ML20236P329
| ML20236P329 | |
| Person / Time | |
|---|---|
| Site: | Yankee Rowe |
| Issue date: | 10/31/1987 |
| From: | Heider L, Whipple S YANKEE ATOMIC ELECTRIC CO. |
| To: | NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM) |
| References | |
| FYR-87-115, NUDOCS 8711170249 | |
| Download: ML20236P329 (6) | |
Text
w--
+
.,h h T Ji OPERATINBDATAREPORT 003ET NO.
50-29 DATE B71106 COMPLETEDBY S.'WHIPPLE TELEPHONE' (617) 072-8100 OPERATING. STATUS
' t.' ' Unit Name Yankee Rowe 2.; ' Reporting Periods October, 1987
'3.
Licensed Thereal Power.(MWth 600
' 4.1 Naseplate Rating (Gross NWe):-
185
_5.
Design Electrical Rating (Net MWe):
175
- 6. - Maxisus Dependable Capacity (6ross MWe): '180 7.'
Maximus Dependable Capacity (Net MWe):. 167
'E..
If Changes Occur in Capacity Ratings (!tres Number 3 Through 7) Since Last Report,6ive Reasons:
9.; Power Level to Which Restricted. [f Any (Net MWeh
.10.: Reasens For Restrictions..lf Any:
This Month Yr.-to-Date Cueulative
!!.. Hours In Reporting Period 745.00 7,296.00
- 12. hue er of Hours Reactor Was Critical 745.00 5,764.31 189,649.31
- 13. Reactor Reserve Shutdown Heurs 0.00 0.00 0.00
' 14. ~ Hours Generater On-Line 708.32 5,651.92 164,632.77
- 15. Unit. Reserve Shutdown Hours 0.00 0.00 0.00 j
- 16.. Gross thereal Energy Generated (M N) 406,140.00 3,172,966.70 100,754.912.22 i
-17. Gross Electrical Energy Generated (MWH) 122,289.20 955,356.90 30,524,901.50
- 18. Net Electrical Energy Generated (MWH) 114,336.79 892,019.59 20,560,959.78
- 19. Unit SerYice Factor 95.08 77.46 78.10
- 20. Unit Availability Factor.
95.08 77.46 78.10
- 21. Unit Capacity Factor (Using MDC Net) 91.90 73.21 74.17
- 22. Unit Capacity Factor (Using DER Net) 87.70 69.06 70.69
- 23. Unit Forced Outage Rate 4.92 2.16 5.14
. 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each): None.
]
1 1
L 25. If Shutdown At End of Report Period, Estiaated Date of Startup:
j 26.. Units In Test Status (Prior to Coseercial Operation):
Forecast Achieved INITIALCRITICALITY INITIALELECTRICITY
[/
COMMERCIAL OPERAi!0N 8711170249 871031
\\s PDR ADOCK 05000029
\\
R PDR
y,-
- -, - - - - - - - - - - - - - - - - - - - - - ~ - - -
l1..
l2 w,..
, '; Q:i ~,
Q.
[
k:
'AVERASE DAILY UNIT' POWER LEVEL-t B
DOCKET NO.
50-29 V'
. UNIT YANKEER0tE DATE 671106
.COMDLETED BY S. WHIPPLE-t
~ TELEPHONE. (617) 872-B100-
.g iMONTH LDCTO.BER,1987
' DAY AVERAGEDA!LYF0WERLEVEL4 DAY'
'AVERA6E DAILY POWER LEVEL l'
(MWe-Net)-
(MWe Net) lg.
- 1 -
(166.6:
17
-103.4-2 166.8' 18
.155.5 ii
.3 166.7-19.
166.1-1
,4-168.0.
- 20 169.1 So
- 170.6 21' 169.2 :
,6-170.3 22 '
169.2~
7; 169.9' 23 169.1-J 8L
.169.4 24J 169.2
{
J 9 --
-169.3 25
-169.1 s
- 10 : '
169.3 26 '
169.2
'11' 169.3 27 169.3
.]
12 -
169.3 28 169.2-
~ 13 169.3-29
'169.6~-
- 14 t 29.5-
-30 169.6 i
15
'13.3-31-169.5
- ' 16 -
63.3~
2t.
INSTRUCTIONS.
On this lorsat, list' the average daily unit power -level in MWe-Net for. each day'in the reporting sonth.
Compute to the nearest whole negawatt.
i 1
k
-l
__.D___~__-._-.._..
i
)
p';
Y
,UNiiSHUTDOWNSANDPOWERREDUCi!0NS DOCKET NO.
50-29 UNIT ' YAWEE RCW!
REPORT MONTH OCTOBER,.1987 DATE 871106 COMPLETEDBY S.' WHIFFLE
'TELEPH0kE
'(617) 972-B100:
Method Licensee Cause & Corrective 1
Duration 2
Of. Shutting Event
'Systes Cospenent Action to' No.
Date type -(Hours). Reason Down Reactor 3 Report 6 Code 4 Coje 5 Prevent Recurrence 7 10/14/87 F-34.65 A
'1 N/A N/A N/A
$sall steas leak on 64-S/Bblowdownlinecheck
-valve. Leakrepaired.
'87 8 '
10/16/87 F-2.03 A-1 N/A N/A N/A Ssall steam leak on il NRV. Fackingleak
- repaired, i
i 1.
1 2
3 4
'F Forced Reason:
Methods Exhibit 6-Instructions
.S Scheduled A-Equipsent Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scras.
EntrySheetsforLicense C-Refueling 3-Autosatic Stras.
Event Report (LER) File
'D-RegulatoryRestriction 4-Other (Explain)
(N' REG-0161)
J
'E-Operator Training & Licensed Examination F-Administrative 5
6-Operational Error (Explain)
Exhibit 1 Sase Source H-Other (Explain)
I.'-. '
.u___
-. = - -
k..
3,
,1 4
h n
lk 1,
DOCKET NO.
50 '
f UNIT '. YANKEE R0WE :
l,
..DATE B71106:
COMPLETED BY
.S. WHIPPLE TELEPHONE' (617)872-B100 REPORT MONTH _- OCTOBER',1957
. y y
t
SUMMARY
OFOPERATINGEXPERIENCES-l 10/14/B7-6enerator'offlinefor. repair.of.04S/6blowdownlinecheck. valve.
I 06381 l
10/15/87 ' 6enerator ca line.:
2 1717; 1
i
)
}
1 :,
]
K
.10/16/97 '6enerator off line for $1 NRV packing leak.-
'.' 1B 30 l
4 i*
~10/16/67-Generatoronline
[2032
'.]
i o.
i i-I's p
4 1;
s i
l..
I a
j
^
l
l Tel? phon 2 (617) S72-8100 TWX 7103807619' Y
YANKEE ATOMIC ELECTRIC COMPANY e-i 1671 Worcester Road, Framingham, Massachusetts 01701-
'YAN KEE v.
November 6, 1987, FYR 87-115
-l i
l i
1
.. United States Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555
Dear Sir:
Submitted herewith' is the monthly Statistical Report for the Yankee Atomic
)
Power Station for the month of October, 1987.
j j
Very truly yours,
. 1 l
YANKEE ATOMIC ELECTRIC COMPANY l
L.
. Heider Vice President / Manager of Operations LHH/gbc Enclosure cc: Region I Resident Inspector - YNPS 7
q.
L. '
l l
j
)
i YANKEE ATOMIC NUCLEAR POWER STATION MONTHLY STATISTICAL REPORT 87-10 FOR THE MONTH OF OCTOBER, 1987 i
i
-l t
.. -. _ _ - - _ _