Text
r : --
i 0L L.
i h
YANKEE ATOMIC NUCLEAR POWER STATION l
MONTHLY STATISTICAL REPORT 86-05 FOR THE MONTH OF MAY,-1986 i
i i
l l
l i
l l
l 8608180032 860531
- I PDR ADOCK 05000029 g
s R
.p m
j li
a OPERATING DATA REPORT DOCKET NO.
50-29 DATE 860603 COMPLETED BY S. WHIPPLE TELEPHONE (617) 872-8100 OPERATING STATUS 1.
Unit Name: Yankee Rcue 2.
Reporting Period: May,1986 3.
Licensed Thereal Power (Mt):
600 4.
Naseplate Rating (6ross Me):
185 5.
Design Electrical Rating (Net M e):
175 6.
Marious Dependable Capacity (6ross Me): ISO 7.
Maxinus Dependable Capacity (Net Me):
167 8.
If Changes Occur in Capacity Ratings (Iteas Number 3 Through 7) Since Last Report, Give Reasons:
9.
Power Level To Which Restricted. If Any (Net He):
- 10. Reasons For Restrictions. If Any:
This Month Yr.-to-Date Cuaulative
- 11. Hours In Reporting Period 744.00 3,623.0v
- 12. Number of Hours Reactor Was Critical 744.00 3,623.00 179,144.48
- 13. Reactor Reserve Shutdown Hours 0.00 0.00 0.00
- 14. Hours Generator On-Line 744.00 3,623.00 174,281.71
- 15. Unit Reserve Shutdown Hours 0.00 0.00 0.00
- 16. Gross Thereal Energy Generated (MH) 444,828.00 2,149,427.00 94,830,043.52
- 17. Gross Electrical Energy Generated (MH) 132,767.60 655,882.60 28,738,570.40
- 18. Net Electrical Energy Generated (MH) 124,329.84 614,690.62 26,890,909.78
- 19. Unit Service Facter 100.00 100.00 77.82
- 20. Unit Availability Factor 100.00 100.00 77.82
- 21. Unit Capacity Factor (Using MDC Net) 100.07 101.59 73.81 l
- 22. Unit Capacity Factor (Using DER Net) 95.49 96.95 70.35
- 23. Unit Forced Outage Rate 0.00 0.00 5.14
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
- 25. If Shutdown At End of Report Period, Estiaatei Date of Startup:
- 26. Units In Test Status (Prior to Consercial Operation):
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMERCIAL OPERATION
AVERA6E DAILY WIT POWER LEVEL DOCKET NO.
50-29 WIT YANKEE R0WE DATE 860603 COMPLETED SY S. W IPPLE TELEPHONE (617) 872-8100 MONTH MAY,1986' DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (Me-Net)
(Me-Net) 1 165.8 17 166.8 2
164.6 18 166.0 3
164.8 19 165.2 4
165.1 20 165.5 5
166.1 21 166.3 6
167.3 22 167.0 7
168.1 23 168.1 8
168.5 24 168.9 9
168.8 25 168.8 10 168.9 26 168.6 11 168.4 27 168.3 12 168.1 28 168.4 13 168.2 29 168.3 14 168.1 30 160.4 15 167.7 31 167.9 16 167.3 INSTRUCTIONS On this format, list the average daily unit power level in Me-Net for each day in the reporting month.
Compute to the nearest whole negawatt.
i
e UNIT SHUTDO W S AND PONER REDUCTIONS DOCKET NO.
50-29 WII YANKEE RONE REPORT MONTH MAY,1986 DATE 860603 COMPLETED BY S. MIPPLE TELEPHONE (617) 872-0100 Method Licensee Cause & Corrective i
Duration 2 Of Shutting Event Systes Coeponent Action to No.
Date Type (Hours) Reason Down Reactor 3 Report I Code 4 Code 5 Prevent Recurrence 4
None 1
2 3
4 F: Forced Reason:
Method:
Exhibit 6-Instructions S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scras.
Entry Sheets for Licenst C-Refueling 3-Automatic Stras.
Event Report (LER) File D-Regulatory Restriction 4-Other (Explain)
(NURES-0161)
E-Operator Training h Licensed Examination F-Administrative 5
6-Operational Error (Explain)
Exhibit 1 - Saee Source H-Other (Explain)
L'
l I
DOCKET N.
50-29 WIT ' YAKEE RONE DATE 86 % 03 COMPLETED BY S. WIPPLE TELEPHONE (617) 872-91M -
-REPORT MONTH MY,1986
-i SU MARY OF'OPERATIM EIPERIENCES Full power operation all sonth.
t i
N t
4 l.
i 1
i r
l l
8 I
i l
1 l
l l-
/-
f)gg((jffgff(([f((jf ffgyjgf T:I: phon 2 (617) 872-8100 c
TWX 710-380-7619
.s -,,
p, 1671 Worcester Road Framingham, Massachusetts 01701 DCC 86-063 f)
./
17.R4.2 June 3, 1986 FYR 86-053 United States Nuclear Regulatory Commission Director, Office of Management Information and Program Control Washington, D.C. 20555
Dear Sir:
Submitted herewith is the Monthly Statistical Report for the Yankee Atomic Power Station for the month of May,1986.
Very truly yours, YANKEE ATOMIC ELECTRIC COMPANY l
L. H. Heider Vice President / Manager of Operations LHH/kmc Enclosure I
cc: Region I l
Office of Inspection & Enforcement i
1 l
I
$ *1,b
.