s O "Y YANKEE ATOMIC NUCLEAR POWER STATION MONTHLY STATISTICAL REPORT 85-10 FOR THE MONTH OF.0CTOBER 1985 c
8601080458 851031 l
R tje L.
OPERATING DATA REPORT DOCKET NO.
50-29 DATE 851113 COMPLETED BY S. WHIPPLE TELEPHONE (617) 872-8100 DPERATING STATUS 1.
Unit Nase: Yankee Rome 2.
Reporting Period: October,1985 3.
Licensed Thermal Power (MWt):
600 4.
Naseplate Rating (6ross Mde):
185 5.
Design Electrical Rating (Net MWe):
175 6.
Marious Dependable Capacity (Bross MWe): 180 7.
Marisue Dependable Capacity (Net MWe):
167 8.
If Changes Occur in Capacity Ratings (itees Number 3 Through 7) Since Last Report, Give Reasons:
. 9.~
Power Level To Which Restricted. if Any (Net MWe):
- 10. Reasons For Restrictions. If Any:
This Month Yr.-to-Date Cuaulative
- 11. Hours In Reporting Period 744.00 7,295.M
- 12. Number of Hours Reactor Was Criti:al 439.20 6,990.20 174,913.30
- 13. Reactor Reserve Shutdown Hours 0.00 0.M 0.M
- 14. Hours Generator On-Line 438.75 6,989.75 170,174.17.
- 15. Unit Reserve Shutdown Hours 0.M 0.00
-0.00
- 16. Gross Thereal Energy Generated (MWH) 193,099.00 3,952,952.M 92,443,604.52
- 17. Gross Electrical Energy Generated (MWH) 56,170.00 1,191,869.90 28,010,673.20
- 18. Net Electrical Energy Generated (MWH) 51,697.66 1,114,907.71 26,209,458.16
- 19. Unit Service Factor-58.97 95.82 77.75
- 20. Unit Availability Factor 58.97 95.82 77.75
- 21. Unit Capacity Factor (Using MDC Net) 41.61 91.52 73.66
- 22. Unit Capacity Factor (Using DER Net) 39.71 87.33 70.20
- 23. Unit Forced Outage Rate 0.00 0.00 5.26
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
Core IVIII Refueling - October 19, 1995 - 6 weeks
- 25. If Shutdoun At End of Report Period, Estisated Date of Startup:
Noveeber 30, 1985
- 26. Units In Test Status (Prior to Coseercial Operation):
Forecast Achieved INITIAL CRITICALITY l
INITIAL ELECTRICITY l
COMMERCIAL OPERAT!DN l
AVERA6E DAILY UNIT POWER LEVEL DOCKET NO.
50-29 UNIT YANKEE R0WE DATE B51113 COMPLETED BY S. WH1PPLE TELEPHONE (617) 872-8100 i
MONTH OCTOBER,1985 DAY AVERA6E DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Met)
(MWe-Net) 1 124.7 17
!!3.7 2
124.1 18 113.2 3
123.4 19 4.5 4
122.7 20 0
5 122.1 21 0
6 121.5 22 0
7 120.8 23 0
i 8
120.1 24 0
1 9
119.2 25 0
10 118.5 26 0
11
!!7.7 27 0
12
!!7.0 28 0
13 116.2 29 0
14
!!5.4 30 0
.15
!!4.6 31 0
16
!!4.1 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.
Compute to the nearest whole negawatt.
i i
l
UNIT SHUT >)NNS AND PONER REDUCTIONS DOCKET NO.
50-29 l
UNIT YANKEE RONE REPORT MONTH OCTDBER, 1985 DATE 851113 COMPLETED BY S. inflPPLE TELEPHONE (617) 872-8100 Method Licensee.
Cause & Corrective 1
Duration 2 Of Shutting Event Systea Cosponent Action to No.
Date Type (Hours) Reason Down Reactor 3 Report 4. Code 4 Code 5 Prevent Recurrence 85-11 10/19/35 S
313 C
1 N/A N/A N/A Core IVill Refueling t
.1 2
3 4
F: Forced Reason:
Method:
Exhibit 6-Instructions S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data 5-Maintenance or Test 2-Manual Scras.
Entry Sheets for License C-Refueling 3-Automatic Scras.
Event Report (LER) File D-Regulatory Restriction 4-Other (Explain)
(NURE6-0161)
E-Operator Training & Licensed Erasination F-Adeinistrative 5
6-Operational Error (Explain)
Exhibit ! - Saee Source H-Other (Explain) l l
I 80CKET NO, 50-29 UNIT YANKEE RONE DATE 851113 COMPLETED BY S. NH!PPLE TELEPHONE 16171 872-0100 4
I REPORT MONTH OCTOBER,1985
't StN9tARY OF OPERATING EIPERIENCES L
-10/19/85 Manually shutdoun for Core IVIII Refueling.
L i
S I
r I
J J
b
=
e ANKEE ATOMIC ELEGTRIC COMPANY "who"" (6 ' ') 8 ' -' 'oo TWX 710-380-7619 l
. W
)
l 1671 Worcester Roact Framingham, Massachusetts 01701 6/.ic K i~ts,,
November 13, 1985 17.R.4.2 FYR 85-129 United States Nuclear Regulatory Commission Director, Office of Management Information and Program Centrol Washington, D.C. 20555
Dear Sir:
Submitted herewith is the Monthly Statistical Report for the Yankee Atomic Power Station for the month of October 1985.
Very truly yours, YANKEE ATOMIC ELECTRIC COMPANY l
L. H. Heider Vice President / Manager of Operations LHH/ba ec: Region 1 Office of Inspection and Enforcement l