ML20137V570
| ML20137V570 | |
| Person / Time | |
|---|---|
| Site: | Yankee Rowe |
| Issue date: | 11/30/1985 |
| From: | Whipple S YANKEE ATOMIC ELECTRIC CO. |
| To: | |
| Shared Package | |
| ML20137V556 | List: |
| References | |
| NUDOCS 8602190618 | |
| Download: ML20137V570 (5) | |
Text
_ _ _ _ _ - - - - - _ _
Y},
- i.
YANKEE ATOMIC NUCLEAR POWAR STATION MONTHLY STATISTICAL REPORT 85-11 FOR THE MONTH OF NOVEMBER 1985 l'
[
0602190618 85120505000029 ADOCM PDR t
PDR R
I
OPERATIN6 DATA REPORT DOCKET NO.
50-29 DATE B51205 COMPLETED BY S. WHIPPLE TELEPHONE (617) 872-8100 OPERATING STATUS l.
Unit Name: Yankee Rome 2.
Reporting Period: Novreber, 1985 3.
Licensed Thereal Power ( Mt):
600 4.
Naseplate Rating (Gross Me):
185 5.
Design Electrical Rating (Net Me):
175 6.
Manteue Dependable Capacity (6ross Me): 180 7.
Manteue Dependable Capacity (Net Me):
167 8.
If Changes Occur in Capacity Ratings (itees Number 3 Through 7) Since Last Report, Give Reasons:
9.
Power Level To Which Restricted. If Any (Net Me):
- 10. Reasons For Restrictions. If Any:
This Month Yr.-to-Date Cuaulative
- 11. Hours in Reporting Period 720.00 0,016.00
- 12. Number of Hours Reactor Nas Critical 0.00 6,990.20 174,913.30
- 13. Reactor Reserve Shutdown Hours 0.00 0.00 0.00
- 14. Hours Generator On-Line 0.00 6,989.75 170,174.17
- 15. Unit Reserve Shutdown Hours 0.00 0.00 0.00
- 16. Gross Thereal Energy Generated IMH) 0.00 3,952,952.00 92,443,604.52
- 17. Gross Electrical Energy Generated (MH) 0.00 1,191,869.90 28,010,673.20
- 18. Net Electrical Energy Generated (MWH) 0.00 1,114,907.71 26,209,458.16
- 19. Unit Service Factor 0.00 87.20 77.49
- 20. Unit Availability Factor 0.00 87.20 77.49
- 21. Unit Capacity Factor (Using MDC Net) 0.00 83.28 73.41
- 22. Unit Capacity Factor (Using DER Net) 0.00 79.48 69.96
- 23. Unit Forced Dutage Rate 0.00 0.00 5.26
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
- 25. If Shutdown ht End of Report Period, Estimated Date of Startup:
December 6, 1985
- 26. Units in Test Status (Prior to Coseercial Operation):
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMERCIAL DPERATION
s AVERA6E MILY UNIT POWER LEVEL DOCKET NO.
50-29 UNIT YANKEE RONE MTE 851205 COMP'ETED BY S. WHIPPLE TELEPHONE (617) 872-8100 MONTH NOVEMBER, 1985 MY
' AVERA6E NILY POWER LEVEL MY AVERAGE M ILY POWER LEVEL (Mue-Net)
(Nue-Net) 1 0
17 0
2 0
18 0
3 0
19 0
4 0
20 0
5 0
21 0
.6 0-22 0
7 0
23 0
8 0
24 0
9 0
3 0
10 0
26 0
11 0
27 0
12 0
28 0
6 13 0
29 0
14 0
30 0
15 0
31 1
16 0
INSTRUCT 10NS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.
Compute to the nearest whole negawatt.
I
)i l.
WIT SHUTDOWS AND KNER REDUCTIONS DOCKET NO.
50-29 Wii YANKEE RONE REPORT MONTH NOVLMBER,1985 DATE B51205 COMPLETED BY S. WIPPLE TELEPHONE (617) 872-8100 Method Licensee Cause & Corrective 1
Duration 2 Of Shutting Event Systes Component Action to No.
Date-Type (Hours) Reason Down Reactor 3 Report 4 Code 4 Code 5 Prevent Recurrence 85-!!
10/19/85 S
720 C
1 N/A N/A N/A Core IVI!! Refueling Continued with cycle IVill refueling all sonth.
I 2
3 4
F: Forced Reason:
Method:
Exhibit 6-instructions S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scras.
Entry Sheets for License C-Refueling 3-Automatic Scraa.
Event Report (LER) File 9-Regulatory Restriction 4-Other (Explain)
(NURE6-0161)
E-Operator Training & Licensed Erasination F-Administrative 5
6-Operational Error (Explain)
Exhibit 1 - Saee Source H-Other (Explain)
DOCKET NO.
50-29 WIT YAMEE ROME DATE 851205 COMPLETED BY S. MIPPLE TELEPHONE M17) 8724100 REPORT MONTH 110VEMBER,1985 SMMARY OF DPERATIH6 EIPERIEllCES Continued with Cycle IVill refueling all conth.
a.
!'