ML20137V570

From kanterella
Revision as of 19:19, 30 June 2020 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Monthly Operating Rept for Nov 1985
ML20137V570
Person / Time
Site: Yankee Rowe
Issue date: 11/30/1985
From: Whipple S
YANKEE ATOMIC ELECTRIC CO.
To:
Shared Package
ML20137V556 List:
References
NUDOCS 8602190618
Download: ML20137V570 (5)


Text

_ _ _ _ _ - - - - - _ _ -

Y},

i . .

YANKEE ATOMIC NUCLEAR POWAR STATION MONTHLY STATISTICAL REPORT 85-11 FOR THE MONTH OF NOVEMBER 1985 l'

[

t 0602190618 PDR ADOCM 85120505000029 PDR R

I

OPERATIN6 DATA REPORT DOCKET NO. 50-29 DATE B51205 COMPLETED BY S. WHIPPLE TELEPHONE (617) 872-8100 OPERATING STATUS

l. Unit Name: Yankee Rome
2. Reporting Period: Novreber, 1985
3. Licensed Thereal Power ( Mt): 600
4. Naseplate Rating (Gross Me): 185
5. Design Electrical Rating (Net Me): 175
6. Manteue Dependable Capacity (6ross Me): 180
7. Manteue Dependable Capacity (Net Me): 167
8. If Changes Occur in Capacity Ratings (itees Number 3 Through 7) Since Last Report, Give Reasons:
9. Power Level To Which Restricted. If Any (Net Me):
10. Reasons For Restrictions. If Any:

This Month Yr.-to-Date Cuaulative

11. Hours in Reporting Period 720.00 0,016.00 --
12. Number of Hours Reactor Nas Critical 0.00 6,990.20 174,913.30
13. Reactor Reserve Shutdown Hours 0.00 0.00 0.00
14. Hours Generator On-Line 0.00 6,989.75 170,174.17
15. Unit Reserve Shutdown Hours 0.00 0.00 0.00
16. Gross Thereal Energy Generated IMH) 0.00 3,952,952.00 92,443,604.52
17. Gross Electrical Energy Generated (MH) 0.00 1,191,869.90 28,010,673.20
18. Net Electrical Energy Generated (MWH) 0.00 1,114,907.71 26,209,458.16
19. Unit Service Factor 0.00 87.20 77.49
20. Unit Availability Factor 0.00 87.20 77.49
21. Unit Capacity Factor (Using MDC Net) 0.00 83.28 73.41
22. Unit Capacity Factor (Using DER Net) 0.00 79.48 69.96
23. Unit Forced Dutage Rate 0.00 0.00 5.26
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
25. If Shutdown ht End of Report Period, Estimated Date of Startup: December 6, 1985
26. Units in Test Status (Prior to Coseercial Operation): Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMERCIAL DPERATION

s ,

AVERA6E MILY UNIT POWER LEVEL DOCKET NO. 50-29 UNIT YANKEE RONE MTE 851205 COMP'ETED BY S. WHIPPLE TELEPHONE (617) 872-8100 MONTH NOVEMBER, 1985 MY ' AVERA6E NILY POWER LEVEL MY AVERAGE M ILY POWER LEVEL (Mue-Net) (Nue-Net) 1 0 17 0 2 0 18 0 3 0 19 0 4 0 20 0 5 0 21 0

.6 0- 22 0 7 0 23 0 8 0 24 0 9 0 3 0 10 0 26 0 11 0 27 0 12 0 28 0 13 0 29 0 6

14 0 30 0 15 0 31 1 16 0 INSTRUCT 10NS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.

Compute to the nearest whole negawatt.

I

)

i .

l. ,

WIT SHUTDOWS AND KNER REDUCTIONS DOCKET NO. 50-29 Wii YANKEE RONE REPORT MONTH NOVLMBER,1985 DATE B51205 COMPLETED BY S. WIPPLE TELEPHONE (617) 872-8100 Method Licensee Cause & Corrective 1 Duration 2 Of Shutting Event Systes Component Action to No. Date- Type (Hours) Reason Down Reactor 3 Report 4 Code 4 Code 5 Prevent Recurrence 85-!! 10/19/85 S 720 C 1 N/A N/A N/A Core IVI!! Refueling Continued with cycle IVill refueling all sonth.

I 2 3 4 F: Forced Reason: Method: Exhibit 6-instructions S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scras. Entry Sheets for License C-Refueling 3-Automatic Scraa. Event Report (LER) File 9-Regulatory Restriction 4-Other (Explain) (NURE6-0161)

E-Operator Training & Licensed Erasination F-Administrative - 5 6-Operational Error (Explain) Exhibit 1 - Saee Source H-Other (Explain)

DOCKET NO. 50-29 WIT YAMEE ROME DATE 851205 COMPLETED BY S. MIPPLE TELEPHONE M17) 8724100 REPORT MONTH 110VEMBER,1985 SMMARY OF DPERATIH6 EIPERIEllCES Continued with Cycle IVill refueling all conth.

a.

!'