ML20206D991
| ML20206D991 | |
| Person / Time | |
|---|---|
| Site: | Yankee Rowe |
| Issue date: | 03/31/1986 |
| From: | Heider L, Whipple S YANKEE ATOMIC ELECTRIC CO. |
| To: | NRC OFFICE OF RESOURCE MANAGEMENT (ORM) |
| References | |
| 86-03, 86-3, DCC-86-028, DCC-86-28, FYR-86-039, FYR-86-39, NUDOCS 8606230032 | |
| Download: ML20206D991 (6) | |
Text
.x
.y-j A w,
._A,.4
~ h
..h-.
-A am, he=m
.U-4-m.
_,h../.
_._wa.
.,.a......st*-
e.ui..464 mr La a4
-Amg
.s E
_w s.
4 0
j e
r o
1 4
i l
l 4
i i
4 4
4 l
YANKEE ATOMIC NUCLEAR POWER STATION NONTHLY STATISTICAL REPORT 86-03 l
FOR THE MONTH OF MARCH 1986 i
i i
i f
i i
I I
i s
)
t E
d
)
e6o6asoo32 seoast PDR ADOCK 050000a9 R
PDft i
1 7
OPERATINS DATA REPORT DOCKET NO.
50-29 DATE 860403 COMPLETED BY S. WHIPPLE TELEPHONE (617) 872-8100 OPERATING STATUS 1.
Unit Nase: Yankee Rowe 2.
Reporting Peried: March,1986 3.
Licensed Thersal Power (MWt):
600 4.
Naseplate Rating (6ross MWe):
185 5.
Design Electrical Rating (Net MWe):
175 6.
Marisue Dependable Capacity (Gross MWe): 180 7.
Maximus Dependable Capa:ity (Net MWe):
167 8.
If Changes Occur in Capacity Ratings (!tess Number 3 Through 7) Since Last Report, Give Reasons:
9.
Power Level To Which Restricted. If Any (Net MWe):
- 10. Reasons For Restrictions. If Any:
This Month Yr.-to-Date Cusulative
- 11. Hours In Reporting Period 744.00 2,160.00
- 12. Number of Hours Reactor Was Critical 744.00 2,160.00 177,691.48
- 13. Reactor Reserve Shutdown Hours 0.00 0.00 0.00
- 14. Hours Generator On-Line 744.00 2,16.00 172,818.71
- 15. Unit Reserve Shutdown Hours 0.00 0.00 0.00
- 16. Gross Thersal Energy 6enerated (MWH) 443,440.00 1,274,119.00 93,954,735.52
- 17. Bress Electrical Energy Generated (MWH) 136,253.80 391,939.20 28,474,627.00
- 18. Net Electrical Energy Generated (MWH) 127,786.73 367,321.35 26,643,540.52
- 19. Unit Service Factor 100.00 100.00 77.67
- 20. Unit Availability Factor 100.00 100.00 77.67
- 21. Unit Capacity Factor (Using MDC Net) 102.85 101.83 73.62
- 22. Unit Capacity Factor (Using DER Net) 98.15 97.17 70.17
- 23. thit Forced Outage Rate 0.00 0.00 5.18
- 24. Shutdemns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
- =.....-
- 25. If Shutdown At End of Report Period, Estiaated Date of Startup:
- 26. Units in Test Status (Prior to Consercial Operation):
Forecast Achieved INITIAL CRITICAllTY I
INITIAL ELECTRICITY COMMERCliL DPERATION
. _. _ ~
+
t j
AVERA6E DAILY IMIT POWER LEVEL i
i DOCKET NO.
50-29 UNIT YANKEE ROWE DA7E 860403 0MPLETED BY S. WHIPPLE 1
4 TELEPHONE (617) 872-8100 i
I i
MONTH MARCH,1986 l
DAY AVERA6E DAILY POWER LEVEL DAY AVERA6E DAILY POWER LEVEL i
(MWe-Net)
(Mue-Net) 172.1 17 172.4 3
2 172.4 18 172.5 l
3 172.5
!?
172.4 4
172.3 20 172.9
)
5 172.2 N
172.8 6
172.2 22 151.0 l
7 172.3 23 172.8 2
8 171.9 24 172.8 I
9 172.2 25 172.9 f
10 172.2 26 172.9 172.0 27 172.9 j
12 172.1 28 172.8 i
13 172.3 29 172.5 4
14 172.3 30 172.5 l
15 172.4 31 172.4 4
16 172.5 i
l 1
l INSTRUCTIONS i
On this forsat, list the average daily unit power level in Mue-Net for each day in the reporting conth.
j Compute to the nearest whole negawatt.
J i
I
]
i
)
l.
i i
l 4
imli SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
50-29 UNIT YANKEE RONE REPORT MONTH MARCH,1986 DATE 860403 COMPLETED BY S. WHIPPLE TELEPHONE (617) 872-8100 l
z...
Method Licensee Cause & Corrective 1
Duration 2 Of Shutting Event Systea Coeponent Action to No.
Date Type (Hours) Reason Down Reactor 3 Report i Code 4 Code 5 Prevent Recurrence None I
I i
l l
I 2
3 4
F: Forced Reason:
Method:
Exhibit 6-Instructions S: Scheduled A-Equipeent Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scras.
Entry Sheets for License i
C-Refueling 3-Automatic Scras.
Event Report (LER) File
)
D-Regulatory Restriction 4-Other (Explain)
(NURE6-0161)
E-Operator Training & Licensed Esasination F-Administrative 5
I 6-Operational Error (Explain)
Exhibit 1 - Saoe Source H-Other (Explain) l
r-e DOCKET NO.
50-29 UNIT YANKEE R0WE DATE 860403 COMPLETED BY S. WHIPPLE TELEPHONE (617) 872-8100 REPORT MONTH MARCH, 1986
SUMMARY
0F 0FERATINS EIPERIENCES 03/22/86 Throttle valve and NRV exercise.
Full pcuer operation for the rest of the sonth.
l l
k_.
I r
YANKEE ATOMIC ELECTRIC COMPANY Tc'opho"' (6 ") 8 ' - 'oo TWX 710 380-7619 1.
j.
~
1671 Worcester Road, Framingham, Massachusetts 01701 DCC 86-028 b 5C$il I
~
--./
April 3, 1986 17.R.4.2 FYR 86-039 United States Nuclear Regulatory Commission Director, Office of Management Information and Program Control Washington, D. C. 20555
Dear Sir:
Submitted herewith is the Monthly Statistical Report for the Yankee Atomic Power Station for the month of March 1986.
Very truly yours, YANKEE AT0!!IC ELECTRIC COMPANY t
p//as]W L. H. Heider Vice President / Manager of Operations LHH/kmc cc: Region I Office of Inspection & Enforcement i
)