Monthly Operating Rept for June 1989 for Yankee Atomic Power Station
ML20247D981
Person / Time
Site: Yankee Rowe
Issue date: 06/30/1989
From: Berry R, Carroll K
YANKEE ATOMIC ELECTRIC CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
BYR-89-113, NUDOCS 8907260025
Download: ML20247D981 (6)


Text

.

'Y4NKEE ATOMIC ELECTRIC COMPANY

"'fMl0. glyl;"l" i

- Am.

. u -9" *q.. -

MO Main Street, Bolton, Massachusetts 01740-1398 r

r

  • TAN KEE,J July 11, 1989 BYR 89-113 United States Nuclear Regulatory Commission

-Document Control Desk Washington, D.C. 20555

Dear Sir:

Submitted herewith is the monthly Statistical Report for the Yankee Atomic Power Station for the month of June, 1989.

Very truly yours, YANKE TOMIC ELECTRIC COMPANY WWl

/

R. L. Berry Assistant to Vice President-Operations LHH/gbc' Enclosure

[-

cc: Region I Resident Inspector - YNPS l

l l

I 8907260025 090630 PDR ADDCK 05000029 R

PNU I'E2-y

'It

i-t

. 9;

't:

l T

' YANKEE ATOMIC NUCLEAR POWER STATION NONTHLY STATISTICAL REPORT 89-06 FOR THE MONTH OF JUNE, 1989 1

___.__.._m____.___._

OPERAi!NGDATAREPORT DOCKETNO. 50-29 DATE 890711 COMPLETEDBY K. CARROLL TELEPHONE (508)779-6711 OPERATINGSTATUS 1.

UnitName: Yankee Rors 2.

ReportingPeriod: June,1989 3.

LicensedthertalPower(MWt):

600 4.

NameplateRating(GrossMWe):

185 5,

DesignElectricalRating(NetMWe):

175 6,

Maxirca Dependble Coacity (Gross MWe): 180 7.

MaxieueDependableCapacity(NetNWeh 167 8.

IfChangesOccurinCapacityRatings(IteesNumber3throughf)SincelastReport,GiveReasons:

(

=

............................................................................................................=

9.

PowerLeneltokhichRestricted, ifAny(hetMWe):

10. ReasonsForRestrictions. If Any:

This Nonth ir.-to-Date Cuculative

11. Heurs In Pecorting Period 720.00 4,343.00
12. Nurter of Neurs Reactor Was critics 1 720.00 4,013.60 202,613.67 i
13. Reactor Reserve Shutdown Hours 0.00 0.00 0.00 l

14 Hours Generator On-Line 707.65 3,870.55 191,377.85 15, Unit Reserve Shutdown Hours 0.00 0.00 0.00

16. Gross Thermal Energy Generated (MWW) 416,241.40 2,236,795.60 107,877,327.12
17. Gross Electrical Energy Generated (MWH) 125,378.00 (77.291.10 32,659,993.70
16. hetElectricalEnergyGenerated(MWH) 117,547.90 (34,507.63 30,555,950.67 l
19. Unit Service Factor 48.29 69.12 78.64
20. Unit Availability Factor 98.28 89.12 78.64 l

l

21. Unit Capacity Factor (Using Wh' Net) 97.76 87.48 74.62
22. Unit Capacity Factor (Using DER Net) 91.29 83.49 71.13
23. Unit forced Cutage Rate 1.72 2.45 4.53 24 ShutdownsScheduledOverNext6 Months (Type,Date,andDurationofEach): None.

.=_

l

25. If Bhutdown At End of Report Period Estimated Date of 6tartup:

l'

26. Units In inst Status (Prior to Costercikl Operation):

Forecast Achieved INITIALCRITICALITY INITIALELECTRICITY COMMERCIALOPERATION

l 1

L i

AVERAGE DAILY UNIT POWER LEVEL I

~

I DOCKET h0.

50-29 UNIT YANLEE R0WE DATE 890111 COMPLETEDBY K. CARROLL TELEPHONE (506)779-6711 MONTH ANE 1989 O AY '

AVERAGEDAILYPOWERLEVEL 04Y AVERAGE DAILY P0"ER LEVEL (Kie Net)

(NYe-Wet)'

l 1

168.9 17 169.8 2

169.0 18 169.8 3

169.2 19 169.1 4

169.2 20 169.5 5

169.2 il 169.4 6

122.6 22 169.4 7

51.6 23 169.1 8

152.4 24 168.9 9

169.1 25 168.8 10 169.9 26 16B.6 11 169.8 27 168.6 12 168.6 28 166.5 13 170.1 29 168.4 14 169.9 30 168.7 15 170.0 31 16 170.L INSTRUCTIONS Onthisformat,listtheaveragedailyunitponerlevelinMie-Netforeachdayinthereportingtenth.

Compute ta the nearest whole segawatt, i

7 i'j DOCKET NO.

50-29 UNIT SHUTDOWNS AND POWER REDUCTION 3 Uk!T. YANKEER0WE

.REPORTMONTH JUNE,1969' DATE E90711

~COMPLETEDBY K. CARROLL

~

TELEPHONE. (508)779-67!1 j

Method Licensee-CauseiCorrective 1

Duration 2 OfShutting Event Systor Component-Actionte No.

Date Type (Hours) Reason Doun Reactor 3 Report i Code 4 Cods 5-PreventRecurrence I'

89-09 06/06/89 F

12.35 A

_N/A N/A N/A N/A 'Tightenedthevalve stespackingandback.

seatedCH-NOV-525,the bleedlineisolation i

valve,inordertoreduce I

thestesleakage' free thisvalve.

i I

2 3

4

. F: Forced Reason:

Nethod:

ExhibitG-Instructions S: Scheduled AEquipmentFailure(Explain) 1Nanual forPreparationofData B%intenanceorTest 2-NanualScrat.

EntrySheetsforLicense C-Refueling 3-Automati:Scrat.

EventReport(LER) File b

D-ReguistoryRestriction 4-Other(Exklein)

(NUREG-0161)

E~0peratorTraining8LicensedExamination F-Admini6trative 5

G-OperationalError(Explain)

Exhibit 1 Stae Source H-Other(Explain) l

\\

l

DOCKET NO, 50-29~

UWli YAhKEE R0WE DATE 890711 COMPLETEDBY K. CARROLL TELEPHONE (508)179-6711 REPORT MONTH JUNE,1969 SVHARY OF OPERATING EXPERIENCES 06/06/89,1853: Generator off-line in order to take loop entry to investigate excessive valve sterleak-offleakage.

06/07/89,0714: Generator phased to grid.

c --_- -

,