ML20199A775
ML20199A775 | |
Person / Time | |
---|---|
Site: | Hope Creek |
Issue date: | 06/09/1986 |
From: | Ward D Advisory Committee on Reactor Safeguards |
To: | Palladino N NRC COMMISSION (OCM) |
References | |
ACRS-R-1197, NUDOCS 8606130263 | |
Download: ML20199A775 (2) | |
Similar Documents at Hope Creek | |
---|---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARML20217M7571999-10-22022 October 1999
[Table view]Advises That Attachment 1 to ,Marked as Proprietary,Re Safety Limit MCPR & Fuel Vendor Change Will Be Withheld from Public Disclosure Per 10CFR2.790(b)(5) ML20217M2101999-10-19019 October 1999 Forwards NRC Rept Number 17, Requal Tracking Rept from Operator Licensing Tracking Sys.Rept Was Used by NRC to Schedule Requalification Exam for Operators & Record Requal Pass Dates ML20217H8471999-10-18018 October 1999 Discusses Completion of Licensing Action for GL 98-01 & Suppl 1, Yr 2000 Readiness of Computer Sys at Npps, to All Holders of Operating Licenses for NPPs ML20217K8441999-10-15015 October 1999 Submits Revised Commitment to NRC Bulletin 90-01,Suppl 1 for Hope Creek Generating Station ML20217H9771999-10-13013 October 1999 Forwards SRO & RO Initial Exam Rept 50-354/98-302,suppl Rept on 990125-29,mtg Meeting on 990322,990429-30 & 0617-18 in-office Review & 990720 Telcon on Appeal Results.Overall, 11 of 16 Applicants Received NRC Licenses ML18107A5561999-10-0707 October 1999 Requests Relief Associated with Containment Examinations at Hope Creek & Salem Generating Stations.Attachment 1 Includes Proposed Alternatives & Supporting Justification for Relief Requests ML20217C4391999-10-0606 October 1999 Informs That Util Authorized to Administer Initial NRC Retake Written Exam to Applicant Listed,During Week of 991011 ML18107A5521999-10-0505 October 1999 Encourages NRC to Support Abb Combustion Engineering Nuclear Power Request for Priority Review of Generic TR Re Crossflow Ultrasonic Flow Measurement Sys ML18107A5501999-10-0505 October 1999 Provides Current Status of Pse&G Actions Re GL 98-01, Y2K Readiness of Computer Sys at Npps, for Salem Nuclear Generating Station,Units 1 & 2 & Hope Creek Nuclear Generating Station ML20217A9601999-10-0404 October 1999 Forwards Errata Redressing Deficiencies & Correcting Two Typos to Ufsar,Rev 10.Incorporate Attached Pages/Figures Into Controlled Copies of UFSAR ML20217A6861999-10-0101 October 1999 Forwards Insp Rept 50-354/99-05 on 990711-0829.Four Violations Occurred Re Areas of Fire Protection,Operation at Reduced Feedwater Inlet Temp & safety-related Battery Charging Operation & Being Treated as NCVs LR-N990430, Forwards Rev 10 to Hope Creek Generating Station Ufsar,Iaw 10CFR50.71(e).Details Re Each Change Also Attached to Facilitate NRC Review1999-09-28028 September 1999 Forwards Rev 10 to Hope Creek Generating Station Ufsar,Iaw 10CFR50.71(e).Details Re Each Change Also Attached to Facilitate NRC Review ML18107A5341999-09-22022 September 1999 Provides Data Re Operator Licensing Exam for Salem & Hope Creek Station,In Response to NRC Form 536 (7-1999) 05000354/LER-1999-009, Forwards LER 99-009-00, License Condition Violation - Min FW Temp Limits. Commitments Made by Util Encl1999-09-20020 September 1999 Forwards LER 99-009-00, License Condition Violation - Min FW Temp Limits. Commitments Made by Util Encl ML20217K7781999-09-16016 September 1999 Forwards Discharge Monitoring Rept for Hope Creek Generating Station for Month of Aug 1999. Rept Is Required by & Prepared Specifically for EPA & Nj Dept of Environ Protection ML20212B3631999-09-14014 September 1999 Forwards Rev 13 to Salem - Hope Creek Security Plan,Iaw 10CFR50.54(p).Summary of Proposed Changes to Plan,Encl. Encl Withheld ML20212B4021999-09-13013 September 1999 Submits Supplemental Info Related to Hope Creek License Change Request (LCR) H98-08,submitted to NRC on 981230, Re Flood Protection TS Changes ML18107A5221999-09-0808 September 1999 Requests Approval to Use ASME Code Case N546,which Provides Alternative Qualification Requirements That Allow Personnel Most Familiar with Walkdown of Plant Sys,Like License Operators to Perform VT-2 Examinations ML20211N5421999-09-0808 September 1999 Forwards Amend 121 to License NPF-57 & Safety Evaluation. Amend Revises TSs by Relocating Procedural Details of RETS to Offsite Dose Calculation Manual LR-N990395, Provides Comments on NRC Ltr Dtd 990714, Closure of TAC Number MA1194 - Response to RAIs to GL 92-01,Rev 1,Suppl 1, Reactor Vessel Structural Integrity, for Hope Creek Generating Sation. Revised GE Report Encl Also1999-09-0101 September 1999 Provides Comments on NRC Ltr Dtd 990714, Closure of TAC Number MA1194 - Response to RAIs to GL 92-01,Rev 1,Suppl 1, Reactor Vessel Structural Integrity, for Hope Creek Generating Sation. Revised GE Report Encl Also ML18107A4911999-08-20020 August 1999 Forwards Revised Plant Attribute Libraries for Salem & Hope Creek Generating Stations,Iaw 10CFR50,App E,Vi, Emergency Response Data Sys, 3.b.Changes Are Identified by Rev Bars ML20211B5341999-08-20020 August 1999 Forwards RAI Re 2nd 10-yr ISI Interval Relief Requests Re Plant.Info Requested to Be Provided within 60 Days of Receipt of Ltr ML18107A4801999-08-13013 August 1999 Requests That Pse&Gs Contact in NUREG-0383, Directory of Compliance for Radioactive Matl Packages, Be Changed ML20210R4911999-08-11011 August 1999 Forwards Insp Rept 50-354/99-04 on 990530-0711.No Violations Noted.Inspectors Reviewed Performance Indicators Submitted as Part of Pilot Program for New Regulatory Oversight Process & Verified Data ML18107A4751999-08-0505 August 1999 Forwards Fitness for Duty Performance Data Rept for Six Month Period Ending 990630 ML20210H9241999-07-26026 July 1999 Informs That State of Nj Dept of Environ Protection Has No Comments on Licensee 990517 Request for Amend to TS by Adding TS 3.3.10, Instrumentation of OPRM Sys ML20210F3271999-07-22022 July 1999 Forwards SE Granting Relief Requests RR-B1,RR-C1,RR-D1 & RR-B3 Re First 10-year Interval for ISI Program at Hope Creek ML20210D3971999-07-16016 July 1999 Forwards Discharge Monitoring Rept for Hope Creek Generating Station, for June 1999.Rept Is Required by & Prepared for EPA & Nj Dept of Environ Protection ML20209G2831999-07-14014 July 1999 Disclosure Closure of TAC MA1194 Re Licensee Response to RAI to GL 92-01,Rev 1,Suppl 1, Rc Structural Integrity, for Plant 05000354/LER-1999-007, Forwards LER 99-007-00,re License Condition Violation - Class-1E Battery Charging Operation.Commitments Made by Util Encl1999-07-14014 July 1999 Forwards LER 99-007-00,re License Condition Violation - Class-1E Battery Charging Operation.Commitments Made by Util Encl LR-N990250, Provides Proposed Alternative & Supporting Justification for Relief from Augmented Inservice Requirements of 10CFR50.55a(g) for Volumetric Exam of RPV Circumferential Welds1999-07-0909 July 1999 Provides Proposed Alternative & Supporting Justification for Relief from Augmented Inservice Requirements of 10CFR50.55a(g) for Volumetric Exam of RPV Circumferential Welds ML20196J4421999-07-0101 July 1999 Forwards Request for Addl Info Re Increase of Allowable Main Steam Isolation Valve (MSIV) Leak Rate & Deletion of MSIV Sealing Sys for Plant LR-N990316, Responds to NRC Request for Info Re Y2K Readiness at Npps, Per GL 98-01,suppl 1.Disclosure Encl1999-06-30030 June 1999 Responds to NRC Request for Info Re Y2K Readiness at Npps, Per GL 98-01,suppl 1.Disclosure Encl ML18107A4131999-06-25025 June 1999 Provides Further Clarification of Licensing & Design Basis for 125 Vdc Battery Margins for Sgs & HCGS for Meeting Station SBO & Loca/Loop Loading Requirements,Per Util 990426 Ltr & Discussion with NRC ML20209B6441999-06-21021 June 1999 Offers No Comments on Licensee 990529 Request for Revs to Plant Radiological Effluent Ts,Per GL 89-01 ML20196F9441999-06-21021 June 1999 Forwards Insp Rept 50-354/99-03 on 990419-0529.Violations Noted.Two Violations of NRC Requirements Occurred Re Reactor Bldg Ventilation Setpoints & Control Rod Drop Analyses ML20196E6471999-06-21021 June 1999 Forwards Revised marked-up TS Page for HCGS License Change Requests H99-02 & H99-05,dtd 990329 & 0524,respectively. Revised Pages Do Not Alter Conclusions Reached in 10CFR50.92 No Significant Hazards Analysis Previously Submitted ML20209C0621999-06-21021 June 1999 Forwards NPDES Discharge Monitoring Rept,May 1999, for Hcgs.Rept Prepared Specifically for EPA & Nj Dept of Environ Protection ML20212J0541999-06-17017 June 1999 Responds to Requesting That NRC Staff ...Allow BWR Plants Identified to Defer Weld Overlay Exams Until March 2001 or Until Completion of NRC Staff Review & Approval of Proposed Generic Rept,Whichever Comes First ML20196E9631999-06-17017 June 1999 Informs That Util Has Made Change to Commitment Stated in NRC Ser,Suppl 5.Commitment That Has Been Changed Is Item Number 1 of First Paragraph on Page 9-3 of Ser,Suppl 5 LR-N990295, Submits Change 1 to Relief Request RR-A4,which Clarifies Requirements Re Snubber Visual Insps.Request Was Submitted as Part of Plant Second Interval ISI Program on 9905111999-06-16016 June 1999 Submits Change 1 to Relief Request RR-A4,which Clarifies Requirements Re Snubber Visual Insps.Request Was Submitted as Part of Plant Second Interval ISI Program on 990511 05000354/LER-1999-006, Forwards LER 99-006-00 Re Esfa B Channel Primary Containment Isolation Signal Actuation.Attachment a Lists Commitments Util Making to NRC Re LER1999-06-15015 June 1999 Forwards LER 99-006-00 Re Esfa B Channel Primary Containment Isolation Signal Actuation.Attachment a Lists Commitments Util Making to NRC Re LER ML20195J1101999-06-0707 June 1999 Informs of Completion of Review of Providing Updated Status on Implementation of Commitments Made in Response to GL 89-13.Confirms Revs Made to Previous Commitments to Resolve Monitoring Pressure Drop Problem ML20195J1051999-06-0707 June 1999 Informs That NRC Office of Nuclear Reactor Regulation Reorganized Effective 990328.As Part of Reorganization,Div of Licensing Project Mgt Created.Jw Clifford Will Be Section Chief for Hope Creek Generating Station ML20207F2681999-06-0303 June 1999 Responds to by Forwarding Gfes & NRC Written Exam Grades for List of Hope Creek Operators Submitted by DE Jackson.Absence of Gfes Grade Indicates That Operator Previously Issued RO or SRO License.Without Encl ML18107A3611999-05-27027 May 1999 Forwards Responses to NRC 990301 & 990323 RAIs for Salem & Hope Creek Generating Stations Relating to GL 96-05 ML20207D0201999-05-27027 May 1999 Discusses 990512 Meeting to Identify Insp Activities at Hope Creek Facility Over Next Six Months & Informs of Planned Insps in Order for Licensee to Have Opportunity to Prepare & Provide Region I with Feedback on Schedule Conflicts ML20195B9931999-05-20020 May 1999 Forwards NPDES Discharge Monitoring Rept,Apr 1999, for Hgcs.Rept Prepared Specifically for EPA & Nj Dept of Environ Protection ML20207A3451999-05-20020 May 1999 Discusses Completion of Licensing Action for NRC Bulletin 96-003, Potential Plugging of ECCS Strainers by Debris in Bwrs ML20206Q6211999-05-14014 May 1999 Informs That on 990119 Licensee Provided NRC with Several Revised TS Bases Pages for Plant.Ts Bases Pages B 3/4 6-1 & B 3/4 6-2 Were Revised 1999-09-08 Category:INTERNAL OR EXTERNAL MEMORANDUM MONTHYEARML20217A9811999-10-30030 October 1999
[Table view]Forwards Sept 1999 Performance Indicator Data Rept for Revised Reactor Oversight Process Pilot Program.Rept Includes Data Through Aug 1999 (two-thirds of 3rd Quarter of 1999) for 13 Units at 9 Pilot Sites ML20210S6371999-08-13013 August 1999 Informs That Attached Info Transmitted by Facsimile on 990813 to P Duke of Pse&G to Facilitate Upcoming Conference Call in Order to Clarify Licensee Submittal ,which Provided Response to GL 98-04 ML20210P0141999-08-0505 August 1999 Forwards Licensee Response to Facility Design & Operation for NRC Staff Questions Re Individual Operator Exam Appeals ML20210F6981999-07-27027 July 1999 Discusses 990430 Request for Waiver of 10CFR170 Fees for Certain Insp Efforts Re NRR Pilot Regulatory Oversight Program.Determined That Thirteen Plants in Pilot Program Will Be Exempted from 10CFR170 Fees for Insp Efforts ML20209G6721999-07-14014 July 1999 Forwards Draft Request for Addl Info Re Inservice Insp - Second 10 Yr Interval ML20196H8491999-06-28028 June 1999 Forwards June 1999 Performance Indicator (PI) Data Rept for Revised Reactor Oversight Process Pilot Program.Rept Constitutes Second Monthly PI Data Submittal from Pilot Plant Licensees,Which Includes Data Through May 1999 ML20196C5051999-06-21021 June 1999 Informs That Attached Draft Request for Addl Info Transmitted by Facimile on 990617 to G Salamon of Pse&G. Review of RAI Would Allow Licensee to Determine & Agree Upon Schedule to Respond to RAI ML20210F7021999-04-30030 April 1999 Requests Waiver of Fees for Thirteen Dockets That Compromise Plant Population for NRR Pilot Regulatory Oversight Program. Purposes of Pilot Program Described in Commission Papers SECY-99-007 & SECY-99-007A ML20205Q9521999-04-15015 April 1999 Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam) for Tests Administered on 980223-0304 ML20205P4861999-04-15015 April 1999 Forwards NRC Operator Licensing Exam Rept 50-354/98-03OL, (Including Completed & Graded Tests) for Tests Administered on 980223-0304 ML20205N7101999-04-0909 April 1999 Forwards Info Which Was Transmitted by Facsimile on 990409 to C Manges of Pse&G,To Facilitate Conference Call in Order to Clarify Licensees Submittal ,which Provided Addl Info Re Relief Request for First 10-year ISI for Plant ML20205F9811999-03-31031 March 1999 Informs That Encl RAI Was Transmitted by Facsimile on 990331 to G Salamon of Public Svs Electric & Gas Co.Review of RAI Would Allow Licensee to Determine & Agree Upon Schedule to Respond to RAI ML20207K3941999-03-0808 March 1999 Notification of Significant Licensee Meeting 99-13 with Util on 990322 in King of Prussia,Pa to Review Util & NRC Assessments Re Dec 1998 Licensed Operator Exam,Including Applicant Performance & Quality of Util Proposed Exam ML20203F5431999-02-12012 February 1999 Notification of 990225 Meeting with Public Service Electric & Gas Co & Asea Brown Boveri in Rockville,Md to Discuss Fuel Design Changes for Hope Creek Generating Station ML20198S3281999-01-0606 January 1999 Informs That on 981218 & 22 Telcons,J Ondish & J Priest Discussed Encl Info with R Ennis.Info Clarifies Pse&G License Change Request LCR H98-03,dtd 980625 Which Requested in Part to Revise TS 4.4.2.1.b ML20196H1441998-12-0303 December 1998 Forwards Info from J Priets of Public Service Electric & Gas to R Ennis,Nrc Hope Creek Project Manager,Transmitted to Facilitate NRC Review of License Change Request Associated with Facility Filtration,Recirculation & Ventilation Sys ML20196A6381998-11-25025 November 1998 Notification of 981207 Meeting with Util in Rockville,Md to Discuss Proposed License Change Request Re Filtration, Recirculation & Ventilation Sys for Plant ML20236S3371998-07-20020 July 1998 Notification of 980804 Meeting W/Util in Rockville,Md to Discuss Technical Issues Associated W/Pse&G Proposed License Change Request Re Ush for Plant ML20249C1341998-06-17017 June 1998 Notification of Significant Licensee Meeting 98-59 W/Util on 980629 in King of Prussia,Pa to Discuss Licensed Operator Initial Training Program & Performance Problems at Plant for February 1998 Initial Exam ML20248M0371998-06-0909 June 1998 Notification of 980624 Meeting W/Util in Rockville,Md to Discuss Technical Issues Associated W/Pse&G Proposed License Change Request Related to Filtration,Recirculation & Ventilation Sys for Hope Creek Generating Station ML20203B1211998-02-19019 February 1998 Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam) for Tests Administered on 970929-1002 IR 05000354/19970081998-02-19019 February 1998 Forwards NRC Operator Licensing Exam Rept 50-354/97-08 (Including Completed & Graded Tests) for Tests Administered on 970929-1002 ML20198D1491997-12-24024 December 1997 Notification of Significant Licensee Meeting 97-130 W/Util on 980114 to Conduct pre-decisional Enforcement Conference to Discuss Two Violations Re Performance Criteria for Sys & Components Associated W/Maint Rule Program ML20198D1421997-12-24024 December 1997 Notification of Significant Licensee Meeting 97-129 W/Util on 980114 to Conduct pre-decisional Enforcement Conference to Discuss Violation for Failure to Follow Reactivity Manipulation Procedures for Control Rod Movements ML20149J9891997-07-22022 July 1997 Notification of Significant Licensee Meeting 97-88 W/Util on 970812 in King of Prussia,Pa to Conduct pre-decisional EC to Discuss Apparent Violations of 10CFR50.59 During Installation of Residual Heat Removal cross-tie Valve Mod ML20236M9111997-01-24024 January 1997 Describes Views on Broader Compliance Policy Concerns Associated W/River Bend Case Which Involves Complex Enforcement Policy Issues Associated W/Relationship Between Appropriate Use of Plant Administrative Controls ML20137B0781996-11-25025 November 1996 Forwards Proposed Notice of Violation & Proposed Imposition of Civil Penalities Based on Six Violations of Security Program at Mentioned Plants IA-96-492, Forwards Proposed Notice of Violation & Proposed Imposition of Civil Penalities Based on Six Violations of Security Program at Mentioned Plants1996-11-25025 November 1996 Forwards Proposed Notice of Violation & Proposed Imposition of Civil Penalities Based on Six Violations of Security Program at Mentioned Plants ML20135A6391996-11-20020 November 1996 Summarizes 940602 Meeting W/Listed Individuals to Discuss Items of Mutual Interest Re Plant Performance & Improvement Plans ML20129K2561996-11-0505 November 1996 Notification of Significant Licensee Meeting 96-109 W/Listed Attendees on 961202-03 in Philadelphia,Pa to Provide Training,Resolve Interagency Exercise Scheduling Conflicts & Discuss Current Issues in Emergency Preparedness ML20134D7161996-10-24024 October 1996 Requests That Encl Internet Mail Received from PM Blanch,Dtd Through 960930,be Placed in Pdr.No Distribution Outside of PDR Necessary ML20135B3831996-09-13013 September 1996 Discusses 960826 Meeting W/Listed Individuals to Discuss Current Activities & Issues Involving Hope Creek & Salem Npps.Info Partially Deleted ML20135B3731996-08-23023 August 1996 Partially Deleted Memo Re 960826 Drop in Meeting ML20135B3781996-08-23023 August 1996 Partially Deleted Memo Re Courtesy Visit W/Ej Ferland & Lr Eliason on 960826 ML20236M0141996-08-0505 August 1996 Recommends That Hope Creek Modify TS 3/4.5.1 to Conform W/ Sts,Which Specifies Steam Pressure & Flow as Necessary Conditions to Perform Test,To Avoid Further Interpretation Problems ML20135B3571996-02-27027 February 1996 Discusses 960222 Visit W/Listed Individuals to Discuss Issues Re Salem & Hope Creek Generating Stations ML20134K8691996-02-0909 February 1996 Partially Deleted Ltr Requesting OGC Interpretation of 10CFR50.5 Re Situation That Occurred at Util Plant ML18101A7851995-06-13013 June 1995 Advises That Util Current Drawer I Will Be Changed to Drawer 0509,effective 950612.Ltr from Hancocks Bridge Post Ofc Encl ML20134C6501995-05-0404 May 1995 Informs That Due to Pending EAs at Both Plants Scope of 950530 Eppr Has Been Reduced.Meeting Will Be Limited to 1 H ML20135B1791994-12-13013 December 1994 Discusses Pse&G 941129 drop-in Visit W/Listed Individuals to Discuss Items of Mutual Interest Including Plant Hope Creek & Salem Generating Station Performance ML20058C7731993-11-10010 November 1993 Notification of 931220 Enforcement Conference in Region I Ofc to Discuss Violations Noted in MOV NRC Team Insp ML20059G1621993-10-27027 October 1993 Notification of Significant Licensee Meeting 93-135 W/Util on 931207 to Discuss Hope Creek Motor Operated Valve NRC Team Insp Violation ML20135A8501993-08-0202 August 1993 Discusses 930723 Pse&G Visit W/Listed Individuals to Discuss Items of Mutual Interest Re Hope Creek & Salem,Units 1 & 2 NPP ML20134C7731993-07-0707 July 1993 Forwards Security & Safeguards SALP Input for Plants Covering Period 911229-930619 ML20128K2461993-02-12012 February 1993 Notification of 930224 Meeting W/Bwrog in Rockville,Md to Discuss Hope Creek Amend Request & SE Status (Increase MSIV Leakage,Remove Leakage Control Sys & Use Ms Lines & Condenser for Treatment) ML20134C8141992-01-16016 January 1992 Forwards SALP Input Relating to Emergency Preparedness for Period 900816-911231 ML20134C6441992-01-15015 January 1992 Forwards Security & Safeguards SALP Input for Plants.Input Covers Period of 900801-911228 ML20058D3211990-10-30030 October 1990 Documents Various Observations Made During INPO 900813-24 Evaluation Process at Facility ML18095A4331990-07-24024 July 1990 Advises That NRC Initiated Formal Section 7 Consultation W/ Dept of Commerce on 900618 Re Util Preparation of Biological Assessment of Plants ML20055G4331990-06-28028 June 1990 Forwards D Kwiatkowski of FEMA Transmitting FEMA Region I Rept for 881129-1201 Full Participation Exercise at Plants.Evaluation of 881202 Medical Drill Also Included in Rept.Encls Should Be Transmitted to Licensee 1999-08-05 Category:MEMORANDUMS-CORRESPONDENCE MONTHYEARML20217A9811999-10-30030 October 1999
[Table view]Forwards Sept 1999 Performance Indicator Data Rept for Revised Reactor Oversight Process Pilot Program.Rept Includes Data Through Aug 1999 (two-thirds of 3rd Quarter of 1999) for 13 Units at 9 Pilot Sites ML20210S6371999-08-13013 August 1999 Informs That Attached Info Transmitted by Facsimile on 990813 to P Duke of Pse&G to Facilitate Upcoming Conference Call in Order to Clarify Licensee Submittal ,which Provided Response to GL 98-04 ML20210P0141999-08-0505 August 1999 Forwards Licensee Response to Facility Design & Operation for NRC Staff Questions Re Individual Operator Exam Appeals ML20210F6981999-07-27027 July 1999 Discusses 990430 Request for Waiver of 10CFR170 Fees for Certain Insp Efforts Re NRR Pilot Regulatory Oversight Program.Determined That Thirteen Plants in Pilot Program Will Be Exempted from 10CFR170 Fees for Insp Efforts ML20209G6721999-07-14014 July 1999 Forwards Draft Request for Addl Info Re Inservice Insp - Second 10 Yr Interval ML20196H8491999-06-28028 June 1999 Forwards June 1999 Performance Indicator (PI) Data Rept for Revised Reactor Oversight Process Pilot Program.Rept Constitutes Second Monthly PI Data Submittal from Pilot Plant Licensees,Which Includes Data Through May 1999 ML20196C5051999-06-21021 June 1999 Informs That Attached Draft Request for Addl Info Transmitted by Facimile on 990617 to G Salamon of Pse&G. Review of RAI Would Allow Licensee to Determine & Agree Upon Schedule to Respond to RAI ML20210F7021999-04-30030 April 1999 Requests Waiver of Fees for Thirteen Dockets That Compromise Plant Population for NRR Pilot Regulatory Oversight Program. Purposes of Pilot Program Described in Commission Papers SECY-99-007 & SECY-99-007A ML20205Q9521999-04-15015 April 1999 Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam) for Tests Administered on 980223-0304 ML20205P4861999-04-15015 April 1999 Forwards NRC Operator Licensing Exam Rept 50-354/98-03OL, (Including Completed & Graded Tests) for Tests Administered on 980223-0304 ML20205N7101999-04-0909 April 1999 Forwards Info Which Was Transmitted by Facsimile on 990409 to C Manges of Pse&G,To Facilitate Conference Call in Order to Clarify Licensees Submittal ,which Provided Addl Info Re Relief Request for First 10-year ISI for Plant ML20205F9811999-03-31031 March 1999 Informs That Encl RAI Was Transmitted by Facsimile on 990331 to G Salamon of Public Svs Electric & Gas Co.Review of RAI Would Allow Licensee to Determine & Agree Upon Schedule to Respond to RAI ML20207K3941999-03-0808 March 1999 Notification of Significant Licensee Meeting 99-13 with Util on 990322 in King of Prussia,Pa to Review Util & NRC Assessments Re Dec 1998 Licensed Operator Exam,Including Applicant Performance & Quality of Util Proposed Exam ML20203F5431999-02-12012 February 1999 Notification of 990225 Meeting with Public Service Electric & Gas Co & Asea Brown Boveri in Rockville,Md to Discuss Fuel Design Changes for Hope Creek Generating Station ML20198S3281999-01-0606 January 1999 Informs That on 981218 & 22 Telcons,J Ondish & J Priest Discussed Encl Info with R Ennis.Info Clarifies Pse&G License Change Request LCR H98-03,dtd 980625 Which Requested in Part to Revise TS 4.4.2.1.b ML20196H1441998-12-0303 December 1998 Forwards Info from J Priets of Public Service Electric & Gas to R Ennis,Nrc Hope Creek Project Manager,Transmitted to Facilitate NRC Review of License Change Request Associated with Facility Filtration,Recirculation & Ventilation Sys ML20196A6381998-11-25025 November 1998 Notification of 981207 Meeting with Util in Rockville,Md to Discuss Proposed License Change Request Re Filtration, Recirculation & Ventilation Sys for Plant ML20236S3371998-07-20020 July 1998 Notification of 980804 Meeting W/Util in Rockville,Md to Discuss Technical Issues Associated W/Pse&G Proposed License Change Request Re Ush for Plant ML20249C1341998-06-17017 June 1998 Notification of Significant Licensee Meeting 98-59 W/Util on 980629 in King of Prussia,Pa to Discuss Licensed Operator Initial Training Program & Performance Problems at Plant for February 1998 Initial Exam ML20248M0371998-06-0909 June 1998 Notification of 980624 Meeting W/Util in Rockville,Md to Discuss Technical Issues Associated W/Pse&G Proposed License Change Request Related to Filtration,Recirculation & Ventilation Sys for Hope Creek Generating Station IR 05000354/19970081998-02-19019 February 1998 Forwards NRC Operator Licensing Exam Rept 50-354/97-08 (Including Completed & Graded Tests) for Tests Administered on 970929-1002 ML20203B1211998-02-19019 February 1998 Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam) for Tests Administered on 970929-1002 ML20198D1421997-12-24024 December 1997 Notification of Significant Licensee Meeting 97-129 W/Util on 980114 to Conduct pre-decisional Enforcement Conference to Discuss Violation for Failure to Follow Reactivity Manipulation Procedures for Control Rod Movements ML20198D1491997-12-24024 December 1997 Notification of Significant Licensee Meeting 97-130 W/Util on 980114 to Conduct pre-decisional Enforcement Conference to Discuss Two Violations Re Performance Criteria for Sys & Components Associated W/Maint Rule Program ML20149J9891997-07-22022 July 1997 Notification of Significant Licensee Meeting 97-88 W/Util on 970812 in King of Prussia,Pa to Conduct pre-decisional EC to Discuss Apparent Violations of 10CFR50.59 During Installation of Residual Heat Removal cross-tie Valve Mod ML20236M9111997-01-24024 January 1997 Describes Views on Broader Compliance Policy Concerns Associated W/River Bend Case Which Involves Complex Enforcement Policy Issues Associated W/Relationship Between Appropriate Use of Plant Administrative Controls IA-96-492, Forwards Proposed Notice of Violation & Proposed Imposition of Civil Penalities Based on Six Violations of Security Program at Mentioned Plants1996-11-25025 November 1996 Forwards Proposed Notice of Violation & Proposed Imposition of Civil Penalities Based on Six Violations of Security Program at Mentioned Plants ML20137B0781996-11-25025 November 1996 Forwards Proposed Notice of Violation & Proposed Imposition of Civil Penalities Based on Six Violations of Security Program at Mentioned Plants ML20135A6391996-11-20020 November 1996 Summarizes 940602 Meeting W/Listed Individuals to Discuss Items of Mutual Interest Re Plant Performance & Improvement Plans ML20129K2561996-11-0505 November 1996 Notification of Significant Licensee Meeting 96-109 W/Listed Attendees on 961202-03 in Philadelphia,Pa to Provide Training,Resolve Interagency Exercise Scheduling Conflicts & Discuss Current Issues in Emergency Preparedness ML20134D7161996-10-24024 October 1996 Requests That Encl Internet Mail Received from PM Blanch,Dtd Through 960930,be Placed in Pdr.No Distribution Outside of PDR Necessary ML20135B3831996-09-13013 September 1996 Discusses 960826 Meeting W/Listed Individuals to Discuss Current Activities & Issues Involving Hope Creek & Salem Npps.Info Partially Deleted ML20135B3731996-08-23023 August 1996 Partially Deleted Memo Re 960826 Drop in Meeting ML20135B3781996-08-23023 August 1996 Partially Deleted Memo Re Courtesy Visit W/Ej Ferland & Lr Eliason on 960826 ML20236M0141996-08-0505 August 1996 Recommends That Hope Creek Modify TS 3/4.5.1 to Conform W/ Sts,Which Specifies Steam Pressure & Flow as Necessary Conditions to Perform Test,To Avoid Further Interpretation Problems ML20135B3571996-02-27027 February 1996 Discusses 960222 Visit W/Listed Individuals to Discuss Issues Re Salem & Hope Creek Generating Stations ML20134K8691996-02-0909 February 1996 Partially Deleted Ltr Requesting OGC Interpretation of 10CFR50.5 Re Situation That Occurred at Util Plant ML18101A7851995-06-13013 June 1995 Advises That Util Current Drawer I Will Be Changed to Drawer 0509,effective 950612.Ltr from Hancocks Bridge Post Ofc Encl ML20134C6501995-05-0404 May 1995 Informs That Due to Pending EAs at Both Plants Scope of 950530 Eppr Has Been Reduced.Meeting Will Be Limited to 1 H ML20135B1791994-12-13013 December 1994 Discusses Pse&G 941129 drop-in Visit W/Listed Individuals to Discuss Items of Mutual Interest Including Plant Hope Creek & Salem Generating Station Performance ML20058C7731993-11-10010 November 1993 Notification of 931220 Enforcement Conference in Region I Ofc to Discuss Violations Noted in MOV NRC Team Insp ML20059G1621993-10-27027 October 1993 Notification of Significant Licensee Meeting 93-135 W/Util on 931207 to Discuss Hope Creek Motor Operated Valve NRC Team Insp Violation ML20135A8501993-08-0202 August 1993 Discusses 930723 Pse&G Visit W/Listed Individuals to Discuss Items of Mutual Interest Re Hope Creek & Salem,Units 1 & 2 NPP ML20134C7731993-07-0707 July 1993 Forwards Security & Safeguards SALP Input for Plants Covering Period 911229-930619 ML20128K2461993-02-12012 February 1993 Notification of 930224 Meeting W/Bwrog in Rockville,Md to Discuss Hope Creek Amend Request & SE Status (Increase MSIV Leakage,Remove Leakage Control Sys & Use Ms Lines & Condenser for Treatment) ML20134C8141992-01-16016 January 1992 Forwards SALP Input Relating to Emergency Preparedness for Period 900816-911231 ML20134C6441992-01-15015 January 1992 Forwards Security & Safeguards SALP Input for Plants.Input Covers Period of 900801-911228 ML20058D3211990-10-30030 October 1990 Documents Various Observations Made During INPO 900813-24 Evaluation Process at Facility ML18095A4331990-07-24024 July 1990 Advises That NRC Initiated Formal Section 7 Consultation W/ Dept of Commerce on 900618 Re Util Preparation of Biological Assessment of Plants ML20055G4331990-06-28028 June 1990 Forwards D Kwiatkowski of FEMA Transmitting FEMA Region I Rept for 881129-1201 Full Participation Exercise at Plants.Evaluation of 881202 Medical Drill Also Included in Rept.Encls Should Be Transmitted to Licensee 1999-08-05 |
Text
.
M5 bil97 I
,xg'og UNITED STATES 8 o NUCLEAR REGULATORY COMMISSIO'N s, ,I ADVISORY COMMITTEE ON REACTOR SAFEGUARDS 3 WASHINGTON, D. C. 20555 o
- June 9, 1986 Honorable Nunzio J. Palladino Chairman U.S. Nuclear Regulatory Comission Washington, D.C. 20555
Dear Dr. Palladino:
SUBJECT:
ACRS RECOMMENDATIONS ON THE HOPE CREEK GENERATING STATION In its report to you of December 18, 1984 on the operating license appli-cation for the Hope Creek Generating Station, the Advisory Comittee on Reactor Safeguards made the following~ comments:
- 1) "Because of the nonoptimum orientation of the turbine relative to
. vital components in this plant, we recomend that a structured test program for evaluating overspeed protection of the turbine be prepared and submitted to the NRC Staff for review and approval before full power operation."
- 2) "Although the control room at the Hope Creek Generating Station has been reviewed with respect to human factors, we encourage the NRC Staff to give additional attention to its habitability requirements.
This should include evaluations of the potential loss of both trains of the emergency ventilation system and the heat load and rate of temperature rise in the room under a range of HVAC conditions."
Appendix H to Supplement No. 5 of the Hope Creek Generating Station Safety Evaluation Report includes the NRC Staff's response to both of these con-cerns.
With respect to the first, the Staff notes that the Applicant plans a loss-of-load test at 100 percent power which meets the requirements of Regulatory Guide 1.68, and observes that the requirements of GDC 4 are met. They slso note, however, that the " test program proposed by the applicant does not actually test the trip setting of the mechanical and backup electrical overspeed trips, nor does it show that the trip setpoints (110% and 112% of rated speed for mechanical and backup electrical overspeed, resp over-design (ectively) are set to limip the turbine, overspeed to 120% of rated speed speed)."
We do not consider this a basis for a conclusion that the turbine overspeed protection at Hope Creek is adequate, and suggest that the Staff be asked to provide justification based on safety considerations, prior to Commission approval of full power operation.
N t(cho h % D s sp,g
-3 $
i Honorable Nunzio J. Palladino June 9, 1986 The Connittee's concerns about control room habitability in the event of loss of ventilation were addressed by an analysis. Although the Staff has con-cluded that a loss-of-ventilation and loss-of-cooling test would be necessery to completely address those concerns, the NRC Staff has concluded that nothing more is needed as part of the operating license review but that additional test requirements or limitations resulting from resolution of Generic Issue 83, " Control Room Habitability," would result in additional plant-specific action. We find this acceptable.
Sincerely, David A. Ward Y -
Chairman 6
1 I
- - - - - ,-