rv.
.S 7
W<
Yk,NKEE ATOMIC ELECTRIC COMPANY
'l$"No".s"jo','*;"l" y
u &yN' 580 Main Street. Bolton, Massachusetts $1740-1398
,\\
, v.E E TAN K l
l August 9, 198f BYR 89-124-United States Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555
Dear Sir:
Submitted herewith is the Monthly Statistical Report for the Yankee Atomic Power Station for. the month of July,1989.
Very truly yours, YAh
' ATOMIC ELECTRIC COMPANY M
trX4bf -
^
/
. L. Berry-Assistant to Vice President-Operations
'** ' ** +.4p- #
Enclosure cc:
Region I Resident Inspector - YNPS RGY e
f I
\\
8906130144 999733 j
ADOCK 05000029 DR PDC
~
4 i
w YANKEE ATOMIC NUCLEAR POWER STATION MC' TU',Y STATISTICAL REPORT 89-07
/OR THE M0hTH OF JULY, 1989 l
)
1 i
mhm
tp,?aun -
t J.
i,n r.g.
3;
.c
- y.3 -
p[fi OPERAilNG DA1A REPORT.
00CitiNo. 50-29 DATE 890809 COMPLETEDBY K. CARROLL y,
TELEPHONE. (508)779-6711
- 0PERAT*WGSTATUS 1.L UnitNano
- Yankee Rose 2.
Reporting Period: July,1989 3.'
LicensedThermalPower(NWt):
600 l
4.'
Nameplate Rating (Gross NWe):
185
~5.
DesignElectricalRating(hetNWel:
- 175 6.
Maxisum Dependable Capacity (Gross We): 180 i
7.
Muisas Dependable Capacity (hst Me):
167 l
9.
IfChangesOccurinCtpacityeatings(ItersNumber3Through7)SinceLastReport,GiveReasons:
7 9.
Power Level To Which Restricted. If Any (Net We):
......... = _
- 10. Reasons For Restrictions. If Any:
i j
ThisManth Yr.-to-Date Cumulative
- 11. Hours in Reporting Period 744.00 5,087.00 12,.NumberofHoursReactorWasCritical 744.00
-4,757.60.
203.257.67 13.. Resctor Reserve Shutdown Gurs 0.00 0.00 0.00
- 14. Ncurs Generator On-Line i44.00 4,614.65 198,121.65
- 15. Unit Reserve Shutdcrn Her,rs 0.00 0.00 0.00
-'ll.. Gross Thereal Energy Generated (WH) 436,129.60 2,674,925.20 108,313,456.72
- 17. Gross Electrical Erittgy Generated (WH) 130,169.80 807,459.90 32,790,162.50 l
- 18. - Net Electrical Energy Generated (WH) 121,962.20 756,469.83 30,677,912.87 j
- 19. Unit Service Factor 100.00 90.71 78.70
- 20. Unit Availability Factor 100.00 90.71 78.70
- 21. Unit Capacity factor (Using NX Net)-
98.16 89.05 74.70
!!. Unit Cacacity Factor (using DER Nst) 93.67 64.90 71.20 j
- 23. Unit Forced Outage Rate 0.00 2.06 4.92
- 24. $hutdornsScheduledOverNext8Ronths(Type,Date,andDurationofEach):
Maintenance /RepairOutageSeptember 16,1989;8 days.
l 4
- 25.. If Shutdown At End cf Report Period, Estimated Date of Startup:
- 26. Units in Test Status (Prior to Ccesercial Operation):
Forecast Achieved i
INITIALCRITICAl!TY INITIALELECTRICITY j
COMMERCIALOPERATION l
I j
g
r.j:::.!
= : :,y:.
- .g ;
- p. <
a
$ i< h_ i l:,::[ kl.
- )I y.'
- .;j:
9
+
}.g:',
, 3__
c-i ff
,2 4-fs -
- c l'O
- AVERAGEDAILYUNITPOWERLEVEL y>
.i.
m, di DOCKET NO.,50229 s
/
UN11 YANKEER0WE m
DATE~ 890609 COMPLETEDBY:
K. CARROLL.-
PW
- j=;
TELEPHONE (508)779-6711' u
MONTH: JULY,'1989 j.
// DAY
'AYlRAGEDAILYMOVER1EVEL DAY AVERAGEDAILYPOWERLEVEL (NWe-Nat)
-(NWe-Net)
' <1f8.6 17 167.7 168.7!
18' 167.7
-l
~ 5 ^ L2 :
.'3 168.5 19 til7 J' 7 '14 16!.6 20-167.8 4
'5 168,1 21 167.7
-6
'168,0 22 167.8 7
~161.9 -
9 23 167.6 8
.41.1 24 167.3 9
142.5
' 25 167.0 7
. 10 166.0 26 167.1
, 11 iii.9 27 166.9 12 168.2L 28
.167.0
/- 13 168.3-29' 166.9 14
'168.0 30 166.6 I'
15 168.1:
31 166.2 h
16 168.2-l c
n c
5 L
INSTRUCTIONS 4
l-On this forsat,~ list the average daily unit power lnel in NWe-Net for each day in the reportird conth.-
.Computetothenearestwholenegawatt, l -
1 1
m
.,f.
1.ji
,) ~'.:
lNi
-. g.
I:#ti i.~
i I
m'..
':i o --
( 7 / e. k
- L! - L,/
1 W
L-.__-_.-__-
n:
UNITSHUTDOWNSANDPOWERREDUCTIONS DOCKETNO.
50-29 UNIT YANKEE R0WE REPORTNONTH JULY,1989' DATE 890809 CONPLETEDBY-K. CARROLL TELEPHONE.(508)779-6711 Nethod Licensee
.Cause i Corrective-1 Duration 2 OfShutting Event Systee Component..
Actionto.
No.
Date Type (Hours) Reasoa Denn Reactor 3 Report i Code 4 Code 51 PreventRecurrence 8910 07/07/89 6
43.17 8
N/A N/A N/A N/A Reduced load for
-condensertubeplugging.
L L
J 1
?
i i
l l
l i
1 2
3 4
1
- Forced Reason:
Nethod:
Exhibit G-Instructions 1
$: Scheduled A-EauipmentFailure(Explain) 1-Nanual forPreparationofData
)
6-NaintenanceorTest 2-ManualScras.
EntrySheetsforLicense l
C-Refueling 3-AutoesticScrae.
EventReport(LER) File l
D-RegulatoryRestriction 4-Other(Explain)
(NUREG-0161) l E-OperatorTraining8LicensedExteination j
F-Administrative 5
i G-OperationalError(Explain)
Exhibit I - Sase Source d
H-Other(Explain) 1
_=
e y.
- )
DOCKET NO.
50-29 UNIT YANKEER0i!
OATE 890809 COMPLETEDBY.
K. CARROLL TELEPHONE (508)779-6711 REPORTMONik JllLY,1989
$UMMARY OF OPERATING EXPERIENCES 01/07/89,2000: Couent.ed load reduction for condenser tube plugging.
07/09/89,1510: Plant returned to full load, l