ML20197D998

From kanterella
Revision as of 16:27, 23 November 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Monthly Operating Rept for Feb 1986 & Revised Operating Rept for Jan 1986.Calculation of Gross Electrical Generation Figures Revised to Improve Accuracy & Consistency of Actual Operating Data
ML20197D998
Person / Time
Site: Beaver Valley
Issue date: 03/06/1986
From: Carey J
DUQUESNE LIGHT CO.
To:
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
Shared Package
ML20197E005 List:
References
NUDOCS 8605150136
Download: ML20197D998 (1)


Text

__ . _ _ _ _ _ _

  • ) ,.

'Af Telephone (412) 393-6000 Nuclear Group Nppingport, PA 15077-0004 '

Beaver Valley Power Station, Unit No.1 Docket No. 50-334, License No. DPR-66 Monthly Operating Report U. S. Nuclear Regulatory Commission Director, Office of Management Information & Program Control Washington, D. C. 20555 Gentlemen :

In accordance with Appendix A, Technical Specifications, the Monthly Operating Report is submitted for the month of February,1986.

The methods used to determine the Net and Gross Electrical Generation figures for Beaver Valley Unit I has been revised. Het Electrical Generation is now reported as the Main Unit Transformer output plus station service tra nsformer losses. Gross Electrical Generation is reported as the sum of the Net Electrical Generation and the total of the station service bus loads.

It was necessary to revise these methods in order to improve the accuracy of actual operating data for the Monthly Operating Report and also to report consistent station generation figures to other agenci es.

January, 1986 will be considered an effective date for implementation. Enclosed, therefore, is a revised Operating Data Report for January,1986.

Very truly yours, L

8605150136 ADOCK 0500 860306 4 ;l) . Carey PDR R Vice President Nuclear Group rw I

Enclosures (I cc: NRC Regional Office King of Prussia, PA