I i

I m

APPENDIX V

ECHANICAL SYSTEMS WALKDOWN CHECKLISTS Checklist No.

Equipment WD-MS-01 Component Cooling Water Surge Tank WD-MS-02 Component Cooling Water Pump h0-MS-03 Component Cooling Water Heat Exchanger WD-MS-04 Residual Heat Removal Heat Exchanger WD-MS-05 Containment Spray Heat Exchanger WD-MS-06

' Control Room A/C Chiller Condenser WD-MS-07 Nuclear Chilled Water System Chiller Condenser WD-MS-08 Piping WD-MS-09 Component Cooling Water Valves 1

ggg52 Dock 5

5 A

Texas Utilities Generating Company Independent Assessment Program. Phase 4 g

g,

unmanummMMu Final Report TR-84056-01, Rev. 0

dB

~~'

D0.C Independent Design 3

jdlL.

Review Checklist ALni n========

-. r

---cieu.

r-i Susie Tank CP1-CCATST-01 Checklist No.

gg.gg.g1 R "'*

  • J. Foley/R. Hess Eric van Stijgeren D*'*

7/20/84 Setlefactory Itesui Yes No NtA Commente 1.

CCW Surge Tank CPI-CCATST-01 (Design Data)

Tank nameplate affixed in accordance with X

ASME Section III.

Tank capacity agrees with:

X Not shown on nameplate. Not re-

a. Specification quired by ASE. Tank size based on field measurement is correct.

X

b. Calculation X

Design pressure in agreement with specification.

Design temperature in agreement with specification.

X Specification = 130*F Nameplate = 200'F, Conservative l

X Tank N-stamped.

X Correct safety class.

X Tank is piped in accordance with flow diagram.

X Tank is piped in accordance with isometrics.

X Safety / relief' valve provided.

X Correct safety / relief valve setting.

Texas Utilities Generating Company; 84056 Page 1 of 3 Independent Assessment Program, Phase 4

J Independent Design i)D ilfi[Ql8ftjP.ijirgj L 5pjjfMjj g Review Checklist AL 6 i Equipment: CamponeN ' Cooling _ Water 2-w i __ wa-stai s s -us c: view.c J. Foley/R. Hess Approver Eric van Stijgeren checknet No.

WD-MS-01 pate 7/20/84 Setlefectory I

item Yes No N/A Comments 1.

CCW Surge Tank CPI-CCATST-01 (Design Data)

(continued) e Vacuum breaker provided.

X Vacuum braker correctly sized.

X 2.

CCW Surge Tank CPI-CCATST-01 (Hazards Protection)

Fire Fire / smoke detection provided in vicinity of X

surge tank.

Suppression equipment provided in vicinity X

of tank.

Redundant trains protected from damage by a X

Comon tank for both CCW trains.

e Acceptable due to lack of single fire.

combustibles, passive nature of tank and detection / suppression equipment.

Flood Lowest piece of equipment associated with X

e surge tank (drain valves, etc) is located above flood level.

Texas Utilities Generating Coinpany; 84056 Page 2 of 3 Independent Assessment Frogram, Phase 4

N ~ m..

i 1e!

b Ill,/

Independent Design

  • Oi f

Review Checklist L41 n i

~

Equipment: Campenent"Caeling Mater

.w.,i_.._ i.ra A.isi-vu Revseww J. Foley/R. Hess App <over Eric van Stijgeren checkelet No.

WD-MS-01 pote 7/20/84 Satisfactory Item Yes No N/A Commente 2.

CCW Surge Tank CPI-CCATST-01 (Hazards Protection)

(continued)

No openings from floors above which X

e could flood surge tank area.

Protected from a single flood that could damage X

Located high in building on open both trains.

metal grating.

Missile Protection Protected from rotating equipment in vicinity of X

e surge tank which could generate a missile which could damage both trains.

High Energy Line Breaks Protected from unrestrained high energy lines in X

the vicinity which could rupture and damage both l

sides of surge tank.

Seismic Protection Protected from non-seismic equipment in the vicinity X

e of the surge, tank which could fail in a seismic event and damage both trains of the surge tank.

Texas Utilities Generating Company; 84056 Page 3 of 3 Independent Assessment Program, Phase 4 l

i I'h(D jhi jp(hm Independent Design t

e El INVfjf Review Checklist AL 6 i Equipment: Campeddit._Ceeling lister

. w I

J. Foley/R. Hess Approver Eric van Stijgeren Checklist No.

WD-MS-02 Ccviewer I

pate 7/20/84 Satisfactory i

Item Yes No N/A Comments 1.

CCW Pump CP1-CCAPCC-01 (Design Data)

Pung nameplate affixed in accordance with X

e ASME Section III.

4 e

Correct safety class.

X Nameplate flow rate in accordance with specification.

X e

NPSH in accordance with specification.

X 1

e Nameplate pressure according to specification.

X e

Certified pump curve available at site, X

e per purchase specification Pump is piped in accordance with flow diagram.

X e

Pump is piped in accordance with isometrics.

X e

2.

CCW Pump CP1-CCAPCC-01 (Hazards Protection)

Fire Fire / smoke detection provided in vicinity of X

CCW pump.

h Page 1 of 3 Texas Utilities Generating Company; 84056 Independent Assessment Program, Phase 4

LLlggl f Independent Design

1) {,lldijd;"MlIp]l Review Checklist AL g

i i NNilNNINNNINNNNNil Equipment: Campos 4m,t Cooling, Water v n -- +-u n

Ccviewe, J. Foley/R. Hess Approv.,

Eric van Stijgeren Checklist No.

WD-MS-02 cat.

7/20/84 Satisfactory item Yes No N/A Comments 2.

CCW Pump CP1-CCAPCC-01 (Hazards Protection)

(continued)

Suppression equipment provided in vicinity of X

CCW pump.

Redundant trains protected from damage by a X

single fire.

Flood Lowest piece of equipment associated with CCW X

pung (drain valves, etc.) located above flood level.

No openings from floors above which could X

flood CCW pump.

Protected from a single flood that could damage both X

trains.

Missile Protection Protected from rotating equipment in vicinity X

which could generate a missile which could damage both trains.

j Texas Utilities Generating Company; 84056 Page 2 of 3 Independent Assessment Program, Phase 4

Independedt Design D.Elhj$j1!jyil Review Checklist ALni Equipment: Compon&dt' Cooling, Water I

Ib L, I

)

WD-MS-02 Eric van Stijgeren Checklist No.

J. Foley/R. Hess ap,,over

Rculewe, Date 7/20/84 Satisfactory Yes No NtA Commente item 2.

CCW Pump CP1-CCAPCC-01 (Hazards Protection)

(continued)

High Energy Line Breaks Protected from unrestrained high energy lines X

e which could rupture and damage both CCW pumps.

Seismic Protection Protected from non-seismic equipment in the vicinity X

e of the CCW pung which could fail in a seismic event and damage both CCW pumps.

i i

Page 3 of 3 Texas Utilities Generating Company; 84056 Independent Assessment Program, Phase 4

Independent Design kIh![THj Review Checklist g I e,,, fajj jf.;j{ y t

ni Fanal - ~ - ^. r

--- - r m 4mm unt.c temat j

' ~

Excitanger CPI-CCAHHK-01 Checkflet No. gg gg g3

^#'**

Eric van St11oeren C0:3*"

J, Foley/R. Hess 0* 7/20/84 Sedefectory item Yes No N/A Comments f,

t 1.

CCW Heat Exchanger CP1-CCAHHX-01 (Design Data)

X Nameplate affixed in accordance with e

ASE Section III.

Surface area in accordance with specification.

X e

X Heat exchanger N-stamped.

e X

e Correct safety class.

Design temperature in agreement with specification.

e X

a. Shell side.

X

b. Tube side.

Design pressure in agreement with specification.

e X

a. Shell side.

X

b. Tube side.

X e

Vents and drains.

X Component pipe'd in accordance with flow diagram.

o Component piped in accordance with isometric drawings.

X e

Texas Utilities Generating Company; 84056 p g, g of 3 Independent Assessment Program, Phase 4 0-

Independent Design g4rcy I/,r 1/

Review Checklist AL

'g I g E-k h2 t l*/

i i J

ii.

NummumuNumuuN Eauinment-r

-- ^ ra=11mm unter that excnenger 6rt A __.a-os ccviewer J, Foley/R. Hess Approver Eric van Stijgeren Checklist No.

WD.MS-03 Date 7/20/84 Setlefactory Item Yee No N/A Comanente 2.

CCW Heat Exchanger CPI-CCAHHX-01 (Hazards Protection)

Fire Fire / smoke detection provided in vicinity of X

e CCW heat exttinger.

Fire suppression equipment provided in vicinity of X

e CCW heat exchanger.

X Located in same room without Redundant trains protected from damage by a intervening fire barriers.

e single fire.

Acceptable due to lack of combustibles, spacing and availability of detection /

suppression equipment.

Fl ood Lowest piece of equipment associated with X

e CCW heat exchanger (drain valves, etc.)

l 1s located above flood level.

I No openings from floors above which could damage X

Opening from CCW pump room on e

floor above but heat exchanger both CCW heat exchangers.

i room volume will allow sufficient time to isolate leakage prior to

{

damaging heat exchanger.

l Texas Utilities Generating Company; 84056 Page 2 of 3 Independent Assessment Program, Phase 4

independent Design r

ALni Jh b, f }

  • 3 !

Review Checklist N

hl h :ij h

s 's D

Eani

-t:

r-^ - - - - - - t

  • 11mm Matar ' -t Exchanger
F1-CEAlslX-Ol j

Checklist No.

WD-MS-03 App'*

  • Eric van Stijgeren C=l***r J. Foley/R. Hess pete 7/20/84 i

Setlefectory Item Yes No N/A Comumente 2.

CCW Heat Exchanger CP1-CCAHHX-01 (Hazards Protection)

(continued)

Missile Protection l

e Protected from rotating equipment in vicinity X

which could generate a missile which could damage both trains?

High Energy Line Breaks Protected from unrestrained high energy lines in X

e the vicinity which could rupture and damage both CCW heat exchangers.

I Seismic Protection Protected from non-seismic equipment in the vicinity X

e which could fail in a seismic event and damage both trains of the CCW heat exchangers.

Texas Utilities Generating Company; 84056 Page 3 of 3 Independent Assessment Program, Phase 4 0

(

independent Design 1

Review Checklist p

')aa AL a8x 6 i d

e'c h>

Q{

Eauipment: Restdual Heat '

.i 55 nean tzcnanger isA

=-us j

Checklist No.

WD-MS-04 App'*'*'

Eric van Stijgeren Q:vlower J. Foley/R. Hess pate 7/20/84 Setlefactory Item Yes No N/A Commente e

1.

RHR Heat Exchanger 1BX-RHAHRS-01 (Design Data)

X Nameplate affixed in accordance with e

ASME Section III.

Surface area in agreement with specification.

X e

X i

e Heat exchanger N-stamped.

X e

Correct safety class.

Design temperature in agreement with specification.

e i

X

a. Shell side.

X

b. Tube side.

j 1

Design pressure in agreement with specification.

e X

a. Shell side.

X

b. Tube side.

X e

Vents and drains.

Component piped in accordance with flow diagram.

X e

l Component piped in accordance with isometric X

e drawi ng s.

Texas Utilities Generating Company; 84056 Page 1 of 3 Independent Assessment Program, Phase 4

Independent Design g,p-n gphgh!gj,jj,,

Review Checklist ALni e_ _ _,..--,.

' ~

Heat Exchanger 191-RHAES-01 i

Checklist No.

WD-MS-04

^ * *

Eric van Stilgeren C ;* "

J. Folev/R. Hess Date 7/20/84 I

Setlefectory item Yes No N/A Commente 1.

RHR Heat Exchanger TBX-RHAHRS-01 (Design Data)

(continued)

'l X

Located on CCW piping.

Safety / relief valves.

e 2.

RHR Heat Exchanger TBX-RHAHRS-01 (Hazards Protection)

Fire Fire / smoke detection provided in vicinity of X

e RHR heat exchanger.

Suppression equipment provided in vicinity of X

e RHR heat exchanger.

Redundant trains protected from damage by a X

e single fire.

F1ood Lowest piece of equipment associated with X

)

RHR heat exchanger (drain valves, etc.)

is located above flood level.

o i

No openings from floors above which could flood X

1 RHR heat exchangers.

Texas Utilities Generating Company; 84056 age 2 of 3 Independent Assessment Program, Phase 4

~

Independe'nt Design nn exEUM!NHY ae r a-vit

~

~

J 4 eat Exchanger TBK-RlWW5t5-01 checklist No.

k'D-MS-04 APPr*'*r Eric van Stijgeren R= lower J. Foley/R. Hess pe'* 7/20/84 Sett *sclory item Yes No N/A Commente l'

2.

RHR Heat Exchanger TBX-RHAHRS-01 (Hazards Protection)

(continued)

Protected from a sing 1e flood that could damage both X

e trains.

Missile Protection Protected from rotating equipment in vicinity which X

e could generate a missile and damage both trains.

High Energy Line Breaks Protected from unrestrained high energy lines X

e which could rupture and damage both RHR heat exchangers.

Seismic Protection Protected from non-seismic equipment in the vicinity X

e which could fail in a seismic event and damage both RHR heat exchangers.

Texas Utilities Generating Company; 84056 Page 3 of 3 Independent Assessment Program, Phase 4

t hhlm)m:h.Vn;$$4hl lf $

independent Design

>ilu Review Checklist m

rant----e.

r-e 1 - - - + h,. '-*

Exchanger CP1'-CTANC5-01 ChekHet No.

WD-MS-05 2008*

  • J. Foley/R. Hess

^#'**

Eric van Sttiaeren Date 7/20/84 Setlefactory item Yes No N/A Commente 1.

Containment Spray Heat Exchanger CP1-CTAHCS-01 (Design Data) 4 Nameplate affixed in accordance with X

e ASE Section III.

e Surface area in agreement with specification.

X e

Heat exchanger N-stamped.

X i

i e

Correct safety class.

X Design temperature in agreement with specification.

e

a. Shell side.

X

b. Tube side.

X Design pressure in agreement with specification.

f

a. Shell side.

X

b. Tube side.

X e

Vents and drains.

X Component is piped in accordance with flow diagram.

X e

e Safety / relief valves provided.

X Located on CCW pipeline.

Texas Utilities Generating Company; 84056 Page 1 of 3 Independent Assessment Program, Phase 4 a

i Independent Design Wra"El'l!j!h{tMt"!ak-Review Checklist n

NF i

din i

tELLsa

==

Equipment: Contalsument 'Serav Heat I;Rchanger bra-4,IRrm.3-U1

)

R:vlower J. Foley/R. Hess Approver Eric van Stijgeren Checkflet No.

WD-MS-05 cet* 7/20/84 Setlefactory 4

item Yes No N/A Commente 1.

Containment Spray Heat Exchanger CP1-CTAHCS-01 (Design Data) 8 (continued)

Component is piped in accordance with isometric X

e drawings.

2.

Containment Spray Heat Exchanger CPI-CTAHCS-01 (Hazards Protection)

Fire Fire / smoke detection provided in vicinity of X

e CS heat exchanger.

Suppression equipment provided in vicinity of X

CS heat exchanger.

Redundant trains protected from damage by a X

single fire.

\\

Flood Lowest piece 'of equipment associated with X

e CS heat exchanger (drain valves, etc.) located above flood level.

Texas Utilities Generating Cohpany; 84056 Page 2 of 3 Independent Assessment Program, Phase 4

Independent Design 00[l @lRM@i A Ol/

i h L L i!

Md1 Review Checklist ALn i e 'e WNNNNNNMMMMM rt e

e-t a t

- h:

-e 4

~ '

Exchanger cpl-CTANCS-01

~

checklist No. WD-MS-05 007 8'"

J. Foley/R. Hess

^#'**

Eric van St11aeren note 7/20/84 Setlefactory item Yes No N/A Commente i

2.

Containment Spray Heat Exchanger CPI-CTAHCS-01 (Hazards Protection)

(continued)

I No openings from flcors above which could flood X

e CS heat exchanger.

Protected from a single flood that could damage both X

e j

trains.

?

Missile Protection Protected from rotating equipment in vicinity X

l e

which could generate a missile which could damage both trains.

High Energy Line Breaks Protected from unrestrained high energy lines in X

e the vicinity which could rupture and damage both sides of CS heat exchangers.

i Seismic Protection Prg)ected from' non-seismic equipment in the vicinity X

I e

which could fail in a seismic event and damage both CS heat exchangers, Texas Utilities Generating Company; 84056 age 3 of 3 Independent Assessment Program, Phase 4

0)d1IUbO.MiljOIff1?fiiADU 3i Independent Design Review Checklist A..Lni

==

rant _

a content --- att ChtU er Condenser CPK-VAACCR-01 CheckHet No. WD-MS-06 RC'8'"

J. Foley/R. Hess

^##'over Eric van Stij geren pate 7/20/84 Setlefactory i

item Yes No N/A Comatonte 1.

Control Room A/C Chiller Condenser CPX-VAACCR-01 l

(Design Data) i Nameplate afftxed in accordance with X

l e

ASE Section III.

Surface area agreement with specification.

X None listed on name plate. Not e

required by TENA.

Heat exchanger N-stamped.

X X

e Safety class correct.

4 Design temperature in agreement with specification.

e j

-I

a. Shell side.

X

b. Tube side.

X i

Design pressure in agreement with specification.

e

a. Shell side.

X X

a

b. Tube side.

e Vents and drains.

X i

Component is piped in accordance with flow diagram.

X e

Component is piped in accordance with isometric drawings, X e

Texas Utilities Generating Company; 84056 Page 1 of 3 Independent Assessment Program, Phase 4 w

Independent Design

[

hs!.e Review Checklist

AL t i 1

Equipment: Control W.A/C Chiller Condenser CPK-VAACCit-01 Ccviewer J. Foley/R. Hess Approver Eric van Stijgeren Checklist No.

WD-MS-06 cete 7/20/84 I

i i

Satisfactory item Yes Ne N/A Commente 2

Control Room A/C Chiller Condenser CPX-VAACR-01 (Hazards Protection)

Fire Fire / smoke detection provided in vicinity of X

e control room A/C chiller condenser.

Suppression equipment provided in vicinity of X

l e

control room A/C chiller condenser.

J Redundant trains protected from simultaneous X

e i

damage by single fire.

j F1ood I

Lowest piece of equipment associated with control X

e room A/C chiller condenser (drain valves, etc.)

Iocated above flood ievel.

No openings from floors above which could flood X

e 1

control room A/C chiller condenser.

i i

Protected from a single flood that could damage X

e both trains.

i j

Texas Utilities Generating Company; 84056 Page 2 of 3 1

l Independent Assessment Program, Phase 4 I

Independe'nt Design Oh. [l $f j!his f ll Review Checklist i

i AL t i

'bb

}(A Equipment: Control N A/C Chiller Comdenser CPK-VAACCR-01 0: viewer J. Foley/R. Hess Approver Eric van Stijgeren checkiset *#S.

Wu-MS-06 oste 7/20/84 Satisfactory item Yes No N/A Commente 2

Control Room A/C Chiller Condenser CPX-VAACR-01 (Haza Ns Protection)

(continued)

Missile Protection e

Protected from rotating equipment in vicinity X

which could generate a missile which could damage both trains.

High Energy 1.ine Breaks Protected from unrestrained high energy lines in the X

e vicinity which could rupture and damage both control room A/C chiller condensers.

Seismic Protection Protected from non-seismic equipment in the vicinity X

e which could fail in a seismic event and damage both trains of the control room A/C chiller condenser.

Page 3 of 3 Texas Utilities Generating Company; 84056 Independent Assessment Program, Phase 4

Independent Design DQ' g.iijAhy Review Checklist j

ALn i

!II

,Ij?Id Y, j

Equipment: Nuclear Chifle'd Water Systg,

A,, cover Eric vaIStijgeren Checklist No. WD-MS-07 C:viewe, J. Foley/R. Hess oste 7/20/84 Sallefactory item Yes No N/A Comments 4

I 1.

Nuclear Chilled Water System Chiller Condenser CP1-CHCICE-05 (Design Data)

Nameplate affixed in accordance with ASME Section III.

X Surface area agreement with specification.

X Not listed on name plate. Not required by TEMA.

Condenser N-stamped.

X Correct safety class.

X Design temperature in agreement with specification.

a. Shell side.

X

b. Tube side.

X Design pressure in agreement with specification.

i

a. Shell side.

X

b. Tube side.

X Vents and drair3.

X Component is piped in accordance with flow diagram.

X Component is 'ptped in accordance with isometric X

drawings.

Texas Utilities Generating Company; 84056 Page 1 of 3 Independent Assess aent Program, Phase 4

.a k

gl gg"! phdljhh Lfu. 3 Qif Independent Design y '[ $ p" Review Checklist ALn2

~

" *"m'm""" "

Equipuent: g ear ChiTied Water Sg tem,

WD-MS-07

d. Poley/M He5S Appsove, Eric van Stijgeren CheckHet No.

e, s...,

Date 7/20/84 Setlefactory Item Yes No N/A Cosasnente l'

q 2.

Nuclear Chilled Water System Chiller Condenser CP1-CHCICE-05 (Hazards Review)

Fire 4

Fire / smoke detection provided in vicinity of X

chiller condenser.

Suppression equipment provided in vicinity of X

chiller condenser.

Redundant trains protected from damage by a X

Double fire doors between rooms single fire.

115A & B do not have U.L. identi-fication tag. Proper doors were on order. Subsequent Cygna rein-spection verified proper doors were installed.

Flood Lowest piece of equipment associated with X

chiller condenser (drain valves, etc.)

located above flood level.

No openings from floors above which could flood X

chiller condenser area.

Protected from a single flood that could damage both X

~

trains.

\\

Page 2 of 3 Texas Utilities Generating Coinpany; 84056 Independent Assessment Program, Phase 4

~

Independent Design gg,ghu, l

Review Checklist

ghg, i

Equipment: Nuclear ChillM Water System

=

bra _r_i d ds' beuvvvus _ _ _ _ _ _:= s

u. toiey/M. ness ap,,,,,,Eric van Stijgeren Citeckflet No. WD-MS-07 g.g,

Date 7/20/84 Setlefactory item Yes No N/A Commente 2.

Nuclear Chilled Water System Chiller Condenser CP1-CHCICE-05 (Hazards Review)

(continued) i Missile Protection Protected from rotating equipment in vicinity X

which could generate a missile and damage both trains.

High Energy Line Breaks Protected from unrestrained high energy lines in X

the vicinity which could rupture and damage both chiller condensers.

)

Seismic Protection 4

Protected from non-seismic equipment in the vicinity X

which could fail in a seismic event and damage both chiller condensers.

1 i

Page 3 of 3 Texas Utilities Generating Company; 84056 Independent Assessment Program, Phase 4 x

I Independent Design P{(("pld]hh*P\\f if fii' Review Checklist ALti g

sif guuuuuuuuuuuuun Equipment: Piping Ocviewer J. Foley/R. Hess Approver E. van Stijgeren CheckHet No.

WD-MS-08 Date 7/20/84 l

k 8ellefectory Item Yes No N/A Commente 6-1.

8RP-CC-1-AB-046 Rev. 7 a.

6"-CC-1-948-152-3 (1) Visually review piping runs for geometry X

and approximate length (2) Check approximate locations and orientation X

of valves (3) Check branch connections off pipe run X

b.

6"-CC-1-07-152-3 (1) Visually review piping runs for geometry X

and approximate length (2) Check approximate locations of valves X

(3) Check branch connections off pipe run X

2.

BRP-CC-1-A8-030 Rev. 8 a.

6"-CC-1-07-152-3 (1) Visually review piping runs for geometry X

and approximate length (2) Check approximate locations and orientation X

No valves, of valves (3) Check branch connections off pipe run X

Texas Utilities Generating Company; 84056 Page 1 of 15 Independent Assessment Program, Phase 4

Independent Design e

v Y

l t

Equipment: Pipine Cxte=or J. Foley/R. Hess Approver E. van Stijgeren Checkitet No.

WD-MS-08 t

cate 7/20/84 Sallefactory Item Yes No N/A Commente 1

3.

BRP-CC-1-AB-003 Rev. 16 a.

24"-CC-1-15-152-3 (1) Visually review piping runs for geometry X

and approximate length (2) Check approximate locations and orientation X

No valves.

of valves (3) Check branch connections off pipe run X

b.

24"-CC-1-10-152-3 i

(1) Visually review piping runs for geometry X

and approximate length (2) Check approximate locations and orientation X

of valves (3) Check branch connections off pipe run X

c.

24"-CC-1-08-152-3 (1) Visually review piping runs for geometry X

and approximate length (2) Check approximate locations and crientation X

No valves.

of valves (3) Check branch connections off pipe run X

Texas Utilities Generating Company; 84056 Page 2 of 15 Independent Assessment Program, Phase 4

I Independent Design

[SIjl@' Mf

)?;

1 d L ilifff!) d f[, [

Review Checkl,is.t AL j

t i Equipment: Piping

' ~ ' - - - - -

l cas w.c J. Foley/R. Hess Approver E. van Stijgeren Checkflet No.

WD-MS-08 cate 7/20/84 i

I 8ellefactory item Yes No N/A Commente 4.

BRP-CC-1-AB-007 Rev. 13 a.

10"-CC-1-09-152-3 (1) Visually review piping runs for geometry X

and approximate length i

(2) Check :pproximate locations and orientation X

of valves (3) Check branch connections off pipe run X

b.

2"-CC-1-013-152-3 (1) Visually review piping runs for geometry X

and approximate length (2) Check approximate locations and orientation X

of valves (3) Check branch connections off pipe run X

j c.

2"-CC-1-071-152-5 (1) Visually review piping runs for gecmetry X

and approximate length (2) Check approximate locations and orientation X

3 i

of valves (3) Check branch connections off pipe run X

Texas Utilities Generating Company; 84056 Page 3 of 15 Independent Assessment Program Phase 4

2)[l!ldu;1pi pjjjjjj Independent Design l

NLc Review Checklist AL t i

,i.-

Hungsamengest f

Equipment: Piping c:cviewer J. Foley/R. Hess Approver E. van Stijgeren Checklist No.

lA)-MS-08 Date 7/20/84 Setlefectory Item Yes No N/A Commente d.

2"-CC-1-072-152-5 (1) Visually review piping runs for geometry X

and approximate length X

No valves.

(2) Check approximate locations and orientation of valves (3) Check branch connections off pipe run X

e.

2"-CC-1-14-152-3 (1) Visually review piping runs for geometry X

and approximate length (2) Check approximate locations and orientation X

of valves (3) Check branch connections off pipe run X

5.

BRP-CC-1-AB-005 Rev. 18 a.

24"-CC-1-19-152-3 (1) Visually review piping runs for geometry X

and approximate length (2) Check approximate locations and orientation X

of valves (3) Check branch connections off pipe run X

Texas Utilities Generating Company; 84056 Page 4 of 15 Independent Assessment Program, Phase 4 0

D jj gi7 Independent Design 1N[)L[iLi[djijftji.!gj "}rg f Review Checklist

,oL 6 i Equipment: Piping ' ' '. '

et,s...e J. Foley/R. Hess Approver E. van Stijgeren CheckHet No.

WD-MS-08 i

este 7/20/84 Setlefactory Item Yes No N/A Commente b.

24"-CC-1-51-152-3 (1) Visually review piping runs for geometry X

and approximate length-i (2) Check approximate locations and orientation X

of valves (3) Check branch connections off pipe run X

6.

BRP-CC-1-AB-009 Rev. 12 a.

24"-CC-1-19-152-3 X

(1) Visually review piping runs for geometry and approximate length (2) Check approximate locations and orientation X

of valves (3) Check branch connections off pipe run X

l 7.

BRP-CC-1-AB-013 Rev. 17 l

a.

24"-CC-1-020-152-3 X

1 (1) Visually review piping runs for geometry and approximate length l

(2) Check approximate locations and orientation X

of valves (3) Check branch connections off pipe run X

Page 5 of 15 Texas Utilities Generating Codpany; 84056 Independent Assessment Program, Phase 4

~~

D W# g Independent Design Iv{I[.(tj:gjfi!.djl.l/[

Review Checklist

~:

  1. l i J J Equipment: Piping

~. -

NMMMNMMMMillli

- ~ _ _

c: viewer J. Foley/R. Hess Approver E. van Stijgeren chechtset No.

WD-MS-08 oste 7/20/84 Setlefactory Yes No N/A Commente item a

b.

24"-CC-1-28-152-3 X

(1) Visually review piping runs for geometry and approximate length X

(2) Check approximate locations and orientation of valves (3) Check branch connections off pipe run X

8.

BRP-CC-1-AB-049 Rev. 13 a.

24"-CC-1-28-152-3 X

(1) Visually review piping runs for geometry and approximate length X

No valves.

(2) Check approximate locations and orientation of valves (3) Check branch connections off pipe run X

b.

8"-CC-1-48-152-3 X

(1) Visually review piping runs for geometry and approximate length X

No valves, (2) Check approximate locations and orientation of valves (3) Check branch connections off pipe run X

l Page 6 of 15 Texas Utilities Generating Company; 84056 l

Independent Assessment Program, Phase 4 nf

s

/ h/[, N-IMgpo independent Design p; c I-f4sjf'9/jp! [!/

f Review Checklist N

s il

/

Equipment: Piping ' ' '.

w.,

WD-MS-08 J. Foley/R. Hess

Approve, E. van Stijgeren Checklist N..

ge,s...,

pote 7/20/84 Setlefactory Yes No N/A Comanente item c.

4"-CC-1-138-152-3 (1) Visually review piping runs for geometry X

and approximate length X

No valves.

(2) Check approximate locations and orientation of valves (3) Check branch connections off pipe run X

9.

BRP-CC-1-AB-060 Rev. 15 a.

4"-CC-1-138-152-3 X

(1) Visually review piping runs for geometry and approximate length (2) Check approximate locations and orientation X

of valves (3) Check branch connections off pipe run X

10. BRP-CC-1-EC-018 Rev. 9 a.

4"-CC-1-138-152-3 X

(1) Visually review piping runs for geometry and approximate length X

No valves.

(2) Check approximate locations and orientation of valves (3) Check branch connections off pipe run X

Page 7 of 15 Texas Utilities Generating Company; 84056 Independent Assessment Program, Phase 4

Independent Design

~

t 4L n i L

g gd$

Review Checklist E

bIh, e '- '

WilllllllllllllHillllNI J

Equipment: Piping

-.J noviewei J. Foley/R. Hess a,,,over E. van Stijgeren CheckHet No.

E-MS-08 Date 7/20/84 e'

Setlefactory Item Yes No N/A Commente

{.i.

b.

3"-CC-1-136-152-3 (1) Visually review piping runs for geometry X

and approximate length (2) Check approximate locations and orientation X

of valves (3) Check branch connections off pipe run X

c.

3"-CC-1-137-152-3 (1) Visually review piping runs for geometry X

and approximate length (2) Check approximate locations and orientation X

of valves (3) Check branch connections off pipe run X

11. BAP-CC-1-EC-019 Rev. 9 a.

3"-CC-1-136-152-3 (1) Visually review piping runs for geometry X

and approximate length (2) Check approximate locations and orientation X

of valves (3) Check branch connections off pipe run X

Page 8 of 15 Texas Utilities Generating Company; 84056 Independent Assessment Program, Phase 4

-l-H ~'d;;, lL h f $U(( j j ji Q '.-:'. i.*. 'f f. '. *[

1 i

+4

.p y

g f

  • f '#iIiIEl Independe'nt Design Review Checklist M6 Equipment: Piping ,.

[

i E-M-N I

L. van 5tijgeren ch eksi.: we, J. Poley/M. Mess Approver Cb'

  1. I I Date Setlefactory Iteen Yes No N/A Coensnents
12. BRP-CC-1-EC-002 Rev. 12 a.

6"-CC-1-40-152-3 X

(1) Visually review piping runs for geometry and approximate length (2) Check approximate locations and orientation X

of valves (3) Check branch connections off pipe run X

b.

3"-CC-1-951-152-3 X

(1) Visually review piping runs for geometry and approximate length (2) Check approximate locations and orientation X

of valves (3) Check branch connections off pipe run X

i

13. 8RP-CC-1-A8-008 Rev. 16 a.

24"-CC-1-70-152-3 X

(1) Visually review piping runs for geometry and approximate length (2) Check approximate locations and orientation X

of velves (3) Check branch connections off pipe run X

Page 9 of 15 Texas Utilities Generating Company; 84056 Independent Assessment Program, Phase 4

dp.

NsL]e. (3 rd-Qg!

pI.

Independent Design Ql.

Review Checklist A1 6 i j

!c m

r.;

~

CheckHet No.

WD-MS-08

^**'*

  • E. van Stiiaeren C"8'"

J. Foley/R. Hess 88

7/20/84 Setlefactory Item Yes No N/A Comments 14 BRP-CC-1-A8-041 Rev. 10 a.

16"-CC-1-158-152-3 (1) Visually review piping runs for geometry X

and approximate length X

No valves.

(2) Check approximate locations and orientation of valves (3) Check branch connections off pipe run X

b.

12"-CC-1-159-152-3 (1) Visually review piping runs for geometry X

and approximate length X

No valves.

(2) Check approximate locations and orientation of valves (3) Check branch connections off pipe run X

15. ??r-CC-1-SB-009 Rev. 8 a.

12"-CC-1-159-152-3 X

(1) Visually review piping runs for geometry and approximate length X

No valves.

(2) Check approximate locations and orientation of valves (3) Check branch connections off pipe run X

1 Texas Utilities Generating Company; 84056 Page 10 of 15 Independent Assessment Program, Phase 4

r

~*

%. _m independent Design

\\

g n.

Review Checklist unna' ann

}

[j#j e

L Ln i d.cu!ji n ~

/

u v.

v--

~

_N ChckHet No.

WD-MS-08

^ P"'

  • E. van Sti.ir.eren C;***'

J. Foley/R. Hess 88

7/20/84 Setlefactory item Yes No N/A C m Me

16. 8RP-CC-1-SB-008 Rev. 15 a.

12"-CC-1-159-152-3 (1) Visually review piping runs for geometry X

and approximate length X

No valves.

(2) Check approximate and orientation locations of valves (3) Check branch connections off pipe run X

b.

8"-CC-1-160-152-3 (1) Visually review piping runs for geometry X

and approximate length X

No valves.

(2) Check approximate locations and orientation of valves (3) Check branch connections off pipe run X

c.

8"-CC-1-250-152-2 (1) Visually review pipitig runs for geometry X

and approximate length (2) Check approximate locations and orientation X

of valves (3) Check branch connections off pipe run X

]

l Texas Utilities Generating C6mpany; 84056 Page 11 of 15 Independent Assessment Program', Phase 4 nl

4

(

~ -*

Sf>jj hy Independent Design olI Review Checklist i

di 6,

it-gungenmuumenu Eeuipment: Pisine Ccviewer J. Foley/R. Hess Approver E. van Stijgeren Checkflet No.

IdD-MS-08 pate 7/20/84

,,t Setlefactory Item Yes No N/A Commente

17. BRP-CC-1-R8-049 Rev. 12

~'

a.

8"-CC-1-250-152-2 (1) Visually review piping runs for geometry X

and approximate length l

(2) Check approximate locations and orientation X

of valves (3) Check branch connections off pipe run X

i b.

8"-CC-1-249-152-3 (1) Visually review piping runs for geometry X

l and approximate length i

(2) Check approximate locations and orientation X

of valves (3) Check branch connections off pipe run X

c.

6"-CC-1-246-152-3 (1) Visually review piping runs for geometry X

and approximate length X

No valves, (2) Check approximate locations and orientation of valves (3) Check branch connections off pipe run X

i j

i Texas Utilities Generating Company; 84056 Page 12 of 15 Independent Assessment Program, Phase 4

Independent Design

]

D D j"l * "

y gd Review Checklist I bIl"F,)i

[a t l AL t.,

12 Eautemmet: Pinine f

CheckNet No.

g.M$.gg Appr*r E. van Stijgeren j

C owl * ***

J. Foley/R. Hess Det*

7/20/84 l'

Setlefactory Yes No N/A Commente item i

18. BRP-CC-1-RB-033 Rev. 12 4

a.

4"-CC-1-255-152-3 (1) Visually review piping runs for geometry X

and approximate length X

No valves.

l (2) Check opproximate locations and orientation of valves l

(3) Check branch connections off pipe run X

b.

2"-CC-1-267-152-3 X

}

(1) Visually review piping runs for geometry and approximate length X

No valves.

(2) Check approximate locations and orientation i

of valves (3) Check branch connections off pipe run X

I c.

2"-CC-1-252-2503-3 X

(1) Visually review piping runs for geometry and approximate length (2) Check approximate locations and orientation X

4 of valves l

(3) Check branch connections off pipe run X

1 4

4 Texas Utilities Generating Company; 84056 Page 13 of 15 Independent Assessment Program, Phase 4 I

ppg ggrh+h;fyinl/h, independent Design libufp ai!agn Review Checklist AL t i r

,e ggunnummumpuu Equipment: Piping

+

~~

R: viewer J. Foley/R. Hess Approver E. van Stijgeren Checklist No.

WD-MS-08 oste 7/20/84 Setlefactory item Yes No N/A Commente

{

1

19. " '-CC-1-RB-001 Rev. 8 i

2"-CC-1-252-2503-3 (1) Visually review piping runs for geometry X

4 and approximate length (2) Check approximate locations and orientation X

No valves.

of valves (3) Check branch connectfons off pipe run X

b.

1-1/2"-CC-1-282-2503-3 (1) Visually review piping runs for geometry X

and approximate Icagth (2) Check approximate locations and orientation X

No valves.

of valves i

(3) Check branch connections off pipe run X

l

20. BRP-CC-1-RB-036 Rev. 12 i

4 a.

4"-CC-1-257-152-3 (1) Visually review piping runs for geometry X

and approximate length (2) Check approximate locations and orientation X

of valves j

(3) Check branch connections off pipe run X

j Texas Utilities Generating Company; 84056 Page 14 of 15 Independent Assessment Program, Phase 4

' %,~

e ) [ ] l;] y ~ [f /

Independeht Design ELLijy[;jlp{[

j;; -

i Review Checklist

L4 L g i L

Equipment: Piping d

Cowlewer J. Foley/R. Hess Approver E. van Stijgeren Checkilet No.

WD-MS-08 Det*

7/20/84 i

Setlefectory l

itsen Yes No N/A Commente

{

f J.

4 b.

3"-CC-1-264-152-3 j

(1) Visually review piping runs for geometry X

and approximate length X

No valves.

(2) Check approximate locations and orientation of valves (3) Check branch connections off pipe run X

c.

3"-CC-1-256-152-3 (1) Visually review piping runs for geometry X

and approximate length

)

(2) Check approximate locations and orientation X

No valves.

i of valves (3) Check branch connections off pipe run X

l

)

21. BRP-CC-1-RB-037 Rev.14 a.

3"-CC-1-260-152-3

~

(1) Visually review piping runs for geometry X

and approximate length j

(2) C'eck approximate locations and orientation X

i

o. valves (3) Check branch connections off pipe run X

i i

I l

Texas Utilities Generating Company; 84056 Page 15 of 15 Independent Assessment Program, Phase 4 l

i

j f fd[!G;3 jy!

Independent Design

---l-"MSMNYNig Review Checklist i

i '- '

NNMMNNNMENNNN

-.~%---

Equipment: Component Cooling Water Valves ccviewer J. Foley/R. Hess Approver Eric van Stijgeren Checklist No.

WD-MS-09 pate 7/20/84 Setlefactory Item Yee No N/A Commente 4

i 1.

1 HV-4527 l

a.

Correct valve type specified for this application.

X b.

Valve "N" stamped per ASE code.

X i

c.

Safety class properly specifled.

X i

d.

Valve size specified as per flow diagram.

X Application suitable for intended function.

X e.

f.

For power operated valves, operator is as specified.

X 7.

1 HV-4526 i

4 a.

Correct valve type specified for this application.

X b.

Valve "N" stamped per ASE code.

X No tag on valve. However, trace-ability to valve data package l

exists via valve identification l

and serial nuder. This is acceptable per ASME Code.

c.

Safety class properly specified.

X No tag on valve. However, trace-ability to valve data package exists via valve identification and serial nu d er. This is acceptable per ASME Code.

j d.

Valve size specified as per flow diagram.

X Application suitable for intended function.

X e.

f.

For power operated valves, operator is as specified.

X j

Texas Utilities Generating Company; 84056 page 1 of 9 Independent Assessment Program, Phase 4

N~

Independent Design

!f{t!l"'j Review Checkl,ist Lt.,a,jbg i

,_,-m.

~~%

ChckNet No.

WD-MS-09 J. Folev/R. Hess

'** Eric van Sti.ioeren 8*'*

7/20/84 i'

Satisfactory j.

it..

v..

u.

nia c

nie i

3.

1 FV-4650 Correct valve type specified for this application.

X X

No tag on valve. However, trace-a.

b.

Valve "N" stamped per ASE code.

ability to valve data package exists via valve identification and serial number. This is acceptable per AS:9E Code.

X No tag on valve. However, trace-c.

Safety class properly specified.

ability to valve data package exists via valve identification and serial number. This is acceptable per ASME Code.

d.

Valve size specified as per flow diagram.

X X

Application suitable for intended function.

e.

f.

For power operated valves, operator is as specified.

X

)

l 4.

ICCP-HV-4515 Correct valve type specified for this application.

X a.

X b.

Valve "M" stamped per ASE code.

X Safety class properly specified.

c.

X d.

Valve size specified as per flow diagram.

X Application suitable for intended function.

e.

X f.

For power operated valves, operator is as specified.

Texas Utilities Generating Coinpany; 84056 Fage 2 of 9 Independent Assessment Program,' Phase 4

r Independent Design S

,E l

Review Checklist

[_ (id *_! jj " !i pJy AL i i g}k fjj}f<

i

, r numannan Eaul- - :: C

-- t caniten unter Valves

  • ^-

CheckNet No.

WD-MS-09

^##

Eric van Stijgeren J. Foley/R. Hess D*'*

7/20/84 Setlefactory l

Item Yee No N/A Commente i

5.

ICCP-HV-4514 Correct valve type specified for this application.

X a.

b.

Valve "M" stamped per ASE code.

X c.

Safety class properly specified.

X d.

Valve size specified as per flow diagram.

X Application suitable for intended function.

X e.

l f.

For power operated valves, operator is as specified.

X i,

i 6.

ICC-023 i

a.

Correct valve type specified for this appitcation.

X i

b.

Valve "N" stamped per ASME code.

X No tag on valve. However, trace-ability to valve data package l

exists via valve identification j

and serial number. This is acceptable per ASME Code.

X No tag on valve. However, trace-c.

Safety class properly specified.

ability to valve data package exists via valve identification and serial number. This is acceptable per ASME Code.

l d.

Valve size specified as per flow diagram.

X e.

Application suitable for intended function.

X l

f.

For power operated valves, operator is as specified.

X Manual.

i l

Texas Utilities Generating Comp'any; 84056 Page 3 of 9 Ind: pendent Assessment Program, Phase 4 l-

%g

$Pt T

Independent Design m/~3 [2./n/gf Av1

}y f fl/

Review Checklist f f i

4Ln i

a.:.,.....

i

-~~

^*"' Eric van StiEaeren Checkilet No.

WD-MS-09 C*"

J. Folev/R. Hess D*

7/20/84 i

Setlefectory 1

Yes No N/A Comunente Item I

7.

CPI-CVSS-01 4

a.

Correct valve type specified for this application.

X b.

Valve "N" stamped per ASE code.

X c.

Safety class properly specified.

X d.

Valve size specified as per flow diagram.

X

)

e.

Application suitable for intended function.

X f.

For power operated valves, operator is as specified.

X Vacuum breaker.

4 I

8.

1-CC-020

\\

a.

Correct valve type specified for this application.

X j

l b.

Valve "N" stamped per ASE code.

X c.

Safety class properly specified.

X Two tags on valve; ASME tag i

indicates Class 3; CPSES tag indicates Class 2 relief valve.

l CPSES tag was incorrect and has been subsequently changed.

d.

Valve size specified as per flow diagram.

X e.

Application suitable for intended function.

X f.

For power operated valves, operator is as specified.

X i

i i

Texas Utilities Generating Company; 84056 p g, 4 og 9 Independent Assessment Program, Phase 4 I

E Independent Design

- ~. _

(p pn ps q

Ni ilO Review Checklist AL L L I Nt b* *. a n 6 i i

,e-mammamuna e

I5 Eeuipment: Censonant Cooline Water Valves

~

^-

J l

C vie **r J. Foley/R. Hess A p8"****

Eric van Stijgeren CheckNet No.

WD-MS-09 Det*

7/20/84 l

Setlefactory Item Yes No N/A Cominente g

i.

l 9.

1-RV-4508 i

a.

Correct valve type specified for this application.

X i

b.

Valve "N" stamped per ASE code.

X i

c.

Safety class properly specified.

X d.

Valve size specified as per flow diagram.

X l

e.

Application suitable for intended function.

X j

f.

For power operated valves, operator is as specified.

X I

l

10. 1-av-4574 l

However PET Tag indicates Unit 2.

l a.

Correct valve type specified for this application.

X (Permanent Equipment Transfer),has b.

Valve "N" stamped per ASE code.

X c.

Safety class properly specified.

X transferred valve to Unit 1.

i d.

Valve size specified as per flow diagram.

X e.

Application suitable for intended function.

X j

f.

For power operated valves, operator is as specified.

X e

i Texas Utilities Generating Company; 84056 Page 5 of 9 Independent Assessment Program, Phase 4

~ ~ -

Dpp, [Wiih no~[ ~

- s Independent Design Review Checklist ff *4Il6Nvq3g l i i oLn i

yV c-Eaut----

- r

- - - - - - r==11 mm " ^ me um1===

nummmmmma

/

CheckHot No.

WD-MS-09

^P*

  • Eric an Stijgeren CC***'

J. Foley/R. Hess D*

7/20/84

{

Setlefactory Yes No N/A Commente item

.i

11. 1-CC-031 X

Correct valve type specified for this application.

X No tag on valve. However, trace-a.

b.

Valve "N" stamped per ASE code.

ability to valve data package exists via valve identification and serial number. This is acceptable per ASME Code.

X No tag on valve. However, trace-Safety class properly specified.

ability to valve data package c.

exists via valve identification j

and serial number. This is acceptable per ASE Code.

X d.

Valve size specified as per flow diagram.

X Application suitable for intended function.

X e.

f.

For power operated valves, operator is as specified.

4 l

12.

ICC-694 X

Correct valve type specified for this application.

X No tag on valve. However, trace-a.

b.

Valve "N" stamped per ASME code.

ability to valve data package l

exists via valve identification and serial number. This is acceptable per ASME Code.

s

.l l

Page 6 of 9 Texas Utilities Generating Company; 84056 Independent Assessment Program, Phase 4 1

7

~

w.u

,~_

Pi lla ffhj}/

Independent Design i

"I j

Lunl[

/

Review Checklist dLn i

i N ___"~~ N Equipment: Component C$oline Mater Valves ggungnugungens ccviewer J. Foley/R. Hess Approver Eric van Stijgeren Checknet No.

ilD-MS-09 pate 7/20/84 Setiefactory Yes No N/A Commente Item X

No tag on valve. However, trace-Safety class properly specified.

ability to valve data package c.

exists via valve identification and serial number. This is acceptable per ASME Code.

X d.

Valve size specified as per flow diagram.

X Application suitable for intended function.

l e.

X Manual stop check.

f.

For power operated valves, operator is as specified.

13. ICC-896 Correct valve type specified for this application.

X X

No tag on valve. However, trace-a.

b.

Valve "N" stamped per ASE code.

ability to valve data package exists via valve identification and serial number. This is acceptable per ASME Code.

X No tag on valve. However, trace-Safety class properly specified.

ability to valve data package c.

exists via valve identification and serial number. This is acceptable per ASME Code.

X d.

Valve size specified as per flow diagram.

X Application suitable for intended function.

e.

X Manual.

f.

For power operated valves, operator is as specified.

i Page 7 of 9 Texas Utilities Generating Company; 84056 j

Independent Assessment Program, Phase 4

r ~ ~.

' N ~~~~

1 Independent Design l Q {g}"M v Ede!33! ! 9 %/

l r g g>

  • y g, l Review Checklist il n. i

/ Ia

"'I

.: tg j'*l

a. 4i

/

i Eauisment: Camoenamt b.liam " ^ =r Valves imungsmuseum

%'~----

' ~ )'

Checklist No.

WD-MS-09

?

Cowie ***

J. Foley/R. Hess App'* Eric van Stijgeren Det' 7/20/84 Setlefactory Item Yes No N/A Commente

14. ICC-713 a.

Correct valve type specified for this application.

X X

No tag on valve. However, trace-b.

Valve "N" stampad per ASE code.

ability to valve data package exists via valve identification and serial number. This is acceptable per ASME Code.

X No tag on valve. However, trace-c.

Safety class properly'specified.

ability to valve data package exists via valve identification and serial number. This is acceptable per ASME Code.

d.

Valve size specified as per flow diagram.

X X

Application suitable for intended function.

e.

X Manual.

f.

For power operated valves, operator is as specified.

15. HV-4699 a.

Correct valve type specified for this application.

X X

No tag on valve. However, trace-b.

Valve "M" stamped per ASE code.

ability to valve data package exists via valve identification and serial number. This is acceptable per ASME Code.

Texas Utilities Generating Co'mpany; 84056 Page 8 of 9 Independent Assessment Program,' Phase 4

h!,S]

Independent Design

/

g

~d"h;!;#i ti [

f Review Checklist AL i i segugunganggang

%,'NI Equipment: Canyonent Cobling Water Valves ccviewer J. Foley/R. Hess Approver Eric van Stijgeren CheckHet No.

WD-MS-09 Date 7/20/84 t

Sallefactory Item Yes No N/A Comments i

l c.

Safety class properly specified.

X No tag on valve. However, trace-i:

ability to valve data package exists via valve identification i

and serial number. This is l

acceptable per ASME Code.

i, l

d.

Valve size specified as per flow diagram.

X e.

Application suitable for intended function.

X l

f.

For power operated valves, operator is as specified.

X i

16. HV-4700 a.

Correct valve type specified for this application.

X b.

Valve "M" stamped per ASE code.

X No tag on valve. However, trace-ability to valve data package exists via valve identification and serial number. This is l

acceptable per ASME Code.

c.

Safety class properly specified.

X No tag on valve. However, trace-ability to valve data package exists via valve identification and serial number. This is acceptable per ASME Code.

d.

Valve size specified as per flow diagram.

X j

e.

Application suitable for intended function.

X f.

For power operated valves, operator is as specified.

X i

Texas Utilities Generating Compiny; 84056 Page 9 of 9 i

Independent Assessment Program, Phase 4

C 6 h /,s

/

To:

D o cd mEc4T Co 4TR_c t F(Lc b '.

$. S. So cNe (I y 2. 7 0 5 7 i

C pc~ Re.vas (Phsse 4)ComackePesk sasaect:

y do c~nte n D :

Alb.c(tecf is the fal(ad.h3 b}'$Al// W $ S, & O Y*W y' /ghWJ, faz w % 9 DLLsb9 7 9l t/ / 2 6 { &

g 3j / 9YT "77 pgg&

p,/ar/& n

'f)2u/Mismi saa elseLied aWy Please chbi f ~fe a2 -Rr((ca.s :

Reg Rfe LB't,/ou 3.8. Saaell(y) n(Rc POK Me&/oE O.7er~o LPDR.

sc ES/pc F.Ains/d; Al Ti.3

/D c G. Bayett,-

EGLey/DS L A5tc Pst3 O. CA cjo rn f<e3. t e n / v' ICs IS/D si M. Li Repn i v': D. Ihn,'edt EGc6/ZE J.Fdr 6 E t O.'

S. 7?eIvy Q UA /SflE J. S rawl p

Ect 8/o E v'. t6eaan dR6 3 /D L

c. h.,n e //

P/' Der L., Sh o ICs 8/DSI J. Co.fvo

--