05000327/LER-1997-002, Forwards LER 97-002-00,documenting Condition Resulting in Granting of Enforcement Discretion & to Deal W/Problems Encountered During Maint Activities to 2A-A DG Governor

From kanterella
Revision as of 02:04, 1 July 2020 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards LER 97-002-00,documenting Condition Resulting in Granting of Enforcement Discretion & to Deal W/Problems Encountered During Maint Activities to 2A-A DG Governor
ML20137A422
Person / Time
Site: Sequoyah Tennessee Valley Authority icon.png
Issue date: 03/13/1997
From: Adney R
TENNESSEE VALLEY AUTHORITY
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20137A427 List:
References
NUDOCS 9703200323
Download: ML20137A422 (2)


LER-2097-002, Forwards LER 97-002-00,documenting Condition Resulting in Granting of Enforcement Discretion & to Deal W/Problems Encountered During Maint Activities to 2A-A DG Governor
Event date:
Report date:
3272097002R00 - NRC Website

text

l l

I l ,

Tennessee Valley Authority, Pact Offee Box 2000. Soddy-Daisy, Tennessee 37379-2000 R.J. Adney Site Vce President Sequoyah Nuclear F4 ant March 13,1997 i

U.S. Nuclear Regulatory Commission  !

ATTN: Document Control Desk ,

Washington, D.C. 20555 Gentlemen:

TENNESSEE VA.LLEY AUTHORITY - SEQUOYAH NUCLEAR PLANT (SQN)

UNITS 1 AND 2 - DOCKET NOS. 50-327 AND 50-328 - FACILITY OPERATING LICENSES DPR-77 AND DPR LICENSEE EVENT REPORT (LER) 50-327/97002 The enclosed report provides details concerning a condition that resulted in the granting of enforcement discretion. The condition dealt with problems encountered during maintenance activities to the 2A-A diesel generator governor. This condition is being reported in accordance with 10 CFR 50.73(a)(2)(i)(B) as an operation prohibited by the pir.nt's technical specifications.

1 It should be noted that on August 22,1996, Technical Specification change request 96-08 was submitted to NRC. This technical specification change request provides the justification to extend the diesel generator allowed outage time to seven days. Approval of this technical specification change request will reduce the need for future enforcement discretion associated with the diesel generators.

Sincerely, f g l / . J. Adney

\

9703200323 970313 \

PDR ADOCK 05000327 S PDR

  • e

, l l . .

U.S. Nuclear Regulatory Commission j Page 2 i March 13,1997  :

s l

i Enclosure j cc (Enclosure): -

. INPO Records Center  !

Institute of Nuclear Power Operations )

700 Galleria Parkway . l Atlanta, Georgia 30339-5957 -l l

Mr. R. W. Hernan, Project Manager '

U.S. Nuclear Regulatory Commission One White Flint, North 11555 Rocksille Pike Rockville, Maryland 20852-2739 NRC Resident Inspector Sequoyah Nuclear Plant 2600 Igou Feny Road '

Soddy-Daisy, Tennessee 37379-3624 Regional Administrator U.S. Nuclear Regulatory Commission Region II 101 Marietta Street, NW, Suite 2900  !

Atlanta, Georgia 30323-2711

-l l

i.  ;

i i

I

!