ML20212C729

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Aug 1986
ML20212C729
Person / Time
Site: Yankee Rowe
Issue date: 08/31/1986
From: Heider L, Whipple S
YANKEE ATOMIC ELECTRIC CO.
To:
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
References
DCC-86-132, FYR-86-082, FYR-86-82, NUDOCS 8612310159
Download: ML20212C729 (6)


Text

5 g m -..m _m- 4 - * . * . . + -a.sa , a-- Hu- a- .44 -- #m,< -

- e.a =2a= s e 4 m =m au ~n 4

-O ,

9 I#. ,

.g J L t

' r

+

t T

j r V

F 1

YANKEE ATOMIC NUCLEAR POWER STATION MONTHLY STATISTICAL REPORT 86-03 FOR THE MONTH OF AUGUST, 1986 l

i 8612310159 860831 PDR ADOCK 05000029 g'; gy[

R PDR

/ /. .-. . - - .

s OPERATING DATA REPORT DOCKET NO. 50-29 DATE 860905 COMPLETED BY S. NHIPPLE TELEPHONE (617) 872-8100 OPERATING STATUS

1. Unit Name: Yankee Rowe
2. - Reporting Period: August, 1986
3. Licensed Thereal Power (Mt): 600
4. Naseplate Rating (6ross Me): 185
5. Design Electrical Rating (Net Me): 175
6. Matisue Dependable Capacity (6ross Mee): 180
7. Maxieue Dependable Capacity (Net Me): 167
8. If Changes Occur in Capacity Ratings (Itees Nueber 3 Through 7) Since Last Report, Give Reasons:
9. Power Level To Nhich Restricted. if Any (Net Me):
10. Reasons For Restrictions. If Any:

This Month Yr.-to-Date Cumulative

11. Hours in Reporting Period 744.00 5,831.00 ---
12. Number of Hours Reactor Nas Critical 744.00 5,445.11 180,966.59
13. Reactor Reserve Shutdown Hours 0.00 0.00 0.00
14. Hours Generator On-Line 744.00 5,434.00 176,093.51
15. Unit Reserve Shutdown Hours 0.00 0.00 0.00
16. Gross Thereal Energy Generated (MH) 445,543.00 3,204,568.00 95,885,184.52
17. Gross Electrical Energy Generated (M H) 133,926.90 974,423.60 29,057,111.40
18. Met Electrical Energy Generated (MH) 125,483.08 912,873.86 27,189,093.03
19. Unit service Factor 100.00 93.21 77.86
20. Unit Availability Factor 100.00 93.21 77.86
21. Unit Capacity Fatter (Using MDC Net) 100,99 93.75 73.88 l
22. Unit Capacity Factor (Using DER Net) 96.38 89.46 70.41
23. Unit Forced Outage Rate 0.00 6.79 5.29
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

i i

25. If Shutdown At End of Report Period, Estieated Date of Startup:
26. Units In Test Status (Prior to Coseercial Ope *ation): Forecast Achieved INITIAL CR!i!CALITY INITIAL ELECTRICITY COMERCIAL OPERAi!0N i

e .

AVERA6E DAILY MIT POWER LEVEL DOCKET NO. 50-29 UNIT' YANKEE ROWE DATE B60905 COMPLETED BY S. WHIPPLE TELEPHONE (617) 872-8100 ll0 NTH M6UST,1986 DAY AVERAGE DAILY POWER LEVEL DAY AVERA6E DAILY POWER LEVEL

(!!We-Net) (NNe-Net) 1 169.9 17 168.6 2 170.1 18 168.3 3 170.1 19 168.3 4 169,6 20 168.3 5 169.7 21 168.2 6 169.4 22 168.2 7 169.3 23 167.8 8 169.3 24 167.0 9 169.2 25 167.8 10 169.1 26 167.7 11 169.2 27 167.5 12 169.1 28 167.4 13 169.0 29 167.7 14 169.0 30 167.7 15 168.9 31 167.7 16 168.8 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting conth.

Eoepute to the nearest whole negawatt.

Ullli SHUTD0lillS MD Poller REDUCTIDWS DOCKET 110. 50-29

' ullii YAllKEE R0llE RFPORT M0llTH AU6UST,1996 DATE 860905 COMPLETED BY S.IIHIPPLE TELEPHONE (617) 872-8100 Method Licensee Cause & Corrective

! Duration 2 Of Shuttir.g Event Systes Component Action to llo. Date Type (Hours) Reason Down Reactor 3 Report 4 Code 4 Code 5 Prevent Recurrence IIDIIE 6

I 2 3 4 F: Forced Reason: Method: Exhibit 6-Instructions S: Scheduled A-Equipment Failure (Explain) 1-Itanual for Preparation of Data B-Maintenance or Test 2-Manual Scras. Entry Sheets for License C-Refueling 3-Automatic Scras. Event Report (LER) File D-Regulatory Restriction 4-Other (Explain) (IlURFG-0161)

E-Operator Training & Licensed Esasination F-Administrative 5 6-Operational Error (Explain) Exhibit 1 - Saee Source H-Other (Explain)

L

s. .

30CKET110. 50-29 8 UlliT YAllKEE ROME DATE 860905 COMPLETED BY S. MIPPLE TELEPHONE (617) 872-8100 REPORT 110 NTH AU6UST,1986 I

SUMARY DF 0FERATill6 EXPERIEllCES ,

Routine full poner operations throughout the sonth.

i i

i r

I i

i l.

  • w- m-m-=- '--- -

9r 7TW ' pa=-f w e e v & te---Te-' wg,-7"---T-w--*e r- mq w y m me -wev i gm-v- w m--aw-r--"---+ - - m---N' 'zs-T'T*M-u---wmN4i---r---+va7-+-"r- - - - - r--s ------

p.

'9 , YANKEE ATOMIC ELECTRIC COMPANY T*'=pho"' (' ") -& ' oo

~

TWX 710-380-7619 j g60- p19 l ."' 1671 Worcester Road, Framingham, Massachusetts 01701 DCC 66-132

(,Y4dk,J '7 "' 2 September 8, 1986 FYR 86-082 United States Nuclear Regulatory Commission Director, Office of Management Information and Program Control Washington, D.C. 20555

Dear Sir:

Submitted herewith is the Monthly Statistical Report for the Yankee Atomic Power Station for the month of August, 1986.

Very truly yours, YANKEE ATOMIC ELECTRIC COMPANY

( /

j)//Shadu' L. H. Heider Vice President / Manager of Operations LHH/kmc Enclosure cc: Region I Office of Inspection & Enforcement

,gqED 0 gg g;Y g61Y

'/