table view] Category:MEMORANDUMS-CORRESPONDENCE
MONTHYEARML20211H4441999-08-27027 August 1999 Notification of Significant Meeting with Util on 990916 & 17 in Arlington,Tx to Improve Utility & NRC Understanding of Industry & Regulatory Perspectives on Current Issues ML20209G2421999-07-14014 July 1999 Notification of 990722 Meeting with License in Rockville, MD to Discuss Changes in EOI Licensing Organization Including Division of Responsibilities within New EOI Corporate Licensing Group ML20203J5931999-02-17017 February 1999 Notification of Significant Licensee Meeting with Util on 990329 Re NRC Plant Performance Review Summary Meeting ML20203A5081999-02-0505 February 1999 Notification of 980226 Meeting with Texas Utils Electric Co, Southern California Edison & NPPD Re Control of Hazard Barrier Tr, .Agenda Encl ML20195H9221998-11-17017 November 1998 Forwards Exam Repts 50-445/98-301 & 50-446/98-301 Conducted on 980619-26 with as Given Written Exams Encl,Designated for Distribution ML20153B0331998-09-18018 September 1998 Notification of 980929 Meeting with Texas Utilities Electric Co in Rockville,Md to Discuss Licensee Proposed App K Exemption Request & Topical Rept Submitted in Support of Exemption Request ML20236G8291998-07-0202 July 1998 Notification of 980720 Meeting W/Util in CPSES Nuclear Operations Support Facility Lab Annex to Discuss Midloop Operations During Last Refueling Outage ML20236F7611998-06-29029 June 1998 Notification of 980714 Meeting W/Util in Rockville,Md to Discuss Methods of ECCS Analyses & Licensing Submittals Required for Proposing Exemption to Appendix K & Power Uprate License Amend ML20217M9351998-04-0606 April 1998 Notification of Licensee Meeting W/Util on 980407 in Arlington,Tx Re Status of Licensee Actions in Response to GL 96-01 ML20202E6791997-12-0202 December 1997 Notification of 971209 Meeting W/Texas Utilities Electric Co in Rockville,Maryland to Discuss risk-informed Inservice Testing Request for Addl Info Responses, ML20202B1421997-11-26026 November 1997 Notification of 971115 Meeting W/Util in Arlington,Texas to Discuss Recent Unit 2 Refueling/Maint Outage at TU Electric Comanche Peak Plant ML20212G3921997-10-27027 October 1997 Notification of 971112 Meeting W/Util to Discuss Util 970228 Responses to Remaining Three Open Items Listed in NRC Safety Evaluation on Cable Functionality, .Reissued Due to Change of Cc:List ML20203C1181997-10-24024 October 1997 Discusses OI Rept 4-97-027 Re Falsification of Thermolag Matl Insp Records.Allegation Not Substantiated Therefore Enforcement Action Not Appropriate ML20212B7261997-10-16016 October 1997 Notification of 971031 Meeting W/Util in Arlington,Tx Re Predecisional Enforcement Conference ML20206E3401997-09-19019 September 1997 Requests That NRR Conduct Review of Licensee Backfit Claim to Determine of plant-specific Backfit Exists & Submits Recommended Actions to Be Taken If One Does Exists ML20217R1561997-08-28028 August 1997 Informs That GL 96-04 Did Not Require Response for Licensee That Did Not Have Boraflex in Sf Racks ML20237B9901997-07-0303 July 1997 Informs That on 970529-30,NRC Team Attended Severe Accident Mgt Implementation Demonstration at Comanche Peak Steam Electric Station,In Granbury,Tx ML20137C9201997-03-20020 March 1997 Forwards Documentation of Meeting Conducted in Region 4 Office on 970225 to Discuss NRC Enforcement Policy as Applied to Nonescalated Enforcement ML20134N2911996-11-22022 November 1996 Notification of 961205 Meeting W/Util in Arlington,Tx to Discuss Responses to Open Items Listed in NRCs Safety Evaluation on Cable Functionality at Plant, ML20134L9821996-11-19019 November 1996 Notification of Licensee Meeting W/Util on 961204 to Discuss Revision 25 to Emergency Plan ML20128P3011996-10-10010 October 1996 Forwards Analysis of Financial Qualifications & Antitrust Reviews & Input to SER on Proposal to NRC by Tuec for Tx Utilities Corp ML20129E9031996-10-0101 October 1996 Notification of 961002 Meeting W/Util in Rockville,Md Re License Amend Request 96-005,inverters & Battery Chargers Mod ML20135A2801996-04-10010 April 1996 Discusses Director'S Decision Re Actions Requested by Petitioners W/Regard to Use of Thermo-Lag by Reactor Licensees.Petitioners Requested Immediate Shutdown of Reactors Using Thermo-Lag ML20078H7831994-11-0707 November 1994 Forwards Rev 11 to CPSES ODCM & Receipt Acknowledgement Sheet ML20059K4921994-01-21021 January 1994 Notification of 940204 Meeting W/Util in Glen Rose,Tx to Discuss Unit 1 Outage Related Activities ML20059K5261994-01-21021 January 1994 Notification of 940203 Meeting W/Util in Arlington,Tx to Discuss Realignment of Nuclear Overview Functions ML20058C5451993-11-22022 November 1993 Notification of 931202 Enforcement Conference Re Reactor Coolant Spill Inside Containment on 931026 ML20058N1471993-10-0505 October 1993 Notification of 931006 Meeting W/Util in Rockville,Md to Discuss Implementation of Std TSs for Both Units ML20057C9801993-09-27027 September 1993 Discusses 930927 Press Conference Re J O'Connor Announcement That Util Settled Six Rate Matters & Appeals Before Illinois Courts & Commerce Commission by Agreeing to Refund Listed Amount to Customers Over Next 12 Months ML20057A8271993-09-13013 September 1993 Notification of 930920 Meeting W/Util in Rockville,Md to Discuss Fire Barrier Testing & Implementation on Unit 1 ML20056H2941993-09-0101 September 1993 Notification of 930916 Meeting W/Util in Comanche Peak Steam Electric Station to Discuss Safe Shutdown Risk & Other Issues Associated W/Scheduled Oct 1993 Refueling Outage ML20056E4571993-08-0505 August 1993 Forwards Technical Review Rept Re, Tardy Licensee Actions Initiated Because of Delayed Replacement of Batteries in Uninterruptible Power Supplies at Plant ML20128H2931993-02-10010 February 1993 Staff Requirements Memo Re Emergency Motion to Stay Issuance of low-power Operating License.Staff Issued Order Denying Motion ML20128E4301993-02-0505 February 1993 Staff Requirements Memo Re 930129 Affirmation/Discussion & Vote on SECY-93-016 Discussing FRN Concerning Proposed Issuance of OL ML20062J1941993-02-0303 February 1993 Board Notification 93-001:notifies of 930202 Emergency Motion to Stay Issuance of low-power OL Requesting Listed Items Including Issue Order Staying Issuance of License ML20128F3531993-02-0202 February 1993 Discusses Emergency Motion to Stay Issuance of low-power Ol.Motion Requested That Commission Issue Order Staying Issuance of Low Power License & Grant Petitioners Chance to Review Withheld Documentation Re Settlement Agreements ML20128D5741993-01-27027 January 1993 Forwards Sworn Joint Affidavit of I Barnes & Ft Grubelich ML20127L9121993-01-26026 January 1993 Forwards NRC Staff Reply to Cfur Request for Publication of Proposed Action Re Licensing of Unit 2.Sworn & Executed Affidavits of I Barnes & Ft Grubelich Will Be Filed as Soon as Possible ML20127H4811993-01-18018 January 1993 Notification of 930121 Meeting W/Util in Rockville,Md to Discuss Fire Protection issues,Thermo-lag Installation Issues & Test Reports ML20127D6951993-01-13013 January 1993 Notification of Significant Licensee Meeting W/Util on on 930122 to Discuss Results of ORAT Insp ML20127C4861993-01-11011 January 1993 Notification of 920115 Public Mgt Meeting W/Util in Region IV Ofc to Discuss CPSES Temporary Mod Program ML20126H3491992-12-29029 December 1992 Notification of Significant Licensee Meeting W/Util on 930107 to Discuss Plant Monthly Status of Const & Licensing Activities ML20126K7681992-12-24024 December 1992 Forwards Part of Earlier Submittal by TU Electric for Distribution as Was Done for Previous Submittal Re ME215 Sapcas Computer Code.Proprietary Abstract Also Encl.Abstract Withheld ML20126F4161992-12-18018 December 1992 Notification of 930107 Meeting W/Util in Rockville,Md to Discuss Design & Operability of Alternate Min Recirculation Path in Highhead Pressure Safety Injection Sys ML20126D9061992-12-14014 December 1992 Notification of 921217 Meeting W/Util in Rockville,Md to Discuss Fire Protection Issues at Plant ML20057C9921992-10-26026 October 1992 Partially Withheld Memo Discussing Rape Allegation at Plant ML20127F5051992-10-21021 October 1992 Discusses 921020 Telcon W/R Feldman of Thermal Science,Inc (TSI) Re 921018 Rept Made by Util That Less than 10 of 2,000 Conduit Sections Provided by TSI Showed Signs of Delamination & Some Had Occluded Porosity in Cross Sections IR 05000445/19920181992-07-0606 July 1992 Discusses Allegation RIV-92-A-0016 Reviewed During Insp Repts 50-445/92-18 & 50-446/92-18 Re Disposal of Radioactive Matl in Landfill Located on Licensee Property ML20057B4601992-05-15015 May 1992 Discusses Telcon W/Rm Dow Re Plant ML20057B1881991-04-18018 April 1991 Discusses 910405 Telcon W/Alleger Re Security Sys at Plant 1999-08-27
[Table view] |
Text
___-
- /st ' Eteg'o. i UNITED STATES
, [ t,s y r NUCLEAR REGULATORY COMMISSION h t.h s. itg [,/
.r f . WA SHINGTON, 0. C. 20555 I
y
%.;;y g, ...
P.EMORANDUM FOR: Those on Attached List
\Y FROM: William J. Dircks V Executive Director for Operations
SUBJECT:
FORMATION OF PANEL TO PREPARE NRC %TAFF POSITION ON COMANCHE PEAK HEARING CONTENTION NO. 5 The staff's formal positions on the Comanche Peak facility are nearing completion. The ASLB Hearings, which have been in progress for three years and are expected to resume in February 1985, have resolved all contentions except Contention No. 5. This contention concerns the Applicants' adherence to QA/QC ' requirements and is provided as Enclosure 1. The issue of construction QA/QC at Comanche Peak is multi-faceted and is addressed, in part, by many records, documents and in testimony from various sources including the Staff, Applicants, Intervenors, and Allegers. The background of this contention and associated records span several years. Various NRC i' offices have been involved, including Region IV, Or, NRR, OELD and IE.
To properly evaluate this contention and to prepare a comprehensive staff position, I am directing the formation of a panel composed of senior managers drawn from your offices. This panel is to be composed of the following individuals:
Nelson Grace, IE (Chairperson)
- Richard Vollmer, NRR Edward Jordan, IE Alan Herdt, R-II Robert Warnick, R-III Roger Fortuna, OI Because of their previous association with Comanche Peak regulatory activities, I am appointing the following advisors to the panel:
Joe Scinto, OELD l Vince Noonan, NRR Thomas Ippolito, AE00 James Gagliardo, IE Brooks Griffin, OI Dorwin Hunter, R-IV ;
Bruce Kaplan, EG&G The advisors may occasionally be asked to assist the panel when issues I involving their specific area of expertise are being considered, and I !
request your support in makin.' them r.vailable w 'as-needed Sasis I 8606120923 860602 DE -17 PDR Fo/A-85-153 i
d ..
Those on Attached List .
The product of the Panel's effort will be a report similar to a SSER, that states clear staff conclusions regarding this Contention. Enclosure 2 provides the outline of a Charter for this Panel. As the first order of business, the Panel will develop a working Charter which shall be submitted for my approval.
The scheduled completion of the Panel's action is January 31, 1985. I expect the Panel to establish its own schedule, consistent with the resumption of the hearing process. Enclosure 3 provides a proposed milestone summary.
The Panel will work under the direction of Vincent S. Noonan, Director of Comanche Peak Project, and should provide periodic status briefings to the Director of Licensing.
William J. Dircks Executive Director for Operations En' closures: As stated cc: B. Hayes, 01 Panel Members Panel Advisors
. . . . - . - . . ..~. . . . . . . . . .
Addressees List:
Harold R. Denton, Director Office of Nuclear Reactor Regulation Richard C. DeYoung, Director Office of Inspection and Enforcement Guy H. Cunningham, III Executive Legal Director Jack Heltemes, Director Office of the Analysis and Evaluation of Operational Data James P. O'Reilly, Regional Administrator Region II -
James Keppler, Regional Administrator Region III Robert Martin, Regional Administrator -
Region IV 8
ENCLOSURE 1 COMANCHE PEAK CONTENTION 5*
Contention 5. The Applicants' failure to adhere to the quality assurance /
quality control provisions required by the construction permits for Comanche Peak, Units 1 and 2, and the requirements of Appendix B of 10 CFR Part 50, and the construction practices employed, specifically in regard to concrete work, mortar blocks, steel,ifracture toughness testing, expansion joints, placement of the reactor vessel'for Unit 2, welding, inspection and testing, materials used, craft labor qualifications and working conditions (as they may affect QA/QC, and training and organizction of QA/QC personnel, have raised substantial questions as to the adequacy of the construction of the facility.
As a result, the Commission cannot make the findings required by 10 CFR 50.57(a) necessary for issuance of an operating license for Comanche Peak.
(CFUR 4A-ACORN 14-CASE 19 JOINT Contention) l l
l l
l l
- Reproduced from Board Order Subsequent to the Pre-hearing Ccnference of April 30, 1980 (dated June 16,1980) 1 -.
l
ENCLOS RE 2 .
C0KANCHE PEAK CONTENTION 5 PANEL CHARTER OBJECTIVES
- 1) To make the staff determination regarding the Applicants' adherence to the QA/QC requirements described in Contention 5.
- 2) Provide a report to management reflecting the panel's determination.
- 3) Provide panel testimony before the Comanche Peak ASLB.
PURPOSE The purpose of this Panel is to integrate the views and experience of senior NRC managers to yield a staff determination regarding Contention 5.
MEMBERSHIP Helson Grace, IE (Chairperson)
Richard Vollmer, NRR Edward Jordan, IE Robert Warnick, R-III Alan Herdt, R-II Roger Fortuna, OI Advisors Joe Scinto, OELD Vince Noonan, NRR Thomas Ippolito, AE0D James Gagliardo, IE Brooks Griffin, 01' Darwin Hunter, R-IV Bruce Kaplan, EG&G
a
- 2'-~
ACTION ITEMS .
- 1) Define criteria for judging the adequacy of the Applicants' adherence to the QA/QC requirements described in Contention 5.
- 2) Conduct a records review. The Panel members should examine and analyze the following records,
- a. CAT Report
- b. CYGNA Reports
- c. Hearing Records / Summary Depositions
- d. OI Reports
- e. Enforcement Actions
- f. SALP Reports
- g. Reg. IVtInspection Reports
- h. TRT Reports
- i. Special Review Team Report To make the workload manageable, summaries of records or briefings to the panel by key individuals associated and familiar with the records may be requested.
- 3) Routinely interface with the Comanche Peak Intimidation Panel and consider input provided by that Panel.
- 4) For each type of records (a.-i.) the team members will prepare a summary of findings highlighting problem areas and root causes, as related to Contention #5.
- 5) The panel, as a body, will consider the finding summaries, briefings provided by key NRC personnel, and other relevant information to develop the staff position on Contention #5 in the format of an SSER.
- 6) The panel will be required as necessary to provide both written and oral testimony before the ASLB.
ENCLOSURE 3 -
CONTENTION 5 PANEL SCHEDULE December January Initial Panel Meeting
, Obtain relevant documents Document Reviews Consolidate Individual (Developed by Panel, consistent views, Develop Panel with resumption of hearings at consensus the end of January 1985)
Prepare Panel Report P.eport Staff Position to Management Prepare Testimony for ASLB I
1
9
. . , , -*e m...,......_..__. . _ . . . . . . . . . . _ . _ _ . . . . . - -...._....._..;:r--
',-a ,
e
.. y, I
, , . , o,, UNITED STATES o NUCLEAR REGULATORY COMMISSION
' (q ! WASHINGTON, D. C. 20555 gg l
%.../ l MEMORANDUM FOR: Those on Attached List FROM: William J. Dircks Executive Director for Operations
SUBJECT:
FORMATION OF PANEL TO PREPARE NRC STAFF POSITION ON COMANCHE PEAK HEARING CONTENTION NO. 5 The staff's formal positions on the Comanche Peak facility are nearing completion. The ASLB Hearings, which have been in progress for three years and are expected to resume in January 1985, have resolved all contentions except Contention No. 5. This contention concerns the Applicants' adherence to QA/QC requirements and is provided as Enclosure 1. The issue of construction QA/QC at Comanche Peak is multi-faceted and involves exten-sive records, documentation and testimony from various sources including the Staff, Applicants, Intervenors, and A11egers. The background of this contention and associated records span several years. Various NRC offices have been involved, including Region IV, 01, NRR, OELD and IE.
To properly evaluate this contention and to prepare a comprehensive staff position I am directing the formation of a panel composed of senior managers drawn from your offices. This panel is to be composed of the following i individuals:
Nelson Grace, IE (Chairperson)
Richard Vollmer, NRR Edward Jordan, IE Allen Herdt, R-II Jim Gagliardo, IE Roger Fortuna, 01 Brucejaplan,EG8G MtU Otdsti M1 Advisors to the panel, by virtue of their previous association with Comanche Peak regulatory activities, are as follows:
Joe Scinto, OELD Vince Noonan, NRR T. Ippolito, AE00 B. Griffin, OI
. D. Hunter, R-IV The advisors may be asked to assist the panel on an "on-call" basis when issues involving their specific area of expertise are being considered.
i l Fo/A-15-!S3 i
A 13
.Y2: rd,.: .' .. :.2= := -w :.2 a = ----
Those on Attached List The product of the Panel's effort should be a report, similar to a SSER, that states clear staff conclusions regarding this Contention. Enclosure 2 provides the draft Charter for this Panel.
The scheduled completion of the Panel's action is January 31, 1985. I expect the Panel to establish its own schedule, consistent with the resumption of the hearing process. Enclosure 3 provides a proposed milestone summary.
William J. Dircks Executive Director for Operations
Enclosures:
As state,d cc: B. Hayes, OI l
l i
l 1
i s 1 ,
l l
y -.cw._ , .-.. -
,s :..:
==.::a - _ ..-...;... -. .u-- - a n = .=.= .=.- - :n. .... a = .: . -
. l i
Addressees List:
Harold R. Denton, Director Office of Nuclear Reactor Regulation ,
Richard C. DeYoung. Director Office of Inspection and Enforcement Guy H. Cunningham, III Executive Legal Director Jack Heltemes, Director Office of the Analisis and Evaluation of Operational Data -
James P. O'Reilly, Regional Administrator Region II James Keppler, Regional Administrator Region III Robert Martin, Regional Administrator Region IV i
i
- * ' " * * * * * * * * * =- -o-s e - , , . , , , , , , , , ,,,
W.ic; T..~.T.: L ..~ ;.~~ .. :w - - ---...--. :----.=-. ::- - .
.- t ENCLOSURE 1 COMANCHE FEAK CONTENTION 5*
Contention 5. The Applicants' failure to adhere to the quality assurance /
quality control provisions required by the construction permits for Comanche Peak, Units 1 and 2, and the requirements of Appendix B of 10 CFR Part 50, and the construction practices employed, specifically in regard to concrete work, mortar blocks, steel,'. fracture toughness testing, expansion joints, placement of the reactor vessel for Unit 2, welding, inspection and testing, materials used, craft labor qualifications and working conditions (as they may affect QA/QC, and training and organization of QA/QC personnel, have raised substantial questions as to the adequacy of the construction of the facility.
As a result, the Commission cannot make the findings required by 10 CFR 50.57(a) necessary for issuance of an operating license for Comanche Peak.
(CFUR 4A-ACORN 14-CASE 19 JOINT Contention) t i
- Reproduced from Board Order Subsequent to the Pre-hearing Conference of j April)0,1980 (dated June 16, 1980) t
Ei! CLOSURE 2 .
COMANCHE PEAK CONTEi! TION 5 PANEL DRAFT CHARTER OBJECTIVES
- 1) To make the staff determination regarding the Applicants' a.dherence to the QA/0C requirements described in Contention 5. *
- 2) Provide a report to management reflecting the panel's determination.
- 3) Provide panel testimony before the Comanche Peak ASLB.
PURPOSE The purpose of this Panel is to integrate the views and experience of senior NRC managers to yield a staff determination regarding Contention 5.
MEMBERSHIP Nelson Grace, IE (Chairperson)
Richard Vollmer, NRR Edward Jordan, IE Jim Gagliardo, IE Allen Herdt, R-II Roger Fortuna, OI Bruce Kaplan, EG&G -
Advisors Jce Scinto, OELD Vince Noonan, NRR Thomas Ippolito, AEOD Brooks Griffin, OI Dorwin Hunter, R-IV
i
_ ,, . ... ... .~ .. -.... .. a - - - - - . . . . . - . . - -. . - - . . . . . = =.
. -g .
J l
ACTION ITEMS
- 1) Define criteria for judging the adequacy of the Applicants' adherence to the QA/QC requirements described in Contention 5.
- 2) Conduct a records review. The team members should examine and analyze the following records.
- a. CAT Report
- b. CYGNA Reports
- c. Hearing Records /Sumary Depositions
- d. OI Reports
- e. Enforcement Actions -
- f. SALP Reports
- g. Reg. IV'. Inspection Reports
- h. TRT Reports
- 1. Special Review Team Report To make the workload manageable, sumaries of records or briefings to the l panel by key individuils associated and familiar with the records may be requested. ;
- 3) Routinely interfa:e with the Comanche Peak Intimidation Panel and- '
consider input pr3vided by that Panel.
- 4) For each type of records (a.-i.) the team members will prepare a .
sumary of findings highlighting proble:n areas and root causes, as related to Contention #5.
- 5) The panel, as a body, will consider the finding sumaries, briefings e provided by key NRC personnel, and other relevant infomation to ;
develop the staff position on Contention #5 in the format of an SSER. .
- 6) The panel will be required as necessary to provide both written and oral testimony before the ASLB. -
l l
e i
i .. . _ ._. .
ENCLOSURE 3 CONTENTION 5 PANEL SCHEDULE December January Initial Panel Meeting .
t Obtain relevant documents b
Dccument Reviews Consolidate Individual (Developed by Panel, consistent views. Develop Panel with resumption of hearings at consensus the end of January 1985)
- Prepare Panel Report l
Report Staff Position
- to Management Prepare Testimony for ASLB l
\
b b