Monthly Operating Rept for Feb 1986
ML20197E034
Person / Time
Site: Beaver Valley
Issue date: 02/28/1986
From: Smith P
DUQUESNE LIGHT CO.
To:
Shared Package
ML20197E005 List:
References
NUDOCS 8605150145
Download: ML20197E034 (6)


Text

{{#Wiki_filter:- - . NARRATIVE

SUMMARY

OF MONTHLY OPERATING EXPERIENCE FEBRUARY 1986 February 1 The Station was in Operational Mode 1 with reactor through power at a nominal 100 percent with the Reactor February 6 Coolant System at a normal operating pressure and tempe rature. February 7 Power output was reduced to approximately 70 percent through at 1930 hours on the 7th to perform periodic testing February 9 on Main Steam Trip Valves. The test results were satisfactory and power level was subsequently returned to a nominal 100 percent at 0300 hours on the 8th. February 10 At 1927 hours on the 10th, a Turbine Trip / Reactor through Trip occurred due to a Hi-Hi Steam Generator Level February 13 caused by a failure of Vital Bus #3. The reactor was returned to criticality at 1450 hours on the 12th and the Station returned to service at 1610 hours on the 12th. Upon power escalation, power level was held at approximately 30 percent due to a leaking Turbine Plant Component Cooling Water line. At 2025 hours on the 12th power ascension, toward a nominal 100 percent, was reestablished. February 14 At 1207 hours on the 14th, power level was reduced through to approximately 65 percent so that maintenance February 18 could be performed on Feedwater Pump (FW-P-1B). Repairs were completed at 0913 hours on the 18th and power ascension, toward a nominal 100 percent, was subsequently begun. February 19 The Station was in Operational Mode I with through reactor power at a nominal 100 percent with February 28 the Reactor Coolant System at a normal operating pressure and temperature. l R [ 1

OPERATLiG DATA REPORT DOCKET NO. 50-334  ; DATE 3/7/86 l COMPLETED BY Paul A. Smith I TELEPHONE. 417-641 1825 l OPERATING STATUS

1. Unit Name: Beaver Valley Power Station. Unit #1 Notes
2. Reporting Period: February 1986
3. Licensed Thermal Power (MWt): WO
4. Nameplate Rating (Gross MWe): 923
5. Design Electrical Rating (Net MWe): 835
6. Maximum Dependable Capacity (Gross MWe): 860
7. Maximum Dependable Capacity (Net MWe): 810
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
9. Power Level To Which Restricted if Any (Net MWe): Non*
10. Reasons For Restrictions. lf Any: N/A -

This Month Yr..to.Dete Cumulative 672.0 1,416.0 86,184.0

11. Hours in Reporting Penod
12. Number Of Hours Reactor Was Critical 628.6 1,372.6 46,973.6
13. Reactor Reserve Shutdown Hours 0.0 0.0 4,482.8
14. Hours Generator on-Line 627.3 1,371.3 45,506.1
15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
16. Cross Thermal Energy Generated (MWH) 1,543,257.0 3,492,824.0 106,516.255.1
17. Gross Electrical Energy Generated IMWH) 504,280.0 1,143,920.0 33,925,320.0
18. Net Electrical Energy Generated (MWH) 474,900.0 1,080,250.0 31,606,553.0
19. Unit Service Factor 93.3 96.8 55.3
20. Unit Availability Factor 93.3 96.8 55.3
21. Unit Capacity Factor (Using MDC Net) 87.2 94.2 48.8
22. Unit Capacity FactoriUsing DER Net) 84.6 91 4 47.4
23. Unit Forced Outage Rate 6.7 3.2 23.4
24. Shutdowns Scheduled Over Next 6 Months ' Type. Date.and Duration of Each):

Fifth Refueling, May 19, 1986, Scheduled 93 days

25. If Shut Down At End Of Report Period. Estimated Date of Startup:
26. Units in Test Status (Prior to Commercial Operationi: Forecast Achieved INITIAL CRITICA LITY N/A N/A INITIAL ELECTRICITY N/A N/A COMMERCIA L OPERATION N/A N/A (9/77)

AVERAGE DAILi UNIT ?OWER LIVEL i DOCKET NO. 50-334 UNIT 3'U S C:'i- Il 1 DATE 3/7/86 COMPLETED SY Paul A. Smith TELEPHONE (412) 643-1825 i gg g FEBRUARY DAY AVERAGE DAILY POWER LEVEL DAY AYERAGE DAILY POWER LEVEL IMWe-Neti (MWe Nets j g 817 g 492 2 33 663 3 817 g9 821 4 08 812 20 1 5 817 gg 821 i 6 817 w 817 7 775 , 817 771 813 g 9 813 821 3 644 821 10 ;g 0 813 Il g 12 23 813 792 __

 ,                   13                                                                   29 679 14                                                                   30 t3           521                                                                                  __
 -{

i 517 J INSTRUCTIONS ' On this format.!ist the nerase dady unit pirxer le.e! in MWe Net far each day in the reputting month. Cumpute to the nearest whule mepwatt. 1 l l l 14/77) i .

                         ,-              ,,w-.w,mww,---+,g-   ,.--7 --w,     .,_.--n.y         , w w-,-   p,,w-e           , en  ,,--.,g,,n,,,,,-,eng                                             ,,-.,y,,, ,m4vn---.a, , , .- -e--
      . s.

3, i 4

MAJOR MAINTENANCE
1. Maintenance of Feedwater Pump _ ( FW-P-1B) 4
2. Repaired #3 Vital Bus Inverter.

I< j 1

3. Repaired Source Range Instrumentation (N-31) 4 f 4. Tut,e shooting of Primary Plant Component Cooling Heat i i Exchsngers (CC-E-1A & 10) l 1

,i J i 4 I T 1 1 . j 4 i i 1 4

 )

I I I i

                                                                                                                                                                                                                                        . e UNIT SHUTDOWNS AND POWER REDUCTIONS                    DOCKETNO.            50-314 UNIT NAME          BVPS Unit #1 IIATE 3/7/86 REPORT MONTH February                         COMPLE1ED BY Paul A. Smith TELEPflONE (412) 643-1825 an                    m so o S

o* N 0 C" g Licensee o "E* Cause & Corrective No. Date "., "E E 3"E Event 0e 5E Action to H R a

                                                                                                                     $5            E       'E .E "    Report #        "a 3    aO                Prevent Recurrence M       ymG                        NU      0 8

1 860207 S 0 B 5 N/A CD VALVEX The Station reduced power to perform the Main Steam Trip Valve Test. The test results were satisfactory and the Station was returned to a nominal 100 percent power level < 2 860210 F 44.7 A 3 86-001 EG ELECON At 1927 hours on the 10th, a Turbine Trip / Reactor Trip occurred caused by a failure of vital Bus #3. The reactor was returned to criticality at 1450 hours and the Station returned to service at 1610 hours on the 12th, 1 2 F: F.u sed 3 4 Reason: Hethod: I~.xlubie G - Insisus tiims S S(hcJu8cil A Equepment Failure (I splain) 1-Manua1 lin Psepasasi.m ol Data B-Maisseenence e.i Test 2-Manual Scra. I.nies Shecs,l.w Ikemcc C Refueling 3-Automatic Scram I sent Relwt al I RII ele iNtIRI G D ReFulaeos) Restriciiim 4-Continued From Frevious Month Oltil l

;                                                                                                         I thiesaios Tianning A Ikense I saminasi'*          5-Reduction
   ,
  • I Adniinistrative 9-Other 5 ,
1. thierassimal I si..e Il nielain t I sinhis 1 Sanic Sunsi-89/77) 11 Osher il splain g
        ,                                                                                                                                                                e-

UNIT SHU1 DOWNS AND POWER REDUCTIONS DOCRET NO. 50-314 UNIT NAME BVPS Unitt #1 DATE 3/7/86 REPORT MONIH Pebruary COMPLETEli BY Paul A. Smit ( TELErlIONE (412) 643-1825 i. cm *wo o,

  • N g

C 0, t Licensee 4 "$* Cause, & Corrective No. Date ".  %@ 2 3U: Event  !. S$ Action to H 0-b

                                                                                                                                 ** 5
5 .a " Report # Y. I aO Prevent Recurrence l

f*Q N* O 8 3 860212 P O A 5 N/A HP PIPEXX Power level was held at a reduced level due to a leaking Turbine Plant Component Cooling Waterline. The line was repaired and power level was returned to a nominal 100 percent. 4 860214 F 0 B 5 N/A CH PUMPXX Power level was reduced so that main-tenance could be performed on Feedwate: Pump (FW-P-1B). Repairs were com-pleted at 0913 hours on the 18th and power level was returned to a nominal 100 percent. 4 ! 1 2 3 4 F: F.uted Reasem: n thod: 1:xhebit G - Insiinitiims S Schedu eil s A.Eiluepment Failvie(I uplaini 1-Manual foe Peerass'i'm "i Da's R-Maintenance e i Test 2-nanual Scram 1.nes) Shecss for lirmee C Refueling 3-Autoestic Scram theni Rep.us ti l Hil Ic l N'llHI G D Rey.slatin) Resseicii'm 4-Coettnised From Frevious Month 111til l i Opcialne Tsaining A Ikense I manunasi'* 5-Itetuc tion

,         .                                                                                                            I Adnunisesative                                   9-other                                    5 G Operatiemal I si.w ll mplaseil                                                                 I stubis 1 Sanw'Soussi-l'8/77)                                                                                                   II(hhes llNplain)