__. _ _ _ _ _ _
- )
'Af Telephone (412) 393-6000 Nuclear Group Nppingport, PA 15077-0004 Beaver Valley Power Station, Unit No.1 Docket No. 50-334, License No. DPR-66 Monthly Operating Report U. S. Nuclear Regulatory Commission Director, Office of Management Information & Program Control Washington, D. C. 20555 Gentlemen :
In accordance with Appendix A,
Technical Specifications, the Monthly Operating Report is submitted for the month of February,1986.
The methods used to determine the Net and Gross Electrical Generation figures for Beaver Valley Unit I has been revised.
Het Electrical Generation is now reported as the Main Unit Transformer output plus station service tra nsformer losses.
Gross Electrical Generation is reported as the sum of the Net Electrical Generation and the total of the station service bus loads.
It was necessary to revise these methods in order to improve the accuracy of actual operating data for the Monthly Operating Report and also to report consistent station generation figures to other agenci es.
- January, 1986 will be considered an effective date for implementation.
Enclosed, therefore, is a revised Operating Data Report for January,1986.
Very truly yours, L
8605150136 860306 4
- l)
. Carey PDR ADOCK 0500 R