ML20149G086

From kanterella
Revision as of 14:19, 26 October 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Rev 0 to Sequoyah Nuclear Plant,Unit 2,Cycle 7 Colr
ML20149G086
Person / Time
Site: Sequoyah Tennessee Valley Authority icon.png
Issue date: 09/23/1994
From: Shell R
TENNESSEE VALLEY AUTHORITY
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20149G091 List:
References
NUDOCS 9409300027
Download: ML20149G086 (3)


Text

r IUA Tennessee Vaney Aatterty PW ONe Ibr,2000 Soddy Da$y Tennessee 37379 September 23, 1994 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 Gentlemen:

In the Matter of ) Docket No. 50-328 Tennessee Valley Authority )

SEQUOYAH NUCLEAR PLANT (SON) - UNIT 2 CORE OPERATING LIMITS REPORT (COLR)

In accordance with the SON Unit 2 Technical Specification 6.9.1.14.c, enclosed is the Unit 2 Cycle 7 COLR.

There are no commitments contained in this submittal. Please direct questions concerning this issue to W. C. Ludwig at (615) 843-7460.

Sincerely, kt Yr R. H. Shell Manager SON Site Licensing Enclosure cc: See page 2 l

l 30005S 9409300027 940923 PDR ADOCK0500g8 1 i

e  ;

U.S. Nuclear Regulatory Commission l Page 2 i September 23, 1994 f cc (Enclosure):  !

Mr. D. E. LaBarge, Project Manager  !

Nuclear Regulatory Commission -

One White Flint, North  !

11555 Rockville Pike Rockville, Maryland 20852-2739 NRC Resident inspector Sequoyah Nuclear Plant 2600 Igou Ferry Road l Soddy-Daisy, Tennessee 37379-3624 i i

Regional Administrator [

U.S. Nuclear Regulatory Commission Region ll  ;

101 Marietta Street, NW, Suite 2900  !

Atlanta, Georgia 30323-2711  !

i t

t 5

I i

J J-al  : , m- M .1A r

.- l i

r i

i ENCLOSURE l t

4 l

SEQUOYAH NUCLEAR PLANT UNIT 2 CYCLE 7  ;

?

CORE OPERATING LIMITS REPORT [

REVISION O  ;

(L36 940815 801) l I

l i

-I r

i I

I I

I I

[

I

[

h b

i h

l e - - _. _