Forwards LER 97-004-02,identifying Two Addl Molded Case Circuit Breakers That Were Not in Appropriate Surveillance Instructions.Revs Annotated by Vertical Bar in Right Margin
ML20198R276
Person / Time
Site: Sequoyah Tennessee Valley Authority icon.png
Issue date: 11/03/1997
From: Bajestani M
TENNESSEE VALLEY AUTHORITY
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20198R281 List:
References
NUDOCS 9711130219
Download: ML20198R276 (2)


LER-2097-004, Forwards LER 97-004-02,identifying Two Addl Molded Case Circuit Breakers That Were Not in Appropriate Surveillance Instructions.Revs Annotated by Vertical Bar in Right Margin
Event date:
Report date:
3272097004R00 - NRC Website

text

_ _ _ _ - _ _ - _ _ - _ _ _ _ _ _ _ _ .._ _ _ _ _ _ _ _ _ _ _ _ , _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

.. L .

Tennessee Valley Authority, Post offee Box 2000. Sodd/ Dasy. Tennessee 37379-2000 Masoud Bajestani Site Voe Presaknt Sequ&/ah Nucioar Plant November 3, 1997 U.S. Nuclear Regulatory Commission 10 CFR 50.73 ATTNt Document Control Desk Washington, D.C. 20555 Gentlemen:

'"ENNESSEE VALLEY AUTHORITY - SEQUOYAH NUCLEAR PLANT (SON)

1. WITS 1 AND 2 - DOCKET NOS. 50-327 AND 50-328 - FACILIT'l O?FRATING LICENSES DPR-77 AND DPR LICENSEE EVENT REPORT (LER) 50-327/97004, REVISION 2 The-purpose of this letter is to provide a supplemental report identifying two additional molded case circuit breakers that were not in the appropriate surveillance instructions. Revisions are annotated by a vertical bar to the right of the text.

The original report was submitted to NRC on April 21, 1997.

The condition was reported in accordance with 10 CFR 50.73 (a) (2) (1) (B) as an operation prohibited by the plant's technical specifications.

Sincerely, t

I Masou ajestani ,. 3 -

/ g. 4 )

Enclosure cc: See page 2 P

9711130219 971103 PDR ADOCK 05000327 s roa _ ll1E111181lll1111iljilll!

  • 4 4 a A, l

PhresdM daty:IndIMDs -

l ..

U.S. Nuclear Regulatory Commission Page 2 November 3, 1997 Enclosure cc (Enclosure):

INPO Records Center Institute of Nuclear Power Operations 700 Galleria Parkway Atlanta, Georgia 30339-5957 Mr. R. W. Hernan, Project Manager U.S. Nuclear Regulatory Commission One White Flint, North 11555 Rockville Pike Rockville, Maryland 20852-2739 NRC Resident Inspector Sequoyah Nuclear Plant 2600 Igou Ferry Road Seddy-Daisy, Tennessee 37379-3624 Regional Administrator U.S. Nuclear Regulatory Commission Region II Atlanta Feoaral Canter 61 Forsyth St., SW, suite 23T85 Atlanta, Georgia 30303-3415 I,