Rev 0 to App Q to TR-84056-01, Independent Assessment Program,Phase 4 Electrical Walkdown Checklist
ML20128F408
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 07/20/1984
From:
CYGNA ENERGY SERVICES, TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To:
Shared Package
ML20128F378 List:
References
TR-84056-01-APP, TR-84056-1-APP, NUDOCS 8505290637
Download: ML20128F408 (10)


Text

- _.

t t

APPENDIX Q ELEC1RICAL MALKDOW CHECKLIST Checklist No. Content WD-EE-01 All Equipment in Scope

- - ~ ~ ~ - - ~

~ x ,e . f

- - - - ~ . - . . . _ . _

l 8505290637 850503 PDR ADOCK 05000455 ,

)

A PDR I

Texas Utilities Generating Company Independent Assessment Program, Phase 4

k. k A Final Report TR-84056-01, Rev. O m m M Nm milm M W 4

Independent Design .

Aldi Review Checklist .

======== FIFcfulCAL = a rw ertIST R;viewe' AP8 E. van Stijgeren Checklist No. WD-EE-01  !'

R. Uhlar/T. R. Martin D* i 7/20/84 Satisfactory item Yes No N/A Commente

) t[

1. The nameplate data and location of the following equipment  ;

will be reviewed to ensure compliance of the installed  :,

equipment with the equipment specified in the design phase. -

a. CCW pump motor CP1-CCAPCC-01 to the requirements of X g i G8H Specification 2323-ES-10. " Electric Motors." , hgg af rE:"?5" d T jh-"
b. The following motor operated valves with the pre- - - --

liminary vendor information provided in letter . -

CVN-027, dated 8/16/77, as required by G8H spe-cification 2323-MS-600, " Power Operated Valves."

l Valve No.

HV-4512 X All valves had 0.7 hp Reliance l motors for Limotorque SMB-00/10 HV-4514 X HV-4524 X valve actuators. Preliminary

design information identified HV-4526 X i

! HV-4572 X valves HV-4512 and HV-4514 as HV-4574 X having 1.0 hp motors. Per Limitorque, motor operator sizes vary depending on the actual l1 manufacturer of the motor oper-ator, and that the SMB-00/10 designation ensures the appro-priate valve operating torque.

This reduction in operator size 3

does not affect the electrical i

Texas Utilities Generating Company; 84056 Sheet 1 of 9 independent Assessment Program, Phase 4 L---------.-------------- _ _ _ _ _ _ _ _ _ _ __ ___ _

r, Independent Dosign Al% i Review Checklist a .

ELECTRICAL IRLEDOWN QECKLIST Approver E. van Stijgeren Checkilet No. WD-EE-01

! C=8ower R. Uhlar/T. R. Martin cat

  • 7/20/84 i Setlefactory Commente i item Yes No N/A installation design, and the fact I that SM8-00/10 actuators were orig-l inally specified ensures the valves '.

will perform their required func-i tion. This does not represent a 8* generic design concern since motor f sizes will only vary marginally for i f-(b2 il I* - 5gg""

35-I r

  1. .# " the use of different manufacturers motor operators and motor starters are manufactured to accommcdate a l

I range of motor sizes.

c. The solenoids for the following valves with the vendor information provided in the following vendor drawings j as -required by G&H specification 2323-MS-600, " Power j Operated Valves."

Valve No. Drawing No.

I LV-4500 35A2243 X All solenoid operated valves are i RV-4508 35A2227 X in compliance with design crf-FV-4536 G26246 X teria.

d. 6.9 Ky switchgear 1EAl compartment three to the re- X quirements of G8H specification 2323-ES-5, "7.2 Kv l Metal-Clad Switchgear and Accessories."

l Sheet 2 of 9 4

Texas Utilities Generating Company; 84056 i Independent Assessment Program, Phase 4 1

I

Independent Design A'

Al% ro Review Checklist ELECTRICAL MALKDENNI QECKLIST emi.w.r R. Uhlar/T. R. Martin Approver E. van Stijgeren Checklist No. WD-EE-01 Date 7/20/84 Sallefactory item Yes No N/A Commente

e. The following compartments of 480 volt motor control center 1EB3-1 to the requirements of G8H specification 2323-ES-7, " Motor Control Centers."

Compartment No.

6J X Verified breaker frame size, trip 6M X rating, voltage level, and short 7C X circuit rating.

7F X 7J X l 7M X j f. The following instrumentation to the requirements of the applicable G8H specifications:

Loop Specification l 4500 2323-MS-611A X Agrees with DCA 6347.

1 4518 2323-MS-616 X i 4536A 2323-MS-611A X 4536B 2323-MS-611A X 4502A 2323-MS-620 X Agrees with DCA 19,198.

c 4502B_ 2323-MS-520 X Agrees with DCA 19,198.

~

.i ,,

}

dEUe P '! ( r : 3 " ; !;}, 3

~ _ _ . - . _

! Texas Utilities Generating Company; 84056 Sheet 3 of 9 l Independent Assessment Program, Phase 4

> Independent Design '

A L n' i Review Checklist ELECTRICAL MLED0lm QECKLIST L

i:

C viewer R. Uhlar/T. R. Martin Approver E. van Stijgeren Checklist No. WD-EE-01 ,

pate 7/20/84

! l Satisfactory

. Item Yes No N/A Commente l 2. The installed raceways for the following cables will be re-viewed for:

I e Installed location in compliance with installation All raceway locations, identifica-drawings. tion, separation and fill require-ments were in compliance with design

  • Routing point identification in compliance with in- criteria. Tray points which are i stallation drawings and change paper identified with only the last two i'

digits or not identified at all are

  • Electrical train designation identification acceptable based on Paragraph 2.26.5.a.3 (c) and (e) of the G8H
  • Adequate train separation Electrical Erection Specification, 2323-ES-100 wnich state:

l

  • Cable tray fill within side rails

! (c) The cable tray identification l a. E9100001 X number (e.g., T11GABB) shall be

b. E9100555 X marked (on the outside of either
c. A3104340 X tray side rail) at ends of each I d. E9104347 X tray, at tray intersections and i e. E9107008

-- ~

X at intervals not to exceed 30

f. E9119630A pn gy X feet. For cable tray sections f

E9119639 s X 10 feet or less in length, i 9 g l- identification may be at the A9= 2 [(-(fl

h. E9119640 n i e -

X

" 3,

g d E -!

midpoint of the section.

1. E9119660 X i j. E9119678 - ----

X

k. E9119701 X

, 1. E9119956 X

m. A9119838 X Texas Utilities Generating C'Smpany; 84056 Sheet 4 of 9 Independent Assessment Program; Phase 4 i

Independent Design .

MMi Fleview Checklist annememma ELECTRICAL WLEDdWI OECKLIST i

i

^#Pr*

  • E. van Stijgeren CheckIlst No. WD-EE-01 R;vlowe' R. Uhlar/T. R. Martin Date 7/20/g4 Satisfactory Yes No N/A Comments Item l

Cable tray identification node ,

l points (i.e., the last two '

i numerical digits added to the cable tray identification

, number, example T11GABB09, T11GABB10, etc.) shall be stanciled on the same side of l the tray as the cable tray l identification number where i shown on the electrical physical layout drawings.

(e) At the discretion of the Owner's field representative, identifi-i cation of conduit and cable tray is not required in cases when

~

q' n g") g g!g,9 a 1;d

$ this identification would not be g; l

'readily visible from floor f.)tye!. g e !sii Jis - -

level.

Texas Utilities Generating Company; 84056 Sheet 5 of 9 independent Assessment Program, Phase 4 i

~

Independent Design A LN i Review Checklist ,

ELECTRICAL telLM OECELIST Approver E. van Stijgeren Checklist No. WD-EE-01 R:vlow R. Uhlar/T. R. Martin Date 7/20/84 Sallefactory Yes No N/A Conwnente item

3. The installation of the following cables will be reviewed for:

e All cable terminations, e Field cable termination block terminations in com- construction, and separation pliance with cabinet wiring drawings and change paper requirements were found to be in

  • Construction (i.e., voltage rating, number of con- compliance.

ductors, size and jacket material) in compliance with , ,

applicable cable specifications, raceway schedule, and lated or measured and iccorded Pull cards on any of the cable pull cards rev T ract ce s e Pull card routing in compliance with raceway schedule , ,

routing and change paper Root's Procedure EEI-07 Para-

. a 4.2 ch e Pulling tension calculation performed in accordance {ap with TUSI instruction CP-El-4.0-24 M M ph w pdis entirely in trays, since there

  • Pulling tension recorded on pull card in compliance '

with calculated maximum allowable tension tens on w p in en rely in trays.

  • Adequate internal panel wiring (MCC's, switchgear, solid state isolation cabinets, shutdown transfer _ _

~

panel, termination racks, junction boxes, etc.) train

, , t

-  % <v :r . *:: 1,~ y . .s .;

Texos Utilities Generating Company; 84056 Sheet 6 of 9 Independent Assessment Program, Phase 4 i

Independent Design  !

! ALHi Review Checklist  ;

E ECTRICAL WLLEDOGR DECKLIST l

R. Uhlar/T. R. Martin Approver E. van Stijgeren Checklist No. WD-EE-01 i a miew.,

oste 7/20/84 Setlefactory Item Yes No N/A Commente t i

a. E9100001 X
  • The pull card to which E9107008
b. E9100555 X was pulled (Rev. 177A) is cor-
c. A9104340 X rect with respect to the physi-I d. E9104347 X cal installation but does not j e. E9107008 X agree with the most recent

~

f. Epl1963A X revision of the G8H Cable and
g. E9119639 X Raceway Schedule (2323-El-1700
h. X Rev. 326) - i.e., the initial l E9119640 i 1. E9119660 X conduit C-13009421 from MCCIEB3-
j. E9119678 X 1 to tray T139SCA50 is installed i

l k. E9119701 X and utilized but is not shown in i 1. E9119956 X Rev. 326 of 2323-El-1700.

X

m. A9119838
  • Further investi ation revealed that conduit C- 3009421 was I manually assigned to routing i

point T130 SCA51 in subsequent

! DCA (No.10606) for the routin0 of an additional cable utilizing i; _

conduit C-13009421. The compu-

' - - = ter did not flag this change

  • since it will accept either g g routing pcint when a conduit l Uig.f[N D r; r *dh  ;

p

- ' ' f{ $h'%g g F leaves the tray system between two routing points. It did l 3 !$ - -

- - assume cable E0107008 as being I

an air drop, which was the rea-I son for the raceway schedule Texas Utilities Generating Company; 84056 Sheet 7 of 9 Independent Assessment Program, Phase 4

Independent Design  :

AL ;J i Review Checklist j ELECTRICAL IRLKDOHN DECKLIST 1

.(

' ).

a ,i..., R. Uhlar/T. R. Martin Approver E. van Stijgeren Checkilet No. WD-EE-01  !,

I pet. 7/20/84 .;

.i Satisfactory Comments t Item Yes No N/A 4

discrepancy. TUSI is correcting -

the raceway schedule. This was '

not considered a design concern 4

i since it did not adversely af-l t

fect divisional routing or i

separation.

4. Review protective component settings and any available All overcurrent relays and circuit

]

field testing documentation related to the verification of breaker trip ratings were in com-the setpoints of the following CCWS devices to the design pliance with design criteria.

setpoints.

a. Switchgear IEA1 compartment three, protective com- X ponent settings.
b. Switchgear IEA1 compartment three protective model X The phase A overcurrent relay was j labeled model no. 223S-3542 in-j numbers i

stead of 2235-8542. A field test

-3 and comparison of its time-current l

characteristics to manufacturer 9 h, data identified the equipment as l

p;ygg

.; L . j 3"f 9, being model no. 2235-8542 as

., h i

/ required. This discrepancy was j

f' d' ^~~?.,,j i c.

~~_,____._.-

apparently due to incomplete I - - - stamping of the number eight.

This model no. is being corrected J in the field.

Texas Utilities Generating Company; 84056 Sheet 8 of 9 Independent Assessment Program, Phase 4 1

Independent Design I.

L11 a i -

Review Checklist  :;

ELECTRICAL Ifu.KDOINI OIECKLIST  !

l t

oc,s..., R. Uhlar/T. R. Martin a,,,,,,, E. van Stij geren Checkflet No. WD-EE-01  ;

ost. 7/20/84 ,

Setlefactory

{

Item Yes No N/A Comments '

l f

c. The following MCC IEB3-1 compartment protective com- l ponent equipment: ,

t Compartment 6J X 6M X 7C X 7F X 7J X 7M X 1

vl g f l. . : :. t : : . 2 ..

i v -

l Texas Utilities Generating Company; 84056 Sheet 9 of 9 Independent Assessment Program, Phase 4