ML20149G086

From kanterella
Jump to navigation Jump to search
Forwards Rev 0 to Sequoyah Nuclear Plant,Unit 2,Cycle 7 Colr
ML20149G086
Person / Time
Site: Sequoyah Tennessee Valley Authority icon.png
Issue date: 09/23/1994
From: Shell R
TENNESSEE VALLEY AUTHORITY
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20149G091 List:
References
NUDOCS 9409300027
Download: ML20149G086 (3)


Text

r IUA Tennessee Vaney Aatterty PW ONe Ibr,2000 Soddy Da$y Tennessee 37379 September 23, 1994 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 Gentlemen:

In the Matter of

)

Docket No. 50-328 Tennessee Valley Authority

)

SEQUOYAH NUCLEAR PLANT (SON) - UNIT 2 CORE OPERATING LIMITS REPORT (COLR)

In accordance with the SON Unit 2 Technical Specification 6.9.1.14.c, enclosed is the Unit 2 Cycle 7 COLR.

There are no commitments contained in this submittal. Please direct questions concerning this issue to W. C. Ludwig at (615) 843-7460.

Sincerely, kt Yr R. H. Shell Manager SON Site Licensing Enclosure cc: See page 2 30005S 9409300027 940923 ADOCK0500g8 1

PDR i

e U.S. Nuclear Regulatory Commission l

Page 2 i

September 23, 1994 f

cc (Enclosure):

Mr. D. E. LaBarge, Project Manager Nuclear Regulatory Commission One White Flint, North 11555 Rockville Pike Rockville, Maryland 20852-2739 NRC Resident inspector Sequoyah Nuclear Plant 2600 Igou Ferry Road l

Soddy-Daisy, Tennessee 37379-3624 i

i Regional Administrator

[

U.S. Nuclear Regulatory Commission Region ll 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323-2711 i

t t

5 I

i

J J-al m-M

.1A r

l i

r i

i ENCLOSURE l

t 4

l SEQUOYAH NUCLEAR PLANT UNIT 2 CYCLE 7

?

CORE OPERATING LIMITS REPORT

[

REVISION O (L36 940815 801) l I

l i

-I r

i I

I I

I I

[

I

[

h b

i h

e

_