ML20133A472

From kanterella
Revision as of 00:08, 5 July 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Results of Operator Initial Exam Conducted at Rensselaer Polytech Institute on 961119.W/o Encl
ML20133A472
Person / Time
Site: Rensselaer Polytechnic Institute
Issue date: 12/26/1996
From: Weiss S
NRC (Affiliation Not Assigned)
To: Harris D
RENSSELAER POLYTECHNIC INSTITUTE, TROY, NY
References
NUDOCS 9612310126
Download: ML20133A472 (1)


Text

_ _ . . . _.. _ __ _ _ _ - - _ _

t Docket?No'.550-225.1 M2 Dr. Donald R. Harris, Director Critical Facility Department of Nuclear Engineering and Science-Rensselaer Polytechnic Institute Troy, New York 12181

Dear Dr. Harris:

SUBJECT:

INITIAL RESULTS - RENSSELAER POLYTECHNIC INSTITUTE Enclosed is a copy of the results of the Operator Initial Examination l conducted at Rensselaer Polytechnic Institute on November 19, 1996.

l Sincerely, 1

i Seymour H. Weiss, Director l Non-Power Reactors and Decommissioning Project Directorate Division of Reactor Program Management Office of Nuclear Reactor Regulation

Enclosures:

1. Summary Sheet
2. Candidate's Form 30lN .
3. Candidate's Answer Sheets l Distribution: w/o encls. 2 & 3 OLB/LA Summary Sheet File (DMcCain)

Facility File (DMcCain)  !

Distribution: w/o enc 1 VDocket Files- f ' '

"SWeiss' I PDoyle POR DF DI D , 1 Central Files

)lK}i PDND:DR D: ND:DRPM l

tin':dm PDoylg SWeiss 12 $96 9612310126 961226 12bg /9 12/z((66 hkpU g Y PDR ADOCK 05000225 V PDR 9100D