4 YANKEE ATOMIC NUCLEAR POWER STATION MONTHLY STATISTICAL REPORT 85-07 FOR THE MONTil 0F JULY 1985 1
8510010649 850731
[C 'd PDR ADOCK 05000029 R
/ //
t.
OPERATING DATA REPORT DOCKET NO.
50-29 DATE B50802 COMPLETED BY S. WHIPPLE TELEPHONE (617) 872-8100 OPERATING STATUS
)
1.
Unit Name: Yankee Rose f
2.
Reporting Period: July,1985 3.
Licensed Thereal Poser (Mut):
600 4.
Naseplate Rating (6ross MWe):
185 5.
Design Electrical Rating (Net MWe):
175 6.
Marious Dependable Capacity (Gross MWe): 180 7.
Marieue Dependable Capacity (Net MWe):
167 8.
If Changes Occur in Capacity Ratings (! tees Number 3 Through 7) Since Last Report, Give Reasons:
9.
Poser Level To Which Restricted. If Any (Net MWel:
- 10. Reasons For Restrictions. If Any:
This Month Yr.-to-Date Coeulative
- 11. Hours In Reporting Feriod 744.00 5,087.00
- 12. Nueber of Hours Reactor Nas Critical 744.00 5,067.00 173,010.10
- 13. Reactor Reserve Shutdown Hours 0.00 0.00 0.00
- 14. Hours Generator On-Line
.744.00 5,087.00 168,271.42
- 15. Unit Reserve Shutdeen Hours 0.00 0.00 0.00
- 16. Srcss Thereal Energy Generated (MWH) 445,455.00 2,994,642.00 91,485,294.52
- 17. Gross Electrical Energy Generated (MWH) 134,122.90 908,036.60 27,726,839.90
- 18. Net Electrical Energy Generated (MWH) 125,826.47 851,420.66 25,945,971.11
- 19. Unit Service Factor 100.00 100.M 77.66
- 20. UnitAvailabilityFactor IM.00 100.00 77.66
- 21. Unit Capacity Factor (Using MDC Net) 101.27 1M.22 73.68
- 22. Unit Capacity Fattor (Using DER Net) 96.64 95.64 70.22
- 23. Unit Forced Outage Rate 0.00 0.M 5.32
- 24. Shutdoens Scheduled Over West 6 Months (Type, Date, and Duration of Each):
Core XVI!! Refueling - October 19, 1985 - 6 weeks
- 25. If Shutdown At End of Report Period, Estimated Date of Startup:
- 26. Units In Test Status (Prior to Coseercial Operation):
Forecast Achieved INITIALCRii!CALITY INITIALELECTRICity COMMERCIAL OPERAi!0N I
AVERME MILY UHli POWER LEVEL DOCKET NO.
50-29 UNii YANKEE Roue MTE 850802 COMPLETES SY S. WHIPPLE TELEPHONE (6171 872-8100 MONTH JULY,1985 MY AVERAGE M ILY POWER LEVEL MY AVERA8E M ILY POWER LEVEL (Mue
- t)
(MWe
- t) 170.0 17 169.3 2
170.1 18 169.1 3
170.1 19 168.7 4
'170.1 20 168.4 5
169.8 21 167.9 6
169.5 22 167.7 7
169.1 23 167.8 8
169.1 24 167.9 9
169.5 25 168.6 10 169.5 26 168.9 11 169.5 27 169.3 12 169.5 28 168.6 13 169.7 29 168.8 14 169.2 30 169.4 15 168.9 31 169.8 16 169.2 INSTRUCTIOWS On this format, list the average daily unit poser level in ille-Net for each day in the reporting meeth.
Compute to the nearest shale negasatt.
UNIT SHUID0NNS AIID PONER REDUCi10NS DOCKET 110.
50-29 UNii YAR EE RONE REPORT MONTH JULY,'1985 BATE 850802 COMPLETED BY S.INilPPLE TELEPHONE (617) 872-8100 Method Licensee Cause & Corrective i
Duration 2-Of Shutting Event Systes Component Action to llo.
Date Type (Hours) Reason Down Reactor 3 Report i Code 4 Code 5 Prevent Recurrence HONE I
2 3
4 F: Forted Reason:
Method:
Eshibit S-Instructions S: Scheduled A-Equipment Failure (Esplain) 1-Manual for Preparation of Sata B-Maintenance or Test 2-Manual Scree.
Entry 3heets for License C-Refueling 3-Autoestic Scrae.
Event Report (LER) File D-RegulatoryRestriction 4-Other (Esplain)
(NURE6-0161)
E-Operator Training & Licensed Examination F-Adelnistrative 5
6-Operational Error (Explain)
Exhibit ! - Saae Source H-Other (Esplaini l
l m
m.
m.-
mu.
T I*
20CKET NO.
50-29 UNIT YAMEE RDWE DATE 850802 COMPLETED BY S. WHIPPLE TELEPHONE (617) 872-8100 REPORT RDNTH JULY,1995
SUMMARY
OF 0FERATING EXPERIENCES Full Power Operaticri - All Month
YANKEE ATOMIC ELECTRIC COMPANY
""" o "" m ") ' '" * " '
TWX 710 380-7619 J
1671 Worcester Road, Framingham, Massachusetts 01701 4.
,/
ii.i K f.h Augus t 2,1985 17.R.4.2 FYR 85-81 United States Nuclear Regulatory Commission Director, Of fice of Management Information and Program Control Washington, D.C. 20555
Dear Sir:
Submitted herewith is the Monthly Statistical Report for the Yankee Atomic Power Station for the month of July 1985.
Very truly yours, YANKEE ATOMIC ELECTRIC COMPANY A
ij Q0 jh5 MfNd Y )$$$1 l}r L.11. lleider Vice President / Manager of Operations LIIH/ba cc: Region I Office of Inspection and Enforcement
[
)
.