APPENDIX Q

ELEC1RICAL MALKDOW CHECKLIST Checklist No.

Content WD-EE-01 All Equipment in Scope

- - ~ ~ ~ - -

~

~ x

,e f

- ~. -...

8505290637 850503 PDR ADOCK 05000455

)

A PDR Texas Utilities Generating Company Independent Assessment Program, Phase 4 k.

k A Final Report TR-84056-01, Rev. O m m M Nm milm M W 4

Independent Design Aldi Review Checklist

==

FIFcfulCAL = a rw ertIST Checklist No.

WD-EE-01 R;viewe' R. Uhlar/T. R. Martin AP8

E. van Stijgeren D*

7/20/84 i

Satisfactory item Yes No N/A Commente

)

t[

1.

The nameplate data and location of the following equipment will be reviewed to ensure compliance of the installed equipment with the equipment specified in the design phase.

g i

a.

CCW pump motor CP1-CCAPCC-01 to the requirements of X

G8H Specification 2323-ES-10. " Electric Motors."

hgg af jh rE:"?5 T d

b.

The following motor operated valves with the pre-liminary vendor information provided in letter CVN-027, dated 8/16/77, as required by G8H spe-cification 2323-MS-600, " Power Operated Valves."

l Valve No.

l HV-4512 X

All valves had 0.7 hp Reliance HV-4514 X

motors for Limotorque SMB-00/10 HV-4524 X

valve actuators. Preliminary HV-4526 X

design information identified

)

i HV-4572 X

valves HV-4512 and HV-4514 as HV-4574 X

having 1.0 hp motors. Per Limitorque, motor operator sizes l

vary depending on the actual l

manufacturer of the motor oper-1 ator, and that the SMB-00/10 designation ensures the appro-priate valve operating torque.

This reduction in operator size 3

does not affect the electrical i

Texas Utilities Generating Company; 84056 Sheet 1 of 9 independent Assessment Program, Phase 4 L---------.--------------

r, Independent Dosign Al% i Review Checklist a

ELECTRICAL IRLEDOWN QECKLIST C=8ower R. Uhlar/T. R. Martin Approver E. van Stijgeren Checkilet No.

WD-EE-01 cat

  • 7/20/84 i

Setlefactory item Yes No N/A Commente i

installation design, and the fact I

l that SM8-00/10 actuators were orig-inally specified ensures the valves will perform their required func-tion. This does not represent a f-(b2 f

8*

generic design concern since motor i

I sizes will only vary marginally for il I* -

5gg""

r the use of different manufacturers i

35-motor operators and motor starters are manufactured to accommcdate a l

I range of motor sizes.

c.

The solenoids for the following valves with the vendor information provided in the following vendor drawings j

as -required by G&H specification 2323-MS-600, " Power j

Operated Valves."

Valve No.

Drawing No.

I LV-4500 35A2243 X

All solenoid operated valves are i

RV-4508 35A2227 X

in compliance with design crf-FV-4536 G26246 X

teria.

d.

6.9 Ky switchgear 1EAl compartment three to the re-X quirements of G8H specification 2323-ES-5, "7.2 Kv l

Metal-Clad Switchgear and Accessories."

l 4

Texas Utilities Generating Company; 84056 Sheet 2 of 9 Independent Assessment Program, Phase 4 i

1' I

Independent Design A' ro Al%

Review Checklist ELECTRICAL MALKDENNI QECKLIST emi.w.r R. Uhlar/T. R. Martin Approver E. van Stijgeren Checklist No.

WD-EE-01 Date 7/20/84 Sallefactory item Yes No N/A Commente e.

The following compartments of 480 volt motor control center 1EB3-1 to the requirements of G8H specification 2323-ES-7, " Motor Control Centers."

Compartment No.

6J X

Verified breaker frame size, trip 6M X

rating, voltage level, and short 7C X

circuit rating.

7F X

7J X

l 7M X

j f.

The following instrumentation to the requirements of the applicable G8H specifications:

Loop Specification l

4500 2323-MS-611A X

Agrees with DCA 6347.

1 4518 2323-MS-616 X

i 4536A 2323-MS-611A X

4536B 2323-MS-611A X

4502A 2323-MS-620 X

Agrees with DCA 19,198.

c 4502B_

2323-MS-520 X

Agrees with DCA 19,198.

}

~

.i dEUe P '! ( r : 3

" ; !;}, 3

~ _ _. -. _

Texas Utilities Generating Company; 84056 Sheet 3 of 9 l

Independent Assessment Program, Phase 4

Independent Design A L n' Review Checklist i

ELECTRICAL MLED0lm QECKLIST L

i:

C viewer R. Uhlar/T. R. Martin Approver E. van Stijgeren Checklist No.

WD-EE-01 pate 7/20/84 l

Satisfactory Item Yes No N/A Commente l

2.

The installed raceways for the following cables will be re-viewed for:

Installed location in compliance with installation All raceway locations, identifica-I e

drawings.

tion, separation and fill require-ments were in compliance with design Routing point identification in compliance with in-criteria. Tray points which are i

stallation drawings and change paper identified with only the last two i

digits or not identified at all are Electrical train designation identification acceptable based on Paragraph 2.26.5.a.3 (c) and (e) of the G8H Adequate train separation Electrical Erection Specification, 2323-ES-100 wnich state:

l Cable tray fill within side rails (c) The cable tray identification l

a.

E9100001 X

number (e.g., T11GABB) shall be b.

E9100555 X

marked (on the outside of either c.

A3104340 X

tray side rail) at ends of each I

d.

E9104347 X

tray, at tray intersections and i

e.

E9107008

-- ~

X at intervals not to exceed 30 X

feet. For cable tray sections f.

E9119630A g l-

[(-(fl f

pn gy i

9 E9119639 X

10 feet or less in length, s

X identification may be at the i

h.

E9119640 n

A9= 2 3, g d E e

X midpoint of the section.

1.

E9119660 i

j. E9119678 X

k.

E9119701 X

1.

E9119956 X

m.

A9119838 X

Texas Utilities Generating C'Smpany; 84056 Sheet 4 of 9 Independent Assessment Program; Phase 4 i

Independent Design Fleview Checklist MMi annememma ELECTRICAL WLEDdWI OECKLIST i

i CheckIlst No.

WD-EE-01

^#Pr*

  • E. van Stijgeren R;vlowe' R. Uhlar/T. R. Martin Date 7/20/g4 Satisfactory Item Yes No N/A Comments l

Cable tray identification node l

points (i.e., the last two i

numerical digits added to the cable tray identification number, example T11GABB09, T11GABB10, etc.) shall be stanciled on the same side of l

the tray as the cable tray l

identification number where i

shown on the electrical physical layout drawings.

(e) At the discretion of the Owner's field representative, identifi-i cation of conduit and cable tray is not required in cases when this identification would not be q' n g") g g!g,9 1;d

~

f.)tye!. g e !sii Jis level.

g; l

a

'readily visible from floor Sheet 5 of 9 Texas Utilities Generating Company; 84056 independent Assessment Program, Phase 4 i

~

Independent Design A LN i Review Checklist ELECTRICAL telLM OECELIST R:vlow

R. Uhlar/T. R. Martin Approver E. van Stijgeren Checklist No.

WD-EE-01 Date 7/20/84 Sallefactory item Yes No N/A Conwnente 3.

The installation of the following cables will be reviewed for:

e All cable terminations, Field cable termination block terminations in com-e construction, and separation pliance with cabinet wiring drawings and change paper requirements were found to be in Construction (i.e., voltage rating, number of con-compliance.

ductors, size and jacket material) in compliance with applicable cable specifications, raceway schedule, and lated or measured and iccorded Pull cards on any of the cable pull cards rev T

ract ce s Pull card routing in compliance with raceway schedule e

routing and change paper Root's Procedure EEI-07 Para-a 4.2 ch Pulling tension calculation performed in accordance

{ap e

with TUSI instruction CP-El-4.0-24 M

M ph w pdis entirely in trays, since there Pulling tension recorded on pull card in compliance with calculated maximum allowable tension tens on w p

in en rely in trays.

Adequate internal panel wiring (MCC's, switchgear, solid state isolation cabinets, shutdown transfer

~

panel, termination racks, junction boxes, etc.) train

,, t

% <v :r.

  • 1,~ y..s.;

Texos Utilities Generating Company; 84056 Sheet 6 of 9 Independent Assessment Program, Phase 4 i

Independent Design ALHi Review Checklist E ECTRICAL WLLEDOGR DECKLIST l

R. Uhlar/T. R. Martin Approver E. van Stijgeren Checklist No.

WD-EE-01 i

a miew.,

oste 7/20/84 Setlefactory Item Yes No N/A Commente t

i The pull card to which E9107008 a.

E9100001 X

b.

E9100555 X

was pulled (Rev. 177A) is cor-c.

A9104340 X

rect with respect to the physi-I d.

E9104347 X

cal installation but does not j

e.

E9107008 X

agree with the most recent i

~

f.

Epl1963A X

revision of the G8H Cable and g.

E9119639 X

Raceway Schedule (2323-El-1700 l

l h.

E9119640 X

Rev. 326) - i.e., the initial i

1.

E9119660 X

conduit C-13009421 from MCCIEB3-i

j. E9119678 X

1 to tray T139SCA50 is installed l

k.

E9119701 X

and utilized but is not shown in i

1.

E9119956 X

Rev. 326 of 2323-El-1700.

m.

A9119838 X

Further investi ation revealed that conduit C-3009421 was I

manually assigned to routing point T130 SCA51 in subsequent i

DCA (No.10606) for the routin0 of an additional cable utilizing i;

ter did not flag this change conduit C-13009421. The compu-

=

since it will accept either g

g routing pcint when a conduit Uig.f[N r *dh $h'%g g p

D r;- ' ' f{

F leaves the tray system between l

two routing points.

It did 3 !$

l assume cable E0107008 as being I

an air drop, which was the rea-i I

son for the raceway schedule Sheet 7 of 9 Texas Utilities Generating Company; 84056 Independent Assessment Program, Phase 4 i

Independent Design AL ;J i Review Checklist j

ELECTRICAL IRLKDOHN DECKLIST 1

.(

' ).

a,i...,

R. Uhlar/T. R. Martin Approver E. van Stijgeren Checkilet No.

WD-EE-01 I

pet.

7/20/84

.i Satisfactory Item Yes No N/A Comments t

4 discrepancy. TUSI is correcting the raceway schedule. This was 4

not considered a design concern i

since it did not adversely af-l fect divisional routing or t

separation.

i

]

4.

Review protective component settings and any available All overcurrent relays and circuit field testing documentation related to the verification of breaker trip ratings were in com-the setpoints of the following CCWS devices to the design pliance with design criteria.

setpoints.

a.

Switchgear IEA1 compartment three, protective com-X ponent settings.

j b.

Switchgear IEA1 compartment three protective model X

The phase A overcurrent relay was labeled model no. 223S-3542 in-j numbers stead of 2235-8542. A field test i

and comparison of its time-current

-3 l

characteristics to manufacturer 9

h, data identified the equipment as p;ygg j "f 9, h

being model no. 2235-8542 as l

.; L. 3 i

f' d' ~ ?.,,j i c.

., /

required. This discrepancy was j

apparently due to incomplete I

^ ~ ~ ~ _, _ _ _ _. _. -

stamping of the number eight.

This model no. is being corrected in the field.

J Sheet 8 of 9 Texas Utilities Generating Company; 84056 Independent Assessment Program, Phase 4 1

Independent Design I.

Review Checklist L11 a i ELECTRICAL Ifu.KDOINI OIECKLIST l

t R. Uhlar/T. R. Martin a,,,,,,, E. van Stij geren Checkflet No.

WD-EE-01 oc,s...,

ost.

7/20/84 Setlefactory

{

Item Yes No N/A Comments '

l f

c.

The following MCC IEB3-1 compartment protective com-l ponent equipment:

t Compartment 6J X

6M X

7C X

7F X

7J X

7M X

1 vl i

g f l.. : :. t : :. 2..

l v

Texas Utilities Generating Company; 84056 Sheet 9 of 9 Independent Assessment Program, Phase 4