ML20151W194

From kanterella
Revision as of 15:23, 24 October 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Industrial Pretreatment Quarterly Self-Monitoring Results for July 1998, for Pnpp
ML20151W194
Person / Time
Site: Perry  FirstEnergy icon.png
Issue date: 07/31/1998
From: Myers L
CENTERIOR ENERGY
To:
Shared Package
ML20151W176 List:
References
NUDOCS 9809150212
Download: ML20151W194 (1)


Text

.- - - _ . . - . .- . .

l 1

l INDUSTRIAL PRETREATMENT  !

QUARTERLY SELF-MONITORING RESULTS Perry Nuclear Power Plant Permit No.: 1004911 10 Center Rd. Report Date: 7/10/98 Perry, Ohio 44081 Laboratory: Electro Analytical Date of Sample: 7/1 to 7/2/98 Time of sample: 1400 {

Sample Location: Sewage Pump Station Name of Sampler: P. Brown  !

Laboratory Address: 7118 Industrial Park Blvd.

Mentor, Ohio 44060-5314 Date of Analysis: 7/6 to 7/9/98 Flow: 42,800 gpd i

PARAMETER SAMPLE EPA ANALYSIS DISCIIARGE ANALYSIS -

TYPE METliOD DATE LIMIT RESULT  :

COD Composite 410.4 7/7/98 n/a 300 mg/l BOD Composite 405.1 7/7/98 n/a 180 mg/l TSS Composite 160.2 7/9/98 n/a 200 mg/l Silver Composite 200.7 7/7/98 n/a <.050 mg/l Mercury Composite 245.2 7/6/98 2 ug/l <.50 ug/l pil Composite 150.1 7/7/98 5.5 to 12 s.u. 8.2s.u.

Oil / Grease Grab 1664 7/9/98 50 mg/l 38 mg/l I certify under penalty oflaw that I have personally examined and I am familiar with the information in this report and that, based on my inquiry of those persons immediately responsible for obtaining the information contained in this report, I believe that the information is true, accurate, and complete. I am aware that there are significant penalties for submitting false information including the possibility of fine and imprisonment.

M MIk/ 9/9/cp Vice President - Nuclear l Sign'ature / ' bate' ' " Title 9809150212 980909 P PDR ADOCK 05000440 R PDR

__ _