Rev 27 to YOQAP-I-A, Operational QA Program
ML20132G677
Person / Time
Site: Vermont Yankee, Yankee Rowe
Issue date: 12/20/1996
From: Clark C, Peterson W, Reid D
YANKEE ATOMIC ELECTRIC CO.
To:
Shared Package
ML20132G675 List:
References
YOQAP-I-A, NUDOCS 9612270012
Download: ML20132G677 (350)


Text

{{#Wiki_filter:- ( YANKEE ATOMIC ELECTRIC COMPANY OPERATIONAL QUALITY ASSURANCE PROGRAM Y00AP-1-A t/ l PREPARED BY: WAk mak h alaAW)  !

                     ' Walter K. Peterson.

Manager, Quality Assessment Services Department APPROVED BY: ( Rutsell Clark . Executive Director Quality Assurance I hA Donald A. Reid

                                              '\'

Vice President. Operations , Vermont Yankee

                                                                      )
                           ~

Stephen P. Schuiti

  • Vice President, Engineering Sciences Yankee
                          -[
                   ' Jay K. Thayer Vice President, Proje[ ,cts    [/ '/

Yankee l

Title:

YOOAP-I-A Page: 1 i Rev.: 27 l Date: December 20, 1996 9612270012 961217 PDR ADOCK 05000029 P PDR

  • YANKEE ATOMIC ELECTRIC COMPANY  ;
                                                                                                                                                           'I YOOAP-I-A t

TABLE OF CONTENTS /INDEX f Section No. Title Revision AMENDMENT / REVISION .27 POLICY STATEMENT 27 { I ORGANIZATION 27  : i 11 OVALITY ASSURANCE PROGRAM. 27 III DESIGN CONTROL 27 IV PROCUREMENT DOCUMENT CONTROL 27 , V INSTRUCTIONS, PROCEDURES, AND 27 , DRAWINGS VI DOCUMENT CONTROL 27 VII CONTROL OF PURCHASED MATERIAL, 27L EQUIPMENT. AND SERVICES i Vill IDENTIFICATION AND CONTROL OF 27 MATERIAL, PARTS, AND COMPONENTS IX CONTROL OF SPECIAL PROCESSES 27 X INSPECTION 27 XI TEST CONTROL 27 XII CONTROL OF MEASURING AND TEST 27 EQUIPMENT XIll HANDLING, STORAGE, AND SHIPPING 27 XIV INSPECTION, TEST, AND OPERATING 27 STATUS

Title:

Table of Contents Page: 11 Rev.: 27 Date: December 20. 1996

l l YANKEE ATOMIC ELECTRIC COMPANY Y00AP-I-A TABLE OF CONTENTS /INDEX (Continued) Section No. Title Revision XV NONCONFORMING MATERIALS, PARTS, 27 AND COMPONENTS  ; XVI CORRECTIVE ACTION 27 i XVII OVALITY ASSURANCE RECORDS 27 i XVIII AUDITS 27 APPENDIX A QUALIFICATION REQUIREMENTS 27 ) l APPENDIX B EXCEPTIONS 27 l APPENDIX C VY CLASSIFICATION 27 l l APPENDIX D YR CLASSIFICATION 27 l

                                                                            )

Title:

Table of Contents l Page: III ! Rev.: 27 Date: December 20, 1996

1 YANKEE ATOMIC ELECTRIC COMPANY l I Y00AP-1-A i l AMENDMENT / REVISION SHEET l l l Revision No. Date Reason j 0 (Amendment 1) 12/10/76 To address questions submitted by letter from NRC (K. R. Goller) to L. H. Heider (11/1/76). 0 (Amendment 2) 1/13/77 To address questions submitted by letter from NRC (K. R. Goller) to L. H. Heider (12/28/76). 1 9/15/77 To address organizational, programmatic, and editorial changes. j I 2 11/01/77 To address organizational changes. j 3 11/25/77 To address organizational changes at Vermont Yankee. 4 1/13/78 To address combined inspection numbers l 50-29/77-20; 50-271/77-15: and 50-309/77-16 unresolved item 4.a. 5 1/30/78 To address change in exception for ANSI N45.2.3-1973. 6 10/19/78 To address exceptions to ANSI N45.2.2-1972. 6 (Amendment 1) 3/29/79 To resolve items submitted by letter from NRC (W. P. Haass) to L. H. Heider (3/6/79). l I 7 9/11/79 To address changes to Yankee Rowe (Appendix D) i and Vermont Yankee (Appendix E) Safety l Classifications, i l 8 4/04/80 To address organizational changes. 9 3/09/81 To address organizational changes. 10 4/03/81 To add " Packaging of Radioactive Materials" and

                                  " Fire Protection of Safety-Related Areas" to    j "Other items Requiring Quality Assurance".

Title:

Amendment / Revision Sheet Page: IV Rev. 27 i Date: December 20, 1996

l l YANKEE ATOMIC ELECTRIC C1HPANY l Y00AP-I-A AMENDMENT / REVISION SHEET (Continued) i Revision No. Date Reason 11 3/01/82 To resolve items submitted by letter from NRC (W. P. Haass) to W. P. Johnson (6/10/81). 12 3/11/83 To address organizational changes. 13 To address organizational and programmatic changes. 14 10/12/83 To address organizational changes. 15 2/15/84 To address programmatic changes. 16 10/31/85 To address organizational and programmatic changes. 17 12/05/86 To address organizational and programmatic changes. 17A 8/14/87 To clarify surveillance activities and change VP-M00 responsibilities for the level of deficiencies requiring evaluation. 18 4/29/88 To address organizational and programmatic changes. 19 10/02/89 To address organizational and responsibility changes and deletion of Appendix C. 19A 6/01/90 To update organizational chart (for VY) to be consistent with Proposed Change No. 157 and to address organizational changes at Vermont Yankee. 20 12/21/90 To update organizational changes at Yankee and change OAD's responsibility from reviewing

Title:

Amendment / Revision Sheet Page: V Rev.: 27 Date: December 20, 1996

YANKEE ATOMIC ELECTRIC COMPANY Y00AP-1-A AMENDMENT / REVISION SHEET (Continued) Revision No. Date Reason design documents to auditing those documents for inclusion of quality requirements. 21 11/15/91 To update organizational changes at Yankee and Vermont Yankee and change OAD responsibility from revising recommendations to prevent recurrences of significant condition adverse to quality to providing the option to review and/or audit recommendations. 22 4/15/92 To delete Appendix 0 listing and reference Yankee Safety Classification of Systems Manual. 23 9/30/92 To address organizational and responsibility changes. 24 12/15/93 To address organizational changes, and DOA/NSARC reporting clarifications for Vermont Yankee. 25 12/15/94 To address organizational changes made at the Yanker Nuclear Power Station addressing the decom.r. 3sioning organization. Clarifications in the revised corrective action process at Vermont Yankee, and to address an exception to Regulatory Guide 1.64, and to clarify responsibilities between the Yankee and Vermont Yankee Plants. 26 12/21/95 To address organizational changes at the Yankee Nuclear Power Station and the Vermont Yankee Nuclear Power Station. To address exceptions to ANSI 18.7 and Regulatory Guide 1.33. 27 12/20/96 To address organizational changes. l

Title:

Amendment / Revision Sheet Page: VI Rev.- 27 Date: December 20, 1996

                                ' YANKEE ATOMIC ELECTRIC COMPANY POLICY STATEMENT OPERATIONAL QUALITY ASSURANCE PROGRAM lt_ is the policy cf those organizations operating under this Quality Assurance Program to strive for excellence in all aspects of nuclear power plant operation. This goal can only be attained if each individual recognizes that Quality is everyone's responsibility.        Each worker, supervisor, and
manager has a role to play in achieving the goal of "doing it right the first time." Only if we recognize that Quality is of paramount importance can we continue to provide for the safe and reliable generation of power.

The function of the Quality Verification Program is to assess the-adequacy, content, and appropriateness of the work being performed and to facilitate continuous enhancements. This function supports the line , organizations and provides management with needed feedback. However, I ! supervision and management should not rely solely upon the efforts of the l Quality Assurance Groups for quality verification they must also take an

    . active role in self-assessment of those activities under their control to identify quality problems.       As previously noted, the ultimate responsibility for quality lies with each individual.

I Under the program, the Yankee Atomic Electric Company President is the j final management authority responsible for assuring that this policy statement and the Quality Assurance. Program are implemented within the Yankee Atomic Electric Company. The Vermont Yankee Vice President, Operations, is the final management authority responsible for assuring that the Quality Assurance Program is implemented within the Vermont Yankee Nuclear Power Corporation. j I The President or a Vice President is responsible for implementing the L program for those departments under his (or her) direction. The Director of

    - Quality Assurance is responsible for establishment, control, and distribution            ;

of the Quality Assurance Program and revisions thereto, and shall establish I policies under which the Quality Assurance Department operates. The Quality Assurance staff shall have the authority and organizational freedom to meet , the requirements of 10CFR50, Appendix B. i

Title:

Policy Statement Page: 1 of 2

'     Rev.:     27 4      Date:     December 20, 1996 l

YANKEE ATOMIC ELECTRIC COMPANY l l The Plant Superintendent / Manager shall be responsible for the day-to-day l implementation of the program's procedural requirements at the plant. The Nuclear Safety Audit and Review Committee shall review the adequacy and effectiveness of this program. Any discrepancies and/or recommendations for corrections or enhancements shall be reported to the Cognizant Corporate  ; Officer. The safe and reliable generation of power can only be achieved with the cooperation and support of all personnel. We expect that every individual i will perform his or her task with the skill, professionalism, and dedication l I necessary to achieve this goal.

                                              /Aca) 0.

Andrew C. Kadak President 1

Title:

Policy Statement Page: 2 of 2 Rev.: 27 Date: December 20, 1996

                                                                                  )

l 1 YANKEE ATOMIC ELECTRIC COMPANY 1 I I. ORGANIZATION l A. SCOPE This section of the Operational Quality Assurance Program describes the duties and responsibilities of the personnel involved in establishing and executing the Operational Quality Assurance Program. B. RESPONSIBILITY The responsibility for design, redesign, evaluation, and operation of the Plant rests with the Yankee Atomic Electric Company Nuclear Services Division and Vermont Yankee Nuclear ' Power Corporation. The responsibility for developing and implementing the Operational Quality Assurance Program within the Yankee Nuclear Services Division and the Yankee Site is vested in the President of the Yankee Atomic Electric Company. The responsibility for implementing the Operational Quality Assurance Program within Vermont Yankee is vested in the Vice President, Operations, of Vermont Yankee Nuclear Power Corporation. They l have delegated certain areas of authority for the development and , implementation of certain phases of the Program as set forth in I the following paragraphs of this section. l The Nuclear Services Division Quality Assurance Department, reporting to the President for NSD for the Yankee Site and reporting to the VY VP, Operations, for Vermont Yankee, has the organizational responsibility for the continuing review and audit of the implementation of the Operational Quality Assurance Program. l C. ORGANIZATIONAL RELATIONSHIPS The lines of authority of all personnel involved in the implementation of the Operational Quality Assurance Program are shown in Figures 1 and 2. Integration between the Yankee Site

Title:

Section 1. Organization Page: 1 of 43 Rev.: 27 Date: December 20, 1996

  . . --. -- ,.                        . - . ~.           . ,          .  . . - . .  - . - - . - . - - .     - . -   . _ . . . .

i I l i ,

i. .

2 YANKEE ATOMIC ELECTRIC COMPANY a E { and the Yankee Nuclear Services Division act'ivities is provided ]- by the Decommissioning Manager. Interfacing between the Vermont l l Yankee plant and the Yankee Nuclear Services Division is provided l l by the Vermont Yankee Vice President,' Operations, and his staff. l .I I i D. OVALITY ASSURANCE PROGRAM RESPONSIBILITIES i 1 i 5 ]

1. Yankee - Nuclear Services Division '

i: a. President .

1. Assumes and maintains overall responsibility l' j for the Operational Quality Assurance Program.

3 ] 2. Delegates to the Director of Quality Assurance l l the responsibility for establishment, control  ; and distribution of the Operational Quality l ! Assurance Program, and revisions,thereto. l

                                                                                                 .                                      -r
3. Establishes and enforces company policies in j the area of Operational Quality Assurance. .

i 4 l 4. Establishes and implements an organization i [ capable of and directed toward a proper Operational Quality Assurance Program, j

l. l
5. Resolves' disputes between Quality Assurance / j
. Quality Control personnel and other organizations, involving quality, for the Yankee Site and the NSD organization.
6. The President or his/her designee appoints the NSAR Committee members including Chairman for Yankee.
7. Responsible for Yankee Site nuclear safety.

4 2

Title:

Section I, Organization Page: 2 of 43 Rev.: 27 Date: December 20, 1996 )

                               , w W--                  c                         s%  .,g.e,               y    ,

3 m-g.

.-    .        ~ .  - .  . . - . - . - . -           .
                                                         -      - . - . . . _ . - . . . . . - . . - . - - ~ _ - . _ .

YANKEE ATOMIC ELECTRIC COMPANY

b. Vice Presidents
1. Report to the President.
2. Provide for implementation of the Program within their respective departments.
3. Review and approve all changes to the Operational Quality Assurance Program.
4. Provide for independent review and acceptance for selected plant repairs and engineering changes.
5. Ensure that applicable Program procedures are implemented. 3
c. Executive Director of Quality Assurance
1. Reports directly to the President.
2. Establishes the qualification' requirements for the principal Quality Assurance management positions to assure competence commensurate with responsibility. See Appendix A.
3. Approves all changes to the Operational Quality  ;

Assurance Program.

4. Reviews or provides company policy relative to Quality Assurance practices conducted at the Site and Yankee Nuclear Services Division.
5. Authorizes personnel performing Quality  ;

Assurance functions to have direct access to i management levels which will assure ) accomplishment of quality-affecting activities. i

Title:

Section 1, Organization l Page: 3 of 43 Rev.: 27 Date: December 20. 1996 i

l l l YANKEE ATOMIC ELECTRIC COMPANY I

6. Establishes policies under which the Nuclear Services Division Quality Assurance Department functions.
7. Provides for establishment of, and control and d.stribution of the Operational Quality j Assurance Program and revisions thereto, l
8. Provides for implementation of the Program within the Quality Assurance Department.
9. Provides to NSARC a periodic review of the I Operational Quality Assurance Program to )

determine the adequacy and effectiveness of the Program. Provide for evaluations of changes to j the Quality Assurance Program to the requirements of 10CFR50.54(a)(3). . l

10. Provides, through the Quality Assurance l Department, for independent verification of site operation by individuals or groups who do not have direct responsibility for performing the work, to assure that applicable approved procedures, specifications, licenses and safety regulations are satisfied.

l

11. Ensures that personnel performing Quality  !

Assurance functions have sufficient authority and organizational freedom to:

a. identify quality problems,
b. initiate, recommend, or provide solutions ;

through designated channels, and

c. verify implementation of solutions.

Title:

Section I. Organization Page: 4 of 43 Rev.: 27 Date: December 20, 1996

l YANKEE ATOMIC ELECTRIC COMPANY  ! l l

12. Provides for review'of'and compliance with federal and state regulations and standards for nuclear power facilities.
13. As directed by the-Vermont- Yankee Vice President, Operations, assures that the OA-Program is effectively implemented.
14. Appoints the NDE and N45.2.6 Level III Examiner
d. Trainino Coordinator  !
1. Reports to the Human Resources Manager. ]

l

2. Responsible for implementation of training l
                                                    , programs at NSD.
3. Assists the company in accomplishing its goals through development of skills and knowledge. ]
4. Ensures that personnel are provided with both the. technical and professional skills required to solve problems, work together effectively, present information, and respond to sponsor needs.
5. Provides training needs assessments to ensure l that organizationally relevant training is  ;

provided.  ! i

6. CoMucts training evaluations to determine when  !

j desired objectives are obtained. l i I i

Title:

Section 1, Organization ! Page: 5 of 43

Rev.
27 l Date: December 20, 1996 L

l . , - . _ , _ _ . --

YANKEE ATOMIC ELECTRIC COMPANY

e. Decommissionino Manaaer and Manager of Operations
1. Reports to the President.
2. Directs engineering, licensing, cost control and planning, and site decommissioning activities.
3. Coordinates YAEC resources to meet decommissioning needs.
4. Provides for implementation of Operational Quality Assurance Program within the Decommissioning Organization.
5. Ensures that applicable Program procedures are implemented within the Decommissioning Organization.
6. Provides for independent review and acceptance for selected plant repairs and all safety-related engineering design changes for i the site and decommissioning work packages. )
7. Provides for review of material service purchase requests, drawings, specifications, and appropriate procedures.
8. Provides, through the Decommissioning l Organization, for independent review and/or  !

approval for all changes.

9. Provides, through the Decommissioning Organization, for review and approval of vendor-provided training programs for site staff; the procedures and purchase requests.

Title:

Section I. Organization Page: 6 of 43 ' Rev.: 27 Date: December 20, 1996

 -.      .  . . . - . . - , . - -                   -         .- .....       .~  .  ~    - - . _ - . .

YANKEE ATOMIC ELECTRIC COMPANY t

10. Provides, through the Decommissioning Organization, for integration between the Yankee Site and the Yankee Nuclear Services {

Division. I

11. Evaluates the site's position of specified  !

in-plant audit discrepancies and prepares  :

                                              " Implementation Directives" for the site.               l
f. Pro.iect Manaaers i i
1. Reports to a Vice President.  ;
2. Provides for implementation of the Program [

within their respective project. t

3. Ensures that applicable Program procedures are i implemented within their respective project.

l i

4. Provides for independent review and acceptance l for selected plant repairs and all safety- [

related engineering design changes for their l respective plant. I

5. Provides for selected review of material I service purchase requests, drawings. I specifications and appropriate procedures.
6. Coordinates engineering requirements necessary to support changes related to the operation of the plant.
7. Provides, through Engineering, for the Quality -

Assurance /0uality Control Standards and/or requirements on all applicable documents.

Title:

Section I, Organization

Page
7 of 43 >
Rev.: 27 -

l Date: December 20, 1996 l 1 4

t YANKEE ATOMIC ELECTRIC COMPANY

8. Provides. direction to the Project Engineering l Managers.

i t

g. Manaaement of Quality Assurance Quality Assurance is divided into two (2) departments. They are the Quality Support Department -

and the Quality Assessment Department. The Quality j Assessment Department' performs audits and surveillances at Vermont Yankee and audits, surveillances, inspections at the Yankee Site, and audits at the Corporate Engineering office. The Quality Support Department performs audits and surveillances at vendor facilities.

1. The Manager of each department reports directly to the Executive Director of Quality Assurance.
2. Assures that-the Operational Quality Assurance l Program satisfies the requirements of 10CFR50.

Appendix B and ANSI N18.7-1976.

3. Provides for the audit of design changes and specifications to verify adequacy of quality requirements. (Independent review shall be performed by an uninvolved, but technically knowledgeable person in the engineering discipline.)
4. Provides for the audit., inspection and/or surveillance of contractor / vendor activities for operating plants to assure the
effectiveness of contractual interfaces and i compliance with the applicable criteria of 10CFR50, Appendix B and ANSI N18.7-1976.

Title:

Section 1. Organization 1 Page: 8 of 43 Rev.: 27 Date: December 20, 1996 i

1 1 YANKEE ATOMIC ELECTRIC COMPANY I I i

5. Provides for the inspection, surveillance and/or sudit of activities pertaining to plant  ;

or site repairs, and/or changes, j

6. Provides for the training and retraining of l
                                                           ~

Quality Assurance personnel 1n quality assurance and audit techniques. l

7. Ensures through verification that the Program is implemented for all activities requiring Quality Assurance.
8. Provides for the stoppage of unsatisfactory work; and for the control of further processing or delivery of nonconforming material.
9. Directs the independent verification of plant or site operational activities to. assure that applicable approved procedures, specifications, licenses, and safety regulations are satisfied.
10. Ensures that the 0A Program is modified'and/or revised as standards, regulations and experience dictate.
h. Director of Enaineerina Services
1. Reports to the President. l
2. Provides for implementation of the Program l within his function. )

1

3. Ensures that applicable Program procedures are '

implemented within his function.

Title:

Section I, Organization Page: 9 of 43 Rev.: 27 Date: December 20. 1996 l

1 l YANKEE ATOMIC l'LECTRIC COMPANY I

4. Coordinates Yankee technical requirements necessary to support activities related to outside engineering services. l
1. Director of Environmental Enaineerina
1. Reports directly to a Vice President.
2. Provides for the review and follow of radiation i protection programs and activities at the plant I or site.
3. Provides for technical assistance to the plant or site on matters of radiological protection, radiological engineering and environmental protection.
4. Coordinates the implementation and maintenance of radiological environmental surveillance programs concerning radioactive effluents from the plant.
5. Supports the implementation and maintenance of the Emergency Plan pursuant to state and federal regulatory requirements.
6. Provides for the review of plant meteorological monitoring data.
7. Coordinate the radiological and environmental engineering requirements necessary t, support changes related to operation of the plant or site.

4 ~

Title:

Section I, Organization Page: 10 of 43 Rev.: 27 Date: December 20, 1996

1 I i l YANKEE ATOMIC ELECTRIC COMPANY j

j. Director of Fuel Manaaement i
1. Reports directly to a Vice-President.
2. Performs fuel cycle and economic studies to improve power costs and as requested by management, j
3. Provides for the general supervision and I coordination of all core component design and procurement, nuclear material and services procurement and fuel cycle economic activities.
4. Ensures that the Operational Quality Assurance Program and the applicable procedures are  !

implemented within the department.

5. Issues bid invitations, evaluates proposals, and negotiates contracts for fuel cycle services and related material requirements.
6. Coordinates the fuel cycle requirements necessarj to support changes related to operation of the plant.
7. Provides support of spent fuel storage activities at the Yankee Site.
k. Director of Environmental Laboratory l

l

1. Reports directly to a Vice President.
2. Provides for the radiochemical processing of environmental, effluer,t. and waste samples.
3. Provides for the processing and internal dosimetric evaluation of bioassay samples.

Title:

Section I, Organization Page: 11 of 43 Rev.: 27 Date: December 20, 1996 l

YANKEE ATOMIC ELECTRIC COMPANY

4. Provides for the routine in situ measurements in support of environmental Technical Specifications as well as ad hoc emergency response in situ measurements or emergency response laboratory sample measurements. -
5. Provides and coordinates technical quality assurance programs in the areas of plant
- chemistry (radiological only) and whole body 1

counting.

6. Provides for the processing of personnel, extremity, and environmental dosimetry needed to support NRC and plant radiological l assessment requirements.

l l l 7. Provides for the necessary special radiation i' flux measurements. ! 8. Provides for on-site support during outages in the personnel dosimetry, whole body counting,  ; and health physics areas. I 9. Provides for the general engineering and technical support in the broad areas of i radiation measurements, health physics, l radiochemistry, and quality assurance.

1. Director of Nuclear Engineerina
1. Reports directly to a Vice President.
2. Performs nuclear engineering and economic studies requested by management.

i

3. Provides for the general supervision and coordination of reactor physics, safety

Title:

Section I, Organization Page: 12 of 43 Rev.: 27 Date: December 20, 1996

l YANKEE ATOMIC ELECTRIC COMPANY i

                                                                                                              ?

assessment, transient analysis, and loss of coolant analysis activities. i

4. Ensures that the Operational Quality Assurance l Program and the applicable procedures are l

, implemented within the department. 'i 4 L 5. Coordinates engineering analysis requirements necessary co support changes related to

                                                                ^

operation of the plant or site. .

m. Plant Sucoort Department Manaaer
1. . Reports directly to a Vice President.
2. Provides for the general supervision and coordination in the areas of materials evaluation, operational services (including I

construction services), and drafting / design support. l 3. Provides for the Plant Support review of design- j changes.

4. Provides engineering services to the Projects l

Departments, upon request. j i

5. Responsible for the administration of the NDE/ ANSI N45.2.6 Training and Certification Programs. (To maintain the independence of the NDE/ ANSI N45.2.6 training and certification process, overall responsibility for appointing the NDE/ ANSI N45.2.6 Level III Examiner will  ;

I remain with the Director of Quality Assurance. l \ l All requirements for certification shall be met l [ prior to appointment as Level III Examiner.) I e i

Title:

Section I, Organization Page: 13 of 43 , Rev.: 27 j Date: December 20, 1996

                                          -                                    - - . . - , , - - - . w..-

l l l~ YANKEE ATOMIC ELECTRIC COMPANY l ! n. Engineerina and Licensina Manager I l

1. Reports to the Decommissioning Manager and l

Manager of Operations.  ;

2. Responsible for coordination of activities pertaining to State, Federal, and license j requirements.

, 3. Provides for independent review and acceptance for selected plant repairs, all safety-related I engineering design changes and decommissioning work packages for the site. 4 Provides for review of material service 1 purchase requests, drawings, specifications, and appropriate procedures.

5. Coordinates and directs engineering services I necessary to support the decommissioning of the site.
6. Assures coordination and implementation of the Emergency plan, j 7. Assures engineering activities are conducted in accordance with the Quality Assurance Program.
8. Assures the Quality Assurance /Ouality Control standards and/or requirements are provided on all applicable documents.

l l l l l

Title:

Section I, Organization Page: 14 of 43 Rev.: 27 Date: December 20, 1996 l l

1 l YANKEE ATOMIC ELECTRIC COMPANY

o. Cost Control and Plannina Manaaer
1. Reports to the Decommissioning Manager and Manager of Operations. l I

, 2. Coordinates and monitors Decommissioning fund ) expenditures. 1

3. Responsible for preparation of the arnual l Decommissioning budget.
4. Responsible for tracking services and materials 4

associated with Decommissioning activities.

5. Responsible for developing strategic plans for Decommissioning activities.
6. Acts as Assistant Site Manager.  !

I

p. Automation Technoloov Department ( ATD) Manager
1. Reports to a Vice President.

l

2. Provides engineering software development and i support services to NSD departments, sponsor plants, and other clients, as requested or contracted.
3. Provides automated plant systems development and support services for sponsor plants and other clients, as requested or contracted.
4. Provides and implements advanced analytical and computational methods and systems to NSD, sponsors, and other clients.

Title:

Section I, Organization Page: 15 of 43 Rev.: 27 Date: December 20, 1996

 . . - .-      . . . . - - .             ~            . - . ~ - _ . -            . - < -      - - . - -    -,_,,x-~

J I I YANKEE ATOMIC ELECTRIC COMPANY 1 t

2. Plant'- Yankee. l l

1

a. Site Manaaer (Site Manager is Plant Manager q r

referenced to in Technical Specifications.) i  :

1. Reports directly to the Decommissioning Manager  !

and Manager of Operations. l

2. Acts as Chairman of the Plant Operation Review Committee with authority and responsibility as '

established in the Technical Specifications of the Site license. 1 1

3. Directly responsible for the safe. orderly and efficient operation of the site, and for compliance with the requirements of the license and applicable St' ate and Federal laws. and .

regulations. l I

4. . Responsible for the on-site implementation of the Operational Quality Assurance Program, Security Program and Fire Protection Prcgram.
5. Responsible for Site maintenance and repair.

l

6. Responsible for the control and surveillance of )

I all special nuclear material at the site.

7. Provides information and reports to the Yankee-Nuclear Services Division and the Nuclear Safety Audit and Review Committee as required  ;

and as directed by the Decommissioning Manager. l l

8. Provides for and coordinates review of industry operating problems with the aim of minimizing likelihood of occurrence at the plant.  !

l

Title:

Section I, Organization Page: 16 of 43 Rev.: 27 I Date: December 20,'1996 i l

i l 1 l ! YANKEE ATOMIC ELECTRIC COMPANY L l 9. Designates an alternate to the Site Manager during his absence with the authority and responsibility thereof.

10. Maintains communications with 'he Training Coordinator involving plant training needs. ,

i

b. Operations Manaaer
1. Reports directly to the Site Manager. .
2. Responsible for the safe, orderly, and efficient operation of the Site for compliance with the requirements of the license and applicable State and Federal laws and regulations.
3. Responsible for shift supervisors and operations support.
4. Administration of the Certified Fuel Handlers  ;

Training Program.

5. Administration of the Equipment Operators Training Program.
6. Coordinates Plant Quality Assurance activities with the Manager of Operations and Decommissioning Manager.
7. Coordinates Plant Fire Protection activities, including Fire Protection Training.
8. Coordinates tesiing of plant hydro requirements.

Title:

Section I. Organization Page: 17 of 43 Rev.: 27 Da te.: December 20, 1996

YANKEE ATOMIC ELECTRIC COMPANY

9. Maintains core component history file of all fuel, control rods, sources and incore detectors.
10. Accounts for all special nuclear material at the plant site.  ;
c. Shift Supervisor l
1. Reports directly to the Operations Manager.  ;
2. Responsible for plant operations in accordance with approved documents and specifications.
3. Responsible for preparing documents outlining system functions and operating modes.
4. Responsible for ensuring that personnel under his supervision perform their duties according to applicable licenses, specifications, safety rules, regulations, and certifications.

l

5. Responsible for ensuring that maintenance requests are provided for the repair or replacement of defective parts and/or componer.t s . l l

i

6. Responsible for verifying the operability of systems and/or components following maintenance or changes by providing for the performance of written test documents which incorporate the requirements and acceptance criteria contained in applicable design documents.
7. Responsible for ensuring that fuel handling operations are safely performed in accordance with approved procedures.

Title:

Section I, Organization Page: 18 of 43 Rev.: 27 Date: December 20, 1996

1 i YANKEE ATOMIC ELECTRIC COMPANY. I !' i l  ! l 8. Responsible for coordination and performance of l } hydrotesting. i r

d. Maintenance and Construction Manaaer  !

l

1. Reports directly to the Site Manager.  ;
2. . Directs the activities of Mechanical and Electrical Maintenance, Instrumentation and )

Control, and Maintenance Engineering.

3. Coordinates the review and update.of plant drawings and specifications.
4. Directs plant maintenance, repairs, and design changes and assures compliance of maintenance activities to applicable State, Federal, and license requirements.
5. Prescribes ar.d directs schedules, and programs, as necessary, to assure the safe
                                                              ~ decommissioning of the site.
6. Provides for major contractor decommir,sioning support including establishment of appropriate contractual arrangements.

l

7. Ensures that contractor decommissioning activities are performed in a safe manner. ,
8. Directs on-site engineering and craft support of decommissioning activities.
9. Coordinates and transmits-information concerning Plant changes to the Manager of Operations and Decommissioning Manager.

l

Title:

Section I, Organization Page: 19 of 43 Rev.: 27 Date: December 20, 1996

                                                                    -.              -_.                           - - - - _ - . - . ~ .               -
        .                 ~~                      _    _                  _    . __  _.

l l I YANKEE ATOMIC ELECTRIC COMPANY l l e. Trainino Coordinator L 1. Reports directly to the Site Manager.

2. Responsible for scheduling and documentation of plant general employee training.
3. Responsible for administration of all plant staff training.
4. Maintains lines of communication with the Site Manager on Plant Training Programs.
f. Site Services Supervisor
1. Reports directly to the Site Manager.
2. Supervises the Store Supervisor.

a) Preparation of requisition for purchase orders. b) The receipt, handling, and storage of materials and equipment. l c) Administering a system of material and equipment identification.

  • d) Maintaining a system which provides traceability and retrievability of Quality Assurance documentation for purchased materials.
3. Coordinates the review, revision, and distribution of procedures.

Title:

Section I, Organization Page: 20 of 43 Rev.: 27 Date: December 20, 1996 i

9 0 3 YANKEE ATOMIC ELECTRIC COMPANY

                                                                                                                                                   ~

a 4

4. Responsible for the operations of the Plant' Document Control Center for the retention of 4

specified Quality Assurance records, reports. and personnel records, f Y 1

5. Maintains and disseminates information  ;

i regarding codes, criteria, standards, l l guidelines, and policy to applicable plant personnel.  ; ] 6. Supervises Plant Administrative personnel.  !

7. Responsible for the Fitness for Duty Program.  ;

i.

i
g. Plant Radiation Protection and Chemistry Manaaer j i

! 1. Reports directly to the Site Manager. , 1 2. Directs maintenance of water conaitioning on } the site as per specifications and/or  : 9 documented and authorized recommendations. 1 i i~ 3. Directs a program to ascertain the J l radioactivity levels of liquids, gases and , ! solids as required. i

4. Directs the review and interpretation of
chemistry test result's.

1 i 5. Directs'the documentation and maintenance of

chemistry and radiation protection records.

l I 6. Responsible for the development and implementation of the Radiation Protection

Program (including ALARA), assuring that these programs meet site standards and State and
!                                                                         -Federal license requirements.

Title:

Section I, Organization i Page: 21 of 43

}              Rev.:            27 l              Date:            December 20. 1996 I

i 4 e g a- _ _ - ., -,+w ~ . . , . . --- ,-m , - ,e . , , ..- r .

YANKEE ATOMIC ELECTRIC COMPANY

7. Directs the maintenance of the Personnel Exposure Record System.
8. Directs radioactive material shipments and receipts pursuant to site and government regulations.
9. Maintain stop work authority when radiological safety is jeopardized or when unnecessary personnel exposure is occurring.
h. Health and Safety Supervisor
1. Reports directly to the Site Manager.
2. Directs the plant Medical Services Program and acts a plant management's point of contact relative to medical matters in coordination with the Plant Medical Consultant.
3. Directs the maintenance of personnel medical records.
4. Responsible for the development and implementation of the plant Occupational Safety programs, assuring that these programs meet site standards and Federal OSHA requirements.
5. Responsible for review and communication of plant safety policies through the plant safety manual and safety meetings.
6. Responsible for work site inspections by safety department personnel.
7. Acts to safeguard worker health and safety.

Title:

Section I. Organization Page: 22 of 43 Rev.. 27 Date: December 20, 1996

YANKEE ATOMIC ELECTRIC COMPANY

8. Directs the review and interpretation of occupational safety exposure monitoring.
9. Directs the maintenance of personnel exposure monitoring record system.
3. Vermont Yankee Nuclear Power Corporation
a. Vice President. Operations
1. Reports to the President - Vermont Yankee Nuclear Power Corporation.
2. Ensures the 0A Program is effectively implemented.  :

~

3. Evaluates disposition of In-Plant Audits and prepares concurrence directives to the plant.
4. Ensures that applicable programs and procedures effectively implement the OA Program.
5. Reviews and approves all changes to the Operational Quality Assurance Program.
6. Appoints the NSAR Committee members including i Chairman and Vice Chairman.
7. Acts as the Manager of Operations.
                                                                                      ]

l

b. Director of Enoineerino i
1. Reports to the Vice President. Operations.
2. Responsible for the engineering support area.

Oversees the planning, scheduling, and

Title:

Section 1, Organization Page: 23 of 43 Rev.: 27 Date: December 20, 1996 i

                   -  ..                    ~         -     .

1 l l YANKEE ATOMIC ELECTRIC COMPANY direction of activities of employees engaged in design changes and alterations. I l

3. Reviews and approves safety-related design  ;

change documents, selected plant programs and ' policies. i I

4. Provides for review and approval of drawings and specifications. 1
5. Provides for interfacing between the Plant and the Yankee Nuclear Services Division.
c. Trainina Manaaer i 1
1. Reports to the Vice President, Operations.  ;

I

2. Establishes and maintains all operator and plant training programs. l j
3. Remains current on all regulatory requirements concerning training and qualifications of plant personnel and ensures that Plant training programs and procedures are revised in a timely manner in response to changing needs and regul ati ons .
4. Provides overall coordination and supervision for the Technical Support Training Supervisor, the Engineering and Maintenance Training Supervisor, the Operations Training Supervisor, and the Training Support Supervisor in carrying out their duties.

I'

5. Evaluates the effectiveness of the training programs and the performance of the individuals participating in the training.

1

Title:

Section I, Organization Page: 24 of 43 Rev.: 27 Date: December 20, 1996  ;

YANKEE ATOMIC ELECTRIC COMPANY

4. Plant - Vermont Yankee i
a. Plant Manaaer .
1. Reports to the:Vice President. 0perations.  ;
2. Directs the on-site implementation of the j Operational Quality Assurance Program. j
3. Prescribes and directs the development of Plant procedures, instructions, schedules, and programs as necessary to assure the safe and dependable operation of the facility.
4. Maintains a thorough knowledge of, and assures compliance with, the regulatory requirements for operating a nuclear power plant.
5. Directs the preparation and maintenance of power plant records, reports, and logs.
6. Acts as Chairman of the Plant Operations Review Committee with authority and responsibility as established in the Technical Specifications of the plant operating license.
7. Provides information and reports to the Yankee j Nuclear Services Division as directed by the Vice President, Operations.

l

8. Provides information and reports to the Nuclear )

Safety Audit and Review Committee as required and as directed by the Vice President, Operations. ) i

9. Directs the control and surveillance of all I special nuclear material on site.

Title:

Section I, Organization Page: 25 of 43 Rev.: 27  ! Date: December 20, 1996 i i 4 w , - - - - - , , ->n. w,--- --- - , , - , ,- - - - - , - + - . m - - - .-m---- .w,- s,,-

l i YANKEE ATOMIC-ELECTRIC COMPANY -l

10. Assure the implementation-of '

f training / retraining programs as required by the- ' Plant license, regulations, or applicable l standards; and as necessary to assure safe work practices and compliance with standard  : ! operating practices, license and Technical 'l Specifications, safety rules,. and applicable , regulations.  ! l b ., Operations Suoerintendent

1. Reports to the Plant Manager.
2. Oversees planning, scheduling, coordination, and direction of activities of employees engaged in the installation, operation, inspection, and maintenance of all equipment, buildings,'and structures as appropriate. Is responsible for the Operations Maintenance, and Instrumentations and Control areas.
3. Assists in the development of Plant procedures, instructions, schedules, and programs as necessary to assure the safe and dependable operation of the facility.
4. Maintains a thorough knowledge of, and assures compliance with, the regulatory requirements i for operating a nuclear power plant. I i
5. Acts as Vice Chairman of the Plant Operations l I

Review Committee with responsibilities as established in the Technical Specificatic as of  ; the plant operating license. ) i i

Title:

Section I, Organization Page: 26 of 43 Rev.: 27 Date: December 20, 1996

                                                                                                                                            )

l 1

  . _ _ _ . - - . _ _ - . ~                     _ .                         . _ .       . . . . _ . . . _ - - _ _ . _ . . . . _ . _ _ _ . _ .        _ _ . . . _ _

~ j YANKEE ATOMIC ELECTRIC COMPANY 4 f i i l l 6. Directs the preparation and maintenance of power plant records, reports, and logs es- [ applicable.

                                                                                .7.      Provides information, reports, and records as
directed by the Plant Manager.
8. Assists in directing the establishment of safe work practices, and the training and

].

instruction of plant personnel in the observance of standard operating practices, NRC 1

lier 4e and Technical Specifications, safety [ rt..es and regulations. }' c. Technical Services Superintendent i . i l 1. Reports to the Plant Manager. l 4 q! i

2. Responsible for the Reactor Engineering, i Security, Radiation Protection, and Chemistry Departments.  ;

i

3. Assists in the development of Plant procedures,

) instructions, schedules, and programs as - l necessary to assure the safe and dependable , ) operation of the facility and the safe conduct , ! of refuel operations'. ) i

4. Maintains a thorough knowledge of, and assures
compliance with, the regulatory requirements of a nuclear power plant, t
5. Acts as Vice chairman of the Plant. Operations l Review Committee with responsibilities as- I l established in the' Technical Specifications of the plant operating license.

1 4 s

Title:

Section I. Organization

Page
27 of 43 i Rev.: 27 d Date: December 20, 1996 i

W y ev-. .

                                                                                                                                              <- - -               n -

YANKEE ATOMIC ELECTRIC COMPANY

6. Directs the preparation and maintenance of power plant records, reports, and logs as applicable.
7. Provides information, reports, and records as directed by the Plant Manager.
8. Assists in directing the establishment of safe work practices, and the training and instruction of plant personnel in the observance of standard operating practices, NRC license and Technical Specifications, safety rules and regulations.
d. Pro.iect Enaineerina Manaaer
1. Reports to the Director of Engineering.
2. Oversees and manages the Project Engineering efforts necessary to support emergency needs of the plant.
3. Provides for the generation of project plans, schedules budget, manloadings, etc. necessary to support field activities.
4. Manage the contracts, contractors used to accomplish projects, and oversee project implementation.
5. Develop maintenance and oversight of implementation of programs and procedures  !

associated with Project Engineering.  !

6. Maintain formal documentation of Project Engineering activities for required operation and license requirements. ]

Title:

Section I, Organization 1 Page: 28 of 43 ) Rev.: 27 Date: December 20, 1996 I

_ _ . . _ _ _ . . . _ . . _ . . . _ . . _ _._-._.m ._ . . - . . _ m-._ ~ -__ YANKEE ATOMIC ELECTRIC COMPANY

7. Fulfills other responsibilities common to all supervisory positions and carries out other  !

duties and. responsibilities as may be. assigned by the Director of Engineering. l

e. Technical SuoDort Manaaer l
1. Reports to the Director of Engineering.
2. Oversee and manage programs rssociated with the technical / administrative supports areas.

3, Maintain formal documentation associated with the technical and administrative activities for required operational and licensee documentation.

4. Fulfills other responsibilities common to all supervisory positions and carries out other  ;

duties and responsibilities as may be assigned by the Director of Engineering.

5. Oversee and manage Fire Pro' action Program.
f. Performance Enoineerina Manaaer
1. Reports to the Vice President, Operations. l
2. Provides engineering support to Operations and '

Maintenance departments.

3. Assess the performance of plant systems and make recommendations for improvement.

I

4. Oversee and manage programs associated with the l performance engineering function.

l

Title:

Section I, Organization Page: 29 of 43 Rev.: 27 Date: December 20, 1996

_ . . _ . . _ . _ . _ . _ . . _ _ . - . . . . _ . . _.._ .. . , _ _ . _ _ _ . . . . _ . _ . ~ . . . _ . _ . . _ . . I e YANKEE ATOMIC ELECTRIC COMPANY L i

5. Maintain formal documentation associated with  !

performance engineering programs for required , operational and license requirements.

6. Fulfills other responsibilities common to all supervisory positions and carries out other .,

duties and responsibilities as may be assigned  ; by the Director of. Engineering.  : i

g. Nuclear Services Manager I
1. Reports to the Director of Engineering.  !
2. Oversees and manages programs associated with nuclear services including the areas of nuclear  !'

and environmental engineering and fuel management.

3. Maintains formal documentation associated with
                                                                        . nuclear services for required operational and                           l license requirements.                                                      ;

i

4. Provides administrative support for NSD employees at the plant site.

l

5. ' Fulfills other responsibilities common to all j supervisory positions and carries out other  ;

duties and responsibilities as may be assigned by the Director Engineering.  :

                                                                                                                                                    )'
h. Desian Enoineerino Managers
1. Reports to the Director of Engineering. I l

l

2. Oversee and manage the electrical /l&C/

mechanical / fluid systems engineering efforts

Title:

Section I. Organization Page: 30 of 43 Rev.: 27 Date: December 20. 1996

                  - _      .        - . . . _ ~ - . . - . . - . .. - . . . . _ ~ - _ . . - . - .

l t YANKEE ATOMIC ELECTRIC COMPANY  !; necessary to support the normal and emergent j needs of the plant. i

3. Oversee and manage programs associated with  ;

design engineering. )

4. Provide for the generation of design change and i installation documents, and support for the I installation of these design changes and the i close-out of associated documentation. I
5. Maintain formal documentation of plant design basis and design change activities for required operational and license requirements.
6. Fulfills other responsibilities-common to all supervisory positions and carries out other duties and responsibilities as may be assigned -

by the Director of Engineering.

1. Operations Manaaer
1. Reports to the 0,.arations Superintendent.
2. Fulfills duties and responsibilities similar to and/or as described in the FSAR and is directly i in charge of the Operations Department. I
3. Has the responsibility and authority for insuring the safe and efficient operation of j the plant and its supporting systems in j accordance with applicable station licenses, Technical Specifications, procedures, j instructions, established company policy and safety rules.

l

Title:

Section I, Organization Page: 31 of 43 i Rev.: 27 Date: December 20, 1996

l I

1.  ;

YANKEE ATOMIC. ELECTRIC COMPANY  :! i

4. Consistent with plant policies and applicable instructions, institutes necessary programs, issues instructions, originates-procedures and insures that department administrative systems exist such that the responsibilities assigned to the Operations Department are executed ,

effectively and efficiently in accordance with- '{ 3 company intent. Insures that necessary  ! documentation is prepared, reviewed, approved, and properly processed to. verify that ' I department activities meet all established requirements. *

5. Maintains current status of Operations l Department activities and requirements.

Prepares and maintains, plans and schedules for' department commitments such as personnel 2 training, retraining and qualification, f

6. Insures that all records, tests, reports, and logs maintained by the Operations Department are properly reviewed and approved.
7. Insures that all Operations Department perscnnel in a training status are actively pursuing the established program and that their performance is being adequately evaluated.
8. Reviews all Operations Department procedures to insure that they are current, accurat., and ,

approved.

9. Implements aspects of the Plant Quality Assurance Program which relate to the activities of the Operations Department.

Title:

Section 1, Organization Page: 32 of 43 Rev.: 27

          .Date:       December 20, 1996
   ...-.-=.-              ....-      _.-.-._--                ..- ..        ~...         -     _.~ -
1 i

YANKEE ATOMIC ELECTRIC COMPANY

j. Instrument & Control Manaaer i j
1. Reports to the Operations Su)erintendent. .i I.

4

2. Fulfills duties and responsibilities similar to
and/or as described in the FSAR and is directly. 'I

$ in charge of the Instrument and Control Department. ].; 3. Plans, schedules and supervises the activities of the Instrumentation and Controls Department. I Such activities to include: installation, inspection, calibration, adjustment, , maintenance, and repair of the plant [ instrumentation and controls.

4. Coordinates the activities of the Instrument and Controls Department with all other plant
j. functions. -

j . j 5. Establishes and directs a program of preventive maintenance, calibration, and surveillance i testing as required by the plant license, , I approved plant procedures, or other plant ' j requirements. I

6. Establishes calibration techniques, l frequencies, and records as necessary to assure reliable indication and control for plant l system parameters. l
7. Establishes and directs a program of  :

departmental training that will assure a staff j of Instrumentation and Controls personnel ' capable of safely and efficiently performing their duties in accordance with established practices, procedures, and r?gulations.

Title:

Section 1,' Organization Page: 33 of.43 i Rev.: 27 Date: December 20, 1996 l l

 -- .      - . - -    ..   - . _ , - = . - - . ,              .   -.    .  .. _ . - _ - - - - - - . . - . - - .

l l l l YANKEE' ATOMIC ELECTRIC COMPANY l

8. Prepares and/or supervises the preparation of~

reports, logs, and 'istorical records as i required.

9. _

Implements those aspects of the'P1 ant'Ouality- l' Assurance Program.which relate t'o the activities of the Instrumentation and Controls l Department.

10. Develops and maintains, in accordance with  ;

approved plant procedures, the procedural controls necessary to fulfill the above  ! responsibilities,

k. Maintenance Manaaer
1. Reports to the Operations Superintendent.
2. Fulfills duties and responsibilities similar to and/or as described in the FSAR and is directly-  !

in charge of the Maintenance Department.

3. Is responsible for all electrical and mechanical maintenance activities.throughout the Plant with the exception of Instrumentation and Control maintenance activities.
4. Consistent with plant policies and applicable instructions, institutes necessary programs, issues instructions, originates procedures, and insures that department administrative systems exist such that the resr:onsibilities assigned .] '

to the Maintenance Department are executed ! effectively and efficiantly in accordance with [ company intent. Insures that necessary l documentation is prepared, reviewed, approved. l l

Title:

Section I, Organization l Page: 34 of 43

                                                                                                                   ~

i Rev.: 27 Date: December 20. 1996 l L

E YANKEE ATOMIC ELECTRIC COMPANY and properly filed to establish that department activities meet all requirements. ! 5. Consistent with plant policies and applicable I instructions, organizes department functions-

                                                                      'and activities, assigns duties, and schedules l                                                                       personnel to accomplish department-requirements. Reviews and supervises.all department assignments.
6. Maintains current status of department ,

activities and requirements. Prepares and maintains long-range plans and schedules for department commitments such as personnel training and qualification, preventive l j maintenance, material procurement, plant modifications, etc.

7. Staffs and trains Maintenance Department-personnel.

i

8. Establishes and maintains equipment history )

records. l l

9. Selects and orders materials and spare parts in areas of assigned responsibility.
10. Implements aspects of the Plant Quality  !

Assurance Program which relate to the activities of the Maintenance Department. ,

11. Reviews mechanical and electrical equipment ,

l' failure frequency and evaluates equipment -l i reliability. l l

12. Assumes responsibility for the condition, )

maintenance, and reliability of all plant i )

Title:

Section I, Organization 1 j Page: 35 of 43 i

 ;             Rev.:            27 i              Date:            December 20, 1996 i

4

 . _ _ _ . - _ . . _ . - . _ _ _                                  _ _              _ . .     . . _ - . . - . _ - . _ _ . _ ~ . . _ - _ . _ . . . _ _ _ . _

L  ; L < l I I i YANKEE ATOMIC ELECTRIC COMPANY j i I electrical and mechanical equipment other than  ; I that'specifically assigned to other.  ! departments. l

1. Chemistry Manager i
1. Reports to the Technical _ Services j Superintendent. ,

i

2. Fulfills duties and responsibilities similar to and/or. as described in the FSAR and is directly i in charge of the Chemistry Department. {

t

3. Consistent with the policies and applicable {

instructions,' institutes necessary programs, . l issues instructions, originates procedures, and l insures that department administrative systems j exist such'that the responsibilities assigned ] to the Chemistry Department are executed  ! effectively and efficiently in accordance with  ; company intent. Insures that necessary.  ! documentation is prepared, reviewed, approved, . and properly filed to establish 1: bat department j activities meet all requirements.

4. Consistent with plant policies and applicable instructions, organizes department functions and activities, assigns and schedules personnel to accomplish' department requirements. Reviews and supervises all department assignments.
5. Maintains current status of department activities and requirements. Prepares and maintains long-range plans and schedules 'for department commitments such as personnel training and qualification, preventive i

Title:

Section I, Organization Page: 36 of'43 ) Rev.: 27 l Date: December 20,.1996 j l

  ..._ .._._.. _ . ._.. _ ._.._.. . . _ _ _. ~ . _ ._-_                    _.- _ .___ _ _ _ _ _ . _ __._. _ .-     . _ _ . . . . m l

YANKEE ATOMIC ELECTRIC COMPANY maintenance, material procurement, plant modifications, etc. l

6. Assumes responsibility for providing the-necessary administrative supervision and required personnel to meet the needs of the established Radiological Environmental Monitoring Programs.
7. Prescribes and maintains chemistry conditions and purification of coolants'within applicable limits.
8. Develops and maintains records of all chemistry and radiochemistry aspects of the plant,
m. Radiation Protection Manaaer
1. Reports to the Technical Service.s Superintendent.
2. Fulfills duties and responsibilities similar to and/or as described in the FSAR and is directly in charge of the Radiation Protection Depa rtnent .
3. Consistent with the policies and applicable instructions, institutes necessary programs, issues instructions, originates procedures, and insures that department administrative systems exist such that the responsibilities assigned to the Radiation Protection Department are executed effectively and efficiently in accordance with company intent. Insures that necessary documentation is prepared, reviewed, approved, and properly filed to establish that department activities meet all requirements.

Title:

Section I, Organization Page: 37 of 43 Rev.: 27 Date: December 20, 1996

f I YANKEE' ATOMIC ELECTRIC COMPANY

4. ' Consistent with plant policies and applicable instructions. organizes department functions and activities, assigns and schedules personnel i to accomplish department requirements. ReYiews i and supervises all department assignments.
5. Maintains current status of-department  !

activities and requirements. Prepares and , maintains long-range plans Land schedules -for  ! department commitments such as personnel j training and qualification preventive i maintenance, material procurement, plant modifications, etc. l t

6. Develops and maintains records of all radioactive waste shipments.
7. Develops work and housekeeping practices in _;

radiologically controlled areas of. the plant to minimize personnel exposure and the spread of. radioactive contamination.

8. Assumes responsibility for receipt, storage, shipment, and disposal of radioactive material utilizing proper Federal and State regulations (other than nuclear fuel).
n. Reactor Enoineerino Manaaer
1. Reports to the Technical Services Superintendent.
2. Fulfills duties and responsibilities similar to and/or as described in the FSAR and is directly in charge of the Reactor Engineering Department.

Title:

Section I, Organization Page: 38 of 43 Rev.: 27 Date: December 20, 1996

      ~..         ...~     .    - .-. -. - -                     -_..        _ -.. - - .. . .- -                                  .  -.      . - . . . - - . _ -

f i YANKEE ATOMIC ELECTRIC COMPANY f

- 3. Plans, schedules, and supervises the activities
                                                                                                                                                                 )

! of the Reactor Engineering Department. Such i activities to include: nuclear and thermal core analysis, pl:r.ning and scheduling of fuel l rearrangements and fuel cycling, rod withdrawal i i sequences, rod patterns, and reactor maneuvering during plant startup. le ! 4. Coordinates the activities of the Reactor i Engineering Department with all other plant L functions. l- 5. Establishes and directs a program of Nuclear Performance Monitoring and Surveillance Testing l as required by the plant license, approved ' l l plant procedures, or other plant requirements. I l 6. Establishes a program of control, , accountability and-record keeping as required I to maintain an accurate inventory of licensed special nuclear material, l l l 7. Establishes and directs a program of ! departmental training that will assure a staff of Reactor Engineering personnel . capable of safely and efficiently performing their duties l  ! in accordance with established practices, procedures, and regulations.

8. Prepares and/or supervises the preparation of l reports, logs, and historical records as l

required. I j.

9. Implements those aspects of the Plant Quality l Assurance Program which relate to the activities of the Reactor Engineering
Department.

i j

Title:

Section I, Organization Page: 39 of 43  ;

Rev.
27 l Date: December 20, 1996 I
    ,y-   , - _ -                            ,-yy~ s,-- . , .            ,-_        ,-m          , -.-- , . . . . - , , - . .                 .,  --._s -

_ _ . _ - _ . . _ . - .._. _ . . _ . . . - - . _ _ , ,m _- .._ -__ _ . _ __ _ _ ._- YANKEE ATOMIC ELECTRIC COMPANY 5

10. Develops and maintains, in accordance with ,

approved plant procedures, the procedural I controls necessary to fulfill the above requirements. E. REVIEW AND AUDIT  ! Two committees have been established for Yankee and the Vermont Yankee plants whose objectives are to insure the plant is e operated safely, utilizing good engineering practices. The  : committees are charged with making recommendations to modify  ! operationai methods or safety precautions. { The Plant Operations Review Committee, is made up of Plant .

                              -personnel. The Nuclear Safety Audit and Review Committee for                             !

Vermont Yankee, shall have no more than three members selected I from the organization reporting to the Manager of Operations. ' The Yankee Nuclear Safety Audit and Review Committee shall not be  ! members of the plant staff.  !

1. Plant Operations Review Committee l
a. Yankee Plant - See Section 6.5 " Review and Audit" of [

Appendix A Technical Specifications to the Operating l License DPR-3.  !

b. Vermont Yankee Plant - See Section 6.2.A " Review and Audit" of Appendix A Technical Specifications to the Operating License DPR-28.
2. Nuclear Safety Audit and Review Committee j
a. Yankee Plant - See Section 6.5 " Review and Audit" of Appendix A Technical Specifications to the Operating License DPR-3.

1 I

Title:

Section I, Organization I Page: 40 of 43 Rev.- 27 Date: December 20, 1996- l

                                                                                                                         )

i i

     . _      ~                           . _ _ _           .._ _ . _.                               ,

YANKEE ATOMIC ELECTRIC COMPANY

b. Vermont Yankee Plant
1. See Section 6.2.B " Review and Audit" of Appendix A Technical Specifications to the Operating Liccase DPR-28.
2. The NSAR Committee shall be responsible for l evaluating changes to the Vermont Yankee j organizational chart (Figure 2 to Section 1). .)

l l I l 1 I i l l l l

Title:

Section I, Organization Page: 41 of 43 Rev.: 27 Date: Decer.ber 20, 1996

k = o :o o -e i

           %EE                             $                                                                                                                                                                                                                                                                                                                                                                    t 2
EU AU2E' 2~ o R '@ 3 YANKEE ATOMIC 5 **'- ELECTRIC COMPANY >

E a wo-

                              **S                                                                                                                                                                                                                        PRESIDENT m                  2 ' .~
           .o                 !;

U U DIRECTOR VICE DECOMMISSIONING NUCLEAR SAFETY EXECUTIVE l 8 - o ENGINEERING PRESIDENT (S) MANAGER AND MANAGER OF OPERATIONS AUDIT AND REVIEW COMMITTEE QUALITY ASSURANCE DIRECTOR.

s SERVICES i
                                                                                                                                                                                                                                                                                                                                                                                                          =

FUEL ENVIRONMENTAL ENGINEERING PROJECT COST / SCHEDULE _ ENGINEERING OA N m MANAGEMENT LABORATORY & LICENSING MANAGER l MANAGERS MANAGERS - CONTROL MANAGER DIRECTOR DIRECTOR y 4

-4 E

E  !

                              ^

I  ;

                     - -h^ R P O_RA_TE _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _                                                                                                                                                                                                                                                                                                      a    t n   i GA SURVEILLANCE                                                                         l SITE       ,,,,,,,,,,_,,,,,_,,,,,,,,,

n MANAGER

                                                                                                                                                                                                                                                                                                                                                     &                                                    o   I INSPECTION GROUP                                                                     2 PLANT OPERATIONS i   !

REVIEW COMMITTEE i a I"TENA"CE a OPERATIONS RP/ CHEMISTRY SITE SERVICES TRAINING l ASSISTANT HAQYA DNSTpuCT}9q SITE MANAGER MANAGER - MANAGER SUPERVISOR COORDINATOR  ! SUPERVISOR MANAGER FUNCTIONAL

                                                                                                                                                                                                                                                                                                         ----------                   COMMUNICATIONS                                                          ,.

t i l, I

                        . _ _     _ _ _ _ .       _      _ . _ _ . _ . _ _ . . _ _ _ _         ._____m    _ _ _ _ _ _ _ . .   ..___.m._  ____.--_.__-_______.___.__.m____--___.m_____._.___________________._______.._._._m____                                                  -

_____m_ _ _ _ _ _ _ _ . _ _ . _ _ _ _ _ _ _ _ - _ _ _ _ _

            . ..                 .                       .                                        ,                                     ,        . - . . . .                      - . - - . .                    -             - ..              .  . _ ~ . -,                                - - . - - . .       - . . - .    -.

o :o o --o e to o e < v.o e to - to -

                    .                                                                                                                            VERMONT YANKEE ORGANIZATION PRESIDENT                                                                                                                                                                                                                                                     '

o N A < ri vi & CHIEF

 *NW*            **                                                 EXECUTIT-S B

o 3 'O S

       %o7 -

OFF CER YANREE ATOMIC ro $*O . - - - - - - . - ---------- Elgp TR C .

          -<.       .                                                                                                                                                   PRES DENT m        m         .-.                                                                                                                                                                                                                                                                                                           ,

o :s ,

  • K l l  ;
  • VICE PRESIDENT }
  • l I G

e o ADMINISTRATION / FINANCE & PRE NT VICE EXECUTIVE m OPERATIONS (1) l PRESIDENT (S)

          ]

TREASURER ' DIRECTOR QUALITY ASSURANCE NUCLEAR ENGINEERING TRAINING SAFETY AUDIT DEPARTMENT > MANAGER REVIEW

  • MANAGERS GA COMM.(4) n m

MANAGERS t m

                    --------------------                  . . = - -               .-= -                                                      =_           . . . . . . - - - - -  --------------------------                                   -            5-.

l l E DIRECTOR OF e PLANT ENGINEERING l MANAGER OA e m (2),(3) PERFORMANCE ------------ ----------------- SURVEILLANCE GROUP. l s Q

                                                                                                                                                                                                                                                                                                                            ;m ENGINEERING MANAGER

{ g I I . TECHNICAL  ! Q OP DNS ENT SU NT { { , COMITTEE . I e <

                            .                   l                                                                            I                                                            I                        I                               l REACTOR INSTRUMENT                           RADIATION                                                                  CHEMISTRY OPERATIONS         MAINTENANCE                                             PROTECTION                                                                                          ENGINEERING                                  !
                                                                 & CONTROL                                                                                                       MANAGER MANAGER            MANAGER                                                       MANAGER                                                                                        MANAGER MANAGER                                                                                                                                                                          l t

i I i l l I PROJECT- TECHNICAL 8 NUCLEAR . DESIGN

  • ENGINEERING SUPPORT l SERVICES ENGINEERING MANAGER MANAGER e MANAGER . MANAGERS Notes:

(1) Responsible for fire protection. i (2) ANSI 18.1-1971 Re: License. (3) In Health Physics matters. the Radiation Protection Manager has direct access to the Plant Manager. (4) The committee membership and its Chairman and Vice Chairman shall be appointed by the Vermont Yankee Vice President. Operations. coeOZERWmG2 S

s

                                          ' YANKEE ATOMIC ELECTRIC COMPANY
    ~II.       $AllTY ASSURANCE PROGRAM                                                                              i 4                    .

A. SCOPE l 3 This section establishes the criteria to be applied to systems I requiring Quality Assurance which prevent or mitigate the consequences of postulated accidents which could cause undue risk

to the health and safety of the public. The structures, systems, components and other items requiring quality assurance are listed
in the Yankee Safety Classification of Systems Manual for the Yankee plant. A listing for tne Vermont Yankee plant is provided

. in the Vermont Yankee Safety Classification Manual. B. . RESPONSIBILITIES U

1. Compliance with the requirements of the Operational Quality Assurance Program - based on the criteria of Title 10 of the Code of Federal Regulations, Part 50, Appendix B, and

- ANSI N18.7-1976 - shall be.the responsibility of all

personnel involved with activities affecting operational I safety. Each facility shall have a matrix of major quality assurance procedures cross referenced to each applicable

. criteria of 10CFR50 Appendix B. The. performance of quality-related activities shall be accomplished with { specified equipment under suitable environmental

conditions.

l Note: Each criterion section for the Program incorporates the designation of specific organizational j responsibilities.

2. Individuals having direct responsibilities for establishment / distribution control / implementation of the Operational Quality Assurance Program are delineated in Section I " Organization" of the Program.

i

Title:

Section II, Quality Assurance Program Page: 1 of 7 Rev.. 27 Date: December 20, 1996

                                                                -   -e--        y    y y   -   .< -        -

w9,

YANKEE ATOMIC ELECTRIC COMPANY C. IMPLEMENTATION Establishment of an e,ffective Operational Quality Assurance Program is assured through consideration of and conformance with ' the Regulatory Fosition in the below listed Regulatory Guides as  ; modified in Appendix B. Implementation of this Program is assured through Quality Assurance procedures derived from Quality Assurance policies. goals and objectives. Quality Assurance , shall review Quality Assurance program procedures to assure their derivation from the policies, goals and objectives established by the President.

1. Title 10 of the Code of Federal Regulations, Part 50, Appendix B, Quality Assurance Criteria for Nuclear Power Plants
2. ANSI N18.7-1976, Administrative Controls and Quality '

Assurance for the Operational Phase of Nuclear Power Plants ] (Endorsed by Regulatory Guide 1.33, Revision 2) l l

3. ANSI N45.2.1-1973, Cleanina of Fluid Systems and Associated Components Durina Construction Phase of Nuclear Power Plants (Endorsed by Regulatory Guide 1.37, March 16,1973) l
4. ANSI N45.2.2-1972, Packaaina. Shippina. Receivina. Storace j and Handlina of items for Nuclear Power Plants (Endorsed by Regulatory Guide 1.38 Revision 2)  ;

I

5. ANSI N45.2.3-1973 Housekeepina Durino the Construction Phase of Nuclear Power Plants (Endorsed by Regulatory Guide l 1.39, Revision 2)
6. ANSI N45.2.4-1972, installation. inspection and Testina Reauirements for Instrumentation and Electric Eauipment Durina the Construction of Nuclear Power Generatina Plants (Endorsed by Regulatory Guide 1.30. August 11, 1972)

Title:

Section 11, Quality Assurance Program Page: 2 of 7 Rev.: 27 Date: December 20, 1996

_ . . ~ _ _ _ _ - _ _ . _ _ _ . _ . . - _ . I  ! l, ?:  ; ! i YANKEE ATOMIC ELECTRIC COMPANY

                                                                                                           )a
7. ANSI N45.2.5-1974, ,Suoolementary Ouality Assurance j Reauirements for It.sta11ation, insoection and Testina of Structural Concrete and Structural Steel Durina the Construction Phase of Nuclear Power Plants (Endorsed by l Regulatory Guide l.94, Revision 1) . t 1

l *

8. ANSI N45.2.6 1978, Qualification of' inspection. j l Examination. and Testina Personnel for the Construction {

Phase of Nuclear Power Plants (Endorsed by Regulatory i i- Guide 1.58. Revision 1) l t

9. ANSI N45.2.8-1975, Sucolementary Ouality Assurance Reauirements for Installation. inspection and Testina of Mechanical Eauioment and Systems for the Construction Phase of Nuclear Power Plants (Endorsed by Regulatory l Guide 1.116,: Revision 0-R)  !
10. ANSI N45.2.9-1974 Reauirements for Collection. Storaae, and Maintenance of Quality Assurance Records for Nuclear
                                                                                                          'l Power Plants (Endorsed by Regulatory Guide 1.88,                                    l Revision 2)                                                                         l l
11. ANSI N45.2.10-1973, Quality Assurance Terms and Definitions l

l

12. ANSI N45.2.11-1974, Quality Assurance Reauirements for the

[ Desian of Nuclear Power Plants (Endorsed-by Regulatory j Guide 1.64, Revision 2)  !

13. ANSI.N45.2.12-1977, Reauirements for Auditina of Quality I Assurance Proaram for Nuclear Power Plants (Endorsed by {'

Regulatory Guide 1.144, Revision 1) i i

14. ANSI N45.2.13-1976, Quality Assurance Reauirements for

{ Control of Procurement of items and Services for Nuclear l Power Plants (Endorsed by Regulatory Guide 1.123, Revision 1) l

Title:

Section 11, Quality Assurance Program Page: 3 of 7 , Rev.: 27 l Date: December 20, 1996 ,

I YANKEE ATOMIC ELECTRIC COMPANY

15. AN31.N45.2.23 1978, Qualification of Quality Assurance Program Audit Personnel for Nuclear Power Plants (Endorsed
                                                       ~ by Regulatory Guide 1.146, August 1980)
16. ANSI N18.1-1971, Selection and Training of Nuclear Pown Plant Personnel (Endorsed by Regulatory Guide 1.8, Revision 1-R)
17. Regulatory Guide 1.26. Revision 3, Ouality Grouo Classifications and Standards for Water . Steam . and Radioactive-Waste-Containino ComDonents of Nuclear Power Plants i
18. Regulatory Guide 1.29, Revision 3, Seismic Desian Classification Notes: 1) When conflicts in similar requirements contained in Technical Specifications and the above documents exist, the requirements contained in Technical Specifications override those in the documents. Requirements.in the documents will be considered when they supplement and are not in conflict with similar requirements in Technical. Specifications.
2) Revisions to the above' listed documents -

will be considered for applicability to the Yankee Operational Quality Assurance , Program upon written direction thereof by the Regional Administrator, Nuclear Regulatory Commission - Office of Inspection and Enforcement - Region I. 1 ! 3) Only those documents listed above shall j l be considered applicable to the Yankee  ; and Vermont Yankee plants. Documents l

Title:

Section II, Quality Assurance Program Page: 4 of 7  ! Rev.: 27 Date: December 20, 1996 1 __ -. -,

YANKEE ATOMIC ELECTRIC COMPANY , further referenced by the above-listed documents shall not be considered applicable. They may, however, be considered as guidelines.

  • Exceptions and alternatives to the provisions contained in this Standard / Guide are detailed in Appendix B.
4) This Program shall be applicable to those activities requiring quality assurance which occur commencing within 90 days after acceptance of the Program by the Nuclear Regulatory Commission.
5) The NRC shall be notified of changes, that reduce commitments in the accepted i description of the QA program, for their l review and acceptance prior to implementation. Acceptance will be assumed 60 days after submittal unless notified otherwise.

l

6) Changes that do not reduce 0A program l commitments shall be submitted to the NRC at least annually,
7) Editorial changes or personnel reassignments of a nonsubstantive nature do not require NRC notification.

l

Title:

Section II, Quality Assurance Program Page: 5 of 7 Rev.: 27 Date: December 20, 1996

l YANKEE ATOMIC ELECTRIC COMPANY D. MANAGEMENT EVALUATION l The Cognizant Corporate Officer directs a thorough evaluation of the established Operaticaal Quality Assurance Program by assigning the Nuclear Safety Audit and Review Committee the task of reviewing for compliance with and evaluating the effectiveness of quality related activities. E. TRAINING

1. The Vice President (s) and Manager of Operations are responsible for the indoctrination and training of their staffs involved with activities affecting quality during plant operatien and/or license commitment.

2, The Training Manager at Vermont Yankee is responsible for the indoctrination and training of plant staff personnel performing activities affecting operations or requiring quality assurance, and of the operators who are formally licensed or qualified.

3. The Training Coordinator at the Yankee Site is responsible for indoctrination and training of site staff personnel performing activities affecting license requirements.
4. Within YNSD, each department Director / Manager is responsible for the indoctrination and training of department personnel performing activities affecting quality in applicable design and engineering, test, operational, construction, or quality phases.
5. The indoctrination and training programs shall provide the f oll owi ng:
a. Instruction as to the purpose, scope, and implementation of quality-related manuals, instructions, and procedures.

Title:

Section II, Quality Assurance Program Page: 6 of 7 Rev.- 27 Date: December 20, 1996

l YANKEE ATOMIC ELECTRIC COMPANY

b. Training and qualification in the principles and techniques of the activity being performed.

l c. Documentation of the scope, objective, and method of implementing the program. l l

d. Maintenance of personnel proficiency by retraining, re-examining, and/or recertifying.

l l e. Documentation of the training sessions including l content, attendance, dates, and results where applicable. l l 1 l l i i l l l l i i l l I

Title:

Section 11 Quality Assurance Program Page: 7 of 7 Rev.: 27 Date: December 20, 1996

J l 5 YANKEE ATOMIC ELECTRIC COMPANY III. 'OESIGN CONTROL 1 A. SCOPE-I This section of the Operational Quality Assurance Program ) establishes measures to assure that the design of and cnanges to I structures, systems, and components covered by the Operational Quality Assurance Program are controlled. . B. RESPONS'IBILITIES

1. The Nuclear Services Division Quality Assurance Department shall be responsible for auditing design ' documents and ,

engineering specifications to verify that quality requirements, such as inspection requirements and acceptance criteria, have been included by the responsible parties. 1

2. The Nuclear Services Division Engineering / Project  !

I Departments / Plants shall be responsible for:

a. The design and control of design activities (including design interfaces) for the change of structures, systems, or components including the requirement for independent review. This NRC mandated review shall be performed by an uninvolved, but technically knowledgeable, person in the engineering discipline.
b. Identification, documentation, and control of deviations from specified design requirements and/or quality standards,
c. Design analysis and delineation of acceptance criteria for inspections and tests.

Title:

Section III, Design Control Page: 1 of 4 . Rev.: 27 Date: December 20, 1996

YANKEE ATOMIC ELECTRIC COMPANY

d. Verification of the adequacy of a specific design feature by implementation of a prototype test when required,
e. Review of inspection and test data for compliance with established engineering criteria.
3. The Plant Operations Review Committee shall be responsible for:
a. Review of all proposed plant changes and recommending )

their approval or disapproval to the Plant  ; Superintendent / Manager, ) i

b. Determination of whether proposed changes involve unreviewed safety questions. )

l

4. The Pir.nt Site Manager shall be responsible for: )
a. Review of the recommendations of the Plant Operations Review Committee.
b. Review and approval of proposed plant changes.
5. The Nuclear Safety Audit and Review Committee shall be responsible for the review of plant changes. l
6. The Vice President (s) and Manager of Operations and their staff shall be responsible for:
a. Aoproval of procedures for processing plant design
t. iges and engineering design changes.
b. Review, approval and distribution of plant change l documents.

l

Title:

Section Ill. Design Control Page: 2 of 4 Rev.: 27 Date: December 20. 1996 l~

m-____ m_.__...__ . . _ _ _ _ _ - . _ _ _ _ . _ _ _ _ _ _ . _ . . _ . _ _ . . _ . . _ . . _ . _ _ . _ _ . , i YANKEE ATOMIC ELECTRIC COMPANY

7. The Nuclear Services Division Plant Support Department shall be responsible for the distribution of design change -

documents to the contractor performing the work where contract administration responsibilities have been assigned. i l C. IMPLEMENTATION I

1. Satisfaction of.this criterion shall be' assured through the j implementation of the Nuclear Services Division and/or ]

plant actions listed below: l a. Correct translation of applicable regulatory L requirements and design bases lnto specifications, drawings and written documents. 1

b. Application of suitable design controls to such l activities as reactor physics; seismic, stress, l thermal, hydraulic, radiation, and accident analyses; compatibility of materials; and accessibility for inservice inspection, maintenance and repair.

l c. Design reviews to assure that design characteristics L can be controlled, inspected and tested. l

d. Performance of proper selection and accomplishment of design verification or checking process such as
l. design reviews, alternate calculations, qualification j testing or test programs. When a test program is l

used to verify the adequacy of a design, a

qualification test of a prototype unit under the most adverse design conditions shall be used. The responsibilities and qualifications of the verifier, the areas and features to be verified, the pertinent considerations to be verified, and the extent of documentation are identified in procedures.

Title:

Section III, Design Control ! Page: 3 of 4 Rev.: 27 I Date: December 20, 1996  ! l

l YANKEE ATOMIC ELECTRIC COMPANY l Procedures will provide the criteria that specify when verification should be by test. If the verification method is by test only, prototype, component, or feature testing is performed in accordance with written procedures prior to relying l upon the component, system, or structure to perform its function.

e. Subjection of design and specification changes, including those originating "on-site", to the same design controls and approvals that were applicable to the original design unless designated in writing to another responsible organization.
f. Documentation of errors and deficiencies in the design process that adversely affect safety classified structures, systems, and compcnents; performance of corrective action to preclude repetition.
g. Review of standard "off-the-shelf" commercial or previously approved materials, parts, and equipment that are essential to the safety functions of structures, systems, and components, for suitability of application prior to selection,
h. Selection of suitable materials, parts, equipment, e and processes for safety classified structures, systems, and components.
1. Establishment of procedures to assure that computer programs are verified and validated for a particular application.

Title:

Section 111, Design Control Page: 4 of 4 Rev. 27 Date: December 20, 1996

l YANKEE ATOMIC ELECTRIC COMPANY IV. PROCUREMENT DOCUMENT CONTROL A. SCOPE This section of the Operational Quality Assurance Program establishes the measures necessary to assure that applicable regulatory requirements, design bases and other requirements which are necessary to assure adequate quality, are suitably included or referenced in the documents for procurement of material, equipment and services. B. RESPONSIBILITIES

1. The Nuclear Services Division Quality Assurance Department shall be responsible for review of procurement requisitions initiated by the Plant and the Yankee Nuclear Services Division, except for Vermont Yankee who may request such reviews. The Vermont Yankee staff shall be responsible for the Procurement Requisition reviews.
2. The Plant or their corporate staffs shall be responsible for:
a. The preparation, review, issue, and control of purchase documents,
b. Preparation of detailed procedures as to how purchase documents are prepared, reviewed, approved, issued, and controlled,
c. Review of plant procurement requisitions (' mont Yankee plant only).
3. The Nuclear Services Division Engineering and/or Project Departments shall be responsible for:

Title:

Section IV, Procurement Document Control Page: 1 of 3 Rev.: 27 Date: December 20, 1996 l l

! l l l I i I

l. YANKEE ATOMIC ELECTRIC COMPANY i

! I i l-

a. Preparation of engineering specifications which  !

i.1 detail the technical and quality re_quirements for I material, equipment and services.  ! i l b. Initiation and/or review (Yankee plant only) cf  ! purchase documentation for material, equipment, and _l services required for Plant changes. { i 4. The Nuclear Services Division Plant Support Department _! !- shall be responsible for initiation and/or' review (Yankee  ! plant only) of purchase documentation for construction I services including contractor supplied material and , !- equipment required for. plant changes where contract  ! l admi_nistration responsibilities have been assigned. . i 1 l 5. For YNSD, the Vice President (s) and Manager of Operations  ; I and their staff shall be responsible for the review and j approval of procurement documents. For Vermont Yankee, l this function is performed by the Vermont Yankee staff. l j C. IMPl.EMENTATION { l .i l t

1. Satisfaction of the criterion shall be assured through the  ;

implementation of the Nuclear Services Division and/or j plant actions listed below: ! a. Documentation of the review and approval of t procurement documents prior to release and ! availability of this documentation for verification.  !

                                                                                                                           't
b. Identification of the vendor's applicable quality  ;

assurance requirements of 10CFR50, Appendix B and/or i ANSI N18.7, and/or other applicable codes, standards  ! or regulatory documents referenced in procurement } documents which are to be reviewed by the qualified I personnel knowledgeable in quality assurance. For , l 1 i  ! 1

Title:

Section IV, Procurement Document Control  ; i Page: 2 of 3 i l- Rev.: 27 1 Date: December 20, 1996 1

                                                                                                                             )

i i l l l l

YANKEE ATOMIC ELECTRIC COMPANY Vermont Yankee, this function will be the responsibility of the Vermont Yankee staff.

c. Identification in the procurement documents of the documentation to be prepared, maintained, and/or submitted to the purchaser prior to use, such as:
1. Drawings, specifications, procedures:
2. Inspection and fabrication plans;
3. Inspection and test records;
4. Personnel and procedure qualifications:
5. Chertical and physical test resulte material; and j l
                                                                                ~
6. Quality Assurance Department's right of the access to the vendor's facilities and records for surveillance and/or audit to procurement  !

documentation. i

d. Review and approval of changes and revisions to l procurement documents at least equivalent to those for the original document.
e. Control of procurement documents for spare and eplacement parts at least equivalent to that used for the original equiptrent.

Title:

Section IV, Procurement Document Control Page: 3 of 3 Rev.: 27 Date: December 20, 1996

l' i i l YANKEE ATOMIC ELECTRIC COMPANY  : 1 V. INSTRUCTION

S. PROCEDURE

S. AND DRAWINGS , I A. SCOPE j u -! This section of the Operational Quality Assurance Program l-l establishes the measures for prescribing and accomplishing- i activities requiring quality assurance in accordance with approved drawings, instructions, or procedures, j ! B. RESPONSIBitITIES Within Yankee Nuclear Services Division, each Department Director / Manager is responsible for establishing and complying i l with applicable procedures governing the activities affecting  ! quality. Persons preparing and approving documents are responsible for l assuring that specifications, instructions, procedures, and , drawings include appropriate quantitative or qualitative { acceptance criteria for determining that activities have been i satisfactorily accomplished; assuring that the applicable criteria of 10CFR50 Appendix B and/or ANSI N18.7 are_ specified:- and assuring that the documents are kept curreat. In addition, the following departments have the disi,inct responsibilities delineated below.

1. The Nuclear Services Division Quality Assurance Department I shall be_ responsible for review of all Plant Quality i Assurance procedures.

1

2. The ?! ant shall be responsible for the preparation, approval, maintenance, and implementation of all l

! instructions and procedures associated with plant I activities. l I' 3. The Nuclear Services Divis . n Engineering and/or Project Departments shall be responsible for:

Title:

S2ction V, Instructions. Procedures, and Drawings

;          Page:       1 of 2 1         Rev.:       27 Date:       December 20. 1996 a

YANKEE ATOMIC ELECTRIC COMPANY

a. Preparation and approval of engineering drawings and instructions, welding and nondestructive examination procedures, and procedures for Engineering Design Control.
b. Updating and control of original drawings and distribution of copies thereof.
4. The Plant Operations Review Committee shall be responsible for reviewing procedures affecting nuclear safety prior to their approval by the Plant Superintendent / Manager.
5. The Nuclear Services Division Plant Support Department shall be responsible for the preparation, approval, maintenance, and implementation of all instructions and procedures associated with Construction Services activities.

C. IMPLEMENTATION i i 4

1. Satisfaction of this criterion shall be assured through the implementation of the Nuclear Services Division and/or plant actions listed below:
a. Establishment of provisions which clearly delineate the sequence of actions to be accomplished in the preparation, review, approval, and control of instructions, procedures, and drawings. l
b. Review of inspection plans; test, calibration, l special process, maintenance and repair procedures:  !

drawings and specifications; and changes thereto by the Quality Assurance Department or other personnel knowledgeable in quality assurance. l

Title:

Section V, Instructions, Procedures, and Drawings Page: 2 of 2 Rev.: 27 Date: December 20, 1996

i

                                                                                       .1 YANKEE ATOMIC ELECTRIC COMPANY VI. DOCUMENT CONTROL A. SCOPE This section of the Operational Quality Assurance Program               ;

establishes the measures for controlling the. issuance of documents, including revisions thereto, which affect quality activities, j B. RESPONSIBILITIES

1. All participating departments shall establish document control measures which provide for the following:

4

a. Identification of organizations responsible for preparation, review, approval, and control of documents.  !
b. Identification of documentation to be used in i performing the activity,
c. Coordination and control of interface documents.
d. Establishment of distribution lists.
e. Action to be taken for obsolete or superseded documents.

in addition, the following organizations have the unique responsibilities delineated below. 4 2, The Plant shall be responsible for:

a. Controlling the issuance of plant operating,

] maintenance, repair, refueling, inspection and test,

                                 'and change documents.

Title:

Section VI. Document Control Page: 1 of 4 Rev.: 27 Date: December 20. 1996

YANKEE ATOMIC ELECTRIC COMPANY

b. Distribution and maintenance of all plant approved and/or revised documents assuring quality at the location where the activity is performed.
c. Review and distribution of drawings.
3. The Nuclear Services Division Engineering and/or Project Departments shall be responsible for:
a. Controlling the issuance of engineering drawings, specifications, welding and nondestructive examination documents.
b. Revision and distribution of welding and nondestructive examination documents.
c. Maintenance and distribution of engineering specifications and drawings.
4. The Vice President (s) and Manager of Operations and their staff shall be responsible for:
a. A system of review and approval of Plant drawings and specifications.
b. Controlling the Nuclear Services Division Operational Support quality assurance documents.
5. The Director of Quality Assurance shall be responsible for '

establishing the rieans for the control and distribution of the Operational 'auality Assurance Program and Approved Vendors List and revisions thereto.

Title:

Section VI. Document Control Page: 2 of 4 Rev.- 27 Date: December 20, 1996

YANKEE ATOMIC ELECTRIC COMPANY

                                                                                                       ]

C. IMPLEMENTATION  ; l

1. Satisfaction of this criterion shall be assured through the {

implementation of the Nuclear Services Division and/or l plant Lactions_ listed below:  ; I

a. Review and approval of document changes by the same '  ;

organizations that performed the original review and , approval or by other responsible organizations 3 delegated by the controlling authority. i

b. Inclusion of approved ' changes in instructions, i drawings, and other applicable documents prior to-l placing the system in operating status.

i

c. Provision of availability of documents at the l location where the activity is to be performed prior to commencing the work, i
d. . Establishment, revision, and distribution of a master l list or equivalent to identify the current revision j number of instructions, specifications, drawings, j procurement documents, or other quality assuring documents.
e. Control of documents identified as follows:
1. Design documents (i.e., Engineering / Plant Design Change Requests, Specifications, Calculations, etc.);
2. Design, manufacturing, construction, and installation drawings;
3. Procurement documents;

Title:

Section VI . Document Control Page: 3 of 4 Rev.:, 27 Date: December 20. 1996

                                                                       -   - . - - ,       y-

l i l YANKEE ATOMIC ELECTRIC COMPANY l l 4. Operational Quality Assurance Program, j maintenance, and operating procedures:

5. Manufacturing, inspection and test instructions:
6. Test documents:
7. Design changes; and
8. Nonconformance reports.
9. Event reports (Vermont Yankee).
f. Appendices to the Operational Quality Assurance Program are considered to be part of the Program and are reviewed and approved in accordance with the Program, l

4 l l 1 l l 1

Title:

Section VI Document Control Page: 4 of 4 Rev. 27 Date: December 20, 1996 l l

l YANKEE ATOMIC ELECTRIC COMPANY Vll. CONTROL OF PURCHASED MATERIAL. E0VIPMENT. AND SERVICES l A. SCOPE This section of the Operational Quality Assurance Program establishes measures to assure that purchased material, equipment and services, whether purchased directly or through contractors and subcontractors, conform to the procurement documents. B. RESPONSIBillTIES

1. The Nuclear Services Division Quality Assurance Department shall be responsible for:
a. Audits and Commercial Surveys of vendor quality assurance programs. I
b. Surveillances of vendor activities.
c. Maintenance of the Yankee Atomic Electric Company Approved Vendors List.
2. The Nuclear Services Division Quality Assurance, j Engineering, and/or Project Departments shall be responsible for evaluating vendor manufacturing and technical capabilities upon request.

I j 3. The Plant shall be responsible for:

a. Receipt inspection and control of material and equipment.

l b. Evaluation of purchased services during and/or after completion of the service. ! c. The Plant Services / Administrative Department at the l Yankee plant and the Material Manager at Section VII Control of Purchased Material, Equipment, and Services

Title:

, Page: 1 of 4 Rev.: 27 i l Date: December 20, 1996

YANKEE ATOMIC ELECTRIC COMPANY 1 Vermont Yankee shall be responsible for the control l of purchased material, parts and components until issued for installation or use. i I C. IMPLEMENTATION l

1. Satisfaction of this criterion shall be assured through the implementation of the Nuclear Services Division and/or plant actions listed below:

1

a. Audits and Commercial Surveys of vendors based on one or more of the following, as appropriate to the scope of procurement activities:

l 1. When required in order to verify vendor capabilities to comply with the applicable criteria of 10CFR50, Appendix R i.'l N18.7, or other quality program baselines.

2. When required based on the results of review and evaluation of vendor performance history.
3. When required in order to observe vendor facilities / service activities to assure l conformance to purchase specifications.
b. Surveillances of vendors which provide for:
1. Specification of applicable quality controls, l processes to be witnessed or verified.

l documentation required, and personnel I responsible for performing the surveillance.

2. Verification that the vendor complies with the
quality requirements specified in procurement i documents by observation of in-process work.

Title:

fection Vil, Control of Purchased Material, Equipment, and Services Page: E of 4 Rev.: 2/ Date: December 20, 1996 i

YANKEE ATOMIC ELECTRIC COMPANY

c. Transfer of the following records from the vendor to the plant:
1. Documentation that identifies the purchased material / services and compliance with the applicable procurement document requirements.
2. Documentation that identifies any deviation (s) from procurement requirements, including a description of those deviations dispositioned
                                " accept as is" or " repair".
d. Review and acceptance of vendor documentation by a responsible quality assurance individual.
e. Receipt inspections of vendor furnished material / services, in accordance with predetermined instructions, to assure:
1. Material is identified and conforms with receiving documentation.
2. Material and documentation are determined acceptable prior to use.
3. Inspection records or certificates of conformance attesting to material acceptability are on-site prior to use.
4. Items are identified as to their inspection status prior to release for controlled storage, installation or further work.

l t l

Title:

Section V11. Control of Purchased Material . . Equipment, and Services Page: 3 of 4 Rev.: 27 Date: December 20, 1996 l l

1 YANKEE ATOMIC ELECTRIC COMPANY l f. Eva'laations of vendor effectiveness to control quality is performed at intervals consistent with the importance, complexity and quality of the item / services. i t

Title:

Section VII, Control of Purchased Material Equipment, and Services Page: 4 of 4 Rev.: 27 Date: December 20, 1996 l

YANKEE ATOMIC ELECTRIC COMPANY , Vill, IDENTIFICATION AND CONTROL OF MATERIAL, PARTS. AND COMPONENTS

'A. SCOPE t This section of the Operational Quality Assurance Program  !

establishes the measures for identification and control necessary l l to prevent the use of incorrect or defective material, parts, and components.  ; B. RESPONSIBILITIES

1. The Nuclear Services Divisio7 Ouality Assurance Department shall be responsible for review, evaluation, or  ;

i verification (audit commercial survey or surveillance) of vendor quality controls _ and work processes for traceability of materials through the use of heat number, part number, or serial number, either on the item or on' records traceable to the items.

2. The Plant shall be responsible for:
a. Preparation and approval of documents for the identification and control of materials. parts,-

components and storage of lubricants and other consumable materials.

b. Maintenance of traceability of materials, parts, and components received, stored, installed, and used at the Plant.
3. The Nuclear Services Division Engineering and/or Project Departments and/or the Vermont Yankee staff shall be responsible for as. curing that specifications contain j appropriate requirements for the identification and control

( of materials, parts, and components. 4

Title:

Section VIII, Identification and Control of Materials, Parts, and Components i Page: 1 of 2 i Rev.: 27 Date: December 20, 1996 l l 1 - - . . ..

l YANKEE ATOMIC ELECTRIC COMPANY 4 For YNSD the Vice President (s) and Manager of Operations and their staff shall be responsible for providing review j and approval of documentation for the purchase of  ! materials, parts, and components. For Vermont Yankee, this function is performed by the Vermont Yankee staff. C. IMPLEMENTATION

1. Satisfaction of this criterion shall be assured through the l l implementation of the Nuclear Services Division and/or plant actions listed below:
a. Traceability of the identification of materials and parts to the appropriate documentation such as I drawings, specifications, purchase orders, manufacturing and inspection documents, deviation reports, and Physical and Chemical Material Test Reports.

l

b. Identification of the item in a location and with a method which does not affect its fit, function or quality.
c. Documented verification c correct identification of materials, parts, and components prior to release for use.

Title:

Section Vill, Identification and Control of Materials Parts, and Components Page: 2 of 2 Rev.: 27 Date: December 20, 1996

  . ~ _ _ _ _ _ _ . . _ - - .                 _ - _ . - _ ~ _ _ . . _ - -        _..      ..
                                                                                                 ._..__.._-._._q 1

l YANKEE ATOMIC ELECTRIC COMPANY IX, CONTROL OF SPECIAL PROCESSES i , 1 A SCOPE I 1 This section of the Operational Quality Assurance Program ) establishes the measures necessary to assure'.that special l processes, including welding, heat treating, and nondestructive testing, are controlled and accomplished by qualified personnel in accordance with applicable codes, standards, specifications, criteria and other special requirements. , B. RESPONSIBILITIES l I-

1. The Nuclear Services Division Quality Assurance Department shall be responsible for:
a. Surveillance of~certain nondestructive tests in

! accordance with " Yankee Atomic Electric Company Welding and Nondestructive Examination Procedures". l l l b. Review of special process documents, as requested, l generated by the Nuclear Services Division 1 Engineering / Project Departments and vendors for.use .! on-site and when otherwise specified. j i

2. The Nuclear Services Division Engineering'and/or Project l Departments shall be. responsible for:  ;

l

a. Preparation of documents for welding, heat treating, j filler metal control, and nondestructive l_ examinations, j
b. Review and approval of special process documents provided by the vendor for use on-site and when i otherwise specified.

Title:

Section IX, Control of Special Processes Page: 1 of 2 ] Rev.: 27 !. Date: December 20, 1996

. .. - - --. -, _~ ~ . -. . -~. . . - . .. . - - . . . - YANKEE ATOMIC ELECTRIC COMPANY

3. The Plant Support Department shall be responsible for training, qualification, and requalification of personnel ,

in nondestructive testing, such as liquid penetrant j examination. .; 4, The Plant shall be . responsible'for:

a. Assurance that maintenance and change work involving  !

special processes are performed by qualified l personnel in accordance with approved documents.

b. Control of material used in special. processes by plant personnel.
5. For YNSD, the Vice President and Manager of Operation and staff shall be responsible for review and approval of purchase documentation for special process material. For Vermont Yankee, this function is performed by the Vermont Yankee staff.

C. IMPLEMENTATION ,

1. Satisfaction of this criterion shall be assured through the implementation of the Nuclear Services Division and/or plant actions. listed below:
a. Completion of qualification records of documents, equipment, and personnel connected with special processes in accordance with applicable codes, standards, and specifications.
b. Performance of special processes accomplished in accordance with written process sheets or equivalent with recorded evidence of verification.
c. Maintenance and updating of qualification records of special process documents, equipment, and personnel .

Title:

Section IX, Control of Special Processes Page: 2 of 2 Rev.: 27 Date: December 20, 1996

_. ._ . _ . _ ___ _ . .- ._ .. _. ~_ _ _. _ __ _ 4

YANKEE ATOMIC ELECTRIC COMPANY 4' f

, X. INSPECTION 4

,                        A.      SCOPE                                                                            <

I, This section of the Operational Quality Assurance Program  :

                                                                                                                  )

i establishes measures for inspection of activities requiring quality assurance.to verify conformance with approved procedures, ] 2 drawings, specifications and instructions. 1 1 l l B. RESPONSIBillTIES j i 1. The Nuclear Services Division Quality Assurance Department

- shall be responsible for:
a. Surveillance of-documentation pertinent to the Inservice Inspection and Test Program (for. Vermont Yankee only).
b. Surveillance of vendor inspection activities and personnel,
c. Review of Installation and Test Procedures and Maintenance Requests to ascertain the extent of any l required 0A surveillances and OC inspections (Yankee l Plant only).
d. Incorporation of mandatory notification / hold points for plant / vendor / service group activities into the 0A surveillances and mandatory hold points for inspections (Yankee Plant only),
e. Writing, reviewing and approving quality control inspection checklists. (Yankee Plant only.)
f. Perform QC inspection activities to assure that predetermined requirements have been met. (Yankee Plant only.)

Title:

Section X. Inspection Page: 1 of 3 Rev.: 27 Date: December 20, 1996

( YANKEE ATOMIC ELECTRIC COMPANY

2. The Plant shall be responsible for:

r

a. Writing and approving inspection instructions and check lists,
b. Assuring that activities requiring quality assurance .

meet predetermined requirements.

c. Providing qualified personnel and necessary equipment for inspections to assure quality work,
d. Perform inspection activities to assure that predetermined requirements have been met,
e. Hold points incorporation where applicable.

C. IMPLEMENTATION i

1. Satisfaction of this criterion shall be assured through the implementation of the Nuclear Services Division and/or plant actions listed below: ,

i i

a. Independence of personnel performing the inspection from the personnel performing the activity being inspected.
b. Use of instructions or check lists which incorporate the details listed in Section XVII Item C.1.a.  !
c. Use of necessary drawings and specifications when l performing inspection operations.
d. Inspection of repairs and replacements in accordance with the approved design and inspection requirements ,

or acceptable alternatives.

Title:

Section X. Inspection Page: 2 of 3 Rev.: 27 Date: December 20, 1996

YANKEE ATOMIC ELECTRIC COMPANY

e. Surveillance of processing methods, equipment, and personnel when direct inspection is not possible,
f. Qualification of inspectors in accordance with applicable codes, standards, and company training  ;

orograms; and maintenance of qualifications and certifications. )

g. Review of maintenance documents by qualified personnel knowledgeable in quality assurance to determine the need for inspection, identification of inspection personnel, and documenting inspection l results.

l

Title:

Section X. Inspection Page: 3 of 3 Rev.: 27 Date: December 20, 1996

YANKEE ATOMIC ELECTRIC COMPANY XI. TEST CONTROL A. SCOPE This section of the Operational Quality Assurance Program establishes the measures for a test program to demonstrate that l structures, systems, and components will perform satisfactorily in service. B. RESPONSIBILITIES l

1. The Nuclear Services Division Quality Assurance Department shall be responsible for:

l

a. Surveillance of vendor test program activities.
b. Surveillance of the documentation generated during j the test program.

) 2. The Nuclear Services Division Engineering / Project Departments / Plants shall be responsible for:

a. Determination of when testing is required following plant changes.
b. Establishment of specifications, requirements, and acceptance criteria for testing following plant changes:
c. Development of test documents, performance of tests, i and documentation, evaluation, and approval of test results.

1

d. Provision of qualified personnel and calibrated equipment for testing.

l

Title:

Section XI Test Control Page: 1 of 3 Rev.: 27 Date: December 20, 1996

i < i YANKEE ATOMIC ELECTRIC COMPANY

3. The Nuclear Safety Audit and Review Committee shall be responsible for reviewing proposed tests or experiments i which involve an unreviewed safety question as defined in -

10CFR50.59.

4. The Plant Operations Review Committee shall be responsible for the review of all test documents and test results for special tests.

C. IMPl.EMENTATION

1. Satisfaction of this criterion shall be assured through the implementation of the Nuclear Services Division and/or plant actions listed below:
a. Assurance that changes, repairs, and replacements are tested in accordance with the approved design and testing requirements or acceptable alternatives.
b. Review of written test documents for incorporation or reference of the following:
1. Requirements and acceptance limits contained in .

applicable design and procurement documents.

2. Instructions for performing the test.
3. Test prerequisites, such as:

1 a) Calibrated instrumentation; b) Adequate and appropriate equipment; , c) Trained, qualified, and licensed / certified personnel; d) Completeness of item to be tested; l I

Title:

Section XI Test Control  ; Page: 2 of 3  ! Rev.: 27 , Date: December 20, 1996 I

YANKEE ATOMIC ELECTRIC COMPANY e) Suitable and controlled environmental conditions; and f) Provisions for data collection and storage.

4. Mandatory inspection hold points for witness by owner, contractor or inspector, when applicable.
5. Acceptance and rejection criteria.
6. Method of documenting test data and results.
c. Procedures shall provide for specification of test equipment with suitable accuracy. The criteria for determining the accuracy requirements of test equipment shall be provided when identification of specific equipment is not practical.

I l l

Title:

Section XI, Test Control Page: 3 of 3 Rev.: 27 Date: December 20, 1996

YANKEE ATOMIC ELECTRIC COMPANY XII. CONTROL OF MEASURING AND TEST E0VIPMENT A. SCOPE This section of.the Operational Quality Assurance Program establishes the measures for the control, calibration and periodic adjustments of tools, gages, instruments, and other measuring and test devices. used to verify conformance to-established requirements. B. RESPONSIBILITIES

1. Each Plant Department shall be responsible for:
a. Development of the implementing documents for control of measuring and test equipment including identification and calibration for. equipment under their control .
b. Provision of calibrated tools, gages and instruments necessary to perform required measurements and tests.
c. Maintenance of calibration records.
d. Preparation and review of specifications for measuring and test equipment, such that all applicable requirements are satisfied.

C .. IMPLEMENTATION

1. Satisfaction of this criterion shall be assured through the implementation of the Nuclear Services Division and/or plant actions listed below:
a. Identification and traceability of measuring and test equipment to the calibration test data.

Title:

Section XII. Control of Measuring and Test Equipment Page: 1 of 2 Rev.: 27 Date: December 20. 1996

l YANKEE ATOMIC ELECTlIC COMPANY

b. Labeling or tagging of measuring and test equipment to indicate due date for calibration.
c. Calibration of measuring and test equipment at specified intervals based on required accuracy, purpose, degree of usage, stability characteristics, end other conditions affecting the measurement.
d. Documentation of measures ehken to determine the validity of previous inspections performed when j measuring and test equipment is found to be out of calibration.
e. Use of calibration standards having an uncertainty l

(error) requirement of no more than 1/4 of the tolerance of the equipment being calibrated. Calibration standards limited by the

                         " state-of-the-art" may have a greater acceptable uncertainty.

l

f. Documentation and maintenance of the status of all items under the calibration system.
g. Traceability of reference and transfe. ctandards to nationally recognized standards; or, documentation of ;

I the basis for calibration where national standards l ! are nonexistent. i l s I l l l l

Title:

Section X11. Control of Measuring and Test Equipment Page: 2 of 2 Rev.: 27 Date: December 20, 1996

l l l ! YANKEE ATOMIC ELECTRIC COMPANY l XIII. HANDLING. STORAGE AND SHIPPING A, SCOPE This section of the Operational Quality Assuran':e Program l establishes measures to control the handling, storage, shipping,. cleaning and preservation of material and equipment to prevent i damage or deterioration. l B. RESPONSIBILITIES

1. The Plant shall be responsible.for:

l l a. Development of the implementing documents for handling, storage and shipping of materials and j -equipment. l l

b. Provisions of suitable facilities and equipment for l

i handling, storage, and shipping of materials. l l c. Inspection and test of special ' handling tools and I equipment. C. IMPLEMENTATION

1. Satisfaction of this criterion shall be assured through the implementation of the Nuclear Services Division and/or Plant actions listed below:

s

a. Specification and accomplishment of'special handling, preservation, storage, cleaning, packaging, and  ;

shipping requirements by qualified individuals in i l. accordance with predetermined work and inspection instructions. I

  ~
b. Preparation ~o. 3. ructions in accordance with design and specification ;equirements which control the j l

Title:

Section XIII, Handling, Storage, and Shipping l Page: 1 of 2 '

Rev.
27 Date: December 20, 1996 1

l

YANKEE ATOMIC ELECTRIC COMPANY cleaning, handling, storage, packaging, shipping and preservation of safety classified materials, components and systems to preclude damage, loss or deterioration by environmental conditions such as temperature or humidity. 1 i l l l ! l ! l I l l 1 l l

Title:

Section XIll, Handling, Storage, and Shipping Page: 2 of 2 Rev.: 27 Date: December 20, 1996

   - . . . . .      - -             . - - . ~ . . _ - . ~ . - - -            _ _ - - . - .          . - - - , , , .     .

l 4 ) YANKEE ATOMIC ELECTRIC COMPANY 4

XIV. INSPECTION, TEST AND OPERATING STATUS A. SCOPE

[ This section of'the Operational Quality Assurance Program establishes the measures for indicating the status of items l undergoing inspections and tests (via tags, labels, logs, data

                               ~s heets, etc.), to prevent the unintentional bypass of required tests.           In addition, this section establishes measures for l-.

j indicating the operating status of components and systems to l' prevent their inadvertent operation. ! B. RESPONSIBILITIES l 1. The Plant shall be responsible for: 4

a. Ensuring indication of the status of operating
!                                                         equipment or systems to be removed from service for maintenance, test, inspection, repair or change.
b. Designation of personnel who are responsible for directing the status change of equipment and systems.

C. IMPLEMENTATION

1. Satisfaction of this criterion shall be assured through the implementation of the Nuclear Services Division 37.d/or plant actions listed below:
a. Notification of affected organizations for chanyes in the inspection, test and operating status of structures, systems,' and components.
b. P'rocedural control of the bypassing of required inspections, tests and other critical operations with the concurrence of the Quality Assurance Department.

Title:

Section XIV, Inspection, Test, and Operating Status Page: 1-of.2 Rev.: 27 Date: Decembe- 20, 1996 j

                                                                                      .    -.   .,.          .      . -              -      .i

l 1 l YANKEE ATOMIC ELECTRIC COMPANY  :

c. Procedural control of the application and removal of inspection and status indicators such as tags, markings, labels and : tamps.

l j i I I 1

Title:

Section XIV. Inspection, Test, and Operating Status l Page: 2 o.f 2 Rev.: 27 Date: December 20, 1996 I l l

   .. - - -            . . . .. . - . .      -.     - _ .     ~ -. - ..--        _-            . ... ...- ..- .-.~ -                -..- -          .

I l I }; YANKEE ATOMIC ELECTRIC COMPANY

~

XV, NONCONFORMING MATERIALS. PARTS. AND COMP 0NENTS 4 $ A. SCOPE

 ,                                                                                                                                                    I This section of the Operational Quality Assurance Program j-                                         establishes the measures to control' materials, parts, components.                                          [

j or any other activities which do not conform to requirements, in order to prevent their inadvertent use.  ! B. RESPONSIBillTIES 3

1. The Nuclear Services Division Quality Assurance Department shall be responsible for:

l a. Review of nonconformance reports to determine f j- repetitive nonconforming conditions and to verify l j resolution of significant conditions adverse to  ; , quality to preclude recurrence (for Yankee Plant l- only). . [ b. Review of Event Reports to verify resolution of significant conditions adverse to quality (Vermont , Yankee only). {  ; 1 l c. Establishment of feedback system between Yankee  ! ! Atomic Electric Company and vendor representatives in

regard to nonconforming material or services.
d. Initiation of nonconformance reports (Yankee Plant and Event Reports for Vermont Yankee) when conditions

, are found which may' adversely affect the. quality of

  • j plant systems, structures, activities, or components.

1 i i j

Title:

Section XV, Nonconforming Materials, Parts, and Components i Page: 1 of 3 i . Rev.: 27

3. Date: December 20, 1996
              - ---                                                                 c .-- .m.,                       , -. - . . . .        ,   , --

l I ! YANKEE ATOMIC ELECTRIC COMPANY l l -

2. The Nuclear Services Division Engineering and/or Project Departments shall be responsible for:

l

a. Review of nonconforming services or items which j cannot be corrected by vendor action.

l

b. Preparation or approval of implementing documents for repair and/or rework of nonconforming items.

l 3. The Vice President (s) and their staff shall be responsible for the evaluation of significant plent-initiated nonconforming item, service, or activity dispositions.

4. The Plant shall be responsible for:
a. Writing implementation documents for the identification, documentation, and corrective action for services, material, installation, testing,

! operation, and/or surveillance nonconformances at the Plant.

b. Establishment of measures to provide for the documented control of nonconforming materials, parts, and components.

1

c. Establishment of feedback system between the plant and vendor representatives for the disposition of nonconforming services, materials, parts and components.

C. IMPLEMENTATION

1. Satisfaction of this criterion shall be assured through the implementation of the Nuclear Services Division and/or plant actions listed below:

Title:

Section XV, Nonconforming Haterials, Parts, and Components Page: 2 of 3 Rev.: 27 Date: December 20, 1996 1.

YANKEE ATOMIC ELECTRIC COMPANY

a. Identification, disposition, inspection and segregation of nonconforming items or activities.
b. Identification of those individuals or groups delegated the responsibility and authority for the disposition and written approval of nonconforming
items or activities.
c. Inspection and test of reworked or repaired items I which require reinspection and retest to original
methods or methods equivalent thereto.
d. Inclusion of nonconformance reports dispositioned
                         " accept as is" or " repair" as part of the inspection records furnished to the plant.
e. Periodic analysis of nonconformance reports to show l quality trends with the results reported to l

management for review and assessment.

2. The identification, description, disposition, inspection and signature approval of the disposition for nonconformance shall be documented in a nonconformance report.

Title:

Section XV, Nonconforming Materials, Parts, and Components Page: 3 of 3 Rev.: 27 Date: December 20, 1996

i YANKEE ATOMIC ELECTRIC COMPANY l l XVI. CORRECTIVE ACTION ' i l A. SCOPE This section of the Operational Quality Assurance Program establishes measures to assure that conditions adverse to quality, such as failures, malfunctions, deficiencies, deviations, defective material and equipment are promptly identified and corrected. B. RESPONSIBILITIES

1. The Nuclear Services Division Quality Assurance Department I shall be responsible for review and/or audit of recommendations to prevent recurrence of a significant condition adverse to quality. l I

~

2. The Vice President (s) and their staff shall be responsible for:
a. Review of significant adverse conditions reported by the Plant including corrective actions taken,
b. Coordination of comments between the Nuclear Services Division Projects Departments and the Plant (for j Yankee Plant only).  ;
3. The Plant shall be responsible for:

t i

a. Identification of causes of conditions adverse to quality.
b. Implementation of the corrective action,
c. Documentation of corrective action taken.

Title:

Section XVI Corrective Action Page: 1 of 3 Rev.: 27 Date: December 20, 1996

YANKEE ATOMIC ELECTRIC COMPANY

d. Coordination of' comments between the Nuclear Services Division Projects Departments and the Plant (for ,

Vermont Yankee only).

4. The Nuclear Services Division Engineering and/or Project ' )

Departments shall be responsible' for': {

a. Review of conditions adverse to quality which involve j design deficiencies to determine the cause of the i condition. i l

1

b. Recommendations of corrective action to preclude  :

repetition of design deficiencies. g l

5. The Plant Operations Review Committee shall be responsible
for:

1

a. Review of significant conditions adverse to quality  !

and recommending corrective action. I , l

                                                                                     -i l
b. Recommendations involving repetition of significant operating deficiencies.

1 I C. IMPLEMENTATION i

1. Satisfaction of this criterion shall be assured through the l_ 'implementat' ion of the Nuclear Services Division and/or plant actions listed below:
a. Initiation of corrective action following the determination of a condition adverse to quality to
                                                                        .              J preclude recurrence.
b. Follow-up reviews to verify proper implementation of corrective actions and to close out the corrective-action documentation.

l 1

Title:

Section XVI, Corrective Action Page: 2 of 3 Rev.: 27 Date: December 20. 1996 ' u

1 I YANKEE ATOMIC ELECTRIC COMPANY l

                                                                             )
c. Reporting of significant conditions adverse to  !

quality, the cause of the conditions, and the correction action implemented to the cognizant levels l of management for review and assessment, both  !

                       "off-site" and "on-site".                             l l

l I i l 1

Title:

Section XVI, Corrective Action Page: 3 of 3 Rev.: 27 Date: December 20, 1996

  - - - - .- -             -. .- _         .      . - . - . . - . . ~ . . - -  - - - -         - - - - -

i t YANKEE ATOMIC-ELECTRIC COMPANY i XVil. QUAllTY ASSURANCE RECORDS A. SCOPE

1. This section of the Operational Quality Assurance Program j- establishes the measures for maintenance of records which provide documentary evidence of the quality of items and i 1 the activities affecting quality. Requirements shall be
j. established for identification, transmittal, retrievability l and retention of quality assurance records including duration, location, protection and assigned responsibility. I

! 2. The quality assurance records shall include, but not be Y limited to, plant history;. operating logs; principal maintenance: design change activities; reportable occurrences: nonconformance reports; results of reviews, ' inspections, tests, audits and material analyses; monitoring of work performance; qualification of personnel,  ! documents and equipment; drawings; specifications; procurement documents; calibration documents and reports; and corrective action reports. B. RESPONSIBILITIES

1. The Nuclear Services Division Quality Assurance Department shall be responsible for: ,
                                                                                       .                 1
a. Maintenance of qualification / certification records i for Quality Assurance Department personnel, j
b. Maintenance of audit, surveillance and inspection records of quality assurance activities generated by the Quality Assurance Department. personnel or their j designates.  ;

l I

Title:

Section XVII, Quality Assurance Records Page: 1 of 3 i Rev.: 27 I Date: December 20, 1996  ;

YANKEE ATOMIC ELECTRIC COMPANY

2. The Plant shall be responsible for:
a. Writing implementation documents for the establishment and maintenance of Plant Operational Quality Assurance records.

4 b. Designating individuals and establishing requirements for the control of plant design, procurement, and operational records involving quality assurance.

c. Provision of facilities to prevent deterioration or loss of documentation.
d. Provision of a system for the review, approval and retention of plant prepared documents such as reportable occurrences, technical reports, required records and the meeting minutes of official committees.
3. The Nuclear Services Division Engineering and/or Project Departments shall be responsible for establishing a system of review, approval and retention of documents relating to i quality assurance for the operation of the departments.
4. The Director of Quality Assurance shall be resptqsible for control and distribution of the Operational Quali'.y Assurance Program and revisions thereto.

C. IMPLEMENTATION

1. Satisfaction of this criterion sha. be assured through the implementation of the Nuclear Services Division and/or plant actions listed below:
a. Specifying the details required for inspections and test records including the following as applicable:

Title:

Section XVII, Quality Assurance Records Page: 2 of 3 Rev.: 27 Date: December 20, 1996

YANKEE ATOMIC ELECTRIC COMPANY  ;

1) Description of the type of observation.  !
2) Evidence of completion and verification of manufacturing, inspection, or test operations.
3) The date and results of the inspection or test.

l

4) Information related to conditions adverse to e

quality.

5) Inspector or data recorder identification.

1

6) Evidence as to the acceptability of the )

, results.

7) Acceptance and rejection criteria. 1
8) Identification of required procedures,

, drawings, and specifications and revisions.  ;,

9) Specification of the necessary measuring and test equipment including accuracy requirements.

l

10) Spent fuel storage records. ,
b. Providing for record administration, receipt, storage, preservation, safekeeping, retrieval and final disposition. I i
c. Construction, loce. tion and security of record storage i facilities to prevent destruction of the records by )

fire, flooding, thef t, and deterioration by environmental conditions such as temperature or , I humidity. Duplicate records shall be stored in a separate remote location when the type of document is j not incl 0ded in the record storage facility. I

Title:

Section XVII, Quality Assurance Records Page: 3 of 3 Rev.: 27 Date: December 20, 1996

YANKEE ATOMIC ELECTRIC COMPANY u XVill. AUDITS 2 A. SCOPE  ! l This section of the Operational Quality Assurance Program 1 establishes the measures for a comprehensive system of planned and documented audits and in-plant surveillances to verify , compliance with all aspects of the Program and to assess the effectiveness of the Program. B. RESPONSIBillTIES

1. The Nuclear Services Division Quality Assurance Department shall be responsible fo,r:  !

l

a. Providing objective evidence for audits /surveillances !

of activities encompassed by the 18 criteria of l 10CFR50 Appendix B, and ANSI N18.7.

b. Training of audit and surveillance personnel,
c. Scheduling, coordinating, and implementing the formal In-Plant Audit / Surveillance Programs performed on activities covered in Sections Ill through XVII of this document.

l

d. Preparing information regarding the In-Plant Audit Program for review by the Nuclear Safety Audit and ,

i Review Committee. l I I e. Performing audits of vendors.  ! l

f. Following up of discrepancies discovered during audits / surveillance.

Title:

Section XVill, Audits Page: 1 of 4 Rev.: 27 l Date: December 20, 1996

                        -                          -~                  _        -

YANKEE ATOMIC ELECTRIC COMPANY

g. Making recommendations to preclude possible audit / surveillance discrepancy repetition (for the Yankee Plant only).
h. Performing periodic audits of all YNSD Departments having responsibilities under the Quality Assurance Program.
2. The Vice President (s) and Manager of Operations and their staff shall be responsible for:
a. Evaluate disposition of In-Plant Audits and prepares concurrence directives to the plant.
3. The Plant shall be responsible for:
a. Documentation of the plant position concerning any outstanding item resulting from an audit requiring a response (for the Yankee Plant only).

1

b. Implementation of action to be taken as directed by the Vice President and Manager of Operations,
c. Disposition of any outstanding items resulting from an audit (for Vermont Yankee only).
d. Implementation of any corrective actions resultant from audit identified Event Reports (for Vermont Yankee only).

l l 4. The Nuclear Safety Audit and Review Committee shall be responsible for:

a. Evaluation of the Operational Quality Assurance Program to determine its overall effectiveness, j

Title:

Section XVill, Audits Page: 2 of 4 i Rev.: 27 l Date: December 20, 1996

YANKEE A10MIC ELECTRIC COMPANY-

b. Reporting results of Program reviews and 3

recommendations resulting therefrom to the cognizant corporate officer. . 5. The Nuclear Services Division Departments shall be

__ responsible for

4

a. Documentation of the department position concerning
any outstanding item resulting from an audit.

n

b. Implementation of action to.be taken to correct deficiencies revealed by an audit.

C. IMPLEMENTATION

1. Satisfaction of this criterion shall be assured through the implementation of plant and/or Nuclear Services Division documents.
2. The implementing documents shall provide for the following:
a. Documentation of audit / surveillance results and review with management'having responsibility in the area.
b. .Necessary action to be taken by responsible management to correct' deficiencies revealed by the audit / surveillance.
c. Re-audit of deficient areas until corrections have been accomplished to preclude recurrence of the deficiencies.
d. Inclusion of an objcctive evaluation of quality-related practices, procedures, instructions and the effectiveness of implementation in the audit.

Title:

Section XVIll, Audits Page: 3 of 4 , Rev.: 27 Date: December 20, 1996 I r

YANKEE ATOMIC ELECTRIC COMPANY

e. Inclusion of an objective evaluation of work areas, activities, processes and items and the review of documentation in the audit.
f. Performance of audits in the below listed areas where the requirements of Appendix B to 10CFR Part 50 and ANSI N18.7 are being implemented:
1) Opecction, maintenance and repairs.
2) The preparation, review, approval, and control of designs, specifications, procurement documents, instructions, procedures, and drawings.
3) Receiving and plant inspections.
4) Indoctrination and training programs.
5) Implementation of operating and test procedures.
6) Calibration of measuring and test equipment. l
g. Scheduling of audits regularly on the basis of the >

I status and safety importance of the activities being performed. l l

Title:

Section XVill, Audits l Page: 4 of 4 Rev.: 27 Date: December 20. 1996

    . _ _ .     . . _ . _ . . . - . _           _ . . . . _ . _    . . _ . . _ _ _ _ , . _ . - _ . . . - _ . _   __...__..____._.-......m.._ .

YANKEE ATOMIC ELECTRIC COMPANY APPENDIX A Oualification Reauirements for Management of'Ouality Assurance Management of Quality Assurance must meet the below listed qualification

                   ' requirements:
A. EDUCATION:

Bachelor's degree.in Science or Engineering, or the equivalent in practical experience. B. EXPERIENCE:

1. Four years experience in the field of Quality Assurance, or
2. Equivalent number of years of nuclear plant experience in a supervisory position preferably at an operating nuclear power plant or a combination of the two.

a) At least one year of this four years experience shall be nuclear power plant experience in the implementation of the Quality Assurance Program, and

                                            -b)        Six months of the one year experience shall be obtained within a Quality Assurance organization.

i l 1 (~ j i l

Title:

Appendix A. Qualifications Requirements Page: 1-of 1 i Rev.: 27~ l Date: December 20, 1996 ! I l'

YANKEE ATOMIC ELECTRIC COMPANY APPENDIX B Exceptions The sub-categories of this Appendix summarize the exceptions noted in Section 11 of the Yankee Atomic Electric Company Operational Quality Assurance ' Manual. . Appendix B Sub-Cateoory Standard / Guide Title

                                                                                    -l I.             ANSI N45.2.3-1973           Housekeeping During the Construction Phase of Nuclear         i Power Plants                          l
11. ANSI N45.2.9-1974 Requirements for Collection, Storage, and Maintenance of Quality Assurance Records for Nuclear Power Plants III. ANSI N45.2.10-1973 Quality Assurance Terms and .

Definitions s IV. R.G. 1.64 Rev. 2 Quality Assurance Requirements for the Design of Nuclear Power Plants V. ANSI N45.2.2-1972. Packaging, Shipping, Receiving, Storage and Handling of Items for Nuclear Power Plants VI. ANSI N45.2.6-1978 Qualification of Inspection. Examination and Testing Personnel for the Construction Phase of Nuclear Power Plants Vll. R.G. 1.26. Rev. 3 Quality Group Classifications and Standards for Water , Steam- and Radioactive-Waste-Containing Components of Nuclear Power Plants Vill. R.G. 1.29. Rev. 3 Seismic Design Classification

Title:

Appendix B. Exceptions Page: 1 of 26

  • Rev.: 27 Date: December 20, 1996

YANKEE ATOMIC ELECTRIC COMPANY APPENDIX B (continued) Appendix B Sub-Category Standard / Guide Title IX. ANSI N18.7-1976 Administrative Controls and Quality Assurance for the Operational Phase of_ Nuclear Power Plants X. R.G. 1.33. Rev. 2 Quality Assurance Program Requirements (Operations)

Title:

Appendix B. Exceptions Page: 2 of 26 Rev.: 27 Date: December 20. 1996

M i YANKEE ATOMIC ELECTRIC COMPANY i

-APPENDIX B (continued)
                                                                                                               ~

j I. ANSI N45.2.3 - 1973, Housekeepina Durina the Construction Phase of Nuclear Power Plants ] j A. EXCEPTION: i j -Subsection 2.1 - Plannina

                       .The Yankee and Vermont Yankee plants take exception to the i

five-zone requirements specified in the subject standard. ALTERNATIVE: L l' The Yankee and Vermont. Yankee plants shall establish as'a minimum.

                                                              ~

j a three zone program as follows: A Zone 111 Zone 111 criteria shall be' applied to major portions of the reactor coolant system which are opened for. inspection, maintenance or. repair.

1. Access control over personnel shall be. required.
2. Cleanliness shall be maintained, commensurate with the work being performed, so as to preclude the entry of foreign material to the Reactor Coolant System.
3. A documented cleanliness inspection shall be performed immediately prior ~ to closure.

Note: The Zone 111 requirements may be expanded for certain maintenance repair activities if deemed appropriate by plant

Title:

Appendix B, Exceptions Page: 3 of 26

     -Rev.:            Date:       December 20, 1996

l YANKEE ATOMIC ELECTRIC COMPANY  ; i l j l APPENDIX B  ! (continued)  ! management. In such instances applicable sections of-Zones I & 11 shall be specified. Zone IV l Zone IV criteria shall be applied to the radiation control areas of the plant.

1. Standard janitorial and work practices shall be utilized to maintain a level of cleanliness commensurate with company policy in the areas of Housekeeping, Plant and Personnel Safety and Fire Protection.
2. Additional housekeeping requirements shall be implemented as required for the control of radioactive contamination. i
3. Smoking and eating shall be controlled consistent with good health physics practices and to maintain cleanliness.

7one V Zone V criteria shall be applied to the remainder of the plant.

1. Standard janitorial and work practices shall- be utilized to maintain a level of cleanliness commensurate with company policy in the areas cf Housekeeping, Plant and Personnel Safety and Fire Protection.

Title:

Appendix B. Exceptions Page: 4 of 26 Rev.: 27 Date: December 20, 1996

a YANKEE ATOMIC ELECTRIC COMPANY APPENDIX B I (continued)

  • B. EXCEPTION: l 1

. 1 Subsection 3.2 - Control of Facilities , l The Yankee and Vermont Yankee plants take exception to the control

                                                                                   ]

of tools, equipment, materials and supplies used in Zone III. l ALTERNATIVE: The Yankee and Vermont Yankee plants shall verify control for Zone III as indicated in Exception A of this sub-category. l l i I

Title:

Appendix B. Exceptions Page: 5 of 26 Rev.: 27 Date: December 20, 1996

l n ! YANKEE ATOMIC ELECTRIC COMPANY  : APPENDIX B (continued)  !

11. ANSI N45.2,9 1974, Reauirements for Collection. Storace, and 1

Maintenance of Quality Assurance Records for Nuclear Power Plants- l t A. EXCEPTION: _ 1 Subsection 5.6(3) Facility  ; i l The Yankee and Vermont Yankee plants take exception to

                                  " structures, doors, frames, and hardware should be Class A fire rated with a recommended four hour minimum rating."

l-ALTERNATIVE: )

                                  " Doors, structures, frames, and hardware shall be designed to                               l l                                  comply with the requirements of a minimum two (2) hour fire l                                  rating, meeting NFPA No. 232 guidelines."

i l JUSTIFICATION:

The two (2) hour rating has been endorsed by the NRC Standard Review Plan NUREG-0800, Revision 2, dated July 1981.

i I L L i i i l l 1

Title:

Appendix B, Exceptions l Page: 6 of 26 i Rev.: 27 Date: December 20, 1996 , l l l - - _ - _ - .- -

i I l YANKEE ATOMIC ELECTRIC COMPANY APPENDIX B (continued) ' 111. ANSI N45.2.10 - 1973, Quality Assurance Tergs and Definitions A. EXCEPTION: Subsection 2 - Terms and Definitions The Yankee and Vermont Yankee plants take exception to the definitions of " Certificate of Conformance" and " Certificate of  ; Compliance". l ALTERNATIVE:  ; The Yankee and Vermont Yankee plants shall reverse the definitions j of the above terms so our Program will be in compliance with the ' implied definitions in the ASME B&PV Code and Yankee specifications. l

                                                                                     )

i I a l I l 1 i

Title:

Appendix B, Exceptions Page: 7 of 26 Rev.: 27 Date: December 20. 1996 l l l

                                              . =  -   .

l l l YANKEE ATOMIC ELECTRIC COMPANY APPENDIX B (continued) IV. Regulatory Guide 1.64, Revision 2 " Quality Assurance Recuirements for the Desian of Nuclear Power Plants" A. EXCEPTION: l Subsection c.2 i The Yankee and Vermont Yankee plants take exception to the regulatory guide position on the exclusion of supervisors performing design verification. Al.TERNATIVE: The Yankee and Vermont Yankee plants will continue the accepted practices for independent design verification in accordance with the provisions of ANSI N45.2.11-1974, Section 6.1. I JUSTIFICATION: The exclusion of line supervision to perform design verification has proven to be an unnecessary burden on the resources within the engineering organizations of the company, and counterproductive during heightened periods of engineering activities. ANSI N45.2.11 contains specific limitations on the situations in which a supervisor is permitted to perform design verification. The standard states, "This verification may be performed by the originator's supervisor provided the supervisor did not specify a singular design approach, or rule out certain design considerations and did not establish the design inputs used in the design, or if the supervisor is the only individual in the organization competent to perform the verification." This control was developed through realistic evaluation of the practicable limits that restrictions impose on engineering organizations by the working group that developed ANSI N45.2.11. l l

Title:

Appendix B Exceptions Page: 8 of 26 Rev.: 27 Date: December 20. 1996

e r YANKEE ATOMIC ELECTRIC COMPANY APPENDIX B (continued) r V. ANSI N45.2.2 - 1972, Packagina. Shippina. Receivina Storage & Handlina of items for Nuclear Power Plants A. EXCEPTION: , Subsection 3.7.1 & A3.7.1 - Containers i The Yankee and Vermont Yankee plants take exception to the specific requirements for containers. ALTERNATIVE: Containers shall be of suitable construction to assure material is received undamaged. JUSTIFICATION: Containers shipped by closed carrier, stored inside and not subjected to a wet environment do not require weather resistant fiberboard, therefore, this is an unnecessary expense. Additionally, numerous vendors utilize shipping containers that do not comply with the specific requirements of this section, i.e., flaps overlap. The acceptance criteria for a shipping container

should be established based on the capability of the container to maintain the component material in a safe condition. Technology has advanced beyond the standard.

l i l

Title:

Appendix B, Exceptions Page: 9 of 26 Rev.: 27 Date: December 20, 1996 l i

1 l 1 i 1 YANKEE ATOMIC ELECTRIC COMPANY l APPENDIX B (continued) B. EXCEPTION: Subsection 3.7.2 - Crates and Skids The Yankee and Vermont Yankee plants take exception to the requirement that skids and runners shall be used on boxes with a gross weight of 100 pounds or more. ALTERNATIVE: Skids or runners shall be used on boxes with a gross weight of 100 pounds or more if practical. JUSTIFICATION: Storage methods and container design frequently are such that runners or skids are not feasible. C. EXCEPTION: Subsection 5.2.1 - Shiocina Damage Insoection The Yankee and Vermont Yankee plants take exception to the requirement that a preliminary visual inspection or examination be performed prior to unloading. ALTERNATIVE: 1 ihe Yankee and Vermont Yankee plants shall perform those required inspections after unloading. In special instances, preunloading j inspections shall be performed, i

Title:

Appendix B. Exceptions Page: 10 of 26 Rev : 27  ; l Date: December 20, 1996

l l I YANKEE ATOMIC ELECTRIC COMPANY l i l l APPENDIX B (continued) !1 1 JUSTIFICATION Post unloading inspection is adequate to determine any damage that may have been incurred during shipping and handling. D. Ev"EPTION: 4 i Subsection 5.2.2 - Item inspection The Yankee and Vermont Yankee plants take exception to the requirement, that "The inspections shall be performed in an area 1 equivalent to the level of storage requirements for the item." ALTERNATIVE: The Yankee and Vermont Yankee plants shall perform receiving inspection in a manner and in an environment which do not endanger the requisite quality of the item: however, receiving area environmental controls may be less stringent than storage environmental controls for that item. When inspections are performed in receiving areas with environmental controls less stringent than storage area environmental controls, o time limit l shall be established on a case basis for retention of items in the l receiving area. Retention time shall be such that deterioration is prevented and applicable manufacturer recommendations are addressed. JUSTIFICATION: Receipt inspection activities are for a much shor tci duration and l therefore should not be subjected to the same stringent requirements as required for storage.

Title:

Appendix B. Exceptions Page: 11 of 26 Rev., 27 Date: December 20, 1996

YANKEE ATOMIC ELECTRIC COMPANY APPENDIX B (continued) E. EXCEPTION: . Subsection 5.2.3 - Special Inspection i The Yankee and Vermont Yankee plants take exception to attaching special inspection procedures to the item or container. ALTERNATIVE: Special inspection procedures shall be readily available to personnel performing inspections. JUSTIFICATION: Procedures are subject to less abuse and more stringent controls when maintained on file and not attached to the item. Inspection status is maintained by tagging and procedure control.  ! F. EXCEPTION: , Subsection 6.1.2 - Levels of Storace d The Yankee and Vermont Yankee plants take exception to two specific requirements associated with fuel storage (classified Level A). ALTERNATIVE: The Yankee and Vermont Yankee plants shall meet the requirements of Level A storage for new fuel with the exception of special air filtering; and temperature and humidity controls..

Title:

Appendix B, Exceptions Page: 12 of 26 Rev.: 27 Date: December 20, 1996

l f YANKEE ATOMIC ELECTRIC COMPANY , [ i ' l APPENDIX B i (continued) i j

                               . JUSTIFICATION:                                                                                                     !

t , L ' l The existing storage conditions at the Yankee operating plants are ]

consistent'with the protection provided to the fuel while in l storage at the manufacturer (vendor) and/or while in transit to 'I the plant site and are judged to provide adequate' protection to

! the fuel assembly structure which is of highly corrosion resistant - l- materials. We believe that the above listed requirements are intended for application at the manufacturing facility (vendor)- l where the uranium pellets may be exposed to the atmosphere and not in its fully encapsulated, and therefore, fully protected form in l a completed fuel assembly. l l G. EXCEPTION: I L l ADoendix A-3 Subsection A3.5.1(1) - Caos & Pluas j l i f' The Yankee and Vermont Yankee plants take exception to the I l requirement that nonmetallic plugs and caps shall be brightly j- colored. l i l. ! ALTERNATIVE: l l < l Nonmetallic plugs and caps 'shall be of.a contrasting color, i i  ; l JUSTIFICATION: The purpose of utilizing brightly colored plugs and caps is to assist in assuring obstructions are not inadvertently placed in operating components or systems. By using plugs and caps of a contrasting color this ot'jective can be achieved. }

Title:

Appendix B. Exceptions ! Page: 13 of 26 i Rev.: 27 Date: December 20. 1996 l l 1 -. . _

l: YANKEE ATOMIC ELECTRIC COMPANY APPENDIX B (continued)- l l H. EXCEPTION: , ADDendix A-3 Subsection A3.9(1) - Second Group. Markinos l The Yankee and Vermont Yankee plants take exception to the requirement that container markings sh?.il appear on a minimum of two sides. ALTERNATIVE:

                                        ' Containers shall be adequately marked' to provide identification and retrievability.

JUSTIFICATION: , l Containers are tagged to provide identification and inspection I > status. Employment of two. tags on small ~ containers adds bulk and , l confusion and does not provide for better identification or traceability. l I. EXCEPTION:

Appendix A-3 Subsection A.3.9(4) - Second Group. Markina l

The Yankee and Vermont Yankee plants take exception to the requirement that container markings shall be no less than 3/4" high, container permitting. ALTERNATIVE: l l Container markings shall be of a size which permits easy recognition.

Title:

Appendix B Exceptions Page: 14 of 26 Rev.- 27 Date: December 20, 1996

w i YANKEE ATOMIC ELECTRIC COMPANY APPENDIX B (continued) 1 JUSTiflCAT10N: l Markings were intended to provide identification and instructions. The criteria should be that the markings clearly provide the same. l J. EXCEPTION: Appendix A-3 Subsection A.3.9(6) - Second Group, Markina e The Yankee and Vermont Yankee plants take exception to the information required for container marking. ALTERNATIVE: Marking shall be adequate in each case to provide identification, traceability and instructions for special handling, as applicable. JUSTIFICATION: The information required is excessive. Cluttering a container with excessive markings only reduces the main objectives, maintaining identification and establishing special controls. l t

Title:

Appendix B, Exceptions Page: 15 of 26 Rev.: 27 Date: December 20, 1996 i i

- - . . .- . . . - ~ . . - . ~- . . . . . _ . .~ - .. ~. -_ . - .. . .- -.... _ - - YANKEE ATOMIC ELECTRIC COMPANY , l APPENDIX B i (continued) [ l i VI. . ANSI N45.2.6 - 1978, Qualification of insoection. Examination and l

                 .Testina Personnel for Nuclear Power Plants                                                               ;
                                                                                                                          'i A.         EXCEPTION:                                                                                  l The Yankee and Vermont Yankee plants take exception-to the application of the Standard to all Yankee and' Vermont Yankee                               f personnel performing inspection, examination and testing.                                   {

ALTERNATIVE: , Yankee and Vermont Yankee personnel identified in ANSI N18.1-1971  ! who perform inspection, examination and testing will be. qualified  ! to ANSI N18.1-1971. l t Yankee and Vermont Yankee personnel not identified in ANSI I N18.1 - 1,971 who perform inspection, examination and testing will be-  ; qualified to ANSI N45.2.6-1978. l

                                                                                                                           )

s { t i i P i

Title:

Appendix B Exceptions  : Page: 16 of 26 Rev.: 27 Date: December 20, 1996  ;

                       ,       4      ._,.. - .- ~ . ,                      , , , -   - _                   _---z
                           ' YANKEE ATOMIC ELECTRIC COMPANY APPENDIX B-(continued)

VII. Regulatory Guide 1.26. Rev. 3. (2/76), Quality Group Classifications and Standards for Water . Steam- and Radioactive-Waste-Containino ComDonents of Nuclear Power Plants A. EXCEPTION: The Yankee and Vermont Yankee plants take exception to.the Regulatory Guide in its entirety. ALTERNATIVES: Yankee Yankee shall continue to classify structures', components and systems in accordance with ANSI Standard N18.2, January 1973.

               " Nuclear Safety Criteria for the Design of. Stationary Pressurized Water Reactor Plants", as in the past,                                 j Vermont Yankee L               Vermont Yankee shall continue to classify struct v.res, components    :l and systems in accordance with ANS-22 Draft No. 4, Rev. 1, May 1973, " Nuclear Safety Criteria for the Design of Stationary Boiling Water Reactor Plants", as in the past.

l

Title:

Appendix B, Exceptions Page: '17 of 26 Rev.: 27 Date: December 20, 1996 (

YANKEE ATOMIC ELECTRIC COMPANY APPENDIX B (continued) , Vill. Regulatory Guide 1.29, Rev. 3, (9/78), Seismic Desian Classification A. EXCEPTION: The Yankee and Vermont Yankee plants take exception to the i application of Regulatory Guide 1.29. Rev. 3, ',9/78). ALTERNATIVES: Yankee Yankee shall apply Regulatory Guide 1.29, Rev. 3, (9/78), to those structures, systems and components as determined by the USNRC System Evaluation Program. Vermont Yankee l I The seismic design classification of structures, systems, and  ; components at Vermont Yankee shall be as defined in the Vermont l Yankee FSAR.

Title:

Appendix B. Exceptions Page: 18 of 26 Rev.: 27 Date: December 20, 1996

YANKEE ATOMIC ELECTRIC COMPANY APPENDIX B (continued) IX. ANSI N18 .7-1976, Administrative Controls and Quality Assurance for the Operational Phase of Nuclear Power Plants A. EXCEPTION (Vermont Yankee Plant only) Subsection 4.5 - Audit Procram The Vermont Yankee Operating Plant takes exception to the requirement that audits of all safety-related functions shall be completed within a period'of two (2) years. Alternative: Audits of selected aspects of operational phase activities shall be performed with a frequency commensurate with their safety significance and in such a manner as.to assure that an audit of all safety-related functions is completed within a period of no less than three (3) years, based upon the results of an annual Functional Area Assessment. The Annual Functional Area Assessment is a documented analysis of functional areas important to safety. The purpose is to identify strengths and weaknesses (if applicable) to determine the level and focus of independent oversight activities for the upcoming year. The basis for the assessment shall include the results of 0A Audits and Surveillance, NRC Inspections, Event Reports, Nonconformance Reports, Corrective Action Reports, and Sel f- Assessments . Other indicators such as Personnel Changes, change / increase in functional area responsibilities, industry findings, and INP0 evaluations will also be considered. Each area will be assigned a rating with a comparison to previous years.

Title:

Appendix B. Exceptions Page: 19 of 26 Rev.: 27 Date: December 20, 1996

 . . _ - _ . .    ~    .     .. _ ...__ _...            _ ._ _                  - _ _. . . .-_ .._ ._. .._ ... ._. ._- __.
                                                                                                                           -l l:

l

                                                                                                                           .' \

YANKEE ATOMIC ELECTRIC COMPANY { 1 t APPENDIX B I (continued)- j j This assessment will be reviewed and approved by QA and Plant Management. 'This document is considered a OA record and will be j available-for NRC review, f Justification: , i j' To utilize quality oversight resources more. effectively, senior i management desires the flexibility to direct resources to areas which have perceived weaknesses. The'two-year audit. cycle has not l ensured that the frequency, scope and associated resources are q based on the risk associated with the audit area. { Vermont Yankee proposes to adjust the audit schedule based on empirical data and performance history to complete audits of safety-related functions within a period of three years. This modification meets the intent of published regulatory requirements l involving activities important to safety. 1 B. EXCEPTION: i Subsection 5.2.15 - Review. Approval and Control of Procedures Yankee Atomic Electric Company and the Vermont Yankee Operating Plant take exception to the following paragraph:

                                     " Plant procedures shall be reviewed by an individual knowledgeable in the area affected by the procedure no less frequently than every two years to determine if changes are necessary or desirable".

l L i

Title:

Appendix B Exceptions Page: 20 of 26 Rev.: 27 Date: December 20, 1996 1 N -- -- r 7 f-- g p

, . . _ _ _ . . _ ... ___.______.__.___.._._....mm.--- .y__. _ . . - ._ \ l l YANKEE ATOMIC ELECTRIC COMPANY APPENDIX B l- -(continued) l l Alternative: ' Plant _ procedures will be periodically reviewed in accordance with j administrative controls. These controls will establish a schedule j for these periodic reviews. All applicable plant procedures will be reviewed following an unusual incident, unexpected transient, I operator error, or equipment failure (malfunction), and following a modification to a system. i . . f Nonroutine procedures such as Emergency Operating Procedures,

                                      ' Emergency Plan Implementing Procedures, or other procedures whose use may be event driven, will be reviewed every two years,
However, if a nonroutine procedure is fully exercised and there is l- a detailed scrutiny of the entire procedure as part of a-l documented training program, this may serve as the biennial review of the procedure used, j j At least every two years, the Quality Assurance (or other independent) organization shall audit a representative sample of l

routine plant procedures that are used more frequently than every  : two years. The audit is to ensure the acceptability of the l ! procedures and verify that the procedure review and' revision program is being implemented effectively. The root cause of significant deficiencies is to be determined and corrected. l Routine plant procedures that have not been used for two years l will be reviewed before use to determine if changes are necessary or desirable. j

Title:

Appendix B. Exceptions i Page: 21 of 26 Rev.: 27 Date: December 20. 1996 l- . L -. . . - . - - - - _ . -

l l i j YANKEE ATOMIC ELECTRIC COMPANY l l APPENDIX B (continued) Justification: 1 The current requirement to review each safety-related procedure on a biennial cycle results in the expenditure of significant technical and administrative resources. Programmatic controls and practices are in place to provide adequate reviews, including the  ; following: l

            . The plant modification processes require that procedures affected by the modification be identified during the design change preparation, and revised prior to closure of the modification package.
            . The Operating Experience Program involves the review of USNRC INPO, and vendor supplied information for applicability and determination of further action. This  ,

review includes an evaluation of applicable documents such I as procedures and the initiation of required changes.

            . Administrative controls currently exist requiring that if a  )

procedure cannot be performed as written, a procedure change I must be completed prior to continuation of the procedure.

            . Temporary changes are occasionally generated during, or prior to procedure use. Current administrative controls require that those changes that are permanent shall be      i incorporated into the procedure via the procedure revision process.
            .      As part of the audit and surveillance process, procedures   l are evaluated as to adequacy, ease of use, proper technical content, and compliance with applicable plans and programs.

, 4

Title:

Appendix B, Exceptions , Page: 22 of 26 l Rev.: 27 Date: December 20, 1996

i I'

s 1 I i YANKEE ATOMIC ELECTRIC COMPANY  ; l , i APPENDIX B ' l (continued) i

                        .       The corrective action process (Event Reports) requires-that    !
.a root cause analysis be performed for events, violations ,

and nonconforming conditions. Where identified as i , contributing factors,-procedure changes are initiated. l 3

                        .       Changes to Technical Specifications and the FSAR are l

reviewed for potential impact on, and initiation of changes to plant procedures. j i

                        .        Plant procedures are approved by appropriate personnel prior to initial use. Current administrative controls also         j require pre-job briefings for procrdures identified as l

infrequent. J I This modification meets the intent o'_ published regulatory ' l requirements involving activities important to safety. C. EXCEPTION: (Vermont Yankee Plant only)

                                                                                              -1 Subsection 5.3.9 The Vermont Yankee Operating Plant takes exception to the requirements that detail Emergency Procedures be in accordance with Paragraph 5.3.9.

Alternative: l Vermont Yankee Emergency Operating Procedures are written in  : accordance with the Symptom / Function-Based Guidelines developed by the BWR Owners Group and accepted by the NRC. These l Symptom / Function Based Procedures, mandated by the NRC in NUREG-0737, have format and content different from the Event-Oriented Emergency Procedures described in ANSI N18.7-1976.

Title:

Appendix B, Exceptions . Page: 23 of 26  ! Rev.: 27 I Date: December 20, 1996 l l l 4

YANKEE ATOMIC ELECTRIC COMPANY ) i i AP/ENDIX B (continued) ilusti fi ca ti on: NUREG 0737 supersedes ANSI N13.7-1976 in the area of Emergency Operating Procedures. Changes to procedure format are required in order to develop Symptom / Function-Based Procedures. i I i i

Title:

Appendix B, Exceptions Page: 24 of 26 Rev.: 27 Date: December 20, 1996

I YANKEE ATOMIC ELECTRIC COMPANY APPENDIX B (continued) I X.. Reaulatory Guide 1.33. Revision 2. Quality Assurance Reauirements (Ocerational) I 1 l A. EXCEPTION: (Vermont Yankee Plant only) l L Subsection 4.5 - Audit Proaram The Vermont Yankee Operating Plant takes exception to the following: I l' . Section 4.5 states that "all audits of safety related l functions are completed within a two (2) year period".

                                                 .             Paragraph 4.a.                   "The results of actions taken to correct deficiencies that affect nuclear safety and occur in facility equipment, structures, systems, or method of operations - shall be audited at least once per 6 months".
                                                 .             Paragraph 4.b.                    "The conformance of facility operation to provisions contained within the technical specifications and .

applicable ' license conditions shall be audited at- least once per 12 months."

                                                 .             Paragraph 4.c.                   "The performance, training, and qualifications of the facility staff - shall be audited at least once per 12 months."

Alternative: l Audits of selected aspects of the functional areas listed above, ) l shall be performed within a frequency commensurate with their safety significance and will be completed within a period of no ? j

Title:

Appendix B, Exceptions Page: 25 of 26

j. Rev.: 27 ,

Date: December 20, 1996 l .l

                                                                                                                                                    ')

i

YANKEE ATOMIC ELECTRIC COMPANY i i l APPENDIX B l (continued) less than three-(3) years, based upon the results of an annual functional area assessment. Justification: i To utilize quality oversight resources more effectively, senior management desires the flexibility to direct resources to areas which have perceived weaknesses. The two-year audit cycle has not ensured that the frequency, scope and associated resources are based on the risk associated with the audit area. Vermont Yankee proposes to adjust the audit schedule based on empirical data and performance history to complete audits of safety-related functions within a period of three years. This modification meets the intent of published regulatory requirements , involving activities important to safety. I

Title:

Appendix B, Exceptions Page: 26 of 26 Rev.: 27 Date: December 20, 1996

I l l 1 l 1 YANKEE ATOMIC ELECTRIC COMPANY AFPENDIX C Vermont Yankee Classification of Structures. Components, and Systems l I NOTE: A comprehensive listing is in the Vermont Yankee Safety Classification Manual, j l l l I l

Title:

Appendix C. Vermont Yankee Classification Page: 1 of 1 Rev.: 27 Date: December 20, 1996 l l

YANKEE ATOMIC ELECTRIC COMPANY l APPENDIX 0 ] l I l Yankee l l l Classification of Structures. Components, and Systems l l 1 l NOTE: A comprehensive listing is in the Yankee Safety Classification I of Systems Manual. 1 1 1

                                                                            )

l l i I l

Title:

Appendix 0, Yankee Classification Page: 1 of 1 Rev.- 27 Date: December 20, 1996 1

YANKEE ATOMIC ELECTRIC COMPANY OPERATIONAL QUALITY ASSURANCE PROGRAM Y00AP-I-A PREPARED BY: tnfWak mak h ala4mAfl

                                ~
                 ' Walter K. Peterson.

Manager, Quality Assessment Services Department APPROVED BY: s (. Rulsell Clark Executive Director, Quality Assurance hM\ Donald A. Reid ~

                                            ~

Vice President, Operations Vermont Yankee Steph'en P. Schuiti " Vice President Engineering Sciences  ; Yankee  !

                      '                       y
               ' Jay K. Thayer Vice President, Proje[ .cts   [/ '/

Yankee

Title:

Y00AP-I-A Page: 1 Rev.: 27 Date: December 20, 1996

 . . _ ..m _ _ _ > . _ . _       _ _ _ . . - . _ _ _ _ . _ _ . - _ _ _ . . _ . . . _ . . . - . _ . . _ . _.m.___.     . _ . . -   _ _ .

I 1 4 YANKEE ATOMIC ELECTRIC COMPANY J l l Y00AP I-A ' 1

                                                                      . TABLE OF CONTENTS /INDEX                                        .

Section No. Title Revision AMENDMENT / REVISION 27 POLICY STATEMENT 27 I ORGANIZATION 27 i l II. QUALITY ASSURANCE PROGRAM 27 j III DESIGN CONTROL 27- i IV PROCUREMENT DOCUMENT CONTROL 27 , 1 V INSTRUCTION

S. PROCEDURE

S, AND 27 I DRAWINGS

VI DOCUMENT CONTROL 27-l VII ' CONTROL OF PURCHASED MATERIAL. 27 EQUIPMENT, AND SERVICES i I

VIII IDENTIFICATION AND CONTROL 0F 27 MATERIAL, PARTS, AND COMPONENTS IX CONTROL OF SPECIAL PROCESSES 27 X INSPECTION 27 l XI TEST CONTROL 27 XII CONTROL OF MEASURING AND TEST 27 EQUIPMENT l l XIII HANDLING, STCRAGE. AND SHIPPING 27 l XIV INSPECTION. TEST, AND OPERATING 27 STATUS i

Title:

Table of Contents Page: II Rev.: 27 Date: December 20, 1996 1

_ ...._._.-__.._...m..~ .

                                                                                                                  )

YANKEE ATOMIC ELECTRIC COMPANY Y00AP-1-A TABLE OF CONTENTS /INDEX L (Continued) l Section No,' Title Revision f

           'XV                       NONCONFORMING MATERIALS, PARTS,                      27 AND COMPONENTS

! XVI CORRECTIVE ACTION- 27 XVil QUALITY ASSURANCE RECORDS '27 l XVIII AUDITS 27 l . APPENDIX A QUAllFICATION REQUIREMENTS 27 i ! APPENDIX B EXCEPTIONS 27 i- ! APPENDIX C VY. CLASSIFICATION 27 l l APPENDIX D YR CLASSIFICATION 27 l l

Title:

Table of Contents Page: Ill Rev.: 27 i Date: December 20, 1996 f

 . . . _ . . . . _ . _ _ _ . _ _ . _ _ _ . . _ . _ - _ . _ _ . . . . . _ _ _ _ . . ~ _ . . _ - . . _ . _ _ _ _ _ _ _

1 I l YANKEE ATOMIC ELECTRIC' COMPANY i i I Y00AP-1-A AMENDMENT / REVISION SHEET l

                                                                                                                                                                    'l Revision ~No.                                 Date-                                                          Reason                       f i

0 (Amendment 1) 12/10/76 Io address questions submitted by letter from l NRC (K. R. Goller) to L. H. Heider (11/1/76). ( 0 (Amendment 2)- 1/13/77 To address questions submitted'by letter from NRC-(K. R. Goller) to L. H. Heider (12/28/76). ' l 1 9/15/77 To address organizational, programmatic, and i editorial changes.

                                                                                                                                                                      )

1 2' 11/01/77 To address organizational changes. I 3 11/25/77 To address organizational changes at Vermont Yankee. 4 1/13/78 To address combined inspection numbers 50-29/77-20: 50-271/77-15; and 50 309/77-16 unresolved item 4.a. 5 1/30/78 To address change in exception for ANSI. N45.2.3-1973. 6 10/19/78 fTo address exceptions to ANSI N45.2.2-1972. 6 (Amendment 1) 3/29/79 To resolve items submitted by letter from NRC (W. P. Haass) to L. H. Heider (3/6/79). 7 9/11/79 To address changes to Yankee Rowe (Appen' dix D) and Vermont Yankee (Appendix E) Safety Classifications. I 8 4/04/80 To address organizational changes. 9 3/09/81 To address organizational changes.  ! 1 10 4/03/81 To add " Packaging of Rodioactive Materials" and j

                                                                                                     " Fire Protection of Safety-Related Areas" to                    l "Other Items Requiring Quality Assurance".                        l 1

I Amendment / Revision Sheet

Title:

Page: IV Rev.: 27 l Date: December 20, 1996  ! l . . . . . . , . .- , - . . , - - . - - . . . - - - - . , .

i YANKEE ATOMIC ELECTRIC COMPANY ~ Y00AP-I-A AMENDMENT / REVISION SHEET (Continued) Revision No. Date Reason 11 3/01/82 To resolve items submitted by letter from NRC

,                                     (W. P. Haass) to W. P. Johnson (6/10/81).

12 3/11/83 To address organizational changes. 13 To address organizational and programmatic changes. 14 10/12/83 To address organizational changes. 15 2/15/84 To address programmatic changes. 16 10/31/85 To address organizational and programmatic changes. 4 17 12/05/86 To address organizational and programmatic , changes, j ~ 17A 8/14/87 To clarify surveillance activities and change , VP-M00 responsibilities for the level of l deficiencies requiring evaluation. d 18 4/29/88 To address organizational and programmatic

changes.

19 10/02/89 To address organizational and responsibility changes and deletion of Appendix C. 19A 6/01/90 To update organizational chart (for VY) to be consistent with Proposed Change No. 157 and to

address organizational changes at Vermont Yankee.

To update organizational changes at Yankee and 20 12/21/90 change OAD's responsibility from reviewing

Title:

Amendment / Revision Sheet Page: V Rev.- 27 Date: December 20. 1996

            -       - . - .        . - _ . . -        . - - - . . ~ . ._                                  .. .

t I YANKEE ATOMIC ELECTRIC COMPANY f i' Y00AP-I-A AMENDMENT / REVISION SHEET  ! (Continued) l l Revision No. Date Reason { design documents to auditing those documents i for inclusion of quality requirements. l I 21 11/15/91 To update organizational changes at Yankee and Vermont Yankee and change OAD responsibility j from revising recommendations to prevent. j recurrences of significant condition adverse to quality to providing the option to review ,

                                               -and/or audit recommendations.                                                  i l

22 4/15/92 To delete Appendix D listing and reference ] Yankee Safety Classification of Systems Manual. ' l 23 9/30/92 To address organizational and responsibility-  ! changes. I I 24 12/15/93 To address organizational changes, and  ! 00A/NSARC reporting clarifications for Vermont l Yankee.

 .25                        12/15/94            To address organizational changes made at the Yankee Nuclear Power Station addressing the decommissioning organization. Clarifications in the revised corrective action process at Vermont Yankee, and to address an exception to                                 .

Regulatory Guide 1.64, and to clarify . responsibilities between the Yankee and Vermont ' Yankee Plants. 26 12/21/95 To address organizational changes at the Yankee Nuclear Power Station and the Vermont Yankee Nuclear Power Station. To address exceptions to ANSI 18.7 and Regulatory Guide 1.33. 27 12/20/96 To address organizational changes. l

Title:

Amendment / Revision Sheet Page: VI Rev.: 27 Date: December 20, 1996 , l

l YANKEE ATOMIC ELECTRIC COMPANY l l POLICY STATEMENT l . OPERATIONAL QUAllTY ASSURANCE PROGRAM L l It' is the policy of those organizations operating under this Quality

Assurance Program to strive for excellence in all aspects of nuclear power plant operation. This goal can only be attained if each individual recognizes l

that Quality is everyone's responsibility. Each worker, supervisor, and manager- has a role to play in achieving the goal of "doing it right the first time." Only if we recognize that Quality is of paramount importance can we continue to provide for the safe and reliable generation of power. l The function of the Quality Verification Program is to assess the i adequacy, content, and appropriateness of the work being performed and to facilitate continuous enhancements. This function supports the line organizations and provides management with needed feedback. However, j~ supervision.and management should not rely solely upon the efforts of the Quality Assurance Groups for quality verification; they must also take an active role in self-assessment of those activities under their. control to  ; identify quality problems. As previously noted, the ultimate. responsibility for quality lies with each individual. ( Under the program, the Yankee Atomic Electric Company President is the final management authority responsible for assuring that this policy statement and the Quality Assurance Program are implemented within the Yankee Atomic l Electric Company. The Vermont Yankee Vice President Operations, is the final

j. management authority responsible for assuring that the Quality Assurance j Program is implemented within the, Vermont Yankee Nuclear Power Corporation. ,

i The President or a Vice President is responsible for implementing the l program for those departments under his (or her) direction. The Director of -l

              .0uality Assurance is responsible for establishment, control, and distribution                           !
              -of the Quality Assurance Program and revisions thereto, and shall establish policies under which the Quality Assurance Department operates.                    The Quality          j
              . Assurance staff shall have the authority and organizational freedom to meet                            j the requirements of 10CFR50. Appendix B.                                                                j l

Title:

Policy Statement l I Page: 1 of 2 Rev.: 27 Date: December 20, 1996 l i

_ _ . _ . _ _ _ _ _ _ _ . _ . . . _ . _ . . _ _ . _ . _ _ . _ . . _ - . _ . . . __ .._.<._-_._---.m-..._._._ i t

                                                                                                                                                  ?

YANKEE ATOMIC ELECTRIC COMPANY i The Plant Superintendent / Manager shall be responsible for the day to-day  ; implementation of the program's procedural requirements at the plant.  !

                                                                       ~

The Nuclear Safety Audit and Review Committee shall review the adequacy . [ and effectiveness of this program. Any discrepancies and/or recommendations for corrections or enhancements shall be reported to the Cognizant Corporate' , Officer.  ! The safe and reliable generation of power can only be achieved with the cooperation and support of all personnel. We expect that every individual  ! will perform his or her task with the skill, professionalism, and dedication  ! necessary to achieve this goal. ] 1 Andrew C. Kadak l President i l 4 i

                                                                                                                                                  )

Title:

Policy Statement Page: 2 of 2 , Rev.: 27 Date: December 20, 1996

l t t I YANKEE ATOMIC ELECTRIC COMPANY i I. ORGANIZATION. , l A. },(,Q P1, This section of the Operational Quality Assurance Program [ describes the duties and responsibilities of the personnel l involved in establishing and executing the Operational Quality  ! l Assurance Program. i B. RESPONSIBILITY The responsibility for design, redesign, evaluation, and operation of the Plant rests with the Yarkee Atomic Electric Company Nuclear Services Division and Vermont Yankee Nuclear Power Corporation. The responsibility for developing and implementing the Operational Quality Assurance Program within the I Yankee Nuclear Services Division and the Yankee Site is vested in the President of the Yankee Atomic Electric Company. The responsibility for implementing the Operational Quality Assurance l Program within Vermont Yankee is vested in the Vice President, Operations, of Vermont Yankee Nuclear Power Corporation. They have delegated certain areas of authority for the development and implementation of certain phases of the Program as set forth in the following paragraphs of this section. The Nuclear Services Division Quality Assurance Department, reporting to the President for NSD for the Yankee Site and reporting to the VY VP, Operations, for Vermont Yankee, has the organizational responsibility for the continuing review and audit of the implementation of the Operational Quality Assurance Program. C. ORGANIZATIONAL RELATIONSHIPS The lines of authority of all personnel involved in the implementation of the Operational Quality Assurance Program are shown in Figures 1 and 2. Integration between the Yankee Site

Title:

Section I, Organization Page: 1 of 43 Rev.: 27 Date: December 20, 1996

i t

i l YANKEE ATOMIC ELECTRIC COMPANY ,

and the Yankee Nuclear Services Division activities is provided  ! by the Decommissioning Manager. Interfacing between the Vermont  ; Yankee plant and the Yankee Nuclear Services Division is provided -l by the Vermont Yankee Vice President, Operations, and 5.is staff. l l D. OUAllTY ASSURANCE PROGRAM RESPONSIBitITIES l l 1. Yankee - Nuclear Services Division j t J

a. President f i
1. Assumes and maintains overall responsibility l for the Operational Quality Assurance Program.
                                                                                                                                                      -i
2. Delegates to the Director of Quality Assurance i the responsibility for establishment, control and distribution of the Operational Quality  ;

Assurance Program, and revisions thereto.

3. Establishes and enforces company policies in ,

the area of Operational Quality Assurance. '

4. Establishes and implements an organization capable of and directed toward a proper Operational Quality Assurance Program.
5. Resolves disputes between Quality Assurance /

Quality Control personnel and other organizations, involving quality, for the Yankee Site and the NSD organization.

6. The President or his/her designee appoints the NSAR Committee members including Chairman for  ;  ;

Yankee. I

7. Responsible for Yankee Site nuclear safety. I

Title:

Section I, Organization Page: 2 of 43 Rev.: 27 Date: December 20. 1996

  . . . . . _ . . . . .    ..  - - . - - = - - - . . .               - - - . . _ .   - .    . -       -.- ~ ~ . - . . - , . -

t ) N i YANKEE ATOMIC ELECTRIC COMPANY 4 1 1 j b. Vice Pr,3sidents i i i i j 1. Report to the President.

2. Provide for implementation;of the Program I i within their respective departments. l i
3. Review and approve all changes to the Operational Quality Assurance Program.
4. Provide for independent review and acceptance for selected plant repairs and engineering

} changes. i 5. Ensure that applicable Program procedures are ! implemented. I

j
c. Executive Director of Quality Assurance I 1

j l

1. Reports directly to the President.
f. 2. Establishes the qualification requirements for the principal Quality Assurance management positions to assure competence commensurate i j with responsibility. See Appendix A. l i

j 3. Approves all changes to the Operational Quality.  ; Assurance Program. j d i 4. Reviews or provides company policy relative to l Quality Assurance practices conducted at the j Site and Yankee Nuclear Services Division.  ! (.

5. Authorizes personnel performing Quality Assurance functions to have direct access to management levels which will assure  ;

accomplishment of quality-affecting activities.

Title:

Section I, Organization Page: 3 of 43 Rev.: 27 Date: December 20, 1996

f i l YANKEE ATOMIC ELECTRIC COMPANY f i I .6. Establishes policies under which the Nuclear " . Services Division Quality Assurance Department functions. ( i

7. Provides; for establishment of, and control and l distribution of the Operational Quality i Assurance Program and revisions thereto.

i

8. Provides for implementation of the Program within the Quality Assurance Department.
9. -Provides to NSARC a periodic review of the Operational Quality Assurance Program to determine the adequacy and effectiveness of the ,

Program. Provide for evaluations of changes to the Quality Assurance Program to the requirements of 10CFR50.54(a)(3). l i

10. Provides, through the Quality Assurance Department, for independent verification'of '

site operation by individuals.or groups who do not have direct responsibility for performing the work, to assure .that applicable approved procedures, specifications, licenses and safety - regulations are satisfied.

11. Ensures that personnel performing Quality s Assurance functions have sufficient authority and organizational freedom to:
a. identify quality problems,
b. initiate, recommend, or provide solutions through destjnated channels, and
c. verify implementation of solutions.

Title:

Section I, Organization Page: 4 of 43

        - Rev.:         27 Date:         December 20, 1996

l l l YANKEE ATOMIC ELECTRIC COMPANY I

12. Provides for review of and compliance with federal and state regulations and standards for nuclear power facilities.
13. As directed by the-Vermont Yankee Vice President. Operations, assures that the 0A Program is effectively implemented.
14. Appoints the NDE and N45.2.6 Level III Examiner
d. Trainino Coordinator
1. Reports to the Human Resources Manager.
2. Responsible for implementation of training programs at NSD.
3. Assists the company in accomplishing its goals through development of skills and knowledge.
4. Ensures that personnel are provided with both the technical and professional skills. required to solve problems, work together effectively, present information..and respond to sponsor needs.
5. Provides training needs assessments to ensure that organizatiocally relevant training is provided.
6. Conducts training evaluations to determine when desired objectives are obtained.

Title:

Section I, Organization Page: 5 of 43 Rev.; 27 Date: December 20, 1996

YANKEE ATOMIC ELECTRIC COMPANY

e. Decommissionino Manaaer and Manaaer of Operations
1. Reports to the President.
2. Directs engineering, licensing, cost control and planning, and site decommissioning activities.
3. Coordinates YAEC resources to meet j decommissioning needs.
4. Provides for implementation of Operational Quality Assurance Program within the Decommissioning Organization.
5. Ensures that applicable Program procedures are implemented within the Decommissioning Organization.

l

6. Provides for independent review and acceptance for selected plant repairs and all safety-related engineering design changes for  ;

the site and decommissioning work packages.

7. Provides for review of material service purchase requests, drawings, specifications, and appropriate procedures.
8. Provides, through the Decommissioning Organization, for independent review and/or approval for all changes.
9. Provides, through the Decommissioning Organization, for review and approval of vendor-provided training programs for site staff; the procedures and purchase requests.

Title:

Section I, Organization Page: 6 of 43 Rev.: 27 Date: December 20, 1996 s

  .- . .- . . -          . - . . . . . . . . - . . . . . . . . . . . . ~ . .                 -.-..-.-.--..~

I ! YANKEE ATOMIC ELECTRIC COMPANY l

10. .Provides, through the Decommissioning l Organization, for integration between the Yankee Site and the Yankee Nuclear Services Division.

l l

11. Evaluates the site's position of specified in-plant audit discrepancies and prepares
                                                                                    " Implementation Directives" for the site.
f. Pro.iect Managers i

l 1.. Reports to a Vice President. I l- 2. Provides for implementation of the Program within their respective project.

3. Ensures that applicable Program procedures are implemented within their respective project.

l

4. Provides for independent review and acceptance for selected plant repairs and all safety -

related engineering design changes for their respective plant.

5. Provides for selected review of material l service purchase requests, drawings, specifications and appropriate procedures, l

l 6. Coordinates engineering requirements necessary j to support changes related to the operation of  ! the plant.

7. . Provides, through Engineering, for the Quality Assurance /0uality Control Standards and/or requirements on all applicable documents.

l

Title:

Section I, Organization Page: 7 of 43 Rev.: 27 Date: December 20, 1996 l i i

.- _ _ . _ . . . _ _ ~. .__ _ _ . . _ . . _ . . _ . - _ _ . ___ l 1 l YANKEE ATOMIC ELECTRIC COMPANY l

8. Provides direction to the Project Engineering Managers.
g. Manaaement of Quality Assuranc,g Quality Assurance is divided into two (2) departments. They are the Quality Support Department and the Quality Assessment Department. The Quality Assessment Department performs audits and surveillances at Vermont Yankee and audits, surveillances, inspections at the Yankee Site, and audits at the Corporate Engineering office. The Quality Support Department performs audits and surveillances at vendor facilities.
1. The Manager of each department reports directly to the Executive Director of Quality Assurance.
2. Assures that the Operational Quality Assurance Program satisfies the requirements of 10CFR50 Appendix B and ANSI N18.7-1976.
3. Provides for the audit of design changes and specifications to verify adequacy of quality requirements. (Independent review shall be performed by an uninvolved, but technically knowledgeable person in the engineering di scipl i ne. )
4. Provides for the audit, inspection and/or surveillance of contractor / vendor activities for operating plants to assure the effectiveness of contractual interfaces and compliance with the applicable criteria of 10CFR50, Appendix B and ANSI N18.7-1976.

Title:

Section I, Organization Page: 8 of 43 Rev.: 27 l Date: December 20, 1996

YANKEE ATOMIC ELECTRIC COMPANY

5. Provides for the inspection, surveillance and/or audit of activities pertaining to plant or site repairs, and/or changes. I
6. Provides for the training and retraining of l Quality Assurance personnel in quality assurance and audit techniques.
7. Ensures through verification that the Program is implemented for all activities requiring Quality Assurance.
8. Provides for the stoppage of unsatisfactory work; and for the control of further processing .

or delivery of nonconforming material.  !

9. Directs the independent verification of plant ,

or site operational activities to assure that l applicable approved procedures, specifications. licenses, and safety regulations are satisfied.

10. Ensures that the 0A Program is modified and/or revised as standards, regulations and experience dictate.
h. Director of Enaineerina Services
1. Reports to the President.
2. Provides for implementation of the Program within his function.
3. Ensures that applicable Program procedures are implemented within his function.

Title:

Section I, Organization Page: 9 of 43 Rev.: 27 Date: December 20. 1996

l i I l l YANKEE ATOMIC ELECTRIC COMPANY l

4. Coordinates Yankee technical requirements necessary to support activities related to outside engineering services.

i~. Director of Environmental Enaineerina

1. Reports directly to a Vice President.

i

2. Provides for the review and follow of radiation protection programs and activities at the plant or site. l 1
3. Provides for technical assistance to the plant i 1

or site on matters of radiological protection, radiological engineering and environmental protection.

                                                                                           ]

l

4. Coordinates the implementation and maintenance ,

of radiological environmental surveillance ) programs concerning radioactive effluents from j the plant. l

5. Supports the implementation and maintenance of the Emergency Plan pursuant to state and federal regulatory requirements.
6. Provides for the review of plant meteorological monitoring data.
7. Coordinate the radiological and environmental engineering requirements necessary to support changes related to operation of the plant or site.

l

Title:

Section 1, Organization , Page: 10 of 43 ' Rev.: 27 Date: December 20, 1996

   ~ - - - . . . _ . - - - . . . _ . . .              - - - - - - . -                      -    . . - . _ . . ~ _ . . - - - .

4 Y l l YANKEE ATOMIC ELECTRIC COMPANY 4

j. Director of Fuel Management 4

1

1. Reports directly to a Vice-President.
2. Performs fuel cycle and economic studies to improve power costs and as requested by

, management. ) +

3. Provides for the general' supervision and i coordination of all core component design and procurement, nuclear material and services I

procurement and fuel cycle economic activities.

4. Ensures that the Operational Quality Assurance

$ Program and the applicable ' procedures are implemented within the' department. 4

5. Issues bid invitations, evaluates proposals,
 ,                                                                  and negotiates contracts for fuel cycle l                                                                   services and related material requirements.

j 6. Coordinates the fuel cycle requirements j' necessary to support changes related to } operation of the plant. t'

7. Provides support of spent fuel storage activities at'the Yankee Site.

1

k. Director of Environmental Laboratory l
1. Reports directly to a Vice President.
2. Provides for the radiochemical processing of -{

environmental. effluent, and waste samples. l

3. Provides for the processing and internal 1 dosimetric evaluation of bioassay samples.  !

Title:

Section I, Organization J Page: 11 of 43 Rev.: 27 Date: December 20. 1996

_ _ . _ _ _ _ _ _ . _ . _ . . _ _ _ _ . _ - . . - _ _ _ _ . __.___m._ _. _. . ._ _. _ .__. i  ! l YANKEE ATOMIC ELECTRIC COMPANY 4

4. Provides for the routine in situ measurements in support of environmental Technical l Specifications as well as ad hoc emergency l response in situ measurements or emergency response laboratory sample measurements.
5. Provides and coordinates technical quality assurance programs in the areas of plant chemistry (radiological only) and whole body counting.
6. Provides for the processing of personnel, extremity, and environmental dosimetry needed to support NRC and plant radiological-assessment requirements.
7. Provides for the necessary special radiation flux measurements.
8. Provides for on-site support during outages in the personnel. dosimetry, whole body counting, and health physics areas.
9. Provides for the general engineering and technical support in the broad areas of radiation measurements, health physics,-

radiochemistry, and quality assurance.

1. Director of Nuclear Enoineerina
1. Reports directly to a Vice President.
                                                       -2.            Performs nuclear engineering and economic studies requested by management.
3. Provides for the general supervision and coordination of reactor physics, safety

Title:

Section I, Organization Page: 12 of 43 Rev.: 27 Date: December 20, 1996 l

                                                                                                                                              )
   ,n. -     -               --,~e+    - - - , w   ,         -. ,                          e-   , m ,      -    - ,            s v.   -ss.--
  . . -  - - .          -- . - . - - . . .                 . - ~ . _   - . .            - . . -- . . ~ ..~ - _.-

t YANKEE ATOMIC ELECTRIC COMPANY l i l= assessment, transient analysis, and loss of coolant analysis activities. l

4. Ensures that the Operational Quality Assurance Program and the applicable procedures are  ;

implemented within the department. I j 5. Coordinates engineering analysis requirements  : necessary to support changes related to , operation of the plant or site.  ! 4 , m. Plant Suocort Department Manaaer .a

1. Reports directly to a Vice President.

] i j 2. Provides for the general supervision and coordination in the areas of materials $ evaluation, operational services (including j construction services), and drafting / design j support. . i l e- 3. Provides for the Plant Support review of design ! changes, i I 4. Provides engineering services to the Projects i Departments, upon request.

5. Responsible for the administration of the l NDE/ ANSI N45.2.6 Training and Certification Programs. (To maintain the independence of the NDE/ ANSI N45.2.6 training and certification  ;

i I process, overall responsibility for appointing the NDE/ ANSI N45.2.6 Level III Examiner will remain with the Director of Quality Assurance. All requirements for certification shall be met prior to appointment as Level III Examiner.)

Title:

Section I, Organization  ! Page: 13 of 43

.       Rev.:  27 Date:  December 20, 1996                                                                                                  i

] 4-

                                                                           - . . - , m- -- +-                    - ~ v. , - . ,

l l YANKEE ATOMIC ELECTRIC COMPANY l l n. Enaineerina and Licensino Manaaer

1. Reports to the Decommissioning Manager and Manager of Operations.
2. Responsible for coordination of activities pertaining to State, Federal, and license requirements.
3. Provides for independent review and acceptance ,

for selected plant repairs, all safety-related engineering design changes and decommissioning work packages for the site. y'

4. Provides for review of material service purchase requests, drawings, specifications, and appropriate procedures.
5. Coordinates and directs engineering services necessary to support the decommissioning of the site.
6. Assures coordination and implementation of the Emergency plan.
7. Assures engineering activities are conducted in l accordance with the Quality Assurance Program. l
8. Assures the Quality Assurance /0uality Control standards and/or requirements are provided on all applicable documents. I l

i

Title:

Section I, Organization Page: 14 of 43 l Rev.: 27 Date: December 20, 1996 l l

YANKEE ATOMIC ELECTRIC COMPANY

o. Cost Control and Plannino Manager
1. Reports to the Decommissioning Manager and' Manager of Operations.
2. Coordinates and monitors Decommissioning fund expenditures.
3. Responsible for preparation of the annual Decommissioning budget.
4. Responsible for tracking services and ma'terials associated with Decommissioning activities.
5. Responsible for developing strategic plans. for Decommissioning activities.
6. Acts as Assistant Site Manager.
p. Automation Technoloay Department (ATD) Manaaer
1. Reports to a Vica President.
2. Provides engineering software development sad support services to NSD departments, sponsor plants,. and other clients, as requested or contracted. J l
3. Provides automated plant systems development and support services for sponsor plants and other clients, as requested or contracted.  !
4. Provides and implements advanced analytical and computational methods and systems to NSD, I sponsors, and other clients.

Title:

Section I, Organization Page: 15 of 43 Rev.: 27 Date: December 20, 1996 i s e

YANKEE ATOMIC ELECTRIC COMPANY i i

2. Plant - Yankee l l
a. Site Manaaer (Site Manager is Plant Manager referenced to in Technical Specifications.)  ;

i

1. Reports'directly to the Decommissioning Manager l and Manager of Operations.

I

2. Acts as Chairman of the Plant Operation Review  :

Committee with authority and responsibility as established in the Technical Specifications of the Site license. t

3. Directly responsible for the safe, orderly and l efficient operation of the site, and for i compliance with the requirements of the license j and applicable State and Federal laws and j regulations.
4. Responsible for the 'on-site implementation of f the Operational Quality Assurance Program, I Security Program and Fire Protection Program. {
5. Responsible for Site maintenance and repair.
6. Responsible for the control and surveillance of all special nuclear material at the site.
7. Provides information and reports to the Yankee Nuclear Services Division and the Nuclear Safety Audit and Review Committee as required and'as directed by the Decommissioning Manager.
8. Provides for and coordinates review of industry operating problems with-the aim of minimizing likelihood of occurrence at the plant.

Title:

Section I, Organization Page: 16 of 43 l Rev.: 27 l Date: December 20, 1996  ! l 1

 . - - . - - .        . - . . . . ~ . - - . - _ . . -                    . . -       . - . - . .     . - . - - - - - - . - . _ , -

YANKEE. ATOMIC ELECTRIC COMPANY l 1 l 9. Designates an alternate to the Site Manager l during his absence with the authority. and  ! responsibility thereof.  !

10. Maintains communications with the Training Coordinator involving plant training needs. ,

I

b. Operations Manager  ;

I

1. Reports directly to the Site Manager.
2. Responsible for the' safe, orderly, and efficient operation of-the Site.for compliance with the requirements of the license and applicable State and Federal laws and regulations.
3. Responsible for shift supervisors and operations support.
4. Administration 'of the Certified Fuel Handlers Training Program.
5. Administration of the Equipment Operators  !

Training Program.  !

6. Coordinates Plant Quality Assurance activities with the Manager of Operations and  ;

Decommissioning Manager.

7. Coordinates Plant Fire Protection activities, including Fire Protection Training.
8. Coordinates testing of plant hydro requirements.

Title:

Section I, Organization Page: 17 of 43 Rev.: 27 Date: December 20, 1996

YANKEE ATOMIC ELECTRIC COMPANY

9. Maintains core component history file of all fuel, control rods, sources and incore detectors.
10. Accounts for all special nuclear material at the plant site.
c. Shift Supervisor
1. Reports directly to the Operations Manager.
2. Responsible for plant operations in accordance with approved documents and specifications.
3. Responsible for preparing documents outlining system functions and operating modes.
4. Responsible for ensuring that personnel under his supervision perform their duties according to applicable licenses, specifications, safety rules, regulations, and certifications.

i

5. Responsible for ensuring that maintenance I request's are provided for the repair or replacement of defective parts and/or components. l l

1

6. Responsible for verifying the operability of systems and/or components following maintenance or changes by providing for the performance of written test documents which incorporate the requirements and acceptance criteria contained in applicable design documents.
7. Responsible for ensuring that fuel handling operations are safely performed in accordance with approved procedures.

Title:

Section I, Organization j Page: 18 of 43 l Rev.. 27  : Date: December 20, 1996  ;

  . _ - . . . . _      . . _ _ .. _ .. _ . _ _ _ _ - .                                     .-~ . _ . - . .         _ . _ _ _ . . _ _ _ _ _ _ . . - _

YANKEE ATOMIC ELECTRIC COMPANY I j 8. Responsible for coordination and performance of 'f l- hydrotesting.

d. Maintenance and Construction Manaaer .

b

1. Reports directly to the Site Manager. l
2. Directs the activities of Mechanical and Electrical Maintenance, Instrumentation and-f Control, and Maintenance Engineering.
3. Coordinates the review and update of plant j
drawings and specifications.

! 4. Directs plant maintenance, repairs, and design changes and assures compliance of maintenance activities. to applicable State, Federal., and ! license requirements. I

5. Prescribes and directs schedules, and programs, as necessary, to assure the safe decommissioning of the site.

l

6. Provides for major contractor decommissioning support including establishment of appropriate contractual arrangements.
7. Ensures that contractor decommissioning activities are performed in a safe manner.

l

8. Directs on-site engineering and craft support I l

of decommissioning activities. l

9. Coordinates and transmits information concerning Plant changes to the Manager of  !

Operations and Decommissioning Manager. i . I' i .

Title:

Section I, Organization

Page: 19 of 43

, Rev.: 27 Date: December 20, 1996 { i, _ - . . . _

i i l i YANKEE ATOMIC ELECTRIC COMPANY l l . l e. Trainina Coordinator i i

1. Reports directly to the Site Manager.

i l 2. Responsible for scheduling and documentation of plant general employee training.  :

3. Responsible for administration of all plant staff training.
4. Maintains lines of communication with the Site Manager on Plant Training Programs.
f. Site Services Supervisor 1.

Reports directly to the Site Manager.  !

2. Supervises the Store Supervisor, a) Preparation of requisition for purchase orders.

b) The receipt, handling, and storage of materials and equipment. c) Administering a system of material and equipment identification. d) Maintaining a system which provides traceability and retrievability of Quality Assurance documentation for l purchased materials. i

                                                                                     \
3. Coordinates the review, revision, and distribution of procedures.

Title:

Section I, Organization ! Page: 20 of 43 i l Rev.: 27 l Date: December 20, 1996 )

         .      -- . ~ . . . .            -      - . - . . - . - . . . - . . . . . . - . . - _ . . _ . _ . . .

l YANKEE ATOMIC ELECTRIC COMPANY

4. Responsible for the operations of the Plant Document Control ~ Center for-the retention of specified.0uality' Assurance records, reports, and personnel records. ,

1

                               -5. Maintains'and disseminates information regarding codes, criteria, standards, guidelines, and policy to applicable plant personnel.
6. Supervises Plant Administrative personnel.
7. Responsible for the Fitness.for Duty Program.
g. Plant Radiation Protection and Chemistry Manaaer
1. Reports directly to the Site Manager.
2. Directs maintenance of water conditioning on the site as per specifications and/or documented and authorized recommendations.
3. Directs a program to ascertain.the radioactivity levels of liquids, gases and solids as required.
4. Directs the review and interpretation of chemistry test results. 1 l

S. Directs the documentation and maintenance of chemistry and radiation protection records.

6. Responsible for the development and implementation of the Radiation Protection i Program (including ALARA), assuring that these programs meet site standards and State and Federal license requirements.

Title:

Section I, Organization Page: 21 of 43 Rev.: 27 , Date: December 20, 1996 l

                                                                                                               )

l i YANKEE ATOMIC ELECTRIC COMPANY i i

7. Directs the maintenance of the Personnel  !

! Exposure Record System, j t  ? L j

8. Directs radioactive material shipments and j receipts pursuant to site and government  :

regulations. l l I l-

9. Maintain stop work authority when radiological  ;

! safety is jeopardized or when unnecessary- l !. personnel exposure is occurring. .;

h. Health and Safety Supervisor- l l

i. ( 1. Reports directly to the Site Manager, , j' 2. Directs the plant Medical Services Program and acts a plant management's point of contact  ; I relative.to medical matters in coordination with the Plant Medical. Consultant.  ; I

3. Directs the maintenance of personnel medical' records.
4. Responsible for the development and implementation of the plant Occupational Safety programs, assuring that these programs meet site standards and Federal OSHA requirements.
5. Responsible for review and communication of plant safety policies through the plant safety manual and safety meetings.
6. Responsible for work site inspections by safety

!. department personnel. , ?. .

7. Acts to safeguard worker health and safety.

t .

Title:

Section I, Organization Page: 22 of 43 Rev.: 27 Date: December 20. 1996 - I 4 s v - , ,,. - - - - , - .

_. . _ - - - . . .. - -.. . - ._. _ .- . . _ . . _ . - - - - ~ . . . - . . ~ . . . - . . - - . . . _ - l

                                     -YANKEE ATOMIC ELECTRIC COMPANY
8. Directs the review and interpretation of occupational safety exposure monitoring.
9. Directs the maintenance of personnel exposure monitoring record system. i
3. Vermont Yankee Nuclear Power Corporation
a. Vice President. Operations j
1. Reports to the President - Vermont Yankee Nuclear Power Corporation.
2. Ensures the OA Program is effectively implemented. ,

1

3. Evaluates disposition of In-Plant Audits and.

prepares concurrence directives to the plant.

4. Ensures that applicable programs and procedures effectively implement the QA Program.
5. Reviews and approves all changes to the l

Operational Quality Assurance Program. '

6. Appoints the NSAR Committe. members including Chairman and Vice Chairmar.,
7. Acts as the Manager of Operat ons.
b. Director of Enaineerina i
1. Reports to the Vice President. Operations.
2. Responsible-for the engineering support area.

Oversees the planning, scheduling, and i

Title:

Section I. Organization . Page: 23 of 43 Rev.: 27  ! Date: December 20, 1996 l 1

YANKEE ATOMIC ELECTRIC COMPANY direction of activities of employees engaged in design changes and alterations.

3. Reviews and approves safety-related design change documents, selected plant programs and policies.
4. Provides for review and approval of drawings and specifications.
5. Provides for interfacing between the Plant and the Yankee Nuclear Services Division.
c. Trainina Manaaer
1. Reports to the Vice President Operations.
2. Establishes and maintains all operator and plant training programs.
3. Remains current on all regulatory requirements concerning training and qualifications of plant ,

personnel and ensures that Plant training programs and procedures are revised in a timely manner in response to changing needs and l regulations.

4. Provides overall coordination and supervision for the Technical Support Training Supervisor, the Engineering and Maintenance Training Supervisor, the Operations Training Supervisor, and the Training Support Supervisor in carrying !

l out their duties. S. Evaluates the effectiveness of the training programs and the performance of the individuals participating in the training.

Title:

Section 1, Organization Page: 24 of 43 Rev.: 27 Date: December 20, 1996

i

                                                              . YANKEE ATOMIC ELECTRIC COMPANY f

i

4. Plant a Vermont Yankee

{

a. Plant Manaaer i
1. Reports to the Vice President, Operations.- )

i

2. Directs the on-site implementation of the j Operational Quality Assurance Program, j
3. Prescribes and directs .the development' of Plant.

l procedures, instructions, schedules, and j programs as necessary to assure the safe and l dependable operation of the facility. l 4. Maintains a thorough knowledge of, and assures , compliance with, the regulatory requirements I for operating a nuclear power plant.

5. Directs the preparation and maintenance of power plant records, reports, and logs.
6. Acts as Chairman of the Plant Operations Review

! .- Committee with authority and responsibility as ! established in the Technical Specifications of the plant operating license.

                                                                                    ~
                                                                 '7.       Provides information and reports to the Yankee Nuclear Services Division as directed by the Vice President, Operations.

1

8. Provides information and reports to the Nuclear )

Safety Audit and Review Committee as required l and as directed by the Vice President, I ( Operations.

i. l
9. Directs the control and surveillance of all j special nuclear material on site.

Title:

Section I, Organization l Page: 25 of 43 ] Rev.: '27 j i Date: December 20, 1996 ' i i e

YANKEE ATOMIC ELECTRIC COMPANY

10. Assure the implementation of training / retraining programs as required by the l Plant license, regulations, or applicable i standards; and as necessary to assure safe work practices and compliance with standard operating practices, license and Technical Specifications, safety rules, and applicable regulations.
b. ODerations Superintendent,
1. Reports to the Plant Manager.
2. Oversees planning, scheduling, coordination, and direction of activities of employees engaged in the installation, operation, inspection, and maintenance of all equipment, buildings, and structures as appropriate. Is responsible for the Operations, Maintenance, ,

and Instrumentations and Control areas.

3. Assists in the development of Plant procedures, instructions, schedules, and programs as ,

necessary to assure the safe and dependable operation of the facility

4. Maintains a thorough knowledge of, and assures compliance with, the regulatory requirements for operating a nuclear power plant.
5. Acts as Vice Chairman of the Plant Operations Review Committee with responsibilities as established in the Technical Specifications of the plant operating license.

Title:

Section I. Organization Page: 26 of 43 i Rev.. 27 Date: December 20, 1996 , i i

YANKEE ATOM V ELECTRIC COMPANY ! 6. Directs the preparation and maintenance of power plant records, reports, and logs as l applicable.

7. Provides information, reports, and records as directed by the Plant Manager.
8. Assists in directing the establishment of safe work practices, and the training and l instruction of plant personnel in the observance of standard operating practices, NRC l license and Technical Specifications, safety l rules and regulations.
c. Technical Services Superintendent i
1. Reports to the Plant Manager.

l 2. Responsible for the Reactor Engineering, Security, Radiation Protection, and Chemistry Departments. l l 3. Assists in the development of Plant procedures, ( instructions, schedules, and programs as l necessary to assure the safe and dependable l operation of the facility and the safe conduct of refuel operations. l 4. Maintains a thorough knowledge of, and assures l compliance with, the regulatory requirements of a nuclear power plant.

5. Acts as Vice chairman of the Plant Operations Review Committee with responsibilities as established in the Technical Specifications of the plant operating license.

Title:

Section I, Organization Page: 27 of 43 Rev.: 27 Date: December 20, 1996

l t l YANKEE ATOMIC ELECTRIC COMPANY ,

6. Directs the preparation and maintenance of power plant records, reports, and logs as applicable.
7. Provides information, reports, and records as directed by the Plant Manager.
8. Assists in directing the establishment of safe work practices, and the training and instruction of plant personnel in the observance of standard operating practices, NRC license and Technical Specifications, safety rules and regulations,
d. Pro.iect Enoineerina Manaaer
1. Reports to the Director of Engineering. I ,
2. Oversees and manages the Project Engineering efforts necessary to support emergency needs of the plant.
3. Provides for the generation' of project plans, schedules budget, manloadings, etc. necessary to support field activities.
4. Manage the contracts, contractors used to accomplish projects, and oversee project implementation.
5. Develop maintenance and oversight of implementation of programs and procedures associated with Project Engineering.
6. Maintain formal documentation of Project Engineering activities for required operation and license requirements.

Title:

Section I, Organization Page: 28 of 43 Rev. 27 Date: December 20, 1996

i I YANKEE ATOMIC ELECTRIC COMPANY l

7. Fulfills other responsibilities common to all supervisory positions and carries out other duties and responsibilities as may be assigned by the Director of Engineering.
e. Technical Support Manaaer
1. Reports to the Director of Engineering.
2. Oversee and manage programs associated with the technical / administrative supports areas.
3. Maintain formal documentation associated with the technical and administrative activities for required operational and licensee documentation.
4. Fulfills other' responsibilities common to all supervisory positions and carries out other duties and responsibilities as may be assigned by the-Director of Engineering.
5. Oversee and manage Fire Protection Program,
f. Performance Enaineerina Manaaer
1. Reports to the Vice President, Operations.

2, Provides engineering support to Operations and Maintenance departments. j

      .                                                                        j
3. Assess the performance of plant systems and 1 make recommendations for improvement. l
4. Oversee and manage programs associated with the performance engineering function.

Title:

Section 1, Organization l Page: 29 of 43 i Rev.: 27 Date: December 20, 1996 1 l

l l YANKEE ATOMIC ELECTRIC COMPANY S. Maintain formal documentation associated with performance engineering programs for required operational and license requirements.

6. Fulfills other responsibilities common to all superviscry positions and carries out other duties ana responsibilities as may be assigned by the Director of Engineering.
g. Nuclear Services Manaaer l
1. Reports to the Director of Engineering.
2. Oversees and manages programs associated with nuclear services including the areas of nuclear and environmental engineering and fuel  ;

management.

3. Maintains formal documentation associated with nuclear services for required operational and license requirements.
4. Provides administrative support for NSD employees at the plant site.

S. Fulfills other responsibilities common to all supervisory positions and carries out other , duties and responsibilities as may be assigned l by the Director Engineering. ]

h. Desian Enaineerina Manaaers l
1. Reports to the Director of Engineering.
2. Oversee and manage the electrical /l&C/

mechanical / fluid systems engineering efforts

Title:

Section I. Organization Page: 30 of 43 Rev.: 27 Date: December 20. 1996

YANKEE ATOMIC ELECTRIC COMPANY r.Ecessary to support the normal and emergent needs of the plant.

3. Oversee and manage programs associated with design engineering.
4. Provide for the generation of design change and installation documents, and support for the installation of these design changes and the close-out of associated documentation.
5. Maintain formal documentation of plant design basis and design change activities for required operational and license requirements.
6. Fulfills other responsibilities common to all supervisory positions and carries out other duties and responsibilities as may be assigned by the Director of Engineering.
 ;                   1. Operations Manaaer
1. Reports to the Operations Superintendent.
2. Fulfills duties and responsibilities similar to
and/or as described in the FSAR and is directly in charge of the dperations Department.
3. Has the responsibility and authority for insuring the safe and efficient operation of the plant and its supporting systems in accordance with applicable station licenses.

Technical Specifications, procedures, instructions, established company policy and safety rules.

Title:

Section 1. Organization Page: 31 of 43 Rev.: 27 Date: December 20, 1996

                                                                                    )

_ _ _ _ _ _ . _ _ . . _ _ _ _ _ _ _ _ _ _ _ . . . . . _ - _ _ . . ._ _ _. -.___._.-.___m.. __ .- _ . _ . YANKEE ATOMIC ELECTRIC COMPANY

4. Consistent with plant policies and applicable instructions, institutes necessary programs, issues instructions, originates procedures and insures that department administrative systems- '

exist such that the responsibilities assigned to the Operations Department are executed effectively and efficiently in accordance with company intent. Insures that necessary documentation is prepared, reviewed, approved, and properly processed to verify that I department activities meet all established requirements.

5. Maintains current status of Operations Department activities and requirements.

Prepares and maintains, plans and schedules for - department commitments such as personnel ] training, retraining and qualification. j l

6. Insures that all records, tests, reports, and j logs maintained by the Operations Department I are properly reviewed and approved.
7. Insures that all Operations Department personnel in a training status are actively
                                                                     , pursuing the established program and that their performance is being adequately evaluated.
8. Reviews all Operations Department procedures to insure that they are current, accurate, and ,

approved,  !

9. Implements aspects of the Plant Quality )

l Assurance Program which relate to the activities of the Operations Department.

Title:

Section I, Organization Page: 32 of 43 Rev.: 27 l Date: December 20, 1996 i 1  ! l  ! l

I i 4

YANKEE ATOMIC ELECTRIC COMPANY.
j. Instrument & Control Manaaer
1. Reports to the Operations Superintendent.
2. Fulfills duties and responsibilities similar to and/or as described in the FSAR and is directly in charge of the Instrument and Control Department.
3. Plans, schedules and supervises the activities of the Instrumentation and Controls Department.

Such activities to include: installation, inspection, calibration, adjustment, maintenance, and repair of the plant instrumentation and controls.

4. Coordinates the activities of the Instrument and Controls Department with all other plant functions.
5. Establishes and directs a program of preventive maintenance, calibration, and surveillance testing as required by the plant license, approved plant procedures, or other plant requirements.
6. Establishes calibration techniques,  !

frequencies, and records as necessary to assure

                                                                                                                                      )

reliable indication and control for plant  ! system parameters. , 1 I

7. Establishes and directs a program of j departmental training that will assure a staff of Instrumentation and Controls personnel j capable of safely and efficiently performing their duties in accordance with established practices, procedures, and regulations.

Title:

Section 1, Organization Page: 33 of 43  ! Rev.: 27 Date: December 20, 1996

YANKEE ATOMIC ELECTRIC COMPANY

8. Prepares and/or supervises the preparation of reports, logs, and historical records as required.
9. Implements those aspects of the Plant Quality Assurance Program which relate to the activities of the Instrumentation and Controls Department.
10. Develops and maintains, in accordance with approved plant procedures, the procedural controls necessary to fulfill the above responsibilities.
k. Maintenance Manaaer
1. Reports to the Operations Superintendent.
2. Fulfills duties and responsibilities similar to and/or as described in the FSAR and is directly  ;

in charge of the Maintenance Department.

3. Is responsible for all electrical and mechanical maintenance activities throughout  !

the Plant with the exception of Instrumentation and Contr/a1 maintenance activities.

4. Consistent with plant policies and applicable instructions, institutes necessary programs, issues instructions, originates procedures, and
                                 . insures that depaitment administrative systems exist such that the responsibilities assigned to the Maintenance Department are executed effectively and efficiently in accordance with company intent. Insures that necessary documentation is prepared, reviewed, approved.

Title:

Section I, Organization Page: 34 of 43 Rev.: 27 Date: December 20, 1996

    .    - . . . . . - -. -           .-.     .     - - . ~ . - - - - . . . _ .      _ . - - . _ _ - - . . , - - .

I - l j-  ! l 1 ! YANKEE ATOMIC ELECTRIC COMPANY j' and properly filed to establish that department j activities' meet all requirements.

5. Consistent with plant policies and applicable. ]

l instructions, organizes de'partment' functions l and activities, assigns duties, and schedules [ 4 s personnel to accomplish department' requirements. Reviews and supervises all

department assignments.
6. Maintains current status of department  !
activities and requirements. Prepares and l l maintains long-range plans and schedules for I

department commitments such as personnel j j training and qualification, preventive j- maintenance, material procurement, plant l

modifications, etc.

J  ! l 7. Staffs and trains Maintenance Department  ! j personnel.

8. Establishes and maintains equipment history -

, records. I

i j 9. Selects and orders materials and spare. parts in areas of assigned responsibility.
l. 10. Implements aspects of the Plant Quality i Assurance Program which relate to the activities of the Maintenance Department.

I ! 11. Reviews mechanical and electrical equipment failure frequency and evaluates equipment f' i reliability. i l' 12. Assumes responsibility for the condition, 3 maintenance, and reliability of all plant i }

Title:

Section 1, Organization 4 Page:. 35 of 43

;     Rev.:          27 i     Date:           December 20, 1996 l

a i .

I l YANKEE ATOMIC ELECTRIC COMPANY electrical and mechanical equipment other than that specifically assigned to other departments.

1. Chemistry Manager
1. Reports to the Technical Services Superintendent.
2. Fulfills duties and responsibilities similar to and/or as described in the FSAR and is directly in charge of the Chemistry. Department.
3. Consistent with the policies and applicable ,

instructions, institutes necessary programs, l issues instructions, originates procedures, and l insures that department administrative systems exist such that the responsibilities assigned to the Chemistry Department are executed j effectively and efficiently in accordance with j company intent. Insures that necessary l documentation is prepared, reviewed, approved, I and properly filed to establish that department activities meet all requirements. , 1

4. Consistent with plant policies and applicable instructions, organizes department functions  !

and activities, assigns and schedules personnel to accomplish department requirements. Reviews and supervises all department assignments.

5. Maintains current status of department  ;

activities and requirements. Prepares and maintains long-range plans and schedules for department commitments such as personnel training and qualification, preventive

Title:

Section I, Organization I Page: 36 of 43 Rev.. 27 Date: December 20, 1996

! YANKEE ATOMIC ELECTRIC COMPANY maintenance, material procurement, plant modifications, etc.

6. Assumes responsibility for providing the-j necessary administrative supervision and j required personnel to meet the needs of the j established Radiological Environmental Monitoring Programs.

[ 7. Prescribes and maintains chemistry conditions j and purification of coolants within applicable limits.

8. Develops and maintains records of all chemistry-l- and radiochemistry aspects of the plant.

, m. Radiation Protection Manaaer l L j 1. Reports to the Technical Services l Superintendent. i

2. Fulfills duties and responsibilities similar to and/or as described in the FSAR and is directly in charge of the Radiation Protection.

Department.

3. Consistent with the policies and applicable instructions, institutes necessary programs, I issues instructions, originates procedures, and insures that department administrative systems  ;

exist such that the responsibilities assigned ) to the Radiation Protection Department are  ; executed effectively and efficiently in ) accordance with company intent. Insures that I necessary documentation is prepared, reviewed, l-approved, and properly filed to establish that l l department activities meet all requirements.

Title:

Section I, Organization Page: 37 of 43 - t Rev.: 27 i Date: December 20, 1996

YANKEE ATOMIC ELECTRIC COMPANY

4. Consistent with plant policies and applicable instructions, organizes department functions and activities, assigns and schedules personnel to accomplish department requirements. Reviews and supervises all department assignments.
5. Maintains current status of department activities and requirements. Prepares and maintains long-range plans and schedules for department commitments such as personnel training and qualification, preventive maintenance, material procurement, plant modifications, etc.
6. Develops and maintains records of all radioactive waste shipments.
7. Develops work and housekeeping practices in radiologically controlled areas of the plant to  ;

minimize personnel exposure and the spread of radioactive contamination.

8. Assumes responsibility for receipt, storage, shipment, and disposal of radioactive material utilizing proper Federal and State regulations (other than nuclear fuel).

l n. Reactor Engineerina Manaaer

1. Reports to the Technical Services l

Superintendent.

2. Fulfills duties and responsibilities similar to and/or as described in the FSAR and :s directly in charge of the Reactor Engineering Department.

Title:

Section I, Organization Page: 38 of 43 Rev.: 27 Date: C;cember 20, 1996

l 1 YANKEE ATOMIC ELECTRIC COMPANY

3. Plans, schedules, and supervises the activities of the Reactor Engineering Department. Such activities to include: nuclear and thermal core analysis, planning and scheduling of fuel rearrangements and fuel cycling, rod withdrawal sequences, rod patterns, and reactor maneuvering during plant startup.  ;

l i 4. Coordinates the activities of the Reactor l Engineering Department with all other plant functions.  ; l S. Establishes and directs a program of Nuclear Performance Monitoring and Surveillance Testing l l as required by the plant license, approved plant procedures, or other plant requirements. ! 6. Establishes a program of control, l accountability and record keeping as required j to maintain an accurate inventory of licensed l special nuclear material.

7. Establishes and directs a program of departmental training that will assure a staff of Reactor Engineering personnel capable of safely and efficiently performing their duties in accordance with established practices, procedures, and regulations.
8. Prepares and/or supervises the preparation of l reports, logs, and historical records as l required.
9. Implements those aspects of the Plant Quality Assurance Program which relate to the activities of the Reactor Engineering Department.

Title:

Section I, Organization Page: 39 of 43 - Rev.- 27 Date: December 20, 1996

1 1 YANKEE ATOMIC ELECTRIC COMPANY i a

10. Develops and maintains, in accordance with approved plant procedures, the procedural.

controls necessary to fulfill the above requirements. i E. REVIEW AND AUDIT [ Two committees have been established for Yankee and the Vermont  ; Yankee plants whose objectives are to insure the plant is j operated safely, utilizing good engineering practices. The  ; committees are charged with making recommendations to modify operational methods or safety precautions. ' i The Plant Operations Review Committee, is made up of Plant personnel. The Nuclear Safety Audit and Review Committee for

  • Vermont Yankee, shall have no more than three members selected from the organization reporting to the Manager of Operations. ,

The Yankee Nuclear Safety' Audit and Review Committee shall not be members of the plant staff.  !

1. Plant ODerations Review Committee  ;

i

a. Yankee Plant - See Section 6.5 " Review and Audit" of i Appendix A Technical Specifications to the Operating  !

License DPR-3.

b. Vermont Yankee Plant - See Section 6.2.A " Review and 1 Audit" of Appendix A Technical Specifications to the Operating License DPR-28. l l
2. Nuclear Safety Audit and Review Committee
a. Yankee Plant - See Section 6.5 " Review and Audit" of Appendix A Technical' Specifications to the Operating License DPR-3.

Title:

Section I, Organization Page: 40 of 43 Rev.: 27 Date: December. 20, 1996

YANKEE ATOMIC ELECTRIC COMPANY

b. Vermont Yankee Plant
1. See Section 6.2.B " Review and Audit" of Appendix A Technical Specifications to the Operating License DPR-28.
2. The NSAR Committee shall be responsible for evaluating changes to the Vermont Yankee organizational chart (Figure 2 to Section 1).

l l l 1

Title:

Section I. Organization Page: 41 of 43 Rev.: 27 Date: December 20, 1996 l l

1 4 l

  ? E'.I r<n r

4 es .. se m

                                                                                                                                                                                                                                                                                                                                                                                                 ?

E"AI2E 2 o % '@ P, YANKEE ATOMIC d +m'- ELECTRIC COMPANY E, a wo-

                         **8                                                                                                                                                                                                                            PRESIDENT i

m 2 ' .*

  .o                     3 E                      U                                            DIRECTOR                                                                                                               VICE                                          DECOMMISSIONING                                     NUCLEAR SAFETY                                                EXECUTIVE DIRECTOR,               l           l
  $                      C.                                  ENGINEERING                                                                                                             PRESIDENT (S)

MANAGER AND MANAGER OF OPERATIONS AUDIT AND REVIEW COMMITTEE QUALITY ASSURANCE g SERVICES y m FUEL ENVIRONMENTAL ENGINEERING PROJECT COST / SCHEDULE ENGINEERING QA N m MANAGEMENT LABORATORY & LICENSING MANAGER MANAGERS MANAGERS CONTROL MANAGER DIRECTOR DIRECTOR y

                                                                                                                                                                                                                                                                                                                                                                                 .a              :

5 o P CORP 0 ______,_____________________ _______ R 3 rit _R AT E _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _  := 4 E  ! QA SURVEILLANCE n SITE

                                                                                                                                                                                                                                                                              ""'"""-""-"~"-"~

MANAGER INSPECTION GROUP O l'm .

                                                                                                                                                                                                                                                                                                                                                                                  *    -         I PLANT OPERATIONS REVIEW COMMITTEE                                                                                                                                                                            .

i HEALTH & MAINTENANCE & OPERATIONS RP/ CHEMISTRY SITE SERVICES TRAINING ASSISTANT CONST U " MANAGER MANAGER SUPERVISOR COORDINATOR SITE MANAGER SU OR ANAGER FUNCTIONAL

                                                                                                                                                                                                                                                                                                                                   ----------               COMMUNICATIONS i

i __ .._..a_.____._._.n- . _ - - _ _ _ . . - - - - _ . _ _ - - . - - - . - - , - . _ . _ . - _ . . _ . ~ . - - . _ _ _ _ _ _ _ _ _ _ _ _ . - _ . - - _ - ~ . _ . _ _ . - __ . _ - _ _ _ - _ - - - _ - _ - -- - _ _ . - - - - . - _ _ - . . -_____ - _ - -.. -

           . .              _ __                   ..m     . . _ .      _ _ _ . .           _ _ _ _    _.m         . - .         .     . . _. .                     ..        ..        _.. . . .        - .               . _ . . .    .
                                                                                                                                                                                                                                             +

o :o o -4 W (D @ $?0 i 2 VERMONT YANKEE ORGANIZATION PRESIDENT C3 N A < M to & CHIEF @"W@g@ EXECUTIVE OFFICER  ; ro oace ~ El %0 ' -" VANKEE ATOMIC to AN O ..--------..=== - __ EL CTRIC p

         -<                                                                                                                       PRES' DENT n         a     .~

o 3 - K I l ~ $ VICE PRESIDENT ADMINISTRATION / VICE VICE l e ~ e o FINANCE & OP (1) PRESIDENT (S) EXECUTIVE

  • TREASURER
        ]-

DIRECTOR QUALITY ASSURANCE TRAINING SAFE AUDIT E "EERING .< DEPARyp(q MANAGER MANAGERS

                                                                                                                     $3                                                              OA MANAGERS                                            m m
               . . - - . - - - - . . . . . . - - - . . . . . . . . . . . . . . ....==-                         ...-----......           ............-- ...--------.                   .0            5..

I  : M DIRECTOR OF e PLANT MANAGER ENGINEERING l PERFORMANCE (2).(3) - - - - - - - - - - - - ----------------- SURVE LANCE ENGINEERING GROUP e N MANAGER g

                                                                                                                                                                                                  !                                  O i                         I                                                                       I TECHNICAL PLANT                        l                                             3 SERVICES                                      l                                  E OPERATIONS SUPERINTENDENT               OP g 5                ,

l SUPERINTENDENT

                                                                                                                                                                                                  .                                  g (2),(4)

C0fM11TTEE . I I E

                         .                      :                           .                       i                                           i                   i                             l INSTRUMENT               RADIATION                                                           REACTOR OPERATIONS           MAINTENANCE                                                                                    CHEMISTRY                                                  !
                                                                    & CONTROL              PROTECTION                                                        ENGINEERING MANAGER                MANAGER                                                                                       MANAGER MANAGER                  MANAGER                                                          MANAGER                            l I

I I i l I e PROJECT TECHNICAL ' NUCLEAR DESIGN ENGINEERING SUPP0stT l SERVICES ENGINEERING MANAGER MANAGER j MANAGER MANAGERS , Notes: (1) Responsible for fire protection. (2) ANSI 18.1-1971 Re: License. (3) In Health Physics matters, the Radiation Protection Manager has direct access to the Plant Manager. (4) The committee membership and its Chairman and Vice Chairman shall be appointed by the Vermont Yankee Vice President. Operations CDe0EstWmG2 l

__ . . . . . _ ~ _ _ _ _ .___. _ _ _ . _ _ . ._m._ . _ _ _ . . _ . _ _ . . - . - _ . _ _ I . l l l l YANKEE ATOMIC ELECTRIC COMPANY 1 l

11. .Q.U)_A,LjTY ASSURANCE PROGRAM A. SCOPE l

l This section establishes the criteria to be applied to systems requiring Quality Assurance which prevent or mitigate the

l. consequences of postulated. accidents which could cause undue risk to.the health and safety of the public. The structures, systems, }

!. components and other items requiring quality assurance are listed  ! l in the Yankee Safety Classification of Systems Manual for the l [ Yankee plant. A listing for the Vermont Yankee plant is provided. j in the Vermont Yankee Safety Classification Manual. . B. RESPONSIBILITIES

1. Compliance with the requirements of the Operational Quality '
l. Assurance Program - based on the criteria of Title 10 of ..

the Code of Federal Regulations Part 50, Appendix B and 'l ANSI N18.7 1976 - shall be the responsibility of all personnel involved with activities affecting operational  ! safety. Each facility shall have a matrix of major quality

                                                                                                                                  ]

assurance procedures cross referenced to each applicable l l criteria of 10CFR50 Appendix B. The. performance of l quality-related activities shall be accomplished with j specified equipment under suitable environmental j conditions, i ! Note: Each criterion section for the Program incorporates the designation of specific organizational i responsibilities.

2. Individuals having direct responsibilities for establishment / distribution control / implementation of the Operational Quality Assurance Program are delineated in Section i " Organization" of the Program.

l l l

Title:

Section II, Quality Assurance Program Page: 1 of 7 1 Rev.: 27 j Date: December 20, 1996 l' I f

                                                                . - . - . - ~ . - - - - - ~ . - -_ -   -

i YANKEE ATOMIC ELECTRIC COMPANY C. IMPLEMENTATION Establishment of an effectiv, Jperational Quality Assurance Program is assured through con.ideration of and conformance with the Regulatory Position in the below listed. Regulatory Guides as modified in Appendix B. Implementation of this Program 'is assured through Quality Assurance procedures derived from Quality Assurance policies, goals and objectives. Quality Assurance shall review Quality Assurance program procedures to assure their derivation from the policies, goals'and Objectives established by the President.

1. Title 10 of the. Code of Federal Regulations, Part 50, Appendix B, Quality Assurance Criteria for Nuclear Power Plants
  • 2. ANSI N18.7-1976, Administrative Controls and Quality Assurance for the Operational Phase of Nuclear Power Plants (Endorsed by Regulatory Guide 1.33 Revision 2)
3. ANSI N45.2.1-1973, CJ!anina of Fluid Systems and Associated Components Durina Construction Phase of Nuclear Power Plants (Endorsed by Regulatory Guide 1.37, March 16,1973)
4. ANSI N45.2.2-1972, Packaaina. Shionino. Receivina. Storace and Handlina of items for Nuclear Power Plants (Endorsed by l l Regulatory Guide 1.38, Revision 2)
5. ANSI N45.2.3-1973, Housekeepino Durina the Construction Phase of Nuclear Power Plants (Endorsed by Regulatory Guide 1.39, Revision 2) l l 6. ANSI N45.2.4-1972, Installation. Inspection and Testina l Reauirements for instrumentation and Electric Eauioment l Durina the Construction of Nuclear Power Generatina Plants (Endorsed by Regulatory Guide 1.30, August 11, 1972) j

Title:

Section 11, Quality Assurance Program , Page: 2 of 7 1

Rev.
.27 Date: December 20, 1996 i l

l

i

                                                                                     )

YANKEE ATOMIC ELECTRIC COMPANY I I

7. ANSI N45.2.5-1974, Supolementary Ouality Assurance Reauirements for installation. Inspection and Testino of Structural Concrete and Structural Steel _0urina the l Construction Phase of Nuclear Power F ants (Endorsed by l

Regulatory Guide 1.94, Revision 1)

8. ANSI N45.2.6-1978, Qualifi_ cation of Inspection.

Examination. and Testina Personnel for the Construction  ! Phase of Nuclear Power Plarts (Endorsed by Regulatory i l Guide 1.58, Revision 1) 1

9. ANSI N45.2.8-1975, Supplementary Ouality Assurance Reauirements for installation. Inspection and Testina of Mechanical Eauipment and Systems for the Construction Phase 4 of Nuclear Power Plants (Endorsed by Regulatory Guide 1.116, Revision 0-R) l l
10. ANSI N45.2.9-1974, Reauirements for Collection. Storaae, and Maintenance of Quality Assurance Records for Nuclear Power Plants (Endorsed by Regulatory Guide 1.88. ,

Revision 2) l

11. ANSI N45.2.10-1973, Quality Assurance Terms and Definitions
12. AHS1 N45.2.11-1974, Ouality Assurance Reauirements for the Desian of Nuclear Power Plants (Endorsed by Regulatory Guide 1.64, Revision 2) I
13. ANSI N45.2.12-1977, Reauirements for Auditina of Quality Assurance Program for Nuclear Power Plants (Endorsed by Regulatory Guide 1.144. Revision 1) J l
14. ANSI N45.2.13-1976, Ouality Assurance Reauirements for Control of Procurement of items and Services for Nuclear Power Plants (Endorsed by Regulatory Guide 1.123 Revision 1) i

Title:

Section II, Quality Assurance Program Page: 3 of 7 Rev.: 27 Date: December 20, 1996

YANKEE ATOMIC ELECTRIC COMPANY

15. ANSI N45.2.23-1978, Qualification of Quality Assurance Procram Audit Personnel for Nuclear Power Plants (Endorsed by Regulatory Guide 1.146, August 1980)
16. ANSI N18.1-1971, Selection and Trainino of Nuclear Power Plant Personnel (Endorsed by Regulatory Guide 1.8, Revision 1-R)
17. Regulatory Guide 1.26. Revision 3, Quality Grouo  ;

Classifications and Standards for Water . Steam . and , Radioactive-Waste-Containino Components of Nuclear Power Plants

18. Regulatory Guide 1,29, Revision 3, Seismic Desian Classification Notes: 1) When conflicts in similar requirements contained in Technical Specifications and the above documents exist, the requirements contained in Technical Specifications override those in the documents. Requirements in the documents will be considered when they supplement and are not in conflict with similar requirements in Technical Specifications.
2) Revisions to the above listed documents will be censidered for applicability to the Yankee Operational Quality Assurance Program upon written direction thereof by the Regional Administrator Nuclear Regulatory Commission - Office of Inspection and Enforcement - Region 1.
3) Only those documents listed above shall be considered applicable to the Yankee and Vermont Yankee plants. Documents

Title:

Section II, Quality Assurance Program Page: 4 of 7 Rev.: 27 Date: December 20, 1996

1 i YANKEE ATOMIC ELECTRIC COMPANY further referenced by the above listed documents shall not be considered applicable. They may, however, be considered as guidelines.

  • Exceptions and alternatives to the j provisions contained in this l Standard / Guide are detailed in I Appendix B. l
                                                                                  )
4) This Program shall be applicable to those activities requiring quality assurance which occur commencing within 90 days 1 after acceptance of the Program by the )

Nuclear Regulatory Commission. l l

5) The NRC shall be notified o.f changes, that reduce commitments in the accepted description of the 0A program, for their )

l review and acceptance prior to  ! implementation. Acceptance will be ) assumed 60 days af ter_ submittal unless I notified otherwise. )

6) Changes that do not reduce OA program commitments shall be submitted to the NRC at least annually.
7) Editorial changes or personnel reassignments of a nonsubstantive nature do not require NRC notification.

1 l l 4

Title:

Section II, Quality Assurance Program Page: 5 of 7 Rev.: 27 Date: December 20, 1996 l 1

YANKEE ATOMIC ELECTRIC COMPANY 4 D. MANAGEMENT EVALUATION The Cognizant Corporate Officer directs a thorough evaluation of the established Operational Quality Assurance Program by assigning the Nuclear Safety Audit and Review Committee the task of reviewing for compliance with and evaluating the effectiveness of quality related activities. E. TRAINING

1. The Vice President (s) and Manager of Operations are responsible for the indoctrination and training of their staffs involved with activities affecting quality during plant operation and/or license commitment.
2. The Training Manager at Vermont Yankee is responsible for the indoctrination and training of plant staff personnel performing activities affecting operations or requiring quality assurance, and of the operators who are formally ,

licensed or qualified.

3. The Training Coordinator at the Yankee Site is responsible for indoctrination and training of site staff personnel performing activities affecting license requirements.
4. Within YNSD, each department Director / Manager is responsible for the indoctrination and training of department personnel performing activities affecting I

quality in applicable design and engineering, test, operational, construction, or quality phases.

5. The indoctrination and training programs shall provide the following:
a. Instruction as to the purpose, scope, and implementation of quality-related manuals, instructions, and procedures.

Title:

Section II, Quality Assurance Program Page: 6 of 7 Rev.: 27 Date: December 20, 1996

YANKEE ATOMIC ELECTRIC COMPANY

b. Training and qualification in the principles and techniques of the activity being performed.
c. Documentation of the scope, objective, and method of implementing the program,
d. Maintenance of personnel proficiency by retraining, l

re-examining, and/or recertifying.

e. Documentation of the training sessions including content, attendance, dates, and results where j applicable. I 1

l 1 l l l

Title:

Section II, Quality Assurance Program Page: 7 of 7 Rev.: 27 Date: December 20. 1996

t

                                                                                                                           -l 1

~ YANKEE ATOMIC ELECTRIC COMPANY 4 I

111. DESIGN CONTROL  !

2 A. SCOPE i'  ; 2 . . i This section of the Operational Quality Assurance Program i establishes measures to assure that the design of and changes to  ; structures, systems, and components covered by the Operational Quality Assurance Program are controlled.

                                                                  ~

j B. RESPONSIBILITIES

1. The Nuclear Services Division Quality Assurance Department shall be responsible for auditing design documents and j engineering specifications to verify that quality
- requirements such as inspection requirements and I acceptance criteria, have been included by the responsible parties.
2. . The Nuclear Services Division' Engineering / Project Departments / Plants shall be responsible for

I

a. The. design and control of design activities
(including design interfaces) for the' change of structures, systems, or components' including the requirement for independent review. This NRC
;,                                                         mandated review shall be performed by an uninvolved, but technically knowledgeable, person in the i                                                                                                                            )

engineering discipline.

b. Identification, documentation, and control of j i deviations from specified design requirements and/or quality standards.

1 1 I

c. Design analysis and delineation of acceptance criteria for inspections and tests.

E l 1 4

Title:

.Section III, Design Control

Page
1 of 4 Rev.: 27 1 Date: -December 20, 1996
                                     , - - e                                                  r                    , - - -

I l l YANKEE ATOMIC ELECTRIC COMPANY

d. Verification of the adequacy of a specific design feature by implementation of a prototype test when ,

required. l l

e. Review of inspection and test data for compliance l with established engineering criteria.
3. The Plant Operations Review Committee shall be responsible for:
a. Review of all proposed plant changes and recommending their approval or disapproval to the Plant Superintendent / Manager.
b. Determination of whether proposed changes involve unreviewed safety questions.
4. The Plant Site Manager shall be responsible for:
a. Review of the recommendations of the Plant Operations Review Committee.
h. Review and approval of proposed plant changes.
5. The Nuclear Safety Audit and Review Committee shall be responsible for the review of plant changes.
6. The Vice President (s) and Manager of Operations and their staff shall be responsible for:
a. Approval of procedures for processing plant design changes and engineering design changes,
b. Review, approval and distribution of plant change documents.

Title:

Section III, Design Control Page: 2 of 4 Rev.: 27 Date: December 20, 1996 l l s l l l .

l I YANKEE ATOMIC ELECTRIC COMPANY l

7. The Nuclear Services 01 vision Plant Support Department shall be responsible for the distribution of design change documents to the contractor performing the work where contract administration responsibilities have been i assigned.

C. IMPLEMENTATION

1. Satisfaction of this criterion shall be assured through the implementation of the Nuclear Services Division and/or plant actions listed below:
a. Correct translation of applicable regulatory requirements and design bases into specifications, drawings and written documents.
b. Application of suitable design controls to such activities as reactor physics; seismic, stress, thermal, hydraulic, radiation, and accident analyses; compatibility of materials; and accessibility for inservice inspection, maintenance and repair.
c. Design reviews to assure that design characteristics can be controlled, inspected and tested, l
d. Performance of proper selection and accomplishment of !

design verification or checking process such as design reviews, alternate calculations, qualification I testing or test programs. When a test program is I used to verify the adequacy of a design, a qualification test of a prototype unit under the most adverse design conditions shall be used. The responsibilities and qualifications of the verifier, the areas and features to be verified, the pertinent considerations to be verified, and the extent of documentation are identified in procedures.

Title:

Section III, Design Control Page: 3 of 4 Rev : 27 Date: December 20, 1996 l l t

1 l YANKEE ATOMIC ELECTRIC COMPANY t Procedures will provide the criteria that specify when verification should be by test. If the verification method is by test only, prototype, component, or feature testing is performed in accordance with written procedures prior to relying upon the component, system, or structure to perform its function.

e. Subjecticn of design and specification changes, including those originating "on-site", to the same design controls and approvals that were applicable to the original design unless designated in writing to another responsible organization.
f. Documentation of errors and deficiencies in the design process that adversely affect safety classified structures, systems, and components; performance of corrective action to preclude repetition.
g. Review of standard "off- he-shelf" commercial or previously approved mater!als, parts, and equipment that are essential to the safety functions of structures, systems, and components, for suitability of application prior to selection.
h. Selection of suitable materials, parts, equipment, and processes for safety classified structures, systems, and components.
i. Establishment of procedures to assure that computer programs are verified and validated for a particular application.

Title:

Section III, Design Control Page: 4 of 4 Rev.: 27 Date: December 20, 1996

  . . ._ . . . _ _       _ . . _ _   _._____.._..._._...._..__.__.m._..                                     __   _ _ . . . _.

t i

i

! i ! l l -YANKEE ATOMIC ELECTRIC COMPANY f > I l IV. PROCUREMENT DOCUMENT CONTROL I I A. ) SCOPE  ! This section of'the Operational Quality Assurance Program  ! establishes the measures necessary to assure that applicable l regulatory requirements, design bases and other requirements which are necessary to assure adequate quality, are suitably l i included or_ referenced in the documents for procurement of l material, equipment and services. l 1 B. RESPONSIBillTIES j i

1. The Nuclear Services Division Quality Assurance Department l shall be responsible for review of procurement requisitions  !

initiated by the Plant and the Yankee Nuclear Services l Division, except for Vermont Yankee.who may request such l

                                             . reviews. The Vermont Yankee staff shall' be responsible for                       !

the Procurement Requisition reviews.

2. The Plant or their corporate staffs shall be responsible {

for:

a. The preparation, review, issue, and control of purchase documents. l l

I

b. Preparation of detailed procedures as to how purchase l documents are prepared, reviewed, approved, issued, )

and controlled. I

c. Review of plant procurement requisitions-(Vermont Yankee plant only)
3. -The Nuclear Services Division Engineering and/or Project Departments shall be responsible for:

Title:

Section IV, Procurement Document Control Page: 1 of 3 Rev.: 27 Date: December 20, 1996 w - . _

YANKEE ATOMIC ELECTRIC COMPANY l a. Preparation of engineering specifications which

  • detail the technical and quality requirements for i material, equipment and services.

l b. Initiation and/or review (Yankee plant only) of purchase documentation for material, equipment, and services required for Plant changes.

4. The Nuclear Services Division Plant Support Department shall be responsible for initiation and/or review (Yankee plant only) of purchase documentation for construction services including contractor supplied material and equipment required for plant changes where contract administration responsibilities have been assigned.
5. For YNSD, the Vice President (s) and Manager of Operations and their staff shall be responsible for the review and ,

approval of procurement documents. For Vermont Yankee, this function is performed by the Vermont Yankee staff. C. IMPLEMENTATION

1. Satisfaction of the criterion shall be assured through the 1 implementation of the Nuclear Services Division and/or plant actions listed below:
a. Documentation of the review and approval of I procurement documents prior to release and availability of this documentation for verification. j 1
b. Identification of the vendor's applicable quality assurance requirements of 10CFR50, Appendix B and/or ANSI N18.7, and/or other applicable codes, standards or regulatory documents referenced in procurement documents which are to be reviewed by the qualified personnel knowledgeable in quality assurance. For 1

Title:

Section IV, Procurement Document Control Page: 2 of 3 Rev.: 27 Date: December 20, 1996

YANKEE ATOMIC ELECTRIC COMPANY r i 1 t j Vermont Yankee, this function will be the responsibility of the Vermont Yankee staff,

c. Identification in the procurement documents of the documentation to be prepared, maintained, and/or
 ,                            submitted to the purchaser prior to use, such as:

l

1. Drawings, specifications, procedures:

l 2. Inspection and fabrication plans: l

3. Inspection and test records;
4. Personnel and procedure qualifications:
5. Chemical and physical test results of material; and
6. Quality Assurance Department's right of the access to the vendor's facilities and records for surveillance and/or audit to procurement documentation.
d. Review and approval of changes and revisions to procurement documents at least equivalent to those for the original document.
e. Control of procurement documents for spare and replacement parts at least equivalent to that used for the original equipment, i

Title:

Section IV, Procurement Document Control Page: '3 of 3 Rev.: 27 Date: December 20, 1996 1

YANKEE ATOMIC ELECTRIC COMPANY a V. INSTRUCTIONS, PROCEDURES. AND DRAWINGS l i A. SCOPE This section 'sf the Operational Quality Assurance Program establishes che measures for prescribing 'and accomplishing j activities requiring quality assurance in _accordance with l approved drawings, instructions, or procedures. l B. RESPONSIBILITIES l l 1 Within Yankee Nuclear Services Division, each Department i Director / Manager is responsible for establishing and complying  ; with applicable procedures governing the activities affecting quality, j 1

                                              ' Persons preparing and approving documents are responsible for                          '

assuring that specifications, instructions, procedures, and , drawings include appropriate quantitative or qualitative 3 acceptance criteria for determining that activities have been  ! satisfactorily accomplished: assuring that the applicable ' criteria of 10CFR50 Appendix B and/or ANSI N18.7 are specified: and assuring that the documents are kept current. In addition, l the following departments have the distinct responsibilities delineated below.

                                                                                                                                       ]
1. The Nuclear Services Division Quality Assurance Department shall be responsible for review of all Plant Quality Assurance procedures. )

l ! 2. The Plant shall be responsible for the preparation. l l approval, maintenance, and implementation of all l instructions and procedures associated with plant l activities. l L 3. The Nuclear Services Division Engineering and/or Project ! Departments shall be responsible for: 4

Title:

Section V, Instructions,. Procedures, and Drawings ! Page: 1 of 2 i Rev.. : 27 Date: December 20, 1996 l,_

l i i i YANKEE ATOMIC ELECTRIC COMPANY a '. Preparation.and approval of engineering drawings and I instructions, welding and nondestructive examination  ! procedures, and procedures for Engineering Design. l Control. j b. Updating and control of original drawings and j distribution of copies thereof. t t

4. The Plant Operations Review Committee shall be responsible for reviewing procedures affecting nuclear safety prior to. l their approval by the Plant Superintendent / Manager.  !
5. The Nuclear Services Division Plant Support Department shall be responsible for the preparation, approval,  !

maintenance, and . implementation of all instructions and  ! procedures associated with Cunstruction Services  ! activities, j l C. IMPLEMENTATION f

1. Satisfaction of this criterion shall be assured through the implementation of_ the Nuclear Services Division and/or. j plant actions listed below: 1
a. Estab; shment of provisions which clearly delineate i the se; :nce of actions to be accomplished in the l preparation, review, approval . , and control of instructions, procedures, and drawings.
b. Review of inspection plans; test, calibration, l special process, maintenance and repair procedures:

drawings and. specifications; and changes thereto by the Quality Assurance Department or other personnel l knowledgeable in quality assurance. 1

Title:

Section V, Instructions, Procedures, and Drawings Page: 2 of 2 Rev.: 27 Date: December 20, 1996 l

          .-                              .      - ..                          , . .            -                        . . , . - - , _   - - .-l

YANKEE ATOMIC ELECTRIC COMPANY VI. DOCUMENT CONTROL A. SCOPE j This section of the Operational Quality Assurance Program establishes the ,easures for controlling the issuance of documents, inciuding revisions thereto, which affect quality activities. B. RESPONSIBILITIES l 1

1. All participating departments shall establish document control measures which provide for the following:
a. Identification of organizations responsible for preparation, review, approval, and control of documents.
b. Identification of documentation te be used in performing the activity.
c. Coordination and control of interface documents.
d. Establishment of distribution lists.
e. Action to be taken for obsolete or superseded documents.

In addition, the following organizations have the unique responsibilities delineated below.

2. The Plant shall be responsible for: l l
a. Controlling the issuance of plant operating, maintenance, repair, refueling, inspection and test,  ;
                            'and change documents.                                    l

Title:

Section VI. Document Control Page: 1 of 4 Rev.: 27 Date: December 20, 1996

I YANKEE ATOMIC ELECTRIC COMPANY

b. Distribution and maintenance of all plant approved and/or revised documents assuring quality at the location where the activity is performed.

l c. Review and distribution of drawings.  !

3. The Nuclear Services Division Engineering and/or Project Departments shall be responsible for:
a. Controlling the issuance of engineering drawings, specifications, welding and nondestructive examination documents.
b. Revision and distribution of welding and 1 j nondestructive examination documents.

1

c. Maintenance and distribution of engineoring specifications and drawings.
i l 4. The Vice President (s) and Manager of Operatiors and their I staff shall be responsible for:
a. A system of review and approval of Plant drawings and  !

i specifications.

b. Controlling the Nuclear Services Division Operational Support quality assurance documents.
5. The Director of Quality Assurance shall be responsible for establishing the means for the control and distribution of the Operational Quality Assurance Program and Approved I Vendors List and revisions thereto.

i I

Title:

Section VI. Document Control Page: 2 of 4 Rev.: 27 Date: December 20. 1996

J YANKEE gr0MIC ELECTRIC COMPANY C. IMPLEMENTATION

1. Satisfaction of this criterion shall be assured through the implementation of the Nuclear Services Division and/or-plant actions listed below:
a. Review and approval of document changes by the same orgt.nizations that performed the original review and tpproval or by other responsible organizations aelegated by the controlling authority.
b. Inclusion of approved changes in instructions, drawings, and other applicable documents prior to placing the system in operating status.
c. Provision of availability of documents at the location where the activity is to be performed prior to commencing the work.
d. Establishment, revision, and distribution c/ a master list or equivalent to identify the current revision number of instructions, specifications, drawings, procurement documents, or other quality assuring documents.
e. Control of documents identified as follows:
1. Design documents (i.e., Engineering / Plant
Design Change Requests Specifications, Calculations, etc.);
2. Design, manufacturing, construction, and installation drawings:
3. Procurement documents:

A

Title:

Sectica VI, Document Control Page: 3 of 4 Rev.- 27 Date: December 20. 1996

YANKEE ATOMIC ELECTRIC COMPANY

4. Operational Quality Assurance Program, maintenance, and operating procedures:
5. Manufacturing, inspection and test instructions:
6. Test documents:

4

7. Design changes: and
8. Nonconformance reports.
9. Event reports (Vermont Yankee).
f. Appendices to the Operational Quality Assurance Program are considered to be part of the Program and are reviewed and approved in accordance with the Program.

i

Title:

Section VI. Document Control Fe;c 4 of 4 Rev.: 27 Date: December 20, 1996 i

YANKEE ATOMIC ELECTRIC COMPANY l VII. CONTROL OF PURCHAhlji MATERI AL, EQUIPMENT. AND SERVICES A. SCOPE ) This section of the Operational Quality Assurance Program j establishes measures to assure that purchased material, equipment 4 and services, whether purchased directly or through contractors and subcontractors, conform to the procurement documents. 4 i B. RESPONSIBILITIES i 1 l 1. The Nuclear Services Division Quality Assurance Department

j. shall be responsible for:

, a. Audits and Commercial Surveys of vendor quality j asscrance programs, i l b. Surveillances of vendor activities. j c. Maintenance of the Yankee Atomic Electric Company Approved. Vendors List. { l 2. The Nuclear Services Division Quality Assurance, Engineering, and/or Project Departments shall be ! responsible for evaluating vendor manufacturing and-technical capabilities upon request. 4

3. The Plant shall be responsible for:
a. Receipt inspection and control of material and equipment.
b. Evaluation of purchased services during and/or after completion of the service.

1 [ c. The Plant Services / Administrative Department at the 4 Yankee plant and the Material Manager at i

Title:

Section Vll, Control of Purchased Material, Equipment, and Services

Page
1 of 4 .

Rev.: 27 ! Date: December 20, 1996 4

YANKEE ATOMIC ELECTRIC COMPANY Vermont Yankee shall be responsible for the control of purchased material, parts and components until issued for installation or use. C. IMPLEMENTATION 1 Satisfaction of this criterion shall be assured through the implementation of the Nuclear Services Division and/or plant actions listed below:

a. Audits and Commercial Surveys of vendors based on one or more of the following, as appropriate to the scope of procurement activities:
1. When required in order to verify vendor capabilities to comply with the applicable criteria of 10CFR50, Appendix B, ANSI N18.7, or other quality program baselines.
2. When required based on the results of review and evaluation of vendor performance history.

l

3. When required in order to observe vendor facilities / service activitics to assure  !

conformance to purchase specifications. l l 1

b. Surveillances of vendors which provide for: l 1
1. Specification of applicable quality controls, processes to be witnessed or verified.

documentation required, and personnel responsible for performing the surveillance. j

2. Verification that the vendor complies with the quality requirements specified in procurement documents by observation of in-process work.

Title:

Section Vil, Control of Purchased Material. Equipment, and Services Page: 2 of 4 l' l Rev.: 27 Date: December 20, 1996 l

     . .-.-           .-       -~        -- .. .. - . . - - - --. - - ..... -             . - _ ..-~ - .. .

l YANKEE ATOMIC ELECTRIC COMPANY  ! l

c. Transfer of the following records from the vendor to the plant-
1. Documentation that identifies the purchased j material / services and compliance with the applicable procurement document requirements.  !

I

2. Documentation that identifies any deviation (s) {

from procurement requirements, including a j description of those deviations dispositioned i

                                               " accept as is" or " repair".                                    l
d. Review and acceptance of vendor documentation by a responsible quality assurance individual. j 1
e. Receipt inspections of vendor furnished material / services, in accordance with predetermined instructions, to assure:
1. Material is identified and conforms with receiving documentation.
2. Material and documentation are determined acceptable prior to use.
3. Inspection records or certificates of conformance. attesting to material acceptability l are on-site prior to use.

l

4. Items are identified as to their inspection status prior to release' for controlled storage, . i l

installation or further work. l l l I

Title:

Section Vil, Control of Purchased Material Equipment, and Services Page: 3 of 4 Rev.: 27 - i Date: December 20, 1996 I

 .~,     ,-    ,

! I l l l YANKEE ATOMIC ELECTRIC COMPANY 1

f. Evaluations of vendor effectiveness to control
quality is performed at intervals consistent with the 1 importance, complexity and quality of the -

item / services. 1 i l 1 i i i l

Title:

Section VII. Control of Purchased Material. Equipment, and Services Page: 4 of 4  ; Rev.: 27  ; Date: December 20, 1996 l 1

l l

                                                                      .         l YANKEE ATOMIC ELECTRIC COMPANY                         I Vill. IDENTIFICATION AND CONTROL OF MATERIAL, PARTS AND COMPONENTS A. SCOPE 1

This section of the Operational Quality Assurance Program establishes the measures for identification and control necessary to prevent the use of incorrect or defective material, parts, and components. l B. RESPONSIBILITIES l I

1. The Nuclear Services Division Quality Assurance Department shall be responsible for review, evaluation, or verification (audit commercial survey or surveillance) of vendor quality controls and work processes for traceability of materials through the use of heat number, part number, or serial number, either on the item or on records traceable to the items.
2. The Plant shall be responsible for: ,

1

a. Preparation and approval of documents for the identification and control of materials, parts, components and storage of lubricants and other consumable materials.
b. Maintenance of traceability of materials, parts, and components received, stored, installed, and used at the Plant.
3. The Nuclear Services Division Engineering and/or Project Departments and/or the Vermont Yankee staff shall be responsible for assuring that specifications contain appropriate requirements for the identification and control of materials, parts, and components.

Title:

Section VIII, Identification and Control of  : Materials, Parts, and Components Page: 1 of 2 Rev.: 27 Date: December 20, 1996

YANKEE ATOMIC ELECTRIC COMPANY I i

4. For YNSD, the Vice President (s) and Manager of Operations and their staff shall be responsible for providing review and approval of documentation for the purchase of j materials, parts, and components. For Vermont Yankee, this j function is performed by the Vermont Yankee staff.

i C. IMPLEMENTATION  ;

1. Satisfaction of this criterion shall be assured through the implementation of the Nuclear Services Division and/or plant actions listed below:
a. Traceability of the identification of materials and parts to the appropriate documentation such as drawings, specifications, purchase orders, manufacturing and inspection documents, deviation reports, and Physical and Chemical Material Test Reports,
b. Identification of the item in a location and with a method which does not affect its fit, function or quality.
c. Documented verification of correct identification of materials, parts, and components prior to release for use.

i I l l i I l 1

Title:

Section Vill, Identification and Control of Materials, Parts, and Components Page: 2 of 2 Rev.: 27 Date: December 20, 1996 I

YANKEE ATOMIC ELECTRIC COMPANY IX. CONTROL OF SPECIAL PROCESSES A. SCOPE This section of the Operational Quality Assurance Program establishes the measures necessary to assure that special processes, including welding, heat treating, and nondestructive i testing, are controlled and accomplished by qualified personnel J in accordance with applicable codes, standards, specifications, criteria and other special requirements. I B. RESPONSIBILITIES

1. The Nuclear Services Division Quality Assurance Department shall be responsible for:
a. Surveillance of certain nondestructive tests in accordance with " Yankee Atomic Electric Company Welding and Nondestructive Examination Procedures".
b. Review of special process documents, as requested, generated by the Nuclear Services Division Engineering / Project Departments and vendors for use on-site and when otherwise specified. ,

i

2. The Nuclear Services Division Engineering and/or Project Departments shall be responsible for:
a. Preparation of documents for welding, heat treating, filler metal control, and nondestructive examinations.
b. Review and approval of special process documents ,

provided by the vendor for use on-site and when otherwise specified. l

Title:

Section IX, Control of Special Processes Page: 1 of 2 Rev.: 27 Date: December 20, 1996

YANKEE ATOMIC ELECTRIC COMPANY

3. The Plant Support Department shall be responsible for training, qualification, and requalification of personnel in nondestructive testing, such as liquid penetrant examination.
4. The Plant shall be responsible for:
a. Assurance that maintenance and change work involving special processes are performed by qualified personnel in accordance with approved documents.
b. Control of material used in special processes by plant personnel.
5. For YNSD, the Vice President and Manager of Operation and staff shall be responsible for review and approval of purchase documentation for special process material. For Vermont Yankee, this function is performed by the Vermont Yankee staff.

C. IMPLEMENTATION l

1. Satisfaction of this criterion shall be assured through the implementation of the Nuclear Services Division and/or plant actions listed below: l
a. Completion of qualification records of documents, equipment, and personnel connected with special processes in accordance with applicable codes, standards, and specifications.
b. Performance of special processes accomplished in accordance with written process sheets or equivalent with recorded evidence of verification.
c. Maintenance and updating of qualification records of  !

special process documents, equipment, and personnel.

Title:

Section IX, Control of Special Processes  ; Page: 2 of 2 Rev.: 27 i I Date: December 20, 1996

YANKEE ATOMIC ELECTRIC COMPANY X. INSPECTION A . -. SCOPE This section of the Operational Quality Assurance Program establishes measures for inspection of activities requiring '

               . quality assurance to verify conformance with approved procedures, drawings, specifications and instructions.

B. RESPONSIBILITIES

1. The Nuclear Services Division Quality Assurance Department shall be responsible for:
a. Surveillance of documentation pertinent to the Inservice Inspection and Test Program-(for Vermont Yankee only).
b. Surveillance of vendor inspection activities and personnel.
c. Review of Installation and Test Procedures and Maintenance Requests to ascertain the extent of any required QA surveillances and OC inspections (Yankee Plant only),
d. Incorporation of mandatory no'tification/ hold points for plant / vendor / service group activities into the 0A surveillances and mandatory hold points for inspections (Yankee Plant only).
e. Writing, reviewing and approving quality control inspection checklists. (Yankee Plant only.)
f. Perform OC inspection activities to assure that predetermined requirements have been met. (Yankee i Plant only.)

Title:

Section X Inspection j Page: 1 of 3 l Rev.: 27  ! Date: December 20, 1996 l

l YANKEE ATOMIC ELECTRIC COMPANY ! 2. The Plant shall be responsible for: i t

a. Writing and approving inspection instructions and check lists. +
b. Assuring that activities requiring quality assurance meet predetermined requirements.
c. Providing qualified personnel and necessary equipment for inspections to assure quality work.

I

d. Perform inspection activities to assure that predetermined requirements have been met.
e. Hold points incorporation where applicable.

i C. IMPLEMENTATION l

1. Satisfaction of this criterion shall be assured through the I implementation of the Nuclear Services Division and/or plant actions listed below:
a. Independence of personnel performing the inspection from the personnel performing the activity being inspected.
b. Use of instructions or check lists which incorporate the details listed in Section XVII Item C.1.a. l
c. Use of necessary drawings and specifications when performing inspection operations.
d. Inspection of repairs and replacements in accordance with the approved design and inspection requirements I or acceptable alternatives.

Title:

Section X. Inspection Page: 2 of 3 Rev.: 27 Date: December 20, 1996

I i I YANKEE ATOMIC ELECTRIC COMPANY

e. Surveillance of processing methods, equipment, and l personnel when direct inspection is not possible. {
f. Qualification of inspectors in accordance with applicable codes, standards, and company training programs; and maintenance of qualifications and certifications. j l
g. Review of maintenance documents by qualified personnel knowledgeable in quality assurance to determine the need for inspection, identification of 1 inspection personnel, and documenting inspection results.

l l l

Title:

Section X Inspection l Page: 3 of 3 Rev.: 27

Date
December 20, 1996
                                                                               }

YANKEE ATOMIC ELECTRIC COMPANY XI. TEST CONTR0l A. SCOPE This section of the Operational Quality Assurance Program establishes the measures for a test program to demonstrate that structures, systems, and components will perform satisfactorily in service. B. RESPONSIBillTIES

1. The Nuclear Services Division Quality Assurance Department shall be responsible for:  :
a. Surveillance of vendor test program activities.  !
b. Surveillance of the documentation generated during ,

the test program.

2. The Nuclear Services Division Engineering / Project Departments / Plants shall be responsible for:
a. Determination of when testing is required following plant changes.
b. Establishment of specifications, requirements, and acceptance criteria for testing following plant changes.
c. Development of test documents, performance of tests, and documentation, evaluation, and approval of test results.
d. Provision of qualified personnel and calibrated equipment for testing.

l

Title:

Section XI. Test Control Page: 1 of 3 Rev.: 27 Date: December 20, 1996

YANKEE ATOMIC ELECTRIC COMPANY

3. The Nuclear Safety Audit and Review Committee shall be responsible for reviewing proposed tests or experiments which involve an unreviewed safety question as defined in  !

10CFR50.59.

4. The Plant Operations Review Committee shall be responsible for the review of all test documents and test results for special tests.

C. IMPl.FMENTATION

1. Satisfaction of this crid.erion shall be assured through the implementation of the Nuclear Services Division and/or plant actions listed below:
a. Assurance that changes, repairs, and replacements are tested in accordance with the approved design and testing requirements or acceptable alternatives.

l

b. Review of written test documents for incorporation or reference of the following:
1. Requirements and acceptance limits contained in j applicable design and procurement documents.
2. Instructions for performing the test.
3. Test prerequisites, such as:

t a) Calibrated instrumentation: l l b) Adequate and appropriate equipment; i c) Trained, qualified, and i licensed / certified personnel: d) Completeness of item to be tested:

Title:

Section XI, Test Control Page: 2 of 3 Rev.: 27 Date: December 20, 1996 i

YANKEE ATOMIC ELECTRIC COMPANY e) Suitable and controlled environmental conditions: and f) Provisions for data collection and storage.

4. Mandatory inspection hold points for witness by owner, contractor or inspector, when applicable.
5. Acceptance and rejection criteria.
6. Method of documenting test data and results.
c. Procedures shall provide for specification of test equipment with suitable accuracy. The criteria for determining the accuracy requirements of test equipment shall be provided when identification of specific equipment is not practical.

l l l l l l 1 l l

Title:

Section XI, Test Control l Page: 3 of 3 Rev.: 27 Date: December 20, 1996 i

YANK,EE ATOMIC ELECTRIC COMPANY l [ Xll. CONTROL OF MEASURING AND TEST' EQUIPMENT-l A. SCOPE i This section of the Oper_ational~Ouality Assurance Program l [ establishes the measures for the control, calibration and periodic adjustments of tools, gages. instruments, and other i measuring and test devices used to verify conformance to j

established requirements.  ;

I B. RESPONSIBILITIES l l

1. Each Plant Department shall be responsible for:
a. Development of the implementing documents for control

! of measuring and test equipment including

identification and calibration for equipment under their control.

l

b. Provision of calibrated tools, gages and instruments necessary to perform required measurements and tests.
c. Maintenance of calibration records.

l

d. Preparation and review of specifications for measuring and test equipment, such.that all applicable requirements are satisfied.

C. IMPLEMENTATION l

1. Satisfaction of this criterion shall be assured through the implementation of the Nuclear Services Division and/or i plant actions' listed below:
a. Identification and traceability of measuring and test equipment'to the calibration test data.

l ! .Ti tl e : Section XII., Control of Measuring and Test Equipment . Page: 1 of 2 i Rev.: 27 ( Date:- December 20, 1996 l

YANKEE ATOMIC ELECTRIC COMPANY

b. Labeling or tagging of measuring and test equipment to indicate due date for calibration.
c. Calibration of measuring and test equipment at specified intervals based on required accuracy, purpose, degree of usage, stability characteristics, and other conditions affecting the measurement,
d. Documentation of measures taken to determine the validity of previous inspections performed when measuring and test equipment is found to be out of calibration.
e. Use of calibration standards having an uncertainty (error) requirement of no more than 1/4 of the tolerance of the equipment being calibrated. l Calibration standards limited by the
                       " state-of-the-art" may have a greater acceptable uncertainty.                                          j
f. Documentation and maintenance of the status of all items under the calibration system.  ;
g. Traceability of reference and transfer standards to nationally recognized standards; or, documentation of the basis for calibration where national standards are nonexistent.

l

Title:

Section X11, Control of Measuring and Test Equipment Page: 2 of 2 Rev.- 27 Date: December 20, 1996

l l YANKEE ATOMIC ELECTRIC COMPANY  ! X111, HANDLING. STORAGE AND SHIPPING A. SCOPE l This section of the Operational Quality Assurance Program , establishes measures to control the handling, storage, shipping. l cleaning and preservation of material and equipment to prevent l damage or deterioration. ' B. RESPONSIBillTIES

1. The Plant shail be responsible for:
a. Development of the implementing documents for handling, storage and shipping of materials and equipment.
b. Provisions of suitable facilities and equipment for handling, storage, and shipping of materials,
c. Inspection and test of special handling tools and l equipment.

C. IMPLEMENTATION l i

1. Satisfaction of this criterion shall be assured through the ]

implementation of the Nuclear Services Division and/or Plant actions listed below:

a. Specification and accomplishment of special handling, preservation, storage, cleaning, packaging, and shipping requirements by qualified individuals in accordance with predetermined work and inspection instructions.
b. Preparation of instructions in accordance with design and specification requirements which control the

Title:

Section XIll Handling, Storage, and Shipping Page: 1 of 2 Rev.: 27 Date: December 20, 1996

i i l l YANKEE ATOMIC ELECTRIC COMPANY cleaning, handling, storage, packaging, shipping and preservation of safety classified materials,

components and systems to preclude damage, loss or l

deterioration by environmental conditions such as { temperature or humidity. l l [ I l 1 l

Title:

Section Xill, Handling, Storage, and Shipping Page: 2 of 2 Rev.: 27 Date: December 20, 1996 i l l 1 1 1

YANKEE ATOMIC ELECTRIC COMPANY XIV. INSPECTION, TEST AND GPERATING STATUS ' A. SCOPE This section of the Operational Quality Assurance Program l establishes the measures for indicating the status of items undergoing inspections and tests (via tags, labels, logs, data sheets, etc.), to prevent the unintentional bypass of required tests. In addition, this section establishes measures for indicating the operating status of components and systems to prevent their inadvertent operation. B. RESPONSIBillTIES

1. The Plant shall be responsible for:
a. Ensuring indication of the status of operating equipmen.t or systems-to be removed from service for maintenance, test, inspection, repair or change.
b. Designation of per sonnel who are responsible for directing the status change of equipment and systems.

C. IMPl.EMENTATION

1. Satisfaction of this criterion shall be assured through the implementation of the Nuclear Services Division and/or plant actions listed below:
a. Notification of affected organizations for changes in the inspection, test and operating status of structures, systems, and components.
b. Procedural control of the bypassing of required inspections, tests and other critical operations with the concurrence of the Quality Assurance Department.

Title:

Section XIV. inspection. Test, and Operating Status Page: 1 of 2 Rev.: 27 Date: December 20, 1996

YANKEE ATOMIC ELECTRIC COMPANY

c. Procedural control of the application and removal of inspection and status indicators such as tags, markings, labels and stamps.

. t 1 i i i l 1 I l 4 l

Title:

Section XIV, inspection. Test, and Operating Status Page: 2 of 2 Rev.: 27 Date: December 20, 1996

YANKEE ATOMIC ELECTRIC COMPANY XV. NONCONFORMING MATERIALS, PARTS. AND COMP 0NENTS  ! A. SCOPE This section of the Operational Quality Assurance Program establishes the measures to control materials, parts, components, or any other activities which do not conform to requirements, in order to prevent their inadvertent use. B. RESPONSIBILITIES

1. The Nuclear Services Division Quality Assurance Department shall be responsible for:

1 l

a. Review of noncc.c ,9ance reports to determine repetitive nonconforming conditions and to verify resolution of significant conditions adverse to quality to preclude recurrence (for Yankee Plant l only).
b. Review of Event Reports to verify resolution of significant conditions adverse to quality (Vermont Yankee only).
c. Establishment of feedback system between Yankee l Atomic Electric Company and vendor representatives in regard to nonconforming material or services.
d. Initiation of nonconformance reports (Yankee Plant and Event Reports for Vermont Yankee) when conditions are found which may adversely affect the quality of plant systems, structures, activities, or components.

Title:

Section XV, Nonconforming Materials, Parts, and Components Page: 1 of 3 Rev.- 27 Date: December 20, 1996

l YANKEE ATOMIC ELECTRIC COMPANY I l

2. The Nuclear Services Division Engineering and/or Project Departments shall be responsible for:
a. Review of nonconforming services or items which cannot be corrected by vendor action,
b. Preparation or approval of implementing documents for repair and/or rework of nonconforming items.
3. The Vice President (s) and their staff shall be responsible for the evaluation of significant plant-initiated nonconforming item, service, or activity dispositions.
4. The Plant shall be responsible for:
a. Writing implementation documents for the identification, documentation, and corrective action t for services, material, installation, testing, operation, and/or surveillance nonconformances at the Plant. ,
b. Establishment of measures to provide for the documented control of nonconforming materials, parts, and components.
c. Establishment of feedback system between the plant and vendor representatives for the disposition of nonconforming services, materials, parts and j components. l l

C. IMPLEMENTATION

1. Satisfaction of this criterion shall be assured through the implementation of the Nuclear Services Division and/or plant actions listed below. j I

l I

Title:

Section XV, Nonconforming Materials Parts, and Components I Page: 2 of 3 Rev.: 27 Date: December 20, 1996 l

1 YANKEE ATOMIC ELECTRIC COMPANY l j i

a. Identification, disposition, inspection and segregation of nonconforming items or activities.
b. Identification of those individuals or groups l delegated the responsibility and authority for the l disposition and written approval of nonconforming items or activities.

l

c. Inspection and test of reworked or repaired items which require reinspection and retest to original methods or methods equivalent thereto.
d. Inclusion of nonccaformance reports dispositioned
                           " accept as is" or " repair" as part of the inspection records furnished to the plant.

l

e. Periodic analysis of nonconformance reports to show quality trends with the results reported to management for review and assessment.
2. The identification, description, disposition, inspection  !

and signature approval of the disposition for nonconformance shall be documented in a nonconformance  ; report.

Title:

Section XV. Nonconforming Materials, Parts, and Components Page: 3 of 3 Rev.: 27 Date: December 20, 1996

i I YANKEE ATOMIC ELECTRIC COMPANY  ; XVI. CORRECTIVE ACTION A. SCOPE This section of the Operational Quality Assurance Program establishes measures to assure that conditions adverse to quality, such as failures, malfunctions, deficiencies, deviations, defective material and equipment are promptly identified and corrected. B. RESPONSIBILITIES

1. The Nuclear Services Division Quality Assurance Department  !

shall be responsible for review and/or audit of I recommendations to prevent recurrence of a significant condition adverse to quality.

2. The Vice President (s) and their staff shall be responsible for:
a. Review of significant adverse conditions reported by the Plant including cerrective actions taken.
b. Coordination of comments between the Nuclear Services Division Projects Departments and the Plant (for Yankee Plant only).

1

3. The Plant shall be responsible for:
a. Identificati0n of causes of conditions adverse to quality.
b. Implementa*.1on of the corrective action.
c. Documentation of corrective action taken.

l l

Title:

Section XVI, Corrective Action Page: 1 of 3 Rev.: 27 Date: December 20, 1996 i i

YANKEE ATOMIC ELECTRIC COMPANY

d. Coordination of comments.between the Nuclear Services Division Projects Departments and the Plant (for Vermont Yankee only).
4. The Nuclear Services Division Engineering and/or Project Departments shall be responsible for:
a. Review of conditions adverse to quality which involve design deficiencies to determine the cause of the condition.
b. Recommendations of corrective action to preclude repetition of design deficiencies.
5. The Plant Operations Review Committee shall be responsible for:
a. Review of significant conditions adverse to quality and recommending corrective action.
b. Recommendations involving repetition of significant operating deficiencies.

C. IMPLEMENTATION

1. Satisfaction of this criterion shall be assured through the implementation of the Nuclear Services Division and/or l plant actions listed below:  ;

l

a. Initiation of corrective action following the determination of a condition adverse to quality to preclude recurrence,
b. Follow-up reviews to verify proper implementation of corrective actions and to close out the corrective action documentation.

Title:

Section XVI, Corrective Action Page: 2 of 3 Rev.: 27 Date: December 20, 1996

YANKEE ATOMIC ELECTRIC COMPANY

c. Reporting of significant conditions adverse to quality, the cause of the conditions, and the correction action implemented to the cognizant levels of management for review and assessment, both
                         " oft-site" and "on-site".

Title:

Section XVI, Corrective Action Page: 3 of 3 Rev. 27 Date: December 20, 1996

YANKEE ATOMIC ELECTRIC COMPANY XVII. QUALITY ASSURANCE RECORDS A. SCOPE

1. This section of the Operational Quality Assurance Program establishes the measures for maintenance of records which provide documentary evidence of the quality of items and the activities affecting quality. Requirements shall be established for identification, transmittal, retrievability and retention of quality assurance records including duration, location, prGiection and assigned responsibility.
2. The quality assurance records shall include, but not be limited to, plant history; operating logs: principal maintenance: design change activities; reportable occurrences; nonconformance reports; results of reviews, inspections, tests, audits and material analyses; monitoring of work performance; qualification of personnel, documents and equipment; drawings; specifications; procurement documents; calibration documents and reports; and corrcctive action reports.

B. RESPONSIBILITIES

1. The Nuclear Services Division Quality Assurance Department shall be responsible for:
a. Maintenance of qualification / certification records for Quality Assurance Department personnel.
b. Maintenance of audit, surveillance and inspection records of quality assurance activities generated by ths Quality Assurance Department personnel or their designates.

Title:

Section XVII, Quality Assurance Records Pate: 1 of 3 Rev.: 27 Date: December 20, 1996

I l l YANKEE ATOMIC ELECTRIC COMPANY l

2. The Plant shall be responsible for:

i

a. Writing implementation documents for the l establishment and maintenance of Plant Operational l Quality Assurance records.
b. Designating individuals and establishing requirements for the control of plant design, procurement, and operational records involving quality assurance.
c. Provision of facilities to prevent deterioration or ,

loss of documentation. l l i

d. Provision of a system for the review, appruval and 1 retention of plant prepared documents such as reportable occurrences, technical reports, required l records and the meeting minutes of official j committees. 1
3. The Nuclear Services Division Engineering and/or Project Departments shall be responsible for establishing a system of review, approval and retention of documents relating to quality assurance for the operation of the departments. j
4. The Director of Quality Assurance shall be responsible for control and distribution of the Operational Quality Assurance Program and revisions thereto.

C. IMPLEMENTATION

1. Satisfaction of this criterion shall be assured through the implementation of the Nuclear Services Division and/or plant actions listed below:
a. Specifying the details required for inspections and test records including the following as applicable;

Title:

Section XVII, Quality Assurance Records l Page: 2 of 3 Rev.: 27 Date: December 20, 1996

i l YANKEE ATOMIC ELECTRIC COMPANY

1) Description of the type of observation.
2) Evidence of completion and verification of manufacturing, inspection, or test operations.
3) The date and results of the inspection or test. l
4) Information related to conditions adverse to )

quality. )

5) Inspector or data recorder identification.

i l

6) Evidence as to the acceptability of the 1 results.

i

7) Acceptance and rejection criteria. l
8) Identification of required procedures.  ;

drawings, and specifications and revisions. '

9) Specification of the necessary measuring and test equipment including accuracy requirements.
10) Spent fuel storage records.

1

b. Providing for record administration, receipt,  !

storage, preservation, safekeeping, retrieval and final disposition.

c. Construction, location and security of record storage facilities to prevent destruction of the records by fire, flooding, theft, and deterioration by environmental conditions such as temperature or humidity. Duplicate records shall be stored in a separate remote location when the type of document is not included in the record storage facility.

Title:

Section XVll, Quality Assurance Records Page: 3 of 3 Rev.: 27 Date: December 20, 1996

1 YANKEE ATOMIC ELECTRIC COMPANY XVill. AUDITS A. SCOPE l This section of the Operational Quality Assurance Program i establishes the measures for a comprehensive system of planned and documented audits and in-plant surveillances to verify l compliance with all aspects of the Program and to assess the l effectiveness of the Program. i l B. RESPONSIBILITIES

1. The Nuclear Services Division Quality Assurance Department j shall be responsible for:  !
a. Providing objective evidence for audits /surveillances of activities encompassed by the 18 criteria of 10CFR50 Appendix B, and ANSI N18.7.
b. Training of audit and surveillance personnel.
c. Scheduling, coordinating, and implementing the formal in-Plant Audit / Surveillance Programs performed on activities covered in Sections 111 through XVII of this document. i
d. Preparing information regarding the In-Plant Audit Program for review by the Nuclear Safety Audit and Review Committee.
e. Performing audits of vendors.
f. Follow:ng up of discrepancies discovered during audi tsh urveill ance.

Title:

Section XVill, Audits .Page: 1 of 4 Rev.: 27 Date: December 20, 1996

YANKEE ATOMIC ELECTRIC COMPANY

g. Making recommendations to preclude possible audit / surveillance discrepancy repetition (for the Yankee Plant only).
h. Performing periodic audits of all YNSD Departments having responsibilities under the Quality Assurance Program.
2. The Vice President (s) and Manager of Operations and their staff shall be responsible for:
a. Evaluate disposition of In-Plant Audits and prepares concurrence directives to the plant.
3. The Plant shall be responsible for:
a. Documentation of the plant position concerning any outstanding item resulting from an audit requiring a response (for the Yankee Plant only).
b. Implementation of action to be taken as directed by the Vice President and Manager of Operations.
c. Disposition of any outstanding items resulting from an audit (for Vermont Yankee only).
d. Implementation of any corrective actions resultant from audit identified Event Reports (for Vermont i Yankee only).

I

4. The Nuclear Safety Audit and Review Committee shall be responsible for:
a. Evaluation of the Operational Quality Assurance Program to determine its overall effectiveness.

Title:

Section XVIII, Audits Page: 2 of 4 Rev.: 27 Date: December 20, 1996

YANKEE AT0 HIC ELECTRIC COMPANY

b. Reporting results of Program reviews and recommendations resulting therefrom to the cognizant corporate officer.
5. The Nuclear Services Division Departments shall be responsible for:
a. Documentation of the department position concerning any outstanding item resulting from an audit. j
b. Implementation of action to be taken to correct deficiencies revealed by an audit.

l 1 C. IMPLEMENTATION ' l

1. Satisfaction of this criterion shall be assured through the implementation of plant and/or Nuclear Services Division I documents.
2. The implementing documents shall provide for the following-
a. Documentation of audit / surveillance results and review with management having responsibility in the i area.

1

b. Necessary action to be taken by responsible l management to correct deficiencies revealed by the l audit / surveillance.
c. Re-audit of deficient areas until corrections have been accomplished to preclude recurrence of the deficiencies.
d. Inclusion of an objective evaluation of j quality-related practices, procedures, instructions and the effectiveness of implementation in the audit.

Title:

Section XVIII. Audits Page: 3 of 4 Rev.: 27 Date: December 20, 1996

l ! YANKEE ATOMIC ELECTRIC COMPANY  ! l l

e. Inclusion of an objective evaluation of work areas, activities, processes and items and the review of l documentation in the audit. l
f. Performance of audits in the below listed areas where l the requirements of Appendix B to 10CFR Part 50 and )

ANSI N18.7 are being implemented: 1

1) Operation, maintenance and repairs.
2) The preparation, review, approval, and control l of designs, specifications, procurement documents, instructions, procedures, and drawings.
3) Receiving and plant inspections.
4) Indoctrination and training programs.
5) Implementation of operating and test procedures.
6) Calibration of measuring and test equipment.

I

g. Scheduling of audits regularly on the basis of the status and safety importance of the activities being performed. l l

Title:

Section XVIII. Audits Page: 4 of 4 Rev.: 27 Date: December 20, 1996 l

YANKEE ATOMIC ELECTRIC COMPANY APPENDIX A Qualification Requirements for Management of Quality Assurance l l Management of Quality Assurance must meet the below listed qualification j requirements: A. EDUCATION: i Bachelor's degree in Science or Engineering, or the equivalent in practical experience. B. EXPERIENCE:

1. Four years experience in the field of Quality Assurance, or l
2. Equivalent number of years vf nuclear plant experience in a i supervisory position preferably at an operating nuclear power l plant or a combination of the two. ,

l l a) At least one year of this four years experience shall be i nuclear power plant experience in the implementation of the Quality Assurance Program, and

,                 b)    Six months of the one year experience shall be obtained within a Quality Assurance organization.                    j I

t

Title:

Appendix A, Qualifications Requirements Page: 1 of 1 Rev.: 27 Date: December 20, 1996

I l YANKEE ATOMIC ELECTRIC COMPANY APPENDIX B Exceptions The sub-categories of this Appendix summarize the exceptions noted in Section II of the Yankee. Atomic Electric Company Operational Quality Assurance Manual. Appendix B Sub-Cateaory Standard / Guide Title

1. ANSI N45.2.3-1973 Housekeeping During the  ;

Construction Phase of Nuclear

                                                                                     ~

Power Plants II. ANSI N45.2.9-1974 Requirements for Collection. Storage, and Maintenance of Quality Assurance Records for Nuclear Power Plants Ill. ANSI N45.2.10-1973 Quality Assurance Terms and Definitions IV. R.G. 1.64. Rev. 2 Quality Assurance Requirements for the Design of Nuclear Power Plants V, ANSI N45.2.2-1.'? Packaging, Shipping, Receiving, Storage and Handling of items for i Nuclear Power Plants VI. ANSI N45.2.6-1978 Qualification of Inspection, j Examination and Testing Personnel I for the Construction Phase of I Nuclear Power Plants Vll. R.G. 1.26, Rev. 3 Quality Group Classifications and Standards for Water , Steam- and , Radioactive-Waste-Containing I Components of Nuclear Power Plants Vill. R.G. 1.29, Rev. 3 Seismic Design Classification

Title:

Appendix B. Exceptions i Page: 1 of 26 l Rev.: 27 Date: December 20, 1996

YANKEE ATOMIC ELECTRIC COMPANY APPENDIX B (continued) Appendix B Sub CateaorY Standard / Guide Title IX. ANSI N18.7-1976 Administrative Controls and Quality Assurance for the Operational Phase of Nuclear Power Plants X. R.G. 1,33, Rev. 2 Quality Assurance Program Requirements (Operations) l l l l 4

Title:

Appendix B. Exceptions Page: 2 of 26 Rev., 27 Date: December 20, 1996

I 9 YANKEE ATOMIC ELECTRIC COMPANY l APPENDIX B , (continued) I. ANSI N45.2.3 - 1973, Housekeepino During the Construction Phase of i Nuclear Power Plants I I A. EXCEPTION: l l Subsection 2.1 - Planninq l l The Yankee and Vermont Yankee plants take exception to the five-zone requirements specified in the subject standard. ALTERNATIVE: The Yankee and Vermont Yankee plants shall establish as a minimum , a three zone program as follows: Zone til Zone 111 criteria shall be applied to major portions of the reactor coolant system which are opened for inspection.

                                                                                       ]

maintenance or repair.

1. Access control over personnel shall be required.
2. Cleanliness shall be maintained, commensurate with the work being performed, so as to preclude the entry of foreign
material to the Reactor Coolant System.
3. A documented cleanliness inspection shall be performed i

immediately prior to closure. Note: The Zone III requirements may be expanded for certain maintenance repair activities if deemed appropriate by plant

Title:

Appendix B, Exceptions Page: 3 of 26 Rev.: 27 Date: December 20, 1996

YANKEE ATOMIC ELECTRIC COMPANY APPENDIX B , (continued) management. In such instances applicable sections of-Zones 1 & 11 shall be specified. Zone IV Zone IV criteria shall be applied to the radiation control areas , of the plant.

1. Standard janitorial and work practices shall be utilized to maintain a level of cleanliness commensurate with company policy in the areas of Housekeeping. Plant and Personnel Safety and Fire Protection.
2. Additional housekeeping requirements shall be implemented as required for the control of radioactive contamination.
3. Smoking and eating shall be controlled consistent with good health physics practices and to maintain cleanliness.

70ne V Zone V criteria shall be applied to the remainder of the plant.

1. Standard janitorial and work practices shall be utilized to l maintain a level of cleanliness commensurate with company policy in the areas of Housekeeping. Plant and Personnel  !

Safety and Fire Protection.

Title:

Appendix B. Exceptions Page: 4 of 26 Rev.: 27 Date: December 20. 1996

YANKEE ATOMIC ELECTRIC COMPANY i APPENDIX B (continued) B. EXCEPTION: I Subsection 3.2 - Control of Facilities The Yankee and Vermont Yankee plar.ts take exception to the control of tools, equipment, materials and supplies used in Zone III. I ALTERNATIVE: I l The Yankee and Vermont Yankee plants shall verify contru for Zone ! III as indicated in Exception A of this sub-category.  ! I I I i i i l

Title:

Appendix B. Exceptions Page: 5 of 26 Rev.: 27 Date: December 20, 1996

YANKEE ATOMIC ELECTRIC COMPANY APPENDIX B (continued) II. ANSI N45.2.9 - 1974, Requirements for Collection. Storace, and Maintenance of Quality Assurance Records for Nuclear Power Plants A. EXCEPTION: Subsection 5.6(3) Facility The Yankee and Vermont Yankee plants take exception to

            " structures, doors, frames, and hardware should be Class A fire rated with a recommended four hour minimum rating."

ALTERNATIVE:

            " Doors, structures, frames, and hardware shall be designed to comply with the requirements of a minimum two (2) hour fire rating, meeting NFPA No. 232 guidelines."

JUSTlFICATION: The two (2) hour rating has been endorsed by the NRC Standard Review Plan NUREG-0800. Revision 2, dated July 1981.

Title:

Appendix B Exceptions Page: 6 of 26 Rev.: 27 Date: December 20, 1996

1 YANKEE ATOMIC ELECTRIC COMPANY 1 l l APPENDIX B l (continued) l l

                                                                                   'l Ill. ANSI N45.2.10 - 1973, Quality Assurance Terms and Definitions A.      EXCEPTION:

l Subsection 2 - Terms and Definitions 1 The Yankee and Vermont Yankee plants take exception to the definitions of " Certificate of Conformance" and " Certificate of l Compliance". l l l ALTERNATIVE. , The Yankee and Vermont Yankee plants shall reverse the definitions l of the above terms so our Program will be in compliance with the  ! implied definitions in the ASME B&PV Code and Yankee specifications. l l l l

Title:

Appendix B. Exceptions , Page: 7 of 26 Rev.: 27 Date: December 20, 1996

                                                                                              .ii YANKEE ATOMIC ELECTRIC COMPANY l

APPENDlX B j (continued) IV. Regulatory Guide 1.64, Revision 2, "0uality Assurance Reauirements for the Desion of Nuclear Power Plants" A. EXCEPTION: i Subsection c.2 The Yankee and Vermont Yankee plants take exception to the regulatory guide position on the exclusion of supervisors performing design verification. ALTERNATIVE. l The Yankee and Vermont Yankee plants will continue the accepted practices for independent design verification in accordance with the provisions of ANSI N45.2.11-1974 Section 6.1. l

                                                                                                )

JUSTIFICATION-I 1 The exclusion of line supervision to perform design verification j has proven to be an unnecessary burden on the resources within the engineering organizations of the company, and counterproductive j during heightened periods of engineering activities. ANSI l N45.2.11 contains specific limitations on the situations in which a supervisor is permitted to perform design verification. The standard states, "This verification may be performed by the originator's supervisor provided the supervisor did not specify a singular design approach, or rule out certain design considerations and did not establish the design inputs used in the design, or if the supervisor is the only individual in the organization competent to perform the verification." This control was developed through realistic evaluation of the practicable limits that restrictions impose on engineering organizations by the working group that developed ANSI N45.2.11.

Title:

Appendix B, Exceptions Page: 8 of 26 Rev.: 27 Date: December 20, 1996

i YANKEE ATOMIC ELECTRIC COMPANY , APPENDIX B (continued) l .V. ANS! N45.2.2 - 1972, Packacino. ShiDDino. Receivino. Storace & Handlino of items for Nuclear Power Plants i A. EXCEPTION: I Subsection 3.7.1 & A3.7.1 - Containers . The Yankee and Vermont Yankee plants take exception to the specific requirements for containers. ALTERNATIVE: Containers shall be of suitable construction to assure material is received undamaged. JUSTIFICATION: Containers shipped by closed carrier, stored inside and not-subjected to a wet environment do not require weather resistant fiberboard, therefore, this is an unnecessary expense. Additionally, numerous' vendors utilize shipping containers that do l not comply with the specific requirements of this section, i.e., flaps overlap. The acceptance criteria for a shipping container should be established based on the capability of the container to maintain the component material in a safe condition. Technology has advanced beyond the standard. l

Title:

Appendix B. Exceptions Page: 9 of 26 Rev.: 27 Date: December 20, 1996 l l

YANKEE ATOMIC ELECTRIC COMPANY

                                       ' APPENDIX B                                    ,

(continued)  ; { B. EXCEPTION: , 1

               ' Subsection 3.7.2 - Crates and Skids
                            ~

The. Yankee and Vermont-Yankee plants take exception to the requirement that skids and runners shall be used on boxes with a gross weight of 100 pounds or more. ALTERNATIVE: 1 Skids or runners shall be used on boxes with a gross weight of l 100 pounds or more if practical.  ; JUSTIFICATION: Storage methods and container design frequently are such that ] runners or skids' are not feasible. J C. EXCEPTION: Subsection 5.2.1 - ShiDDinQ Damage insDeCtion The Yankee and Vermont Yankee plants take exception to the requirement that a preliminary visual inspection or examination be performed prior to unloading. ALTERNATIVE: ) The Yankee and Vermont Yankee plants shall perform those required inspections after unloading. In special instances, preunloading inspections shall be performed.

Title:

Appendix B, Exceptions Page: 10 of 26 Rev.: 27

 -Date:     December 20, 1996

4  ! 1  ! YANKEE ATOMIC ELECTRIC COMPANY i ] APPENDIX B 4 (continued) i JUSTIFICATION: j t Post unloading inspection is adequate to determine any damage that may have been incurred during shipping and handling. , D. EXCEPTION: Subsection 5.2.2 - Item insoection i The Yankee and Vermont Yankee plants take exception to the , requirement, that "The inspections shall be performed in an area i equivalent to the level of storage requirements for the item." ALTERNATIVE: l The Yankee and Vermont Yankee plants shall perform receiving inspection in a manner and in an environment which do not endanger the requisite quality of the item: however, receiving area environmental controls may be'less stringent than storage environmental controls for that item. When inspections are performed.in receiving areas with environmental controls less stringent than storage area environmental controls, a time limit shall be established on a case basis for retention of items in the receiving area. Retention time shall be such that deterioration is prevented and applicable manufacturer recommendations are addressed. JUSTIFICATION: Receipt inspection activities are for a much shorter duration and therefore should not be subjected to the same stringent requirements as required for storage.

Title:

Appendix B. Exceptions Page: 11 of 26 Rev.: 27 Date: December 20, 1996

YANKEE ATOMIC ELECTRIC COMPANY l l t APPENDIX B i (continued)  ! l E. EXCEPTION: { l Subsection 5.2.3 - Special Inspection l l The Yankee and Vermont Yankee plants take exception to attaching i special inspection procedures to the item or container. f ALTERNATIVE: Special inspection procedures shall be readily available to personnel performing inspections. ' JUSTIFICATION: . Procedures are subject to less abuse and more stringent controls l when maintained on file and not attached to the item. Inspection [ status is maintained by tagging and procedure control. F. EXCEPTION: Subsection 6.1.2 - Levels of Storaae e The Yankee and Vermont Yankee plants take exception to two specific requirements associated with fuel storage (classified Level A). ALTERNATIVE: The Yankee and Vermont Yankee plants shall meet the requirements of Level A storage for new fuel with the exception of special air

                                        . filtering; and temperature and humidity controls.

Title:

Appendix B, Exceptions ) Page: 12 of 26 , Rev.: 27 l Date: December. 20, 1996 I

YANKEE ATOMIC ELECTRIC COMPANY APPENDIX B (continued) JUSTIFICATION: The existing storage conditions at the Yankee operating plants are consistent with the protection provided to the fuel while in storage at the manufacturer (vendor) and/or while in transit to the plant site and are judged to provide adequate protection to the fuel assembly structure which is of highly corrosion resistant materials. We believe that the above listed requirements are intended for application at the manufacturing facility (vendor) where the uranium pellets may be exposed to the atmosphere and not in its fully encapsulated, and therefore, fully protected form in a completed fuel assembly. G. EXCEPTION: Appendix A-3 Subsection A3.5.l(l) - Caos & Pluas The Yankee and Vermont Yankee plants take exception to the requirement that nonmetallic plugs and caps shall be brightly colored. ALTERNATIVE: Nonmetallic plugs and caps shall be of a contrasting color, JUSTIFICATION: The purpose of utilizing brightly colored plugs and caps is to assist in assuring obstructions are not inadvertently placed in operating components or systems. By using plugs and caps of a contrasting color this objective can be achieved.

Title:

Appendix B. Exceptions Page: 13 of 26 Rev.: 27 Date: December 20, 1996

_ . _. _. _ . _. __ _ _. _ _ ._ _ __ ..._ _ _ . _ . _ _ . _.m_ . . _ _ . . _ _ . . _ _ . _ _ . . . . _ ._. .___ [ YANKEE ATOMIC ELECTRIC COMPANY APPENDIX B (continued) f l H. EXCEPTION: j l Ap;endix A-3 Subsection A3.9(1) - Second Group. Markinas- , t The Yant?e and Vermont Yankee plants take exception to the i requirement that container markings shall appear on a minimum of l two sides.  ; ALTERNATIVE: f i Containers shall be adequately marked to provide identification f l and retrievability. l l JUSTIFICATION: Containers. are tagged to provide identification and inspection , status. Employment of two tags on small containers adds bulk and i confusion and does not provide for better identification or { traceability, j

1. EXCEPTION:

l l Appendix A-3. Subsection A.3.9(4) - Second Group. Markina The Yankee and Vermont Yankee plants take exception to the-requirement that container markings shall be no less than 3/4" high, container permitting. ALTERNATIVE: 1 Container markings shall be of a size which permits easy recognition.

Title:

Appendix B, Exceptions Page: 14 of 26 Rev.: 27 Date: December 20, 1996 l

                    . r -    . - . . - . . ,            .,_,,_..y           y   ____.._m., # -             r -                                      ,_,..-m-   ,v,.
  ._.__ ..___         . _ . . _     _ . , _ . . . . _ . _ .         _  _ . . . . - . . _ . _ . . . . . _ _ . . _ _ _              _ _ . _ _ . ~ . _ _ _ _ _ .

i

                                                                                                                                                                             ?

f l YANKEE ATOMIC ELECTRIC COMPANY  ! i APPENDIX B i L (continued)  !

                                                                                                                                                                             }

JUSTIFICATION: { l Markings were intended to provide identification and instructions. The criteria should be that the markings clearly provide the same.

                                                                                                                                                                             )

l i J, EXCEPTION:

                                                                                                                                                                             )

Appendix A-3 Subsection A.3.9(6) - Second Group. Markina The Yankee and Vermont Yankee plants take exception to the I I information required for container marking. l ALTERNATIVE: I Marking shall be adequate in each case to provide identification, traceability and instructions for special handling,.as applicable. JUSTIFICATION:  ! The information required is excessive. Cluttering a container with excessive markings only reduces the main objectives, maintaining identification and establishing special controls. l l l-i

Title:

Appendix B, Exceptions

,             Page:        15 of 26 Rev.:       27
Date
December 20, 1996 i

1

l 1 YANKEE ATOMIC ELECTRIC COMPANY l I APPENDIX B (continued) VI. ANSI N45.2.6 - 1978, Qualification of Inspecti"n, Examination and

       ,Tejtina Personnel for Nuclear Power Plants A. EXCEPTION:

The Yankee and Vermont Yankee plants take exception to the i application of the Standard to all Yankee and Vermont Yankee personnel performing inspection, examination and testing. ALTERNATIVE: Yankee and Vermont Yankee personnel identified in ANSI N18.1-1971 who perform inspection, examination and testing will be qualified I to ANSI N18.1-1971. Yankee and Vermont Yankee personnel not identified in ANSI N18.1-1971 who perform inspection, examination and testing will be i qualified to ANSI N45.2.6-1978. I 1

Title:

Appendix B, Exceptions Page: 16 of 26 Rev.: 27 Date: December 20, 1996

a t ) ! YANKEE ATOMIC ELECTRIC COMPANY i. b APPENDIX B

-(continued) j Vll. Regulatory Guide 1.26, Rev. 3 (2/76), Quality Grouo' classifications and j Standards for' Water . Steam- and Radioactive-Waste-Containina Components i of Nuclear Power Plants l A. ' EXCEPTION

i l The Yankee and V'ermont Yankee plants take exception to the 1 Regulatory Guit.e in its entirety. l . ALTERNATIVES: a-i }. Yankee j Yankee shall continue to classify structures,-components and-i systems in accordance with ANSI Standard N18.2, January 1973 I

                                   " Nuclear Safety Criteria for the Design of Stationary Pressurized

] Water Reactor Plants", as in the past. 1 Vermont Yankee

l j Vermont Yankee shall continue to classify structures, components _

j and systems in accordance with ANS-22, Draft No. 4, Rev. 1 j .May 1973, " Nuclear Safety Criteria for the Design of Stationary ] Boiling Water Reactor Plants", as in the past. i-j- 1 4 i 1 l I

Title:

Appendix B Exceptions Page: 17 of 26 i Rev.: 27  ! Date: December 20, 1996 )

YANKEE ATOMIC ELECTRIC COMPANY APPENDIX B. (continued) VIII. Regulatory Guide 1.29, Rev. 3, (9/78), Seismic Desian Classification A. EXCEPTION: The Yankee and Vermont Yankee plants take exception to the application of Regulatory Guide 1.29, Rev. 3, (9/78). J ALTERNATIVES: Yankee Yankee shall apply Regulatory Guide 1.29, Rev. 3, (9/78), to those structures, systems and components as determined by the USNRC System Evaluation Program. Vermont Yankee The seismic design classification of structures, systems, and components at Vermont Yankee shall be as defined in the Vermont Yankee FSAR.

Title:

Appendix B. Exceptions Page: 18 of 26 Rev.: 27 Date: December 20, 1996

l YANKEE ATOMIC ELECTRIC COMPANY APPENDIX B (continued) IX. ANSI N18 .7-1976, Administrative Controls and Quality Assurance for the l Operational Phase of Nuclear Power Plants A. EXCEPTION (Vermont Yankee Plant only) Subsection 4.5 - Audit Program The Vermont Yankee Operating Plant takes exception to the requirement that audits of all safety-related functions shall be  ; completed within a period of two (2) years.  ! Alternative: Audits of selected aspects of operational phase activities shall { be performed with a frequency commensurate with their safety significance and in such a manner as to assure that an audit of all safety-related functions is completed within a period of no  ; less than three (3) years, based upon the results of an annual i Functional Area Assessment. The Annual Functional Area Assessment is a documented analysis of functional areas important to safety. The' purpose is to identify strengths and weaknesses (if applicable) to determine the level and focus of independent oversight activities for the upcoming year. The basis for the assessment shall include the results of 0A Audits and Surveillance, NRC Inspections, Event Reports. I Nonconformance Reports, Corrective Action Reports, and Self-Assessments. Other indicators such as Personnel Changes, change / increase in functional area responsibilities Industry Findings, and INP0 evaluations will also be considered. Each area will be assigned a rating with a comparison to previous years. i l

Title:

Appendix B, Exceptions Page: 19 of 26 Rev.: 27 Date: December 20, 1996 l . l

~ YANKEE ATOMIC ELECTRIC COMPANY APPENDIX B (continued) l This assessment will be reviewed and approved by 0A and Plant Management. This document is considered a OA record and will be available for NRC review.

                                                                                                                                                    ')

Justification:

                                                                                                                                                    .i To utilize quality oversight resources more effectively, senior management desires the flexibility to direct resources.to areas which have perceived-weaknesses. The two-year audit cycle has not                                         i ensured that the frequency, scope and associated resources are based on the risk associated with the audit area.

Vermont Yankee proposes to adjust the audit schedule based on empirical data and performance history to complete audits of safety-related functions within a period of three years. This i modification meets the intent'of published regulatory' requirements l involving activities important to safety. B. EXCEPTION: Subsectio". G.9.15 - Review. Approval and Control of Procedures Yankee Atomic r.lectric Company and the Vermont Yankee e,. rating Plant take exception to the following paragraph:

                                             " Plant procedures shall be reviewed by an individual knowledgeable in the area affected by the procedure no less frequently than every two years to determine if changes are necessary or desirable".

l 1 l

Title:

Appendix B, Exceptions i Page: '20 of 26 l Rev.: 27 l Date: December 20, 1996 i

        ,                               ,-c    . - , , --           . , . . , , ,    -    -, - . -
   . .    .-     . -.-      _ . . . _ - -              _ _ _ . ._-.. . -                                  - ~ . . _ . -       _      .-.

4 i I YANKEE ATOMIC ELECTRIC COMPANY , APPENDIX'B (continued) 4 y Alternative: Plant procedures will be periodically reviewed in accordance with administrative controls. These controls will establish a schedule for.these periodic reviews. All applicable plant procedures will i be reviewed following an unusual incident, unexpected transient, operator error, or equipment failure (malfunction), and-following a modification to a system. l Nonroutine procedures such as Emergency Operating Procedures, i Emergency Plan Implementing Procedures, or other procedures whose use may be event driven, will be reviewed every two years. I However, if a nonroutine procedure is fully exercised and there is ! a detailed scrutiny of the entire procedure as part of a l- documented training program, this may serve as the biennial review of the procedure used. At least every two years, the Quality Assurance (or other independent) organization shall audit a representative sample of i routine plant procedures that are used more frequently than every two years. The audit is to ensure the acceptability of the l procedures and verify that the procedure review and revision

program is being implemented effectively. The root cause of significant deficiencies is to be determined and corrected.

j Routine plant procedures that have not been used for two years I will be reviewed before use to determine if changes are necessary or desirable. i 'T

Title:

Appendix B, Exceptions

,            Page:     21 of 26 Rev.:     27 Date:     December 20, 1996

YANKEE ATOMIC ELECTRIC COMPANY l APPENDIX B (continued) Justification: The current requirement to review each safety-related procedure on a biennial cycle results in the expenditure of significant technical and administrative resources. Programmatic controls and practices are in place to provide adequate reviews, including the following: l i

            . The plant modification processes require that procedures      '

affected by the modification be identified during the design change preparation, and revised prior to closure of the , modification package. l

            . The Operating Experience Program involves the review of       '

USNRC INP0, and vendor supplied information for applicability and determination of further action. This review includes an evaluation of applicable documents such I as procedures and the initiation of required changes.  !

            . Administrative controls currently exist requiring that if a   ,

procedure cannot be performed as written, a procedure change must be completed prior to continuation of the procedure.

            .      Temporary changes are occasionally generated during, or prior to procedure use.      Current administrative controls require that those changes that are permanent shall be incorporated into the procedure via the procedure revision process.
            .      As part of the audit and surveillance process, procedures are evaluated as to adequacy, ease of use, proper technical content, and compliance with applicable plans and programs.

Title:

Appendix B. Exceptions Page: 22 of 26 Rev : 27 Date: December 20. 1996

i l  : I YANKEE ATOMIC ELECTRIC COMPANY APPENDIX B (continued) l . The corrective action process (Event Reports) requires that ' a root' cause analysis be performed for events, violations and nonconforming conditions. Where identified as contributing factors, procedure changes are initiated. ,

                                  .              Changes to Technical Specifications and the FSAR are             I reviewed for potential impact on. and initiation of changes l                                                 to plant procedures.

1

                                  .              Plant procedures are approved by appropriate personnel prior j         ,

to initial use. Current administrative controls also l require pre-job briefings for procedures identified as  ! infrequent. l This modification meets the intent of published regulatory l requirements involving activities important to safety. C. EXCEPTION: (Vermont Yankee Plant only) l' l Subsection 5.3.9 The Vermont Yankee Operating Plant takes exception to the requirements that detail Emergency Procedures be in accordance with Paragraph 5.3.9. Alternative: l l i l Vermont Yankee Emergency Operating Procedures are written in l accordance with the Symptom / Function-Based Guidelines developed by the BWR Owners Group and accepted by the NRC. These  ! l Symptom / Function Based Procedures, mandated by the NRC in ! NUREG-0737, have format and content different from the Event-l- Oriented Emergency Procedures described in ANSI N18.7-1976.  : l l

Title:

Appendix B. Exceptions ! Page: 23 of 26 Rev.: 27 Date: December 20, 1996 l

YANKEE A"0MIC ELECTRIC COMPANY 1 APPENDIX B (continued) Justification: ) i NUREG 0737 supersedes ANSI N18.7-1976 in the area of Emergency ) Operating Procedures. Changes to procedure format are required in

                                                                                  )

order to develop Symptom / Function-Based Procedures. l l l l l

Title:

Appendix B. Exceptions Page: 24 of 26 Rev.: 27 Date: December 20, 1996

    . . _    ..    . _ _ .. _ - __ ._._. . _ -._ .__.._                                          _.- _ m   - . . _ __ _ __ _ __        . _ _ _

YANKEE ATOMIC ELECTRIC COMPANY APPENDIX B (continued) X. Reaulatory Guide'1.33. Revision 2. Quality Assurance Reauirements (Operational) A. EXCEPTION: (Vermont Yankee Plant only) Subsection 4.5 - Audit Prooram - The Vermont Yankee Operating Plant takes exception to the following: Section 4.5 states that "all' audits of safety related functions are completed within a two (2) year period".

                                         .              Paragraph 4.a.      "The'results of actions taken to correct deficiencies that affect nuclear safety and occur in facility equipment, structures, systems, or method of operations - shall be audited at least'once per 6 months".
                                         .              Paragraph 4.b.       "The conformance of facility operation to provisions contained within the technical specifications and applicable license conditions - shall be audited at least once per 12 months."
                                         .              Paragraph 4.c.      "The performance, training, and qualifications of the facility staff - shall be audited at least once per 12 months."

Alternative: Audits of selected aspects of the functional areas listed above, shall be performed within a frequency commensurate with their safety significance and will be completed within a period of no L

Title:

Appendix B, Exceptions Page: 25 of 26 l Rev.: 27 l Date: December 20, 1996

 ~.       ..                                 _            . _ .      . _ .   -        _    . _ .                                  _

YANKEE ATOMIC ELECTRIC COMPANY APPENDIX B (continued) less than three (3) years, based upon the results of an annual functional area assessment. Justification: To utilize quality oversight resources more effectively, senior management desires the flexibility to direct resources to areas which have perceived weaknesses. The two-year audit cycle has not ensured that the frequency, scope and associated resources are based on the risk associated with the audit area. Vermont Yankee proposes to adjust the audit schedule based on empirical data and performance history to complete audits of safety-related functions within a period of three years. This modification meets the intent of published Iegulatory requirements involving activities important to safety. 1 l l

Title:

Appendix B, Exceptions Page: 26 of 26 Rev.: 27 Date: December 20, 1996

YANKEE ATOMIC ELECTRIC COMPANY APPENDIX C Vermont Yankee Classification of Structures. Components. and Systems NOTE: A comprehensive listing is in the Vermont Yankee Safety Classification Manual. 1 I l l l 1 l

Title:

Appendix C, Vermont Yankee Classification Page: 1 of 1 Rev.: 27 Date: December 20, 1996

YANKEE ATOMIC ELECTRIC COMPANY APPENDIX D Yankee Classification of Structures. Components, and Systems NOTE: A comprehensive listing is in the Yankee Safety Classification of Systems Manual. ., I l l l I l 1 l l l

Title:

Appendix D, Yankee Classification Page: 1 of 1 Rev.: 27 Date: December 20, 1996

YANKEE ATOMIC ELECTRIC COMPANY OPERATIONAL QUALITY ASSURANCE PROGRAM Y00AP-I-A uf PREPARED BY: WAk mak h alae 4V)

                                 ~
                 ' Walter K. Peterson-Manager, Quality Assessment Services Department APPROVED BY:                                       s

(. Rulsell Clark Executive Director. Quality Assurance hdN Donald A. Reid Vice President, Operations Vermont Yankee

                        ~

Stephen P. Schuiti Vice President, Engineering Sciences Yankee

               ' Jay K. Thayer Vice President, Proje[ cts,[/    '/

Yankee

Title:

Y00AP-1-A Page: I Rev.: 27 Date: December 20, 1996 a

YANKEE ATOMIC ELECTRIC COMPANY Y00AP-i i TABLE OF CONTENTS /INDEX Section No. Title Revision AMENDMENT / REVISION 27 POLICY STATEMENT 27 I ORGANIZATION 27 11 OVALITY ASSURANCE PROGRAM 27 III DESIGN CONTROL 27 IV PROCUREMENT DOCUMENT CONTROL 27 V INSTRUCTIONS, PROCEDURES, AND 27 DRAWINGS VI DOCUMENT CONTROL 27 VII CONTROL OF PURCHASED MATERIAL, 27 EQUIPMENT, AND SERVICES VIII IDENTIFICATION AND CONTROL OF 27 MATERIAL, PARTS. AND COMPONENTS IX LONTROL OF SPECIAL PROCESSES 27 X INSPECTION 27 XI TEST CONTROL 27 XII CONTROL OF MEASURING AND TEST 27 EQUIPMENT XIll HANDLING, STORAGE, AND SHIPPING 27 XIV INSPECTION, TEST, AND OPERATING 27 STATUS

Title:

Table of Contents Page: II Rev.: 27 Date: December 20, 1996 l

i 4 i YANKEE ATOMIC ELECTRIC COMPANY j Y00AP-I-A

                                                        ' TABLE OF CONTENTS /INDEX                                                                l (Continued)

Section No.' Title Revision XV NONCONFORMING MATERIALS, PARTS, 27 AND COMPONENTS XVI CORRECTIVE ACTION 27 XVII QUALITY ASSURANCE RECORDS 27 XVIII' AUDITS 27 APPENDIX A' QUALIFICATION REQUIREMENTS 27 APPENDIX B. . EXCEPTIONS 27 l 1 APPENDIX C VY CLASSIFICATION ?7 l APPENDIX D YR CLASSIFICATION 27 i l

Title:

Table of Contents Page: III Rev.: 27 Date: December 20, 1996

i l l' YANKEE ATOMIC ELECTRIC COMPANY Y00AP-I-A I AMENDMENT / REVISION SHEET l Revision No. Date Reason l l 0 (Amendment 1) 12/10/76 T'o address questions submitted by letter from l NRC (K. R. Goller) to L. H. Heider (11/1/76). 0 (Amendment 2) 1/13/77 To address questions submitted by letter from NRC (K. R. Goller) to L. H. Heider (12/28/76). 1 9/15/77 To address organizational. programmatic, and editorial changes. 2 11/01/77 To address organizational changes. 3 11/25/77 To address organizational changes at Vermont Yankee. 4 1/13/78 To address combined inspection numbers i 50-29/77-20: 50-271/77-15: and 50-309/77-16 unresolved item 4.a. 5 1/30/78 To address change in exception for ANSI N45.2.3-1973. 6 10/19/78 To address exceptions to ANSI N45.2.2-1972. 6 (Amendment 1) 3/29/79 To resolve items submitted by letter from NRC (W. P. Haass) to L. H. Heider (3/6/79). 7 9/11/79 To address changes to Yankee Rowe (Appendix 0) and Vermont Yankee (Appendix E) Safety l Classifications. l 8 4/04/80 To address organizational changes. 9 3/09/81 To address organizational changes. 10 4/03/81 To add " Packaging of Radioactive Materials" and

                                     " Fire Protection of Safety Related Areas" to "Other Items Requiring Quality Assurance".

Title:

Amendment / Revision Sheet Page: IV Rev.: 27 Date: December 20, 1996 1

YANKEE ATOMIC ELECTRIC COMPANY Y00AP-1-A-AMENDMENT / REVISION SHEET (Continued) Revision No. Date Reason 11 3/01/82 To resolve items submitted by letter from NRC (W. P. Haass) to W. P. Johnson (6/10/81). 12 3/11/83 To address ' .zational changes. 13 To address organizational and programmatic changes. 14 10/12/83 To address organizational changes. 15 2/15/84 To address programmatic changes. 16 10/31/85 To address organizational and programmatic changes. 11 12/05/86 To address organizational and programmatic changes. 17A 8/14/87 To clarify surveillance activities and change VP-M00 responsibilities for the level of deficiencies requiring evaluation. 18 4/29/88 To address organizational and programmatic changes. l l 10/02/89 19 To address organizational and responsibility changes and deletion of Appendix C. 19A 6/01/90 To update organizational chart (for VY) to be consistent with Proposed Change No. 157 and to , address organizational changes at Vermont l Yankee. l l 20 12/21/90 To update organizational changes at Yankee and ! change OAD's responsibility from reviewing l l l

Title:

Amendment / Revision Sheet Page: V  : Rev.: 27 Date: December 20. 1996 i

YANKEE ATOMIC ELECTRIC COMPANY Y00AP-I-A AMENDMENT / REVISION SHEET (Continued) Revision No. Date Reason design documents to auditing those documents for inclusion of quality requirements. 21 11/15/91 To update organizational changes at Yankee and Vermont fankee and change OAD responsibility from revi.iing recommendations to prevent recurrences of significant condition adverse to quality to providing the option to review and/or audit recommendations. 22 4/15/92 To delete Appendix D listing and reference Yankee Safety Classification of Systems Manual. 23 9/30/92 To address organizational and responsibility changes. 24 12/15/93 To address organizational changes, and DOA/NSARC reporting clarifications for Vermont Yankee. 25 12/15/94 To address organizational changes made at the Yankee Nuclear Power Station addressing the decommissioning organization. Clarifications in the revised corrective action process at Vermont Yankee, and to address an exception to Regulatory Guide 1.64, and to clarify responsibilities between the Yankee and Vermont Yankee Plants. 26 12/21/95 To address organizational changes at the Yankee Nuclear Power Station and the Vermont Yankee Nuclear Power Station. To address exceptions to ANSI 18.7 and Regulatory Guide 1.33. 27 12/20/96 To address organizational changes. l

Title:

Amendment / Revision Sheet Page: VI Rev.. 2/ Date: December 20, 1996

YANKEE ATOMIC ELECTRIC COMPANY POLICY STATEMENT OPERATIONAL QUAllTY ASSURANCE PROGRAM It is the policy of those organizations operating under this Quality Assurance Program to strive for excellence in all aspects of nuclear power plant operation. This goal can only be attained if each individual recognizes that Quality is everyone's responsibility. Each worker, supervisor, and manager has a role to play in achieving the goal of "doing it right the first time." Only if we recognize that Quality is of paramount importance can we continue to provide for the safe and reliable generation of power. The function of the Quality Verification Program is to assess the adequacy, content, and appropriateness of the work being performed and to facilitate continuous enhancements This function supports the line organizations and provides management with needed feedback. However, supervision and management should not rely solely upon the efforts of the Quality Assurance Groups for quality verification; they must also take an active role in self-assessment of those activities under their control to identify quality problems. As previously noted, the ultimate responsibility for quality lies with each individual. Under the program, the Yankee Atomic Electric Company President is the final management authority responsible for assuring that this policy statement and the Quality Assurance Program are implemented within the Yankee Atomic Electric Company. The Vermont Yankee Vice President, Operations, is the final management authority responsible for assuring that the Quality Assurance Program is implemented within the Vermont Yankee Nuclear Power Corporation. The President or a Vice President is responsible for implementing the program for those departments under his (or her) direction. The Director of Quality Assurance is responsible for establishment, control, and distribution -of the Quality Assurance Program and revisions thereto, and shall establish policies under which the Quality Assurance Department operates. The Quality Assurance staff shall have the authority and organizational freedom to meet the requirements of 10CFR50, Appendix B.

Title:

Policy Statement Page: 1 of 2 Rev.: 27 , Date: December 20, 1996

                                                                               )

l

_ . _ . _ _ _,..- __ _ _ .._ _ _ . _ _ .. _ _ . _ _ ._. . .__ . ~ _ _ , _ . _ . - _ . .. _ _ _ P YANKEE ATOMIC ELECTRIC COMPANY r The Plant Superintendent / Manager shall be responsible for the day-to-day .  ; implementation of the program's procedural requirements at the plant. i The Nuclear Safety Audit and Review Committee shall review the adequacy and. effectiveness of this program. Any discrepancies and/or recommendations 3 for corrections or enhancements shall be reported to the Cognizant Corporate Officer. The safe and reliable generation of power can only be achieved with the cooperation and support of all personnel. We expect that every individual will perform his or her task with the skill, professionalism, and dedication  ; necessary to achieve this goal.

                                                                                                                                           -l i

L c. nu l Andrew C. Kadak - President s

                                                                                                                                            ]

f

                                                                                                                                              ]

I I l

Title:

Policy Statement Page: 2 of 2 Rev.: 27 Date: December 20, 1996 4

YANKEE ATCHIC ELECTRIC COMPANY I. ORGANIZATION A. SCOPE This section of the Operational Quality Assurance Program describes the duties and responsibilities of the personnel involved in establishing and executing the Operational Quality _ Assurance Program. B. RESPONSIBILITY The responsibility for design, redesign, evaluation, and operation of the Plant rests with the Yankee Atomic Electric Company Nuclear Services Division and Vermont Yankee Nuclear Power Corporation. The responsibility for developing and implementing the Operational Quality Assurance Program within the Yankee Nuclear Services Division and the Yankee Site is vested in the President of the Yankee Atomic Electric Company. The responsibility for implementing the Operational Quality Assurance Program within Vermont Yankee is vested in the Vice President, Operations, of Vermont Yankee Nuclear Power Corporation. They have delegated certain areas of authority for the development and implementation of certain phases of the Program as set forth in  ! J the following paragraphs of this section. The Nuclear Services Division Quality Assurance Department, reporting to the President for NSD for the Yankee Site and reporting to the VY VP, Operations, for Vermont Yankee, has the organizational responsibility for the continuing review and audit of the implementation of the Operational Quality Assurance Program. C. ORGANIZATIONAL REL TIONSHIPS The lines of authority of all personnel involved in the implementation of the Operational Quality Assurance Program are shown in Figures 1 and 2. Integration between the Yankee Site

Title:

Section I, Organization Page: 1 of 43 Rev.: 27 Date: December 20, 1996

YANKEE ATOMIC ELECTRIC COMPANY and the Yankee Nuclear Services Division activities is provided by the Decommissioning Manager. Interfacing between the Vermont Yankee plant and the Yankee Nuclear Services Division is provided by the Vermont Yankee Vice President, Operations, and his staff. l D. QUAllTY ASSURANCE PROGRAM RESPONSIBillTIES

1. Yankee - Nuclear Services Division
a. President
1. Assumes and maintains overall responsibility for the Operational Quality Assurance Program.
2. Delegates to the Director of Quality Assurance the responsibility for establishment, control and distribution of the Operational Quality Assurance Program, and revisions thereto.
3. Establishes and enforces company policies in the area of Operational Quality Assurance.
4. Establishes and implements an organization 1 capable of and directed toward a proper Operational Quality Assurance Program.

1

5. Resolves disputes between Quality Assurance /

Quality Control personnel and other organizations, involving quality, for the l Yankee Site and the NSD organization.

6. The President or his/her designee appoints the NSAR Committee members including Chairman for Yankee.
7. Responsible for Yankee Site nuclear safety.

Title:

Section I, Organization Page: 2 of 43 Rev.. 27 Date: December 20, 1996

 .. _.  . _ . . . . .     . . _ . .    .    ..         . . . _ . . . _ _ . . . . _ - _ . ~ _ _ _ _ . - _ . _ . _ _ _ _ _ _ _ _ _ _ _ _

YANKEE ATOMIC ELECTRIC COMPANY

b. Vice Presidents l.

l

1. Report to the President.

l l 2. Provide for implementation of the Program within their respective departments.

3. Review and approve all changes to the Operational Quality Assurance Program.

l, 4. Provide for independent review and acceptance for selected plant repairs and engineering changes.

5. Ensure that applicable Program procedures are j implemented.

i I-

c. Executive Director of Quality Assurance 1
1. Reports directly to the President.
2. - Establishes the qualification requirements for j the principal Quality Assurance management
j. positions to assure competence commensurate with responsibility. See Appendix A. ',

, l f 3. Approves all changes to the Operational Quality l Assurance Program. 1 i

4. Reviews or provides company policy relative to Quality Assurance practices conducted at the Site and Yankee Nuclear Services Division.
5. Authorizes personnel performing Quality I Assurance functions to have direct access to j management levels which will assure i accomplishment of quality-affecting activities.

Title:

Section 1, Organization Page: 3 of 43 ! Rev.- 27

!      Date:          -December 20, 1996                                                                                                     !

I i I 4

                                                                                                                                        ,e

YANKEE ATOMIC ELECTRIC COMPANY

6. Establishes policies under which the Nuclear Services Division Quality Assurance Department functions.
7. Provides for establishment of, and control and I distribution of the Operational Quality {

Assurance Program and revisions thereto. l

8. Provides for implementation of the Program  ;

within the Quality Assurance Department.  ;

9. Provides to NSARC a periodic review of the Operational Quality Assurance Program to '

determine the adequacy and effectiveness of the Program. Provide for evaluations of changes to j the Quality Assurance Program to the l requirements of 10CFR50.54(a)(3). l

10. Provides, through the Quality Assurance Department, for independent verification of site operation by individuals or groups who do not have direct responsibility for performing i the work, to assure that applicable approved l procedures, specifications, licenses and safety  !

regulations are satisfied.

11. Ensures that personnel performing Quality I

Assurance functions have sufficient authority and organizational freedom to:

a. identify quality problems,
b. initiate, recommend, or provide solutions through designated channels, and
c. verify impiementation of solutions.

Title:

Section I, Organization Page: 4 of 43 Rev.: 27 Date: December 20, 1996

YANKEE ATOMIC ELECTRIC COMPANY

12. Provides for review of and compliance with federal and state regulations and standards for nuclear power facilities.
13. As directed by the-Vermont Yankee Vice l President, Operations, assures that the 0A Program is effectively implemented. '
14. Appoints the NDE and N45.2.6 Level III Examiner
d. Trainino Coordinator
1. Reports to the Human Resources Manager.
2. Responsible for implementation of training programs at NSD.
3. Assists the company in accomplishing its goals through development of skills and knowledge.
4. Ensures that personnel are provided wi?.h both the technical and professional skills required to solve problems, work together effectively, present information, and respond to sponsor needs.
5. Provides training needs assessments to ensure that organizational 1y relevant training is provided.
6. Conducts training evaluations to determine when desired objectives are obtained.

Title:

Section 1. Organization Page: 5 of 43 Rev.- 27 Date: December 20, 1996

I YANKEE ATOMIC ELECTRIC COMPANY

e. Decommissionino Manager and Manager of Operations
1. Reports to the President.
2. Directs engineering, licensing, cost control and planning, and site decommissioning activities.
3. Coordinates YAEC resources to meet decommissioning needs.
4. Provides for implementation of Operational Quality Assurance Program within the ,

Decommissioning Organization. l S. Ensures that applicable Program procedures are j implemented within the Decommissioning Organization. l l 6. Provides for independent review and acceptance l for selected plant repairs and all safety-related engineering design changes for the site and decommissioning work packages.

7. Provides for review of material service purchase requests, drawings, specifications, '

and appropriate procedures.

8. Provides, through the Decommissioning Organization, for independent review and/or approval for all changes.
9. Provides, through the Decommissioning Organization, for review and approval of vendor-provided training programs for site staff; the procedures and purchase requests.

Title:

Section I. Organization Page: 6 of 43 Rev.: 27 Date: December 20, 1996

_ . _ _ . _ . _ _ _ _ . . _ - . _ _ . _ _ _ _ _ _ _ _ _ . _ _ - . . _ _ . . _ _ _ . . . ~ . _ _ _ 1 YANKEE ATOMIC ELECTRIC COMPANY f f

10. Provides, through the Decommissioning l Organization, for integration between the  !

Yankee Site and the Yankee Nuclear Services  ; Division.

11. Evaluates the site's position of specified in-plant audit discrepancies 'and prepares l
                                                                         " Implementation Directives" for the site.                   ;

i

f. Pro.iect Manaaers
1. Reports to a Vice President.
2. Provides for implementation of the Program within their respective project.
3. Ensures that applicable Program procedures are ,

implemented within their respective project.  ! l i

4. Provides for independent review and acceptance r for selected plant repairs and all safety-related engineering design changes for'their j respecti ve- pl ant. l

[

5. Provides .for selected review of material  !

service purchase requests, drawings, specifications and appropriate procedures.

6. Coordinates engineering requirements necessary l

to support changes related to the operation of l the plant. l

7. Provides, through Engineering, for the Quality Assurance /0uality Control Standards and/or requirements on all applicable documents.

l l. I

Title:

Section I, Organization j Page: 7 of 43 Rev.: 27 i Date: December 20, 1996

b YANKEE ATOMIC ELECTRIC COMPANY ,

8. Provides direction to the Project Engineering Managers. l
g. Manaaement of Quality Assurance i

i Quality Assurance is divided into two-(2)  ! departments, They are the Quality Support Department [ and the Quality Assessment Department. The Quality r i Assessment Department performs audits and i l surveillances at Vermont Yankee and audits, l l surveillances, inspections at the Yankee Site, and ~ audits at'the Corporate Engineering office. The j Quality Support Department performs audits and  ! surveillances at vendor facilities. l i l

1. The Manager of each department reports directly
                                                                                                                          ~

to the Executive Director of Quality Assurance. l

2. Assures that the Operational Quality Assurance l

Program satisfies the requirements of 10CFR50  ; Appendix B and ANSI N18.7-1976. 1 l l

3. Provides for the audit of design changes and )

l specifications to verify adequacy of quality requirements. (Independent review shall be performed by an uninvolved, but technically knowledgeable person in the engineering discipline.)

4. Provides for the audit, inspection and/or i surveillance of contractor / vendor activities for operating plants'to assure the effectiveness of contractual interfaces and j compliance with the applicable criteria of 10CFR50. Appendix B and ANSI N18.7-1976.  !

Title:

Section I, Organization

          .Page:         8 of 43 Rev.:         27 Date:         December 20, 1996

YANKEE ATOMIC ELECTRIC COMPANY i

5. Provides for the inspection, surveillance and/or audit of activities pertaining to plant f or site repairs, and/or changes.
6. Provides for the training and retraining of Quality Assurance personnel in quality  ;

assurance and addit techniques, j

7. Ensures through verification that the Program I is implemented for all activities requiring l Quality Assurance.
8. Provides for the stoppage of unsatisfactory work; and for the control of further processing or delivery of nonconforming material.

l 9. Directs the independent verification of plant L or site operational activities to assure that

applicable approved procedures, specifications.

l licenses, and safety regulations are satisfied. l , 10. Ensures that the OA Program is modified and/or ! revised as standards, regulations and experience dictate. i

h. Director of Enaineerina Services
1. Reports to the President.
                                                                                  )

Provides for implementation of the Program 2. I within his function.

3. Ensures that applicable Program procedures are implemented within his function.

I l l t

Title:

Section 1, Organization Page: 9 of 43

Rev.: 27 j Date: December 20, 1996 i
                                                                            ,  4
   . . _ . _ _ . . . _ _ . _ _ _ _ . . . _ . _ - _ _ _ . _ _ , _ _ _ _ .                                      .   .___.._m           . _ _ _ _ . . _ _  ,

I

YANKEE ATOMIC ELECTRIC COMPANY
                                                                                                                                                          .i
                                                                               -4. Coordinates Yankee technical requirements necessary to support activities related to-                          !

outside engineering services.

i. Director of Environmental Enaineerina l l  !
1. Reports directly to a Vice President. f
2. Provides for the review and' follow of radiation i

protection programs and activities at the plant or site. , i

3. Provides for technical assistance to the plant or site on matters of radiological protection, radiological engineering and environmental  ;

protection. , l

4. Coordinates the implementation and maintenance of radiological environmental surveillance i programs concerning radicactive effluents from ,

the plant. .

5. Supports the implementation and maintenance of '

the Emergency Plan pursuant to state and -' federal regulatory requirements.

6. Provides for the review of plant meteorological monitoring data.
7. Coordinate the radiological and environmental engineering requirements necessary to support changes related to operation of the plant or site.

Title:

Section I, Organization Page: 10 of 43 Rev.: 27 Date: December 20, 1996

t YANKEE ATOMIC ELECTRIC COMPANY

j. Director of Fuel Manaaement -
1. Reports directly to a Vice-President.

l l 2. Performs fuel cycle and economic studies to ! improve power costs and as requested by j management.

3. Provides for the general supervision and .]'

coordination of all core component design and l procurement, nuclear material and services i procurement and fuel cycle economic activities. l 4. Ensures that the Operational Quality Assurance Program and the applicable procedures are implemented within the department. ! 5. Issues bid invitations, evaluates proposals, and negotiates contracts for fuel cycle services and related material requirements. i l

6. Coordinates the fuel cycle requirements i necessary to support changes related to operation of the plant.
7. Provides support of spent fuel storage activities at the Yankee Site.

1

k. Director of Environmental laboratorv 1

i

1. Reports directly to a Vice President.

{ 2. Provides for the radiochemical processing of  : ! environmental, effluent, and waste samples. i

3. Provides for the processing and internal dosimetric evaluation of bioassay samples.

i

Title:

Section I, Organization Page: 11 of.43 i Rev.. 27 Date: December 20, 1996 i l 3

I l YANKEE ATOMIC ELECTRIC COMPANY

4. Provides for the routine in situ measurements in support of environmental Technical Specifications as well as ad hoc emergency response in situ measurements or emergency response laboratory sample measurements.
5. Provides and coordinates technical quality assurance programs in the areas of plant chemistry (radiological only) and whole body counting.
6. Provides for the processing of personnel, extremity, and environmental dosimetry needed to support NRC and plant radiological assessment requirements.
7. Provides for the necessary special radiation flux measurements.
8. Provides for on-site support during outages in the personnel dosimetry, whole body counting, and health physics areas.
9. Provides for the general engineering and technical support in the broad areas of radiation measurements, health physics, i radiochemistry, and quality assurance. l
1. Director of Nuclear Enoineerino
1. Reports directly to a Vice President, i
2. Performs nuclear engineering and economic J studies requested by management. j
3. Provides for the general supervision and coordination of reactor physics, safety

Title:

Section I, Organization Page: 12 of 43 Rev.: 27 Date: December 20. 1996

i t G l-I- YANKEE' ATOMIC ELECTRIC COMPANY

assessment, transient analysis, and loss of coolant analysis activities.
_
4. Ensures that the.0perational Quality Assurance i Program and the applicable procedures are

' implemented within the department. l 4 I 5. Coordinates engineering-analysis requirements j j necessary to support changes related to l j operation of the plant or site. r 2 l

m. Plant SuDDort DeDartment Manaaer i

i 1. Reports directly to a Vice President,

2. Provides for the general supervision and j' coordination in the areas of materials evaluation, ' operational services (including l
construction services), and drafting / design

] support. i j 3. Provides for the Plant Support review of design changes.

4. Provides engineering services to the Projects Departments, upon request.

1

5. Responsible for the administration of the )

NDE/ ANSI N45.2.6 Training and Certification , Programs. (To maintain the independence of the ) NDE/ ANSI N45.2.6 training and certification process, overall responsibility for appointing i the NDE/ ANSI N45.2.6 Level III Examiner will remain with the Director of Quality Assurance. All requirements for certification shall be-met prior to appointment as Level III Examiner.) i I

Title:

Section I, Organization i Page: 13 of 43 Rev.: 27 Date: December-20, 1996 , l l

._. _ . _ . _ . _ . _._ _ . _ _ _ _ . - - . _ _ _ - . _ . . - - - . . _ . . _ _ _ . ~. _. YANKEE ATOMIC ELECTRIC COMPANY .I

n. Enaineerina and Licensina Manaaer
1. Reports to the Decommissioning Manager and Manager of Operations. l
2. Responsible for. coordination of activities l pertaining to State, Federal, and license requirements.  !
3. Provides for independent review and acceptance ,

for selected plant repairs, all safety-rel'ated ~i engineering design changes and decommissioning work packages for the site. l 4 Provides for review of material service purchase requests, drawings, specifications,- l and appropriate procedures.  ! i

5. Coordinates and directs engineering services  !

necessary to support the decommissioning of the .l site. -j

6. Assures coordination and implementation _ of the Emergency plan. '
7. Assures engineering activities are conducted in accordance with the Quality Assurance Program. {

l l

8. Assures the Quality Assurance /0uality Control i standards and/or requirements are provided on j all applicable documents. '

Title:

Section I, Organization Page: 14 of 43 Rev.: 27 Date: December 20, 1996 I

   .. ._        _.. _ . .._ - _       _ _ . _ _        _m.    . _ . . _ _ . . . . _ _ _ _ . . _ _ _ _ . _ _ . _ _ _.- .

i YANKEE. ATOMIC ELECTRIC COMPANY

o. Cost Control and Plannino Manaaer  !

r

1. Reports to the Decommissioning Manager and Manager of Operations.  !
                                     .2.        Coordinates and monitors Decommissioning fund expenditures.                                                            -
3. Responsible for preparation of the annual i Decommissioning budget. E
4. Responsible for tracking services and materials associated with Decommissioning activities.
5. Responsible for developing strategic plans for Decommissioning activities.

i

6. Acts as Assistant Site Manager.

i

p. Automation Technoloov DeDartment ( ATO) Manaaer- i
1. Reports to a Vice President.
2. Provides engineering software development and-support services to NSD departments, sponsor l plants, and other clients, as requested or l contracted. ,
3. Provides automated plant systems development and support services for sponsor plants and I other clients, as requested or contracted.  ;

1

4. Provides and implements advanced analytical and computational methods and systems to NSD,  ;
i. sponsors, and other clients.

i 1

Title:

Section I, Organization l Page: 15 of 43 Rev.: 27 l Date: December 20, 1996  ; l 4

YANKEE ATOMIC ELECTRIC COMPANY

2. Plant - Yankee
a. Site Manager (Site Manager is Plant Manager referenced to in Technical Specifications.)
1. Reports directly to the Decommissioning Manager and Manager of Operations.
2. Acts as Chairman of the Plant Operation Review Committee with authority and responsibility as established in the Technical Specifications of the Site license.
3. Directly responsible for the safe, orderly and efficient operation of the site, and for compliance with the requirements of the license and applicable State and Federal laws and regulations.
4. Responsible for the on-site implementation of the Operational Quality Assurance Program, Security Program and Fire Protection Program.
5. Responsible for Site maintenance and repair.
6. Responsible for the control and surveillance of all special nuclear material at the site.
7. Provides information and reports to the Yankee Nuclear Services Division and the Nuclear Safety Audit and Review Committee as required and as directed by the Decommissioning Manager.
8. Provides for and coordinates review of industry operating problems with the aim of minimizing l likelihood of occurrence at the plant.

l

Title:

Section I, Organization l Page: 16 of 43 Rev.: 27 Date: December 20, 1996 l

YANKEE ATOMIC ELECTRIC COMPANY

9. Designates an alternate to the Site Manager during his absence with the authority and

, responsibility thereof.

10. Maintains communications with the Training Coordinator involving plant training needs.
b. Operations Manager
1. Reports directly to the Site Manager.
2. Responsible for the safe orderly, and efficient operation of the Site for compliance with the requirements of the license and applicable State and Federal laws and regulations.

. 3. Responsible for shift supervisors and operations support.

4. Administration of the Certified Fuel Handlers Training Program.

l

5. Administration of the Equipment Operators Training Program.

I

6. Coordinates Plant Quality Assurance activities with the Manager of Operations and Decommissioning Manager.

l

7. Coordinates Plant Fire Protection activities, including Fire Protection Training.

l l

8. Coordinates testing of plant hydro i requirements.

l

Title:

Section I. Organization Page: 17 of 43 l Rev.: 27 Date: December 20, 1996

1

                                                                                      'l k

YANKEE ATOMIC ELECTRIC COMPANY I

                           ' 9 '. Maintains core component history file of all fuel, control rods, sources and incore detectors.                                           ,
10. Accounts for all special nuclear material at.

l the plant site. l

c. Shift' Supervisor .
1. Reports directly to the Operations Manager.
2. Responsible for plant operations in accordance with approved documents and specifications.
3. Responsible for preparing documents outlining system functions and operating modes'.
4. Responsible for ensuring that personnel under his supervision perform their duties according to applicable licenses, specifications, safety ,

rules, regulations, and certifications. i

5. Responsible for ensuring that maintenance ~!

requests are provided for the repair or , replacement of defective parts and/or l components. l

6. Responsible for verifying the operability of l systems and/or components following maintenance l or changes by providing for the performance of  ;

written test documents which incorporate the requirements and acceptance criteria contained in applicable design documents. I

7. Responsible for ensuring that fuel handling )

operations are safely performed in accordance l with approved procedures.

Title:

Section I, Organization Page: 18 of 43-Re v . .: 27 Date: December 20, 1996

1 I

                                                                               'l YANKEE ATOMIC ELECTRIC COMPANY
8. Responsible for coordination and-performance of .j hydrotesting. .j t
d. Maintenance and Construction Manager
1. Reports directly to the Site Manager.
2. Directs the activities of Mechanical and l Electrical Maintenance, Instrumentation and
                                                                                 ]

Control, and Maintenance Engineering.

3. Coordinates the review and update of plant drawings and specifications. l
                                                                                .l
4. Directs plant maintenance,-repairs, and design  !

changes and assures compliance-of maintenance activities to applicable State, Federal, and license requirements.

5. Prescribes and directs schedules, and programs, as necessary, to assure the safe decommissioning of the site.
6. Provides for major contractor decommissioning support including establishment of appropriate contractual arrangements.
7. Ensures that contractor decommissioning )

activities are performed in a safe manner, j

8. Directs on-site engineering and craft support  ;

of decommissioning activities.

9. Coordinates and transmits information concerning Plant changes to the Manager of j Operations and Decommissioning Manager. i

Title:

Section I, Organization l Page: 19 of 43 Rev.: 27 Date: December 20, 1996

t YANKEE ATOMIC ELECTRIC' COMPANY f l

e. Trainina Coordinator' ,
                                                                                                                                                        -l
1. Reports directly to the Site Manager, j I
2. Responsible for scheduling.and documentation of. -!

l plant general employee training. l l

3. Responsible for. administration of all plant -

staff training.  ! l i

4. Maintains lines of communication with the j Site Manager on Plant Training Programs.  !

I

f. Site Services Supervisor i
1. Reports directly to the Site Manager. )

! J l: 2. Supervises the Store Supervisor. i 1

                                                                     ~a)            Preparation of requisition for purchase
                                                                                  - orders.

b) The receipt, handling, and storage of -! materials and equipment.  ! c) Administering a system of material and - equipment identification. ' d) Maintaining a system which provides traceability and ret'rievability of Quality Assurance documentation for purchased materials.

3. Coordinates the review, revision, and distribution of procedures.

Title:

Section I, Organization Page: 20 of 43 Rev.: 27 Date: December 20, 1996 t i

 +e - - g <                   y     g.           -- , - - - -

7,-- , , 9 --,,

                                                                     -. _ _ . ~. _ .m- _. _ - . _ _ .

i l 1 i I YANKEE ATOMIC ELECTRIC COMPANY l

4. Responsible for the operations of the Plant

! Document Control Center for the retention of j specified Quality Assurance records, reports, I } and personnel records. ) i

5. Maintains and disseminates information

$- regarding codes, criteria, standard's,

;                                           guidelines, and policy to applicable plant
    .                                       personnel.
6. Supervises Plant Administrative personnel.

l

7. Responsible for the Fitness for Duty Program.

. g. Plant Radiation Protection and Chemistry Manager

1. Reports directly to the Site Manager. )

4 i a ! 2. Directs maintenance of water conditioning on the site as per specifications and/or documented and authorized recommendations. } { 3. Directs a. program to ascertain the l radioactivity levels of liquids, gases and 4 solids as required. ! 4

.                                     4. Directs the review and interpretation of                   l

, chemistry test results. i 1 j 5. Directs the documentation and maintenance of l j chemistry and radiation protection records.

6. Responsible for the development and implementation of the Radiation Protection
.                                           Program (including ALARA), assuring that these
programs meet site standards and State and Federal license requirements.

j

Title:

Section I, Organization Page: 21 of 43

  ;   Rev.:         27                                                                                  ;

j Date: December 20, 1996  ; I.

l 1

                                                                                -YANKEE ATOMIC ELECTRIC COMPANY                                          j i
7. Directs the maintenance of the Personnel Exposure Record System.  !

i

8. Directs radioactive material shipments and '

receipts pursuant to site and government  ! regulations,  !

9. Maintain stop work authority when radiological ,

safety is jeopardized or when unnecessary l personnel exposure is occurring. *

h. Health and Safety SuDervisor ,

l

1. Reports directly to the Site Manager.  ;

i i

2. Directs the plant Medical Services Program and  !

l acts a plant management's point of contact j relative to medical matters in coordination with the Plant Medical Consultant.  ! I

3. Directs the maintenance of personnel medical records.
4. Responsible for the development and implementation of the plant.0ccupational Safety programs, assuring that these programs meet site standards and Federal OSHA requirements.
5. Responsible for review and communication of plant safety policies through the plant safety manual and safety meetings.
6. Responsible for work site inspections by safety department personnel.
7. Acts to safeguard worker health and safety.

Title:

Section I, Organization Page: 22 of 43 l Rev.: 27 i Date: December 20, 1996

I YANKEE ATOMIC ELECTRIC' COMPANY {

8. Directs the' review and interpretation of f

occupational safety exposure monitoring. 4

9. . Directs the maintenance of per.sonnel exposure

{ monitoring record system, i

3. Vermont Yankee Nuclear Power Corocration l a. Vice President. f9erations  ;
                                                                                                                ^

i

1. Reports to the President - Vermont Yankee .;

Nuclear Power Corporation.

2. Ensures the 0A Program is effectively implemented. i
3. Evaluates disposition of In-Plant Audits and prepares concurrence directives to the plant.
4. Ensures that applicable programs and procedures effectively implement'the 0A Program.
5. Reviews and approves all changes to the Operational Quality Assurance Program.
6. Appoints the NSAR Committee members including Chairman and Vice Chairman.
7. Acts as the Manager of Operations.
b. Director of Enaineerina
1. Reports to the Vice President. Operations.
2. Responsible for the engineering support area.

Overse as the planning, scheduling, and

Title:

Section I. Organization Page: 23 of 43 Re v ~. : 27 l Date: December 20, 1996

1 i l I l

                                                                 -                                i

! YANKEE ATOMIC' ELECTRIC COMPANY ~  ! direction of activities of employees engaged in , design changes and_ alterations.

3. Reviews and approves' safety-related design  !
                                        -change documents, selected' plant programs and           i i

policies, l

4. Provides for. review and approval' of drawings and specifications.
5. 'Prov' ides for interfacing between the Plant and the Yankee Nuclear Services Division.
c. Trainino Manaaer
                                 .1. Reports to the Vice President, Operations.
2. Establishes am: maintains all operator and plant training programs.
3. Remains current on all-regulatory requirements concerning training and qualifications of plant personnel and ensures that Plant training programs and procedures are revised 'in a timely- j manner in response to changing needs and regulations.
4. Provides overall coordination and supervision for the Technical Support Training Supervisor, the Engineering and Maintenance Training Supervisor, the Operations Training Supervisor, and the Training Support Supervisor in carrying out their duties.

1

5. Evaluates the effectiveness of the training I programs and the performance of the individuals participating in the training.

Title:

Section I, Organization Page: 24 of 43 Rev.: 27 I Date: December 20, 1996 l

_ ._ _ . _ _ . . - ___.--____..._..._-.__..__..____._____m__ i-YANKEE ATOMIC ELECTRIC COMPANY l I

4. Plant - Vermont Yankee
a. Plant Manaaer l

l 1. Reports to the Vice President,.0perations. V l l 2. Directs the on-site implementation of the < l Operational Quality Assurance Program.

3. Prescribes and directs the development _of Plant  !

procedures, instructions, schedules, and  ! programs as necessary to assure the safe and I dependable operation of the facility. l I

4. Maintains a thorough knowledge of, and assures compliance with, the regulatory requirements l for operating a nuclear power plant. l
5. Directs the preparation and maintenance of j power plant records, reports, and logs. .]
6. Acts as Chairman of the Plant Operations Review- j Committee with authority and responsibility. as established in the Technical Specifications of the plant' operating license.
7. Provides information and reports to the Yankee Nuclear. Services Division as directed by the Vice President, Operations.
8. Provides information and reports to the Nuclear Safety Audit and Review Committee as required and as directed by the Vice President, Operations.
9. Directs the control and surveillance of all special nuclear material on site.

Title:

Section I, Organization Page: 25 of 43 Rev.: 27 l Date: December 20, 1996 I

l l YANKEE ATOMIC ELECTRIC COMPANY

10. Assure the implementation of training / retraining programs as required by the  !

Plant license, regulations, or applicable standards; and as necessary to assure safe work practices and compliance with standard l operating practices, license and Technical ) Specifications, safety rules, and applicable l regulations.

b. Operations Superintendent
1. Reports to the Plant Manager. 1 1
2. Oversees planning, scheduling, coordination, and direction of activities of employees ,

engaged in the installation, operation, inspection, and maintenance of all equipment, buildings, and structures as appropriate. Is i responsible for the Operations, Maintenance, I and Instrumentations and Control areas.

3. Assists in the development of Plant procedures, instructions, schedules, and programs as necessary to assure the safe and dependable operation of the facility.
4. Maintains a thorough knowledge of, and assures compliance with, the regulatory requirements for operating a nuclear power plant.

S. Acts as Vice Chairman of the Plant Operations Review Committee with responsibilities as I established in the Technical Specifications of I the plant operating license. I l

Title:

Section I, Organization Page: 26 of 43 Rev.: 27 Date: December 20, 1996

  .- . .      - ,     - - - . . - -               _ . -   - . - - - . . - . . . - . . . ~ .  . . . . , - . . . ~

YANKEE ATOMIC ELECTRIC COMPANY 3

6. Directs the preparation and maintenance of l -power plant records,-reports, and logs as applicable.

) 7. Provides information, reports, and records as directed by the Plant Manager. ! 8. Assists in directing the establishment of safe work practices, and the training and 4 instruction of plant personnel in the J j observance of.. standard operating pra:tices, NRC j

license and Technical Specifications, safety 4

rules and regulations. I c.- Technical Services Superintendent- i 1 1. Reports to the Plant Manager. i-l 2. Responsible for the Reactor Engineering, I Security, Radiation Protection, and Chemistry Departments.

3. Assists in the development of Plant procedures, instructions, schedules, and programs as necessary to assure the safe and dependable j

operation of the facility and the safe conduct j of refuel operations.  !

4. Maintains a thorough knowledge of, and assures compliance with, the regulatory requirements of a nuclear power plant.
5. Acts as Vice chairman of the Plant Operations Review Committee with responsibilities as established in the Technical Specifications of the plant operating license.

Title:

Section I, Organization i Page: 27 of 43 Rev.: 27 Date: December 20, 1996 7- l

YANKEE ATOMIC ELECTRIC COMPANY

6. Directs the preparation and maintenance of power plant records, reports, and logs as applicable.
7. Provides.information, reports, and records as directed by the Plant Manager.
8. Assists in directing the establishment of safe work practices, and the training and instruction of plant personnel in the observance of standard' operating practices, NRC' l license and. Technical Specifications, safety. '

rules and regulations.

d. Project Enaineerina Manaaer
                                                                                                               )
1. Reports to the Director of Engineering.
2. Oversees and manages the Project Engineering efforts necessary to support emergency needs of the plant.
3. Provides for the generation of project plans, schedules budget, manloadings, etc. necessary to support field activities.

l l-

4. Manage the' contracts, contractors used to

! accomplish projects, and oversee project l' implementation. 1

5. Develop maintenance and oversight of implementation of programs and procedures associated with Project Engineering.

l 6. Maintain formal documentation of Project ! Engineering activities for required operation and license requirements.

Title:

Section I. Organization Page: 28 of 43 Rev.: 27 Date: December 20, 1996

I i i

                                                                                                          .J j

l YANKEE. ATOMIC ELECTRIC COMPANY , l t

7. Fulfills other responsibilities common to all '

e supervisory positions and carries out other l l duties and responsibilities as may be assigned by the Director.of Engineering. l

e. Technical SUDDort Manager
1. Reports to the Director of Engineering.

i

2. Oversee and manage programs associated with the technical / administrative' supports areas. l

? r

3. Maintain formal documentation associated with l the technical and administrative activities for (

required operational and licensee documentation.  ; l

4. Fulfills other responsibilities common to all  !

supervisory positions and carries out-other  ; duties and responsibilities as may be assigned l by the Director of Engineering. l 5. Oversee and manage Fire Protection Program. I

f. Performance Enaineerina Manaaer l l l t i
1. Reports to the Vice President, Operations. '

i

2. Provides engineering support to Operations and  !

i Maintenance departments. i

3. Assess the performance of plant systems and make recommendations for improvement.
4. Oversee and manage. programs associated with the performance engineering function, t

Title:

Section 1. Organization Page: 29 of 43 Rev.: 27 , Date: December 20. 1996 l l l l

YANKEE ATOMIC ELECTRIC COMPANY j i l

5. Maintain formal documentation associated with performance engineering programs for required operational and license requirements.
6. Fulfills other responsibilities common to all l supervisory positions and carries out other duties and responsibilities as may be assigned by the Director of Engineering,
g. Nuclear Services Manaaer
1. Reports to the Director of Engineering.
2. Oversees and manages programs associated with nuclear services including the areas of nuclear and environmental engineering and fuel management.
3. Maintains formal documentation associated with nuclear services for required operational and license requirements.
4. Provides administrative support for NSD employees at the plant site.
5. Fulfills other responsibilities common to all supervisory positions and carries out other duties and responsibilities as may be assigned by the Director Engineering,
h. Desian Enaineerina Managers
1. Reports to the Director of Engineering.
2. Oversee and manage the electrical /I&C/

mechanical / fluid systems engineering efforts

Title:

Section I. Organization Page: 30 of 43 Rev.: 27 Date: December 20. 1996

  . - . .. .   . . - . - -            - _ - -           .- - - - . - - - - . .       ..   ..~ . . - . ~ . . ~

i l' l 1

1

! YANKEE ATOMIC ELECTRIC COMPANY 4-  ; j necessary to support the norma.1 and emergent i needs of the plant. ) 4

3. Oversee and manage programs associated with )

1

design engineering.
1
4. Provide for the generation of design change and installation documents, and support for the
j. installation of these design changes and che j

! close-out of associated documentet'.on. j 1

5. Maintain formal documentation of plant design  :

F basis and design change activities for required l 5 operational and license requirements. J 1 i'

6. Fulfills other responsibilities L. Jmon to all )

j supervisory positions and carries out other l duties and responsibilities as may be assigned j i by the Director of Engineering. I i l

1. Operations Manaaer l

. 1. Reports to the Operations Superintendent.

2. Fulfills duties and responsibilities similar.to and/or as described in the FSAR and is directly in charge of the Operctions Department.
3. Has the responsibility and authority for insuring the safe and efficient operation of the plant.and its supporting systems in accordance with applicable station licenses, Technical Specifications, procedures, instructions, established company policy and safety rules.

Title:

Section I. Organization  ! Page: 31 of 43 { Rev.: 27  : Date: December 20, 1996

YANKEE ATOMIC ELECTRIC COMPANY 4 Consistent with plant policies and applicable instructions, institutes necessary programs, issues instructions, originates procedures and insures that department administrative systems exist such that the responsibilities assigned to the Operations Department are executed effectively and efficiently in accordance with company intent. Insures that necessary documentation is prepared, reviewed, approved, and properly processed to verify that department activities meet all established requirements.

5. Maintains current status of Operations Department activities and requirements.

Prepares and maintains, plans and schedules for department commitments such as personnel training, retraining and qualification.

6. Insures that all records, tests, reports, and logs maintained by the Operations Department are properly reviewed and approved.
7. Insures that all Operations Department personnel in a training status are actively pursuing the established program and that their performance is being adequately evaluated.
8. Reviews all Operations Department procedures to insure that they are current, accurate, and approved.
9. Implements aspects of the Plant Quality Assurance Program which relatt 1 the activities of the Operations 0 n.'tment.

Title:

Section I, Organization Page: 32 of 43 l Rev.: 27 ' Date: December 20, 1996 1

I YANKEE ATOMIC ELECTRIC COMPANY , J. Instrument & Control Manager l l 1. Reports to the Operations Superintendent. l 2. Fulfills duties and responsibilities similar to j and/or as described in the FSAR and is directly in charge of the Instrument and Control  ; Department.

                                                                                      \

l

3. Plans, schedules and supervises the activities )

of the Instrumentation and Controls Department. Such activities to include: installation, inspection, calibration, adjustment, maintenance, and repair of the plant instrumentation and controls. l ! 4. Coordinates the activities of the Instrument l and Controls Department wi+.h all other plant functions.

5. Establishes and directs a program of preventive l maintenance, calibration, and surveillance testing as required by the plant license, approved plant procedures, or other plant requirements.
6. Establishes calibration techniques, frequencies, and records as necessary to assure reliable indication and control for plant l

system parameters.

7. Establishes and directs a program of l departmentdl training that will assure a staff of Instrumentation and Controls personnel capable of safely and efficiently performing

, their duties in accordance with established { practices, procedures, and regulations.

Title:

Section I, Organization Page: 33 of 43 Rev.: 27 Date: December 20, 1996

YANKEE ATOMIC ELECTRIC COMPANY

8. Prepares and/or supervises the preparation of reports, logs, and historical records as required.
9. Implements those aspects of the Plant Quality Assurance Program which relate to the activities of the Instrumentation and Controls Department.
10. Develops and maintains, in accordance with approved plant procedures, the procedural controls necessary to fulfill the above responsibilities.
k. Maintenance Manaaer
1. Reports to the Operations Superintendent.
2. Fulfills duties and responsibilities similar to and/.c as described in the FSAR and is directly in charge of the Maintenance Department.
3. Is responsible for all electrical and mechanical maintenance activities throughout the Plant with the exception of Instrumentation and Control maintenance activities.
4. Consistent with plant policies and applicable j instructions, institutes necessary programs, l issues instructions, originates procedures, and l insures that department administrative systems j exist such that the responsibilities assigned l to the Maintenance Department are executed effectively and efficiently in accordance with company intent. Insures that necessary documentatio" is prepared, reviewed, approved.

Title:

Section I, Organization Page: 34 of 43 Rev.: 27 Date: December 20, 1996

YANKEE ATOMIC ELECTRIC COMPANY and properly filed .to t tablish that department activities meet all requirements.

5. Consistent with plant policies and applicable instructions, organizes department functions and activities, assigns duties, and schedules personnel to accompl'ish department requirements. . Reviews and supervises all department assignments.
6. Maintains current status of-department activities and requirements. Prepares and maintains long-range plans and schedules for department commitments such as personnel training and qualification, preventive maintenance, material procurement, plant modifications, etc.
7. Staffs and trains Maintenance Department personnel.
8. Establishes and maintains equipment history records.
9. Selects and orders materials and spare parts in areas of assigned responsibility.
10. Implements aspects of the Plant Quality Assurance Program which relate to the activities of the Maintenance Department.
11. Reviews mechanical and electrical equipment failure frequency and evaluates equipment reliability.
12. Assumes responsibility for the condition, maintenance, and reliability of all plant

Title:

Section I, Organization Page: 35 of 43 Rev.: 27 Date: December 20. 1996 m

YANKEE ATOMIC ELECTRIC COMPANY electrical and mechanical equipment other than that specifically assigned to other d epa rtnient s . l

1. Chemistry Manager
1. Reports to the Technical Services Superintendent.
2. Fulfills duties and responsibilities similar to and/or as described in the FSAR and is directly in charge of the Chemistry Department.
3. Consistent with the policies and applicable instructions, institutes necessary programs, l issues instructions, originates procedures, and insures that department administrative systems exist such that the responsibilities assigned to the Chemistry Department are executed effectively and efficiently in accordance with company intent. Insures that necessary documentation is prepared, reviewed, approved, and properly filed to establish that department activities meet all requirements.
4. Consistent with plant policies and applicable instructions, organizes department functions and activities, assigns and schedules personnel to accomplish department requirements. Reviews and supervises all department assignments.
5. Maintains current status of department activities and requirements. Prepares and maintains long-range plans and schedules for department commitments such as personnel training and qualification, preventive

Title:

Section 1. Organization Page: 36 of 43 Rev.: 27 i Date: December 20. 1996

_ _ _ . . . - _ .. . _ _ . _ . _ _ . ._._._._.m _._ _.._ _ -.,__. . _ _ . _ _ _ . . . . _ 4 l YANKEE ATOMIC ELECTRIC COMPANY - 2 1 . maintenance, material procurement, plant I j modifications, etc.

6. Assumes responsibility for'providing the i

necessary administrative supervision and , required personnel to meet the needs of the ) established Radiological Environmental l .,_ Monitoring Programs.

. t 4 7. Prescribes and maintains chemistry conditions b

and purification of coolants within applicable lim:is.  ; 1. i 8. Develops and maintains records of all chemistry

and radiochemistry aspects of the plant.

j m. Radiation Protection Manaaer i i

1. Reports to the Technical Services  ;

4 Superintendent.  ; i t j 2. Fulf<lih $ sties and responsibilities similar to l and/Lc as t' ascribed in the FSAR and is directly { - in char 9c of the. Radiation Protection  ! ! Department. [ 3. lonsistent with the policies and applicable , instructions, institutes necessary programs, j issues instructions, originates procedures, and . insures that department. administrative systems ! exist such that the responsibilities assigned , to the Radiation Protection Department are ! executed effectively and efficiently in ! . accordance with company intent. Insures that 1 necessary documentation is prepared, reviewed, ) approved, and properly filed to establish that j department activities meet all requirements.

Title:

Section I, Organizatioi: 1 Page: 37 of 43

Rev.
27 j Date: December 20, 1996 I
                                                .-           _ - . . . - . . . - . - ~ .  . - - _ _ - - -.

I I l YANKEE ATOMIC ELECTRIC COMPANY

4. Consistent with plant policies andLapplicable instructions, organizes department functions ,

and activities, assigns and schedules personnel j to accomplish department requirements. Reviews and supervises all department assignments.  !

5. Maintains current status of department activities and requirements. Prepares and  ;

maintains long-range plans and schedules for  ; department _ commitments such as personnel i training and qualification, preventive t maintenance, material procurement, plant j' modifications, etc. l

6. Develops and maintains records of all radioactive-waste shipments. -l l 7. Develops work and housekeeping practices in l radiologically controlled areas of the plant to minimize personnel exposure and the spread of radioactive contamination.
8. Assumes responsibility for receipt, storage, .

shipment, and disposal of radioactive material utilizing proper Federal and State regulations l (other than nuclear fuel).

n. Reactor Enaineerina Manaaer
1. Reports to the Technical Services Superintendent, j l
2. Fulfills duties and responsibilities similar to ')

and/.or as described in the FSAR and is directly i in charge of the Reactor Engin'eering

                                                                                                                 ]

Department. l l

Title:

Section I, Organization I Page: 38 of 43 Rev.: 27 Date: December 20, 1996

YANKEE ATOMIC ELECTRIC COMPANY

3. Plans, schedules, and supervises the activities l

of the Reactor Engineering Department. Such i activities to include: nuclear and thermal

                                                                                         )

core analysis, planning and scheduling of fuel i rearrangements and fuel cycling, rod withdrawal sequences, rod patterns, and reactor maneuvering during plant startup.

4. Coordinates the activities of the Reactor Engineering Department with all other plant {

functions. l

5. Establishes and directs a program of Nuclear Performance Monitoring and Surveillance Testing as required by the plant license, approved plant procedures, or other plant requirements.
6. Establishes a program of control, l accountability and record keeping as required l to maintain an accurate inventory of licensed special nuclear material.
7. Establishes and directs a program of departmental training that will assure a staff of Reactor Engineering personnel capable of safely and efficiently performing their duties in accordance with established practices, procedures, and regulations.
8. Prepares and/or supervises the preparation of reports, logs, and historical records as required.
9. Implements those aspects of the Plant Quality Assurance Program which relate to the activities of the Reactor Engineering Department.

Title:

Section I, Organization Page: 39 of 43 Rev.: 27 Date: December 20. 1996

l  ! l 1 j YANKEE ATOMIC ELECTRIC COMPANY-l

10. Develops and maintains, in accordance with approved plant procedures, the procedural controls necessary to fulfill the above requirements.

E. REVIEW AND AUDIT Two committees have been established for Yankee and the Vermont Yankee plants whose objectives are to insure the plant is operated safely, utilizing good engineering practices. The committees are charged with making recommendations to modify  ; operational methods or safety precautions. The Plant Operations Review Committee, is made up of Plant I personnel. The Nuclear Safety Audit and Review Committee for Vermont Yankee, shall have no more than three members selected I from the organization reporting to the Manager of Operations. The Yankee Nuclear Safety Audit and Review Committee shall not be members of the plant staff.

1. Plant Operations Review Committee ,
a. Yankee Plant - See Section 6.5 " Review and Audit" of Appendix A Technical Specifications to the Operating License DPR-3.
b. Vermont Yankee Plant - See Section 6.2.A " Review and Audit" of Appendix A Technical Specifications to the Operating License DPR-28.
2. Nuclear Safety Audit and Review Committee
a. Yankee Plant - See Section 6.5 " Review and Audit" of
Appendix A Technical Specifications to the Operating l

License DPR-3.

Title:

Section I, Organization ( Page: 40 of 43 I Rev.: 27 Date: December 20, 1996

l YANKEE ATOMIC ELECTRIC COMPANY

b. Vermont Yankee Plant
1. See Section 6.2.B " Review and Audit" of Appendix A Technical Specifications to the Operating License DPR-28.
2. The NSAR Committee shall be responsible for evaluating changes to the Vermont Yankee organizational chart (Figure 2 to Section 1).

l l i l l l l 4

Title:

Section I. Organization Page: 41 of 43 Rev.: 27 Date: December 20, 1996

E N l' 2 C S.i 5 2.. . .. m

                                                                                                                                                                                                                                                             )

a c: M = ? 2 o E- @ S YANKEE ATOMIC

     +*,-                                                                                                                                                                                                                                                     i as                                                                                                           ELECTRIC COMPANY E,    =  **8                                                                                                    . PRESIDENT                                                                                                                                    i u o .~ *-*

1 ~ e - c= . .o :5 e 5 DIRECTOR VICE DECOMMISSIONING NUCLEAR SAFETY EXECUTIVE l AUDIT AND REVIEW DIRECTOR. $ C ENGINEERING PRESIDENT (S) MANAGER AND MANAGER OF OPERATIONS COMMITTEE QUALITY ASSURANCE g SERVICES z t FUEL ENVIRONMENTAL ENGINEERING PROJECT COST / SCHEDULE ENGINEERING QA E [' MANAGEMENT LABORATORY & LICENSING MANAGER m MANAGERS MANAGERS CONTROL MANAGER DIRECTOR DIRECTOR y y i x t E , P m _ g o.!tA_TE_ _ _ __ _ _ __ _ _ __ ___ _ ____ _____ _____ g eo QA SURV ILLANCE n SITE __________________________ MANAGER INSPECTION GROUP l

                                                                                                                                                                                                                                                     ?

PLANT OPERATIONS REVIEW [ COMMITTEE HEALTH & MAINTENANCE & OPERATIONS RP/ CHEMISTRY SITE SERVICES TRAINING ASSISTANT CONST T " SITE MANAGER MANAGER MANAGER SUPERVISOR COORDINATOR SU OR pANAGER , FUNCTIONAL COMMUNICATIONS t

                                                         .._        _.__...___._o._..__.m._____.

__. _ _ . _ _ . _ _ _ _ _ _ , ____m___-~_m - -

                                                                                                                                                                                                                                              .-.-,__-,_-  L

o n ~o ~4 mmm - r+<c e+ @

  • O ~

" " "

  • VERMONT YANKEE ORGANIZATION PRESIDENT o N A < -ri t.n & CHIEF
  • "W* ** EXECUTIVE '

S B o3

      *O    '"

S OFF CER VANKEE ATOMIC m A5 0 ................._....... ELECTRIC p y

         <*
  • PRESIDENT m cu .-*

o s - x l l . ~ @ VICE PRESIDENT VICE I f e VICE - KMINISTRATION/ PRESIDENT - - - - - - - e o i FINANCE & OPERATIONS (I) PRESIDENT (S) EXECUTIVE m

         ]

TREASURER OIRECTOR QUALITY ASSURANCE ENGINEERING g TRAINING SAF TY AUDIT DEPARTMENT y-MANAGER REVIEW COMM.(4) MANAGERS gg g MANAGERS m m

               ..____ ....____..-- ---==...._.                                                                                                                 ..........-...         ....-.........=_                  - -.--     .       E.

I  : a DIRECTOR OF e PLANT ENGINEERING l MANAGER CA 8 m PERFORMANCE (2).(3) ------------ ----------------- SURVEILLANCE l Q ENGINEERING GROUP e a r MANAGER l O

                                                                                                                                                                                                                                         !                             O I                            I                                                               IECHNICAL PLANT               l                                              SERVICES                                l                             @

OPERATIONS SUPERINTENDENT OP g S SUPERINTE ENT a p. (2),(4) COMITTEE . i l 4 I I I j REACTOR INSTRUMENT RADIATION CHEMISTRY OPERATIONS MAINTENANCE & CONTROL PROTECTION ENGINEERING  ! MANAGER MANAGER MANAGER MANAGER MANAGER MANAGER l l 1 I i i i i PROJECT TECHNICAL 8 NUCLEAR DESIGN ENGINEERING SUPPORT l SERVICES ENGINEERING MANAGER MANAGER MANAGER MANAGERS l Notes: , (1) Responsible for fire protection. (2) ANSI 18.1-1971 Re: License. (3) In Health Physics matters, the Radiation Protection Manager has direct access to the Plant Manager. (4) The committee membership and its Chairman and Vice Chairman shall be appointed by the Vermont Yankee Vice President. Operations. CDe0ZEKWWFIG2

s

1 YANKEE ATOMIC ELECTRIC COMPANY II. QUAllTY ASSURANCE PROGRAM i A. SCOPE This section establishes the criteria to be applied to systems requiring Quality Assurance which prevent or mitigate the , consequences of postulated accidents which could cause undue risk to the health and safety of the public. The structures, systems, components and other items requiring quality assurance are listed in the Yankee Safety Classification of-Systems Manual for the  ; Yankee plant. A listing for the Vermont Yankee ' plant is provided in the Vermont Yankee Safety Classification Manual. B. _ RESPONSIBILITIES

1. Compliance with the requirements of the Operational Quality Assurance Program - based on the criteria of Title 10 of the Code of Federal Regulations, Part 50, Appendix B, and ANSI N18.7-1976 - shall be the responsibility of all personnel involved with, activities affecting operational safety. Each facility shall have a matrix of major quality assurance procedures cross referenced to each applicable criteria of 10CFR50 Appendix-B. The. performance of quality-related activities shall be accomplished with specified equipment under suitable environmental conditions.

Note: Each criterion section for the Program incorporates the designation of specific organizational responsibilities.

2. Individuals having direct responsibilities for establishment / distribution control / implementation of the Operational Quality Assurance Program are delineated in Section i " Organization" of the Program.

Title:

Section II, Quality Assurance Program Page: 1 of 7 Rev.: 27 Date: December 20, 1996

4 YANKEE ATOMIC ELECTRIC' COMPANY C. IMPLEMENTATION Establishment of an effective Operational Quality Assurance [ Program is assured through consideration of and conformance with [ the Regulatory Position in the below listed Regulatory Guides as modified _in Appendix B. Implementation of this Program is , assured through Quality Assurance procedures; derived from Quality  ! Assurance policies, goals and objectives. Quality Assurance shall review Quality Assurance program procedures-to assure their  ; derivation from the policies, goals and objectives _ established by the President.  !

1. Title 10 of the Code of Federal Regulations, Part 50, '

Appendix B, Quality Assurance Criteria for Nuclear Power , Plants ) i

2. ANSI N18.7-1976, Administrative Controls and Quality 'l Assurance for the Operational Phase of Nuclear Power Plants (Endorsed by Regulatory Guide 1.33, Revision 2)
3. ANSI N45.2.1-1973, Cleanina of Fluid Systems and Associated Components Durina Construction Phase of Nuclear Power Plants (Endorsed by' Regulatory Guide 1.37, March 16,1973)'
4. ANSI N45.2.2-1972, Packaaina. Shinoina Receivina. Storace and Handlina of items for Nuclear Power Plants (Endorsed by Regulatory Guide 1.38 Revision 2)
5. ANSI N45.2.3-1973 Housekeepina Durina the Construction l Phase of Nuclear Power Plants (Endorsed by Regulatory Guide 1.39. Revision 2) ,
                                                                                                                                               ^l
6. ANSI N45.2.4-1972 Installation. Inspection and Testina Reauirements for Instrumentation and Electric Eauipment Durina the Construction of Nuclear Power Generatina Plants (Endorsed by Regulatory Guide 1.30, August 11, 1972)

Title:

Section II, Quality Assurance Program Page: 2 of 7

                         ' Rev.:     '27 Date:      December 20, 1996
                           . YANKEE ATOMIC ELECTRIC COMPANY l
7. ANSI N45.2.5-1974, SuDolementary Ouality Assurance Reauirements for Installation. InsDection and Testina of Structural Concrete and Structural Steel Durina the l

Construction Phase of Nuclear Power Plants (Endorsed by l' Regulatory Guide 1.94, _ Revision 1) l

8. ANSI-N45.2.6-1978, Qualification of InsDection,
j. Examination and Testina Personnel for the Construction l Phase of Nuclear Power Plants (Endorsed by Regulatory l

Guide 1.58. Revision 1) l 9. ANSI N45.2.8-1975, SuoDiementary Ouality Assurance Reauirements for installation. InsDection and Testina of Mechanical EauiDment and Systems-for the Construction Phase [ of Nuclear Power Plants (Endorsed by Regulatory l Guide 1.116, Revision 0-R) i i '

  • 10. -ANSI N45.2.9-1974, Reauirements for Collection. Storace, and Maintenance of Quality Assurance Records for Nuclear Power Plants (Endorsed by Regulatory Guide 1.88, Revision 2)
11. ANSI N45.2.10-1973, Quality Assurance Terms and Definitions
12. ANSI N45.2.11-1974, Quality Assurance Reauirements for the Desian of Nuclear Power Plants (Endorsed by Regulatory Guide 1.64. Revision 2)
               .13 .  ' ANSI H45.2'.12-1977, Reauirements for Auditina of Quality Assurance Proaram for Nuclear Power Plants (Endorsed by      ;

Regulatory Guide 1.144. Revision 1) _j i

14. ANSI'N45.2.13-1976, Quality Assurance Reauirements for, j Control of Procurement of items and Services for Nuclear Power Plants (Endorsed by Regulatory Guide 1.123 Revision 1) l l

Title:

Section II, Quality Assurance Program Page: 3 of 7 Rev.: 27 Date: December 20, 1996

l l YANKEE ATOMIC ELECTRIC COMPANY

15. ANSI N45.2.23-1978, Qualification of Ouality Assurance Program Audit Personnel for Nuclear Power Plants (Endorsed by Regulatory Guide 1.146, August 1980)
16. ANSI N18.1-1971. Selection and Training of Nuclear Power l

Plant Personnel (Endorsed by Regulatory Guide 1.8, Revision 1-R)

17. Regulatory Guide 1.26. Revision 3, Quality Group Classifications and Standards for Water . Steam . and Radioactive-Waste-Containino Components of Nuclear Power Plants
18. Regulatory Guide 1.29, Revision 3, Seismic Desian Classification Notes: 1) When conflicts in similar requirements contained in Technical Specifications and the above documents exist, the requirements contained in Technical Specifications override those in the documents. Requirements in the documents will be considered when they supplement and are not in conflict with similar requirements in Technical Specifications.
2) Revisions to the above listed documents will be considered for applicability to the Yankee Operational Quality Assurance Program upon written direction thereof by the Regional Administrator, Nuclear Regulatory Commission - Office of Inspection and Enforcement - Region 1.
3) Only those documents listed above shall be considered applicable to the Yankee and Vermont Yankee plants. Documents

Title:

Section 11, Quality Assurance Program Page: 4 of 7 Rev.: 27 Datei December 20, 1996

l YANKEE ATOMIC ELECTRIC COMPANY further referenced by the above listed documents shall not be considered applicable. They may, however, be considered as guidelines.

  • Exceptions and alternatives to the provisions contained in this l Standard / Guide are detailed in Appendix B.
4) This Program shall be applicable to those activities requiring quality assurance which occur commencing within 90 days l l after acceptance of the Program by the Nuclear Regulatory Commission.
5) The NRC shall be notified of changes, that reduce commitments in the accepted description of the 0A program, for their  ;

review and acceptance prior to l implementation. Acceptance will be  ! assumed 60 days after submittal unless notified otherwise.

6) Changes that do not reduce 0A program j commitments shall be submitted to the NRC at least annually.

l

7) Editorial changes or personnel reassignments of a nonsubstantive nature i do not require NRC notification.

l l l

Title:

Section II, Quality Assurance Program Page: 5 of 7 Rev.: 27 Date: December 20, 1996 l l

                                                                                    .   - - -  __m. _ . . . _ _ .

_--.-.._.q l l I l YANKEE ATOMIC ELECTRIC COMPANY

D. MANAGEMENT EVALUATION i l The Cognizant Corporate Officer directs a thorough evaluation of the established Operational-Quality Assurance Program by ,

assigning the Nuclear Safety Audit and Review Committee the task  ! of reviewing for compliance with and evaluating the effectiveness ) of quality related activities. i E. TRAINING l l l 1. The Vice President (s) and Manager of Operations are l responsible for the indoctrination and training of their  : staffs involved with activities affecting quality during plant operation and/or license commitment.

2. The Training Manager at Vermont Yankee is responsible for l

the indoctrination and training of plant staff personnel performing activities affecting operations or requiring l l quality assurance, and of the operators.who are formally licensed or qualified.

3. The Training Coordinator at the Yankee Site is responsible  !

for indoctrination and training of site staff personnel  ! performing activities affecting license requirements.

4. Within YNSD, each department Director / Manager is responsible for the indoctrination and training of department personnel performing activities affecting quality in applicable design and engineering, test, operational, construction, or quality phases.

l-

5. The indoctrination and training programs shall provide the following:

i

j. a. Instruction as to the purpose, scope, and implementation of quality-related manuais, instructions, and procedures.

I

Title:

Section II, Quality Assurance Program i Page: 6 of 7 ) Rev.: 27 Date: December 20, 1996

YANKEE ATOMIC ELECTRIC COMPANY

b. Training and qualification in the principles and techniques of the activity being performed.
c. Documentation of the scope, objective, and method of implementing the program.
d. Maintenance of personnel proficiency by retraining, re-examining, and/or recertifying.
e. Documentation of the training sessions including content, attendance, dates, and results where applicable.

l l

Title:

Section II, Quality Assurance Program Page: 7 of 7 Rev.: 27 Date: December 20, 1996

YANKEE ATOMIC ELECTRIC COMPANY 111. OfSIGN CONTROL A. SCOPE This section of the Operational Quality Assurance Program establishes measures to assure that the design of and changes to structures, systems, and components covered by the Operational Quality Assurance Program are controlled. B. RESPONSIBILITIES

1. The Nuclear Services Division Quality Assurance Department shall be responsible for auditing design documents and engineering specifications to verify that quality requirements, such as inspection requirements and acceptance criteria, have been included by the responsible parties.
2. The Nuclear Services Division Engineering / Project Departments / Plants shall be responsible for:
a. The design and control of design activities (including design interfaces) for the change of structures, systems, or components including the requirement for independent review. This NRC mandated review shall be performed by an uninvolved, but technically knowledgeable, person in the engineering discipline.
b. Identification, documentation, and control of deviations from specified design requirements and/or quality standards.
c. Design analysis and delineation of acceptance  ;

criteria for inspections and tests. i

Title:

Section Ill. Design Control  ! Page: 1 of 4 l Rev.: 27 Date: December 20, 1996

YANKEE ATOMIC ELECTRIC COMPANY

d. Verification of the adequacy of a specific design I feature by implementation of a prototype test when l required. I
e. Review of inspection and test data for compliance with established engineering criteria.
3. The Plant Operations Review Committee shall be responsible for:
a. Review of all proposed plant changes and recommending their approval or disapproval to the Plant Superintendent / Manager.
b. Determination of whether proposed changes involve unreviewed safety questions.
4. The Plant Site Manager shall be responsible for:
a. Review of the recommendations of the Plant Operations Review Committee.  ;

I l

b. Review and approval of proposed plant changes. I
5. The Nuclear Safety Audit and Review Committee shall be responsible for the review of plant changes.
6. The Vice President (s) and Manager of Operations and their staff shall be responsible for:
a. Approval of procedures for processing plant design changes and engineering design changes.
b. Review, approval and distribution of plant change documents.

Title:

Section 111, Design Control Page: 2 of 4 Rev.: 27 Date: December 20, 1996 1

l YANKEE ATOMIC ELECTRIC COMPANY l

7. The Nuclear Services Division Plant Support Department shall .be responsible for the distribution of. design change documents to the contractor performing the work where contract administration responsibilities have been assigned.

C. IMPLEMENTATION'

1. Satisfaction of this criterion shall be assured through the .

implementation of the Nuclear Services Division and/or plant actions listed below

a. Correct translation of applicable regulatory I requirements and design bases into specifications, I drawings and written documents.
b. Application of suitable design controls to such-activities as reactor physics: seismic, stress, thermal, hydraulic, radiation, and accident analyses; compatibility of materials; and accessibility for l inservice inspection, maintenance and repair,
c. Design reviews to assure tht.. design characteristics Cdn be Controlled, inspected and tested. i
d. Performance of proper selection and accomplishment of design verification or checking process such as design reviews, alternate calculations, qualification testing or test programs. When a test program is used to verify the adequacy of a design, a qualification test of a prototype unit under the most
j. adverse. design conditions shall be used. The j responsibilities and qualifications of the verifier, L the areas and features to be verified, the pertinent

! considerations to be verified, and the extent of documentation are identified in procedures.

Title:

Section III, Design Control Page: 3 of 4 Rev.: 27 5 Date: December 20, 1996 L t

L YANKEE ATOMIC ELECTRIC COMPANY j Procedures will provide the. criteria that specify when verification should be by test. If the { verification method is by test only, prototype. component, or feature testing is performed in t accordance with written procedures prior to relying r upon the component, system, or structure to perform j its function.  ; i

                  .e. Subjection of design and specification changes,               l including those originating "on-site", to the same            l design controls and approvals that were applicable to         !

the' original design unless designated in writing to l another responsible organization. i i

f. Documentation of errors and deficiencies in the design process that adversely affect safety  !

classified structures, systems, and components; performance of corrective action to preclude  ; repetition. .l

                                                                                     .I
g. Review of standard "off-the-shelf" commercial or previously approved materials, parts, and equipment j that are essential to the safety functions of l structures, systems, and components, for suitability of application prior to selection.
h. Selection of suitable materials, parts, equinment, and processes for safety classified structures, systems, and components.

i i

1. Establishment of procedures to assure that computer programs are verified and validated for a particular application. -l

Title:

Section 111, Design Control l Page: 4 of 4 j Rev.: 27 Date: December 20, 1996

l l YANKEE ATOMIC ELECTRIC COMPANY IV. PROCUREMENT DOCUMENT CONTROL f A. SCOPE r l This section of the Operational Quality Assurance Program establishes the measures necessary to assure that applicable regulatory requirements, design bases and other requirements which are necessary to assure adequate' quality, are suitably included or referenced in the documents for procurement of material, equipment and services. l B. RESPONSIBILITIES L . l 1. The Nuclear Services Division Quality Assurance Department shall be responsible for review of procurement' requisitions , initiated by the. Plant and the Yankee Nuclear Services l Division, except for Vermont Yankee who may request such reviews. The Vermont Yankee staff shall be responsible for i the Procurement Requisition reviews.

2. The Plant or their corporate staffs shall be responsible for:
a. The preparation, review, issue, and control of purchase documents,
b. Preparation of detailed procedures as to how purchase documents are prepared, reviewed, approved, issued, and controlled.
c. Review of plant procurement requisitions (Vermont Yankee plant only).
3. The Nuclear Services Division Engineering and/or Project Departments shall be responsible for:

Title:

Section IV, Procurement Document Control L Page: 1 of 3 ) l Rev.: 27 1 Date: December 20, 1996

l l t l YANKEE ATOMIC ELECTRIC COMPANY l a. Preparation of engineering specifications which detail the technical and quality requirements for material, equipment and services.  !

b. Initiation and/or review (Yankee plant only) of )

purchase documentation for material, equipment, and l services required for Plant changes. ,

4. The Nuclear Services Divisirn Plant Support Department shall be responsible for initiation and/or review (Yankee plant only) of purchase documentation for construction I services including contractor supplied material and equipment required for plant changes where contract administration responsibilities have been assigned. ,

i

5. For YNSD, the Vice President (s) and Manager of Operations and their staff shall be responsible for the review and approval of procurement documents. For Vermont Yankee, this function is performed by the Vermont Yankee staff.

l C. IMPLEMENTATION

1. Satisfaction of the criterion shall be assured through the l implementation of the Nuclear Services Division and/or i plant actions listed below:
a. Documentation of the review and approval of procurement documents prior to release and availability of this documentation for verification.
b. Identification of the venaor's applicable quality assurance requirements of 10CFR50, Appendix B and/or ANSI N18.7. and/or other applicable codes, standards or regulatory documents referenced in procurement documents which are to be reviewed by the qualified personnel knowledgeable in quality assurance. For

Title:

Section IV. Procurement Document Control Page: 2 of 3 Rev.: 27 Date: December 20, 1996

  - . . - _ . - . -      - . . ~ ~ . .         . . -                          ..        . - - . -             . - . . . - - . - . - . - - - . - . . . . . . . .

YANKEE ATOMIC ELECTRIC COMPANY Vermont Yankee, this function will be the responsibility of the Vermont Yankee staff.

c. Identification in the procurement documents of the documentation to be prepared, maintained, and/or submitted to the purchaser prior to use, such as:
1. Drawings, specifications, procedures:

l

2. Inspection and fabrication plans:
3. Inspection and test records:
4. Personnel und procedure qualifications:
5. Chemical and physical test results of material; and
6. Quality Assurance Department's right of the access to the vendor's facilities and records for surveillance and/or audit to procurement documentation.
d. Review and approval of changes and revisions to procurement documents at least equivalent to those for the original document,
e. Control of procurement documents 'for spare and replacement parts at least equivalent to that used for the original equipment.

l-l < l l' I

Title:

Section IV, Procurement Document Control I Page: 3 of 3  ;

Rev.
27 Date:

December 20, 1996

                                                                                                                                    )

l i YANKEE ATOMIC ELECTRIC COMPANY 1 V. 1HSTRUCTIONS, PROCEDURES. AND DRAWINGS I i A. SCOPE ' This sect' ion of the Operational Quality Assurance Program l establishes the measures for prescribing and accomplishing i activities requiring quality assurance in accordance with l approved drawings, instructions, or procedures, j B. RESPONSIBILITIES Within Yankee Nuclear Services Division, each Department j Director / Manager is responsible for establishing and complying with applicable procedures governing the activities affecting quality. Persons preparing and approving documents are responsible for j assuring that spec 1fications, instructions, procedures, and' drawings include appropriate quantitative or qualitative acceptance criteria for determining that activities have been satisf actorily accomplished; assuring that the applicable criteria of 10CFR50 Appendix B and/or ANSI N18.7 are specified; and assuring that the documents are kept current. In addition, the following departments have'the distinct responsibilities delineated below.

1. The Nuclear Services Division Quality Assurance Department shall be responsible for review of all Plant Quality Assurance procedures.
2. The Plant shall be responsible for the preparation, l approval, maintenance, and implementation of all l l instructions and procedures associated with plant l activities.
o. The Nuclear Services Division Engineering and/or Project  !

Departments shall be responsible for:

Title:

Section V, Instructions, Procedures, and Drawings  ; l

Page
1 of 2
,               Rev.:               27 Date:               December 20, 1996

YANKEE ATOMIC ELECTRIC COMPANY ,

a. Preparation and approval of engineering drawings and instructions, welding and nondestructive examination procedures, and procedures for Engineering Design Control, I
b. Updating and control of original drawings and distribution of copies thereof.
4. The Plant Operations Review Committee shall be responsible for reviewing procedures affecting nuclear safety prior to their approval by the Plant Superintende .t/ Manager.
5. The Nuclear Services Division Plant Supp0rt Department shall be responsible for the preparation, approval, maintenance, and implementation of all instructions and procedures associated with Construction Services
                                                                                          ]

activities. , t C. IMPl.EMENTATION

1. Satisfaction of this criterion shall be assured through the implementation of the Nuclear Services Division and/or plant actions listed below: )

I

a. Establishment of ,7rovisions which clearly delineate the sequence of actions to be accomplished in the i preparation, review, approval, and control of instructions, procedures, and drawings,
b. Review of inspection plans; test, calibration, special process, maintenance and repair procedures:

drawings and specifications; and changes thereto by the Quality Assurance Decartment or other personnel knowledgeable in quality .ssurance. 1

Title:

Section V, Instructions, Procedures, and Drawings Page: 2 of 2 Rev.: 27 Date: December 20, 1996

i l YANKEE ATOMIC ELECTRIC COMPANY VI. DOCUMENT CONTROL l A. SCOPE i l This section of the Operational Quality Assurance Program establishes the measures for controlling the issuance of l documents, including revisions thereto, which affect quality activities. B. RESPONSIBILITIES

1. All participating departments shall establish document j control measures which provide for the following:

i

a. Identification of organizations responsible for l preparation, review, approval, and control of documents.

l

b. Identification of documentation to be used in performing the activity.
c. Coordination and control of interface documents. l l

i

d. Establishment of distribution lists.
e. Action to be taken for obsolete or superseded documents.

i in addition, the following organizations have t' unique responsibilities delineated below.

2. The Plant shall be responsible for:
a. Controlling the issuance of plant operating, maintenance, repair, refueling, inspection and test,
                              'and change documents.

4

Title:

Section VI. Document Control . Page: 1 of 4 Rev.: 27 Dets: December 20, 1996 4 1

1 YANKEE ATOMIC ELECTRIC COMPANY

b. Distribution and maintenance of all plant approved and/or revised documents assuring quality at the location where the activity is performed,
c. Review and distribution of drawings.  !
3. The Nuclear Services Division Engireering arid /or Project Departments shall be responsible for:
a. Controlling the issuance of engineering drawings,  ;

specifications, welding and nondestructive + examination documents,

b. Revision and distribution of welding and  !

nondestructive examination documents.

c. Maintenance and distribution of engineering
  • specifications and drawings.
4. The Vice President (s) and Manager of Operations and their staff shall be responsible for:
a. A system of review and approval of Plant drawings and specifications.
b. Controlling the Nuclear Services Division Operational Support quality assurance documents.
5. The Director of Quality Assurance shall be responsible for establishing the means for the control and distribution of the Operational Quality Assurance Program and Approved i Vendors List and revisions thereto.

Title:

Section VI. Document Control Page: 2 of 4

                                                                              ]

Rev.: 27 1 Date: December 20. 1996 l

YANKEE ATOMIC ELECTRIC COMPANY C. IMPLEMENTATION

1. Satisfaction of this criterion shall be assured through'the implementation of the Nuclear Services Division and/or plant actions listed below:
a. Review and approval of document changes by the same organizations that performed the original review and approval on by other responsible organizations delegated by the controlling authority,
b. Inclusion of approved changes in instructions, drawings, and other applicable documents prior to placing the system in operating status.
c. Provision of availability of documents at the location where the activity is to be performed prior to commencing the work.
d. Establishment, revision, and distribution of a master list or equivalent to identify the current revision number of instructions, specifications, drawings, procurement documents, or other quality assuring documents,
e. Control of documents identified as follows:
1. Design documents (i.e., Engineering / Plant Design Change Requests, Specifications, Calculations, etc.);
2. Design manufacturing, construction, and installation drawings;
3. Procurement documents:

l

Title:

Section VI. Document Control Page: 3 of 4 Rev.: 27 Date: December 20, 1996

l 1 l l YANKEE ATOMIC ELECTRIC COMPANY

4. Operational Quality Assurance Program, maintenance, and operating procedures:
5. Manufacturing, inspection and test i instructions:
6. Test documents:
7. Design changes; and
8. Nonconformance reports.
9. Event reports (Vermont Yankee).

1 i

f. Appendices to the Operational Quality Assurance j Program are considered to be part of the Program and l are reviewed and approved in accordance with the I Program. l l

l l l 1

Title:

Section VI Document Control Page: 4 of 4 Rev.. 27 Date: December 20, 1996

1 YANKEE ATOMIC ELECTRIC COMPANY VII. CONTROL OF PURCHASED MATERIAL. EQUIPMENT. AND SERVICES  ; i A. SCOPE This section uf the Operational Quality Assurance Program  ; establishes measures to assure that purchased material, equipment i and services, whether purchased directly or through contractors  ; and subcontractors, conform to the procurement documents. B. RESPONSIBILITIES l l l

1. The Nuclear Services Division Quality Assurance Department shall be responsible for:
a. Audits and Commercial Surveys of vendor quality assurance programs.
                                                                                ]
b. Surveillances of vendor activities.

l

c. Maintenance of the Yankee Atomic Electric Company Approved Vendors List.
2. The Nuclear Services Division Quality Assurance, l Engineerir.g. and/or Project Departments shall be l responsible for evaluating vendor manufacturing and technical capabilities upon request.
3. The Plant shall be responsible for:
a. Receipt inspection and control of material and equipment.
b. Evaluation of purchased services during and/or after completion of the service.
c. The Plant Services / Administrative Department at the Yankee plant and the Material Manager at

Title:

Section VII, Control of Purchased Material, Equipment. and Services Page: 1 of 4 Rev.: 27 Date: December 20, 1996 i

YANKEE ATOMIC ELECTRIC COMPANY Vermont Yankee shall be responsible for the control of purchased material, parts and components until issued for installation or use. i C. IMPLEMENTATION 1

1. Satisfaction of this criterion shall be assured through the implementation of the Nuclear Services Division and/or plant actions listed below: 1
a. Audits and Commercial Surveys of vendors based on one ,

or more of the following, as appropriate to the scope

                                                                                   ]

of procurement activities:

1. When required in order to verify vendor capabilities to comply with the applicable criteria of 10CFR50, Appendix B. ANSI N18.7, or other quality program baselines.
2. When required based on the results of review and evaluation of vendor performance history.
3. When required in order to observe vendor facilities / service activities to assure conformance to purchase specifications.
b. Surveillances of vendors which provide for:  !
1. Specification of applicable quality controls, processes to be witnessed or verified, j l documentation required, and personnel ,

responsible for performing the surveillance. ! 2. Verification that the vendor complies with the quality requirements specified in procurement documents by observation of in-process work. l

Title:

Section VII. Control of Furchased Material Equipment, and Services Page: 2 of 4 l Rev.: 27 Date: December 20, 1996 1 l i I

l l YANKEE ATOMIC ELECTRIC COMPANY

c. Transfer of the following records from the vendor to the plant:
1. Documentation that identifies the purchased material / services and compliance with the l applicable procuremer.t document requirements.
2. Documentation that identifies any deviation (s) l from procurement requirements, including a description of those deviations dispositioned
                                   " accept as is" or " repair".
d. Review and acceptance of vendor documentation by a responsible quality assurance individual.
e. Receipt inspections of vendor furnished material / services, in accordance with predetermined j instructions, to assure: j
1. Material is identified and conforms with receiving documentation.

I

2. Material and documentation are determined '

acceptable prior to use.

3. Inspection records or certificates of conformance attesting to material acceptability are on-site prior to use.
4. Items are identified as to their inspection status prior to release for controlled storage, installation or further work.

Title:

Section VII. Control of Purchased Material. Equipment, and Services Page: 3 of 4 Rev.: 27 Date: December 20, 1996 7 4

YANKEE ATOMIC ELECTRIC COMPANY

f. Evaluations of vendor effectiveness to control quality is performed at intervals consistent with the importance, complexity and quality of the item / services.

l

Title:

Section VII, Control of Purchased Material. Equipment, and Services Page: 4 of 4 Rev. 27 Date: December 20, 1996 i

  . _ _ . . _ _ _ _ _ . _ _ _ _ _                   _ . _ . _ _             _   __ _ _ . ~ _ _ - . . _ _ . _ _ . _

i l \, l j l l l YANKEE ATOMIC ELECTRIC COMPANY VIII. IDENTIFICATION AND' CONTROL OF MATERIAL, PARTS. AND COMPONENTS j' A. SCOPE f i This section of the Operational Quality Assurance Program ! establishes the measures for identification and contrci necessary. to prevent the use of incorrect or defective material, parts, and components. i l B. RESPONSIBILITIES

1. The Nuclear Services Division Quality Assurance Department

! shall be responsible for review, evaluation, or verification (audit commercial survey or surveillance) of vendor quality controls and work processes for traceability of materials through the use of heat number, part number, j or serial number, either on the item or on records traceable to the items. l 2, The Plant shall be responsible for: l

a. Preparation and approval of documents for the ,

identification and control of materials, parts, components and storage of lubricants and other consumable materials. l

b. Maintenance of traceability of materials, parts, and  !

components received, stored, installed', and used at the Plant. i l

3. The Nuclear Services Division Engineering and/or Project Departments and/or the Vermont Yankee staff shall be i responsible for assuring that specifications contain 4 appropriate requirements for the identification and control j of materials, parts, and components.

i i r

Title:

Section VIII, Identification and Control of , Materials, Parts, and Components l l Page: 1 of 2  ;

Rev.: 27 i l Date: December 20, 1996:

i i i J h

YANKEE ATOMIC ELECTRIC COMPANY

4. For YNSD, the Vice President (s) and Manager of Operations and their staff shall be responsible for providing review and approval of documentation for the purchase of materials, parts, and components. For Vermont Yankee, this function is performed b; the vermont Yankee staff.

C. IMPLEMENTATION

1. Satisfaction of this criterion shall be assured through the implementation of the Nuclear Services Division and/or plant actions listed below:
a. Traceability of the identification o'/ mater als and parts to the appropriate documentation such as drawings, specifications, purchase orders, manufacturing and inspection documents, deviation reports, and Physical and Chemical Material Test Reports,
b. Identification of the item in a location and with a method which does not affect its fit, function or quality,
c. Documented verification of correct identification of materials, parts, and components prior to release for use.

i

Title:

Section VIII, Identification and Control of Materials, Parts, and Components j Page: 2 of 2 Rev.: 27 i Date: December 20, 1996 6

YANKEE ATOMIC ELECTRIC COMPANY l IX. CONTROL OF SPECIAL PROCESSES l A. SCOPE l 1 This section of the Operational Quality Assurance Program l establishes the measures necessary to assure that special i processes, including welding, heat treating, and nondestructive testing, are controlled and accomplished by qualified personnel j in accordance with applicable codes, standards, specifications, i criteria and other special requirements, l B. RESPONSIBILITIES l l

1. The Nuclear Services Division Quality Assurance Department l shall be responsible for: l
a. Surveillance of certain nondestructive tests in accordance with " Yankee Atomic Electric Company j Welding and hondestructive Examination Procedures".

i

b. Review of special process docume s, as requested, !

generated by the Nuclear Service Division Engineering / Project Department and vendors for use l l on-site and when otherwise specified. j l

2. The Nuclear Services Division Engineering and/or Project Departments shall be responsible for:

l a. Preparation of documents for welding, heat treating, filler metal control, and nondestructive examinations.  ; I l b. Review and approval of special process documents provided by the vendor for use on-site and when otherwise specified. t i

Title:

Section IX, Control of Special Processes Page: 1 of 2 Rev.: 27 Date: December 20, 1996

_ ._ . . . _ . _ _ . _ _ . _ _ _ _ _ . . _ . - _ . . - _ . _ _ . _ _ _ . . ~ _ . . ___- _. , -1 l l l-t YANKEE ATOMIC ELECTRIC COMPANY

3. The Plant Support Department shall be responsible for  ;

training, qualification, and. requalification of personnel l in nondestructive testing, such as liquid penetrant  ; examination. .;

4. . The Plant shall be responsible for:

i

a. Assurance that maintenance and change work involving j special processes are performed by qualified '

personnel in accordance with approved documents,

b. Control of material used in special processes by plant personnel.
5. For YNSD, the Vice President and Manager of Operation and staff shall be responsible for review and approval of )

purchase documentation for special process material. For j Vermont Yankee, this function is performed by the Vermont ' Yankee staff. l C. IMPLEMENTATION )l I

1. Satisfaction of this criterion shall be assured through the implementation of the Nuclear Services Division and/or )

plant actions listed below:

a. Completion of qualification records of documents, equipment, and personnel connected with special processes in accordance with applicable codes, j standards, and specifications.
b. Performance of special processes accomplished in accordance with written process sheets or equivalent with recorded evidence of verification.
c. Maintenance and updating of qualification records of special process documents, equipment, and personnel .

Title:

Section IX, Control of Special Processes Page: 2 of 2 Rev.: 27 Date: December 20, 1996

i i  ! YANKEE ATOMIC ELECTRIC COMPANY X. INSPECTION A. SCOPE This section of the Operational Quality Assurance Program establishes measures for inspection of tctivities requiring  ; quality assurance to verify conformance with approved procedures, l drawings, specifications end instructions. B. RESPONSIBILITIES l

1. The Nuclear Services Division Quality Assurance Department '

shall be responsible for: 1 1

a. Surveillance of documentation pertinent to the Inservice Inspection and Test Program (for Vermont j Yankee only). l l
b. Surveillance of vendor inspection activities and personnel.
c. Review of Installation and Test Procedures and Maintenance Requests to ascertain the extent of any j required 0A surveillances and OC inspections (Yankee Plant only). j
d. Incorporation of mandatory notification / hold points for plant / vendor / service group activities into the OA surveillances and mandatory hold points for inspections (Yankee Plant only).
e. Writing, reviewing and approving quality control ,

inspection checklists. (Yankee Plant only.)  ! l

f. Perform OC inspection activities to assure that predetermined requirements have been met. (Yankee Plant only.)

Title:

Section X, inspection l Page: 1 of 3 l Rev. 27 Date: December 20, 1996

YANKEE ATOMIC ELECTRIC COMPANY

2. The Plant shall be responsible fo'r:
a. Writing and approving inspection instructions and check lists.  ;
b. Assuring that activities requiring quality assuran:c meet predetermined requirements.
c. Providing qualified personnel and necessary equipment for inspections to assure quality work.
d. Perform inspection activities to assure that I predetermined requirements have been met.
e. Hold points incorporation where applicable. I C. IMPLEMENTATION
1. Satisfaction of this criterion shall be assured through the implementation of the Nuclear Services Division and/or plant actions listed below:

I

a. Independence of personnel performing the inspection I from the personnel performing the activity being inspected.
b. Use of instructions or check lists which incorporate the details listed in Section XVII Item C.1.a.
c. Use of necessary drawings and specifications when performing inspection operations.
d. Inspection of repairs and replacements in accordance with the approved design and inspection requirements or acceptable alternatives.

Title:

Section X. Inspection Page: 2 of 3 Rev.. 27 Date: December 20. 1996

I l YANKEE ATOMIC ELECTRIC COMPANY

e. Surveillance of processing methods, equipment, and personnel when direct inspection is not possible.
f. Qualification of inspectors in accordance with applicable codes, standards, and company training programs; and maintenance of qualifications and certifications. l
g. Review of maintenance documents by qualified personnel knowledgeable in quality assurance to determine the need for inspection, identification of j inspection personnel, and documenting inspection j results.

l l l l i

Title:

Section X. Inspection Page: 3 of 3 Rev.- 27 Date: December 20, 1996

YANKEE ATOMIC ELECTRIC COMPANY XI. TEST CONTROL A. SCOPE This section of the Operational Quality Assurance Program establishes the measures for a test program to demonstrate that , structures, systems, and components will perform satisfactorily in service. B. RESPONSIBILITIES

1. The Nuclear Services Division Quality Assurance Department shall be responsible for:
a. Surveillance of vendor test program activities.
b. Surveillance of the documentation generated during the test program.
2. The Nuclear Services Division Engineering / Project i Departments / Plants shall be responsible for: )
a. Determination of when testing is required following plant changes, l I
b. Establishment of specificatio1s, requirements, and acceptance criteria for testing following plant changes.
c. Developmant of test documents performance of tests, and documentation, evaluation and approval of test results.
d. Provision of qualified personnel and calibrated equipment for testing.

Title:

Section XI, Test Control Page: 1 of 3 Rev.- 27 Date: December 20, 1996  ! l l

l , YANKEE ATOMIC ELECTRIC COMPANY

3. The Nuclear Safety Audit and Review Committee shall be responsible for reviewing proposed tests or experiments l which involve an unreviewed safety question as defined in 10CFR50.59.
4. . The Plant Operations Review Committee shall be responsible for the review of all test documents and test results for special tests, l

C. IMPLEMENTATION

1. Satisfaction of this criterion shall be assured through the implementation of the Nuclear Services Division and/or plant actions listed below:

i

a. Assurance that changes, repairs, and replacements are tested in accordance with the approved design and testing requirements or acceptable alternatives. l 1
b. Review of written test documents for incorporation or reference of the following:
1. Requirements and acceptance limits contained in I applicable design and procurement documents.
2. Instructions for performing the test.
3. Test prerequisites, such as:

a) Calibrated instrumentation; b) Adequate and appropriate equipment: c) Trained, qualified, and licensed / certified personnel; d) Completeness of item to be tested:

Title:

Section XI. Test Control Page: 2 of 3 Rev.: 27 Date: December 20, 1996

i l 1 ! YANKEE ATOMIC ELECTRIC COMPANY e) Suitable and controlled environmental conditions; and 1 f) Provisions for data collection and storage.

                                                                                )
4. Mandatory inspection hold points for witness by owner, contractor or inspector, when applicable.  !
5. Acceptance and rejection criteria. )
6. Method of documenting test data and results.
                                                                                )
c. Procedures shall provide for specification of test equipment with suitable accuracy. The criteria for determining the accuracy requirements of test i equipment shall be provided when identification of )

specific equipment is not practical. 1 l l t t l l l

Title:

Section XI. Test Control Page: 3 of 3 Rev.: 27

Date
December 20, 1996
                                                                                                  .     .     .. m.. . _ . __

I . l YANKEE ATOMIC ELECTRIC COMPANY

Xil. CONTROL OF MEAStl RING AND TEST EQUIPMENT -

p 1

A. SCOPE l l This section of the Operational Quality Assurance Program
establishes the measures for the control, calibration and j periodic adjustments of tools, gages, instruments, and other

{ measuring and test devices used to verify conformance to j ' established requirements. i B. RESPONSIBILITIES 1 l, 1

1. Each Plant Department shall be responsible for: l l
a. Development of the implementing documents for control of measuring and test equipment including identification and calibration for equipment under their control .
b. Provision of calibrated tools, gages and instruments necessary to perform required measurements and tests.
c. Maintenance of calibration records,
d. Preparation and review of specifications for j measuring and test equipment, such that all j applicable requirements are satisfied.

C. IMPLEMENTATION

                                                                                                                                 ]
1. Satisfaction of this criterion shall be assured through the implementation of the Nuclear Services Division and/or plant actions listed below:

1

a. Identification.and traceability of measuring and test ,

equipment to the calibration test data.

Title:

Section XII Control of Measuring and Test Equipment . l Page: 1 of 2 Rev.- 27 Date: December 20, 1996

l YANKEE ATOMIC ELECTRIC COMPANY l

b. Labeling or tagging of measuring and test equipment to indicate due date for calibration. .

l

c. Calibration of measuring and test equipment at l specified intervals based on required accuracy, purpose, degree of usage, stability characteristics, and other conditions affecting the measurement. i I
d. Documentation of measures taken to determine the validity of previous inspections performed when j measuring and test equipment is found to be out of I calibration.
e. Use of calibration standards having an uncertainty )

(error) requirement of no more than 1/4 of the tolerance of the equipment being calibrated. Calibration standards limited by the

                         " state-of-the-art" may have a greater acceptable uncertainty.
f. Documentation and maintenance of the status of all l items under the calibration system. I l

l

g. Traceability of reference and transfer standards to nationally recognized standards; or, documentation of the basis for calibration where national standards are nonexistent.

l l

Title:

Section XII, Control of Measuring and Test Equipment Page: 2 of 2 Rev.: 27 Date: December 20, 1996

                                              - - _ _ . _ .        _.._. . . _ . _. _ _ _ . . . . . . _ _                   _ ..   - . . _ ._m_.

YANKEE ATOMIC ELECTRIC COMPANY l l XIII. HANDLING. STORAGE AND SHIPPING A. SCOPE l l L This'section of the_0perational Quality Assurance Program establishes measures to control the handling, storage, shipping, cleaning and preservation of material and equipment'to prevent 1 damage or deterioration. i B. RESPONSIBILITIES l

1. The Plant shall be responsible for:

[ a. Development of the implementing documents for handling, storage and shipping of materials and

equipment.

l

b. Provisions of suitable facilities and equipment for handling, storage, and shipping of materials.

c '. Inspection and test of special handling tools and equipmen". C. IMPLEMENTATION

1. Satisfaction of this criterion shall be assured through the implementation of the Nuclear Services Division and/or j Plant actions listed below:
a. Specification and accomplishment of special handling,

, preservation, storage, cleaning, packaging, and ! shipping requirements by qualified individuals in accordance with predetermined work and inspection

instructions.
b. Preparation of instructions in accordance with design  !
l. and specification requirements which control the
-                                                                                                                                                i

Title:

Section XIll, Handling, Storage, and Shipping { Page: 1 of 2 l Rev.: 27 l- Date: December 20, 1996 1 t'

+

YANKEE ATOMIC ELECTRIC COMPANY cleaning, handling, storage, packaging, shipping and preservation of safety classified materials, components and systems to preclude damage, loss or deterioration by environmental conditions such as temperature or humidity.

Title:

Section XIII, Handling, Storage, and Shipping Page: 2 of 2 l Rev.: 27 l Date: December 20, 1996 l

I l i  : YANKEE ATOMIC ELECTRIC COMPANY i XIV. INSPECTION, TEST AND OPERATING STATUS I A. 1G,QPE This section of the Operational Quality Assurance Program establishes the measures for indicating the status of items i undergoing inspections and tests (via tags, labels, logs, data sheets, etc.), to prevent the unintentional bypass of required [ tests. in addition, this section establishes measures for indicating the operating status of components and systems to prevent their inadvertent operation. . i B. RESPONSIBillTIES  !

1. The Plant shall be responsible for:  !

a, Ensuring indication of the status of operating equipmen.t or systems to be removed from service for maintenance, test, inspection, repair or change.

                            'b. Designation of personnel who are responsible for directing the status change of equipment and systems.

C. IMPLEMENTATION

1. Satisfaction of this criterion shall be assured through the implementation of the Nuclear Services Division and/or plant actions listed below:  !

l

a. Notification of affected organizations for changes in l

the inspection, test and operating status of l structures, systems, ind components.

b. Procedural control of the bypassing of required inspections, tests and other critical operations with the concurrence of the Quality Assurance Department.

Title:

Section XIV, inspection, Test, and Operating Status Page: 1 of 2 Rev.: 27 Date: December 20, 1996 l

i YANKEE ATOMIC ELECTRIC COMPANY l

c. Procedural control of the application and removal of )

inspection and status indicators such as tags, l markings, labels and stamps. l l i l l l I l l l

                                                                            )

l l

Title:

Section XIV, Inspection Test, and Operating Status Page: 2 of 2 Rev.: 27 Date: December 20, 1996

YANKEE ATOMIC ELECTRIC COMPANY XV. NONCONFORMING MATERIALS. PARTS AND COMPONENTS A. SCOPE This section of the Operational Quality Assurance Program establishes the measures to control materials, parts, components, or any other activities which uo not .snform to requirements, ir, order to prevent their inadvertent use. B. RESPONSIBILITIES l

1. The Nuclear Services Division Quality Assurance Department shall be responsible for:
a. Review of nonconformance reports to determine repetitive nonconforming conditions and to verify resolution of significant ronditions adverse to quality to preclude recurrence (for Yankee Plant l only). l 1
b. Review of Event Reports to verify resolution of significant conditions adverse to quality (Vermort Yankee only). ,
c. Establishment of feedback system between Yankee ]

Atomic Electric Company and vendor representatives in  ! regard to nonconforming material or services. l l

d. Initiation of nonconformance reports (Yankee Plant and Event Reports for Vermont Yankee) when conditions are found which may adversely affect the quality of plant systems, structures, activities, or components.

I

Title:

Section XV, Nonconforming Materials, Parts, and Components Page: 1 of 3 Rev.: 27  : Date: Decemoer 20, 1996 l 1 I

l YANKEE ATOMIC ELECTRIC COMPANY

2. The Nuclear Services Division Engineering and/or Project Departments shall be responsible for:

l l a. Review of nonconforming services or items which cannot be corrected by vendor action.

b. Preparation or approval of implementing documents for repair and/or rework of nonconforming items.
3. The Vice President (s) and their staff shall be responsible for the evaluation of significant plant-initiated nonconforming item, service, or activity dispositions.
4. The Plant shall be responsible for:
a. Writing implementation documents for the identification, documentation, and corrective action for services, material, installation, testing, operation, and/or surveillance nonconformances at the Plant.
b. Establishment of measures to provide for the  ;

documented control of nonconforming materials, parts. ) and componerits. l

                                                                                       \
c. Establishment of feedback system between the plant and vendor representatives for the disposition of I nonconforming services, materials, parts and  !

components. C. IMPLEMENTATION

1. Satisfaction of this criterion shall be assured through the implementation of the Nuclear Services Division and/or plant actions listed below:

Title:

Section XV, Nonconforming Materials, Parts, and Components Page: 2 of 3 l Rev.: 27 Date: December 20, 1996

YANKEE ATOMIC ELECTRIC COMPANY

a. Identification, disposition, inspection and segregation of nonconforming items or activities,
b. Identification of those individuals or groups delegated the responsibility and authority for the disposition and written approval of nonconforming items or activities.
c. Inspection and test of reworked or repaired items which require reinspection and retest to original methods or methods equivalent thereto.
d. Inclusion of nonconformance reports dispositioned
                         " accept as is" or " repair" as part of the inspection records furnished to the plant.
e. Periodic analysis of nonconformance reports to show quality trends with the results reported to management for review and assessment.

i

2. The identification, description, disposition, inspection l and signature approval of the disposition for nonconformance shall be documented in a nonconformance i report.

L l 1

Title:

Section XV, Nonconforming Materials, Parts, and Components Page: 3 of 3 Rev.: 27 Date: December 20, 1996 i

YANKEE ATOMIC ELECTRIC COMPANY XVI. CORRECTIVE ACTION A. SCOPE This section of the Operational Quality Assurance Program l establishes measures to assure that conditions adverse to i quality, such as failures, malfunctions, deficiencies, I deviations, defective material and equipment are promptly I identified and corrected. B. RESPONSIBillTIES

1. The Nuclear Services Division Quality Assurance Department shall be responsible for review and/or audit of recommendations to prevent recurrence of a significant condition adverse to quality.
2. The Vice President (s) and their staff shall be responsible for:
a. Review of significant adverse conditions reported by the Plant including corrective actions taken,
b. Coordination of comments between the Nuclear Services Division Projects Departments and the Plant (for l Yankee Plant only).

l

3. The Plant shall be responsible for: I
a. Identification of causes of conditions adverse to quality.
b. Implementation of the corrective action.
c. Documentation of corrective action taken.

Title:

Section XVI, Corrective Action Page: 1 of 3 Rev.: 27 Date: December 20, 1996

YANKEE ATOMIC ELECTRIC COMPANY

d. Coordination of comments between the Nuclear Services Division Projects Departments and the Plant (for
   .                       Vermont Yankee only).

4 The Nuclear Services Division Engineering and/or Project Departments shall be responsible for: 1

a. Review of conditions adverse to quality which involve design deficiencies to determine the cause of the condition,
b. Recommendations of corrective action to preclude repetition of design deficiencies.
5. The Plant Operations Review Committee shall be responsible for:
a. Review of significant conditions adverse to quality and recommending corrective action.

i

b. Recommendations involving repetition of significant j operating deficiencies.

C. IMPLEMENTATION

1. Satisfaction of this criterion shall be assured through the implementation of the Nuclear Services Division and/or plant actions listed below:
a. Initiation of corrective action following the determination of a condition adverse to quality to preclude recurrence.

l ! b. Follow-up reviews to verify proper implementation of I corrective actions and to close out the corrective action documentation.

Title:

Section XVI, Corrective Action Page: 2 of 3 Rev.- 27 Date: December 20, 1996 l

YANKEE ATOMIC ELECTRIC COMPANY

c. Reporting of significant conditions adverse to quality, the cause of the conditions, and the correction action implemented to the cognizant levels of management for review and assessment, both "off-site" and "on-site".

4 4 i i J 1 l a 4 l T e

Title:

Section XVI Corrective Action 3 Page: 3 of 3 Rev.: 27

,   Date:  December 20, 1996

YANKEE ATOMIC ELECTRIC COMPANY i XVII. 00ALITY ASSURANCE RECORDS A. SCOPE l

1. This section of the Operational Quality Assurance Program establishes the measures for maintenance of records which provide documentary evidence of the quality of items and the activities affecting quality. Requirements shall be established for identification, transmittal, retrievability and retention of qualit:, assurance records including duration, location, protection and assigned responsibility. i 1
2. The quality assurance records shall include, but not be limited to, plant history; operating logs; principal maintenance: design change activities: reportable occurrences; nonconformance reports; results of reviews, i inspections, tests, audits and material analyses; monitoring of work performance: qualification of personnel, documents and equipment: drawings; specifications; procurement documents; calibration documents and reports; and corrective action reports.

B. RESPONSIBILITIES

1. The Nuclear Services Division Quality Assurance Department shall be responsible for:

I

a. Maintenance of qualification / certification records ;

for Quality Assurance Department personnel.  ;

b. Maintenance of audit, surveillance and inspection records of quality assurance activities generated by the Quality Assurance Department personnel or their designates.

Title:

Section XVII, Quality Assurance Records Page: 1 of 3 Rev.: 27 Date: December 20, 1996

l l l YANKEE ATOMIC ELECTRIC COMPANY i

2. The Plant shall be responsible for:
a. Writing implementation documents for the >

establishment and maintenance of Plant Operational Quality Assurance records.

b. Desianating individuals and establishing requirements for the control of plant design, procurement, and operational records involving quality assurance.
c. Provision of facilities to prevent deterioration or loss of documentation.
d. Provision of a system for the review, approval and retention of plant prepared documents such as reportable occurrences, technical reports, required records and the meeting minutes of official committees.
3. The Nuclear Services Division Engineering and/or Project Departments shall be responsible for establishing a system of review, approval and retention of documents relating to l quality assurance for the operation of the departments.

l

4. The Director of Quality Assurance shall be responsible for l

control and distribution of the Operational Quality l Assurance Program and revisions thereto. 1 C. IMPLEMENTATION l l

1. Satisfaction of this criterion shall be assured through the j implementation of the Nuclear Services Division and/or plant actions listed below:
a. Specifying the details required for inspections and test records including the following as applicable:

Title:

Section XV11. Quality Assurance Records Page: 2 of 3 Rev.: 27 Date: December 20, 1996 i

l l l 1 YANKEE ATOMIC ELECTRIC COMPANY l

1) Description of the type of observation.
2) Evidence of completion and verification of )

manufacturing, inspection, or test operations. l

3) The date anr results of the inspection or test.
4) Information related to conditions tdverse to quality.
5) Inspector or data recorder identification.
6) Evidence as to the acceptability of the results.
7) Acceptance and rejection criteria.
8) Identification of required procedures, drawings, and specifications and revisions.
9) Specification of the necessary measuring and test equipment includ.ing accuracy requirements.
10) Spent fuel storage records.  ;

i

b. Providing for record administration, receipt,  !

storage, preservation, safekeeping, retrieval and l final disposition,

c. Construction, location and security of record storage facilities to prevent destruction of the records by fire, flooding, theft, and deterioration by environmental conditions such as temperature or humidity. Duplicate records shall be stored in a separate remote location when the type of document is l not included in the record storage facility.

Title:

Section XVII, Quality Assurance Records Page: 3 of 3 2 Rev.: 27 Date: December 20, 1996 l l l

YANKEE ATOMIC ELECTRIC COMPANY XVill. AUDITS A. SCOPE This section of the Operational Quality Assurance Program establishes the measures for a comprehensive system of planned I and documented audits and in-plant surveillances to verify compliance with all aspects of the Program and to assess the effectiveness of the Program. B. RESPONSIBILITIES

1. The Nuclear Services Division Quality Assurance Department shall be responsible fo,r: l l
a. Providing objective evidence for audits /surveillances ;

of activities encompassed by the 18 criteria of l l 10CFR50 Appendix B, and ANSI N18.7. l

b. Training of audit and surveillance personnel, i
c. Scheduling, coordinating, and implementing the formal In-Plant Audit / Surveillance Programs performed on i I

activities covered in Sections Ill through XVII of this document.

d. Preparing information regarding the In-Plant Audit Program for review by the Nuclear Safety Audit and

, Review Committee. 1

e. Performing audits of vendors.
f. Following up of discrepancies discovered during audits / surveillance.

Title:

Section XVill. Audits Page: 1 of 4 Rev.: 27 Date: December 20, 1996

YANKEE ATOMIC ELECTRIC COMPANY l

g. Making recommendations to preclude possible audit / surveillance discrepancy repetition (for the !

Yankee Plant only). j i

h. Performing periodic audits of all YNSD Departments >

having responsibilities under the Quality Assurance Program.

2. The Vice President (s) and Manager of Operations and their staff shall be responsible for:
a. Evaluate disposition of In-Plant Audits and prepares concurrence directives to the plant.
3. The Plant shall be responsible for:
a. Documentation of the plant position concerning any outstanding item resulting from an audit requiring a response (for the Yankee Plant only).
b. Implementation of action to be taken as directed by the Vice President and Manager of Operations.
c. Disposition of any outstanding items resulting from an audit (for Vermont Yankee only).
d. Implementation of any corrective actions resultant from audit identified Event Re7 orts (for Vermont Yankee only).

4 The Nuclear Safety Audit and Review Committee shall be responsible for:

a. Evaluation of the Operational Quality Assurance Program to determine its ove 11 effectiveness.

Title:

Section XVIII. Audits Page: 2 of 4 Rev.: 2, , Date: December 20. 1996 l l

M YANKEE ATOMIC ELECTRIC COMPANY t

b. Reporting results of Program reviews and recommendations resulting therefrom to the cognizant  !

corporate officer.

5. The Nuclear Services Division Departments shall be responsible for:
a. Documentation of the department position concerning any outstanding item resulting from an audit.
b. Implementation of action to be taken to correct deficiencies revealed by an audit.

C. IMPLEMENTATION

1. Satisfaction of this criterion shall be assured through the implementation of plant and/or Nuclear Services Division documents.
2. The implementing documents shall provide for the following: ,

I

a. Documentation of audit / surveillance results and review with management having responsibility in the area.
b. Necessary action to be taken by responsible management to correct deficiencies revealed by the audit / surveillance. l
c. Re-audit of deficient areas until corrections have been accomplished to preclude recurrence of the I

deficiencies.

d. Inclusion of an objective evaluation of quality-related practices, procedures, instructions and the effectiveness of implementation in the audit.

Title:

Section XVIII. Audits Page: 3 of 4 Rev.- 27 Date: December 20, 1996

YANKEE ATOMIC ELECTRIC COMPANY

e. Inclusion of an objective evaluation of work areas, activities, processes and items and the review of documentation in the audit.
f. Performance of audits in the below listed areas where the requirements of Appendix B to 10CFR Part 50 and ANSI Nt8.7 are being implemented:
1) Operation, maintenance and repairs.
2) The preparation, review, approval, and control of designs, specifications, procurement documents, instructions, procedures, and drawings.
3) Receiving and plant inspections.
4) Indoctrination and training programs.
5) Implementation of operating and test I procedures.

l

6) Calibration of measuring and test equipment.
g. Scheduling of audits regularly on the basis of the

, status and safety importance of the activities being l performed. l l l l l r

Title:

Section XV111. Audits Page: 4 of 4 Rev.: 27 Date: December 20, 1996

YANKEE ATOMIC ELECTRIC COMPANY APPENDIX A Oualification Reauirements for Management of Quality Assurance Management of Quality Assurance must meet the below listed qualification requirements: A. EDUCATION: Bachelor's degree in Science or Engineering, or the equivalent in practical experience. B. EXPERIENCE:

1. Four years experience in the field of Quality Assurance, or
2. Equivalent number of years of nuclear plant experience in a supervisory position preferably at an operating nuclear power plant or a combination of the two.

a) At least one year of this four years experience shall be j nuclear power plant experience in the implementation of the j Ouality Assurance Program, and i b) Six months of the one year experience shall be obtained within a Quality Assurance organization.

Title:

Appendix A, Qualifications Requirements Page: 1 of 1 Rev.: 27 Date: December 20. 1996

I i YANKEE ATOMIC ELECTRIC COMPANY APPENDIX B 1 Exceptions The sub-categories of this Appendix summarize the exceptions noted in Section 11 of the Yankee Atomic Elect ric Company Operational Quality Assurance Manual. Appendix B Sub-Category Standard / Guide Title

1. ANSI N45.2.3-1973 Housekeeping During the Construction Phase of Nuclear Power Plants
11. ANSI N45.2.9-1974 Requirements for Collection, Storage, and Maintenance of Quality Assurance Records for Nuclear Power Plants 111. ANSI N45.2.10-1973 Quality Assurance Terms and Definitions IV. R.G. 1,64, Rev. 2 Quality Assurance Requirements for the Design of Nuclear Power Plants V. ANSI N45.2.2-1972 Packaging, Shipping, Receiving, Storage and Handling of items for Nuclear Power Plants VI. ANSI N45.2.6-1978 Qualification of Inspection, ,

Examination and Testing Personnel I for the Ccastruction Phase of Nuclear Power Plants l Vll. R.G. 1.26, Rev. 3 Quality Group Classifications and Standards for Water Steam- and  ! Radioactive-Waste Containing Components of Nuclear Power Plants Vill. R.G. 1.29 Rev. 3 Seismic Design Classification

Title:

Appendix B. Exceptions Page: 1 of 26 Rev.: 27 Date: December 20, 1996 I l

YANKEE AT0 HIC ELECTRIC COMPANY APPENDIX B (continued) Appendix B Sub-Category Standard / Guide Title IX. ANSI N18.7-1976 Administrative Controls and Quality Assurance for the Operational Phase of Nuclear Power Plants X. R.G. 1.33, Rev. 2 Quality Assurance Program Requirements (Operations) P 1 i i l l l

Title:

Appendix B Exceptions  ! 2 of 26 Page: Rev.: 27 Date: December 20, 1996

YANKEE ATOMIC ELECTRIC COMPANY APPENDIX B (continued)

1. ANSI N45.2.3 - 1973, Housekeepino Durina the Construction Phase of Nuclear Power Plants A. EXCEPTION:

Subsection 2.1 - Plannina The Yankee and Vermont Yankee plants take exception to the five-zone requirements specified in the subject. standard. ALTERNATIVE: The Yankee and Vermont Yankee plants shall establish as a minimum a three zone program as follows: Zone III i Zone III criteria. shall be applied to major portions of the reactor coolant. system which are opened for inspection, maintenance or repair.

1. Access control over personnel shall be required.
2. Cleanliness shall be maintained, commensurate with the work being performed, so as to preclude the entry of foreign material to the Reactor Coolant System.
3. A documented cleanliness inspection shall be performed immediately prior to closure, Note: The Zone III requirements may be expanded for certain maintenance repair activities if deemed appropriate by plant

Title:

Appendix B Exceptions .Page: 3 of 26 Rev.- 27 ) Date: December 20, 1996

YANKEE ATOMIC ELECTRIC COMPANY APPENDIX B , (continued) management. In such instances applicable sections of-Zones 1 & 11 shall be specified. Zone IV Zone IV criteria shall be applied to the radiation control areas of the plant. I

1. Standard janitorial and work practices shall be utilized to '

maintain a level of cleanliness commensurate with company policy in the areas of Housekeeping, Plant and Personnel Safety and Fire Protection.

2. Additional housekeeping requirements shall be implemented as required for the control of radioactive contamination.
3. Smoking and eating shall be controlled consistent with good health physics practices and to maintain cleanliness.

Zone V Zone V criteria shall be applied to the remainder of the plant.

1. Standard janitorial and work practices shall be utilized to maintain a level of cleanliness commensurate with company policy in the areas of Housekeeping, Plant and Personnel Safety and Fire Protection.

Title:

Appendix B. Exceptions Page: 4 of 26 Rev.: 27 Date: December 20, 1996 l l I l l l

YANKEE ATOMIC ELECTRIC COMPANY A! ENDIX B (continued) B. EXCEPTION: I Subsection 3.2 - Control of Facilities The Yankee and Vermont Yankee plants take exception to the control

of tools, equipment, materials and supplies used in Zone Ill.

ALTERNATIVE: The Yankee and Vermont Yankee plants shall verify control for Zone III as indicated in Exception A of this sub-category. l l l

Title:

Appendix B. Exceptions Page: 5 of 26 Rev.: 27 Date: December 20, 1996 i i

YANKEE ATOMIC ELECTRIC COMPANY APPENDIX B (continued) II. ANSI N45.2.9 - 1974, Reauirements for Collection. Storace, and , Maintenance of Ouality Assurance Records for Nuclear Power Plants , A. EXCEPTION: 1 Subsection 5.6(3) Facility The Yankee and Vermont Yankee plants take exception to

            " structures, doors, frames, and hardware should be Class A fire        ,

rated with a recommended four hour minimum rating." ALTERNATIVE:

            " Doors, structures, frames, and hardware shall be designed to comply with the requirements of a minimum two (2) hour fire rating, meeting NFPA No. 232 guidelines."

JUSTIFICATION: The two (2) hour rating has been endorsed by the NRC Standard Review Plan NUREG-0800, Revision 2, dated July 1981, 1

Title:

Appendix B. Exceptions  : Page: 6 of 26 ' Rev.: 27 Date: December 20, 1996 l

4 { YANKEE ATOMIC ELECTRIC COMPANY APPENDIX B 4 (continued) Ill. ANSI N45.2.10 - 1973, Quality Assurance Terms and Definitions A. EXCEPTION: Subsection 2 - Terms and Definitions The Yankee and Vermont Yankee plants take exception to the definitions of " Certificate of Conformance" and " Certificate of Compliance". 1 ALTERNATIVE: i J The Yankee and Vermont Yankee plants shall reverse the definitions , of the above terms so our Program will be in compliance with the implied definitions in the ASME B&PV Code and Yankee j specifications. 4 i~

Title:

Appendix B. Exceptions Page: 7 of 26 Rev.: 27 Date: December 20. 1996

1 YANKEE ATOMIC ELECTRIC COMPANY I APPENDIX B (continued) i IV. Regulatory Guide 1.64, Revision 2, " Quality Assurance Reauirements for the Desian of Nuclear Power Plants" A. EXCEPTION: Subsection c.2 The Yankee and Vermont Yankee plants take exception to the regulatory guide position on the exclusion of supervisors l performing design verification. ALTERNATIVE: The Yankee and Vermont Yankee plants will continue the accepted practices for independent design verification in accordance with the provisions of ANSI N45.2.11-1974, Section 6.1. JUSTIFICATION: The exclusion of line supervision to perform design verificatic.. has proven to be an unnecessary burden on the resources within the engineering organizations of the company, and counterproductive during heightened periods of engineering activities. ANSI N45.2.11 contains specific limitations on the situations in which a supervisor is permitted to perform design verification. The standard states, "This verification may be performed by the originator's supervisor provided the supervisor did not specify a singular design approach, or rule out certain design , considerations and did not establish the design inputs used in the i design, or if the supervisor is the only individual in the organization competent to perform the verification." This control was developed through realistic evaluation of the practicable limits that restrictions impose on engineering organizations by the working group that developed ANSI N45.2.11. 1

Title:

Appendix B. Exceptions Page: 8 of 26 Rev.: 27 Date: December 20, 1996

i YANKEE ATOMIC ELECTRIC COMPANY APPENDIX B , (continued) V. ANSI N45.2.2 - 1972, Packaaina. ShiDDina. Receivina. Storace & Handlino of items for Nuclear Power Plants A. EXCEPTION: Subsection 3.7.1 & A3.7.1 - Containers The Yankee and Vermont Yankee plants take exception to the specific requirements for containers. ALTERNATIVE: l Containers shall be of suiteole construction to assure material is l received undamaged. JUSTIFICATION: Containers shipped by closed carrier, stored inside and not i subjected to a wet environment do not require weather resistant fiberboard, therefore, this is an unnecessary expense. Additionally, numerous vendors utilize shipping containers that do not comply with the specific requirements of this section, i.e., flaps overlap. The acceptance criteria for a shipping container ! should be established based on the capability of the container to maintain the component material in a safe condition. Technology ! has advanced beyond the standard. l l

Title:

Appendix B, Exceptions Page: 9 of 26 Rev.: 27

Date: December 20, 1996
  . . . - - . _ - _ . ~ . - . . - _ . - - ~ _ , - . . . . . . . . . _ . - .                               . . . . . ~ . ~ . ~ - - . . - . . - - _ -

p* l YANKEE ATOMIC ELECTRIC COMPANY APPENDIX B L (continued) I B. EXCEPTION:  ! Subsection 3.7.2 - Crates and Skids i The-Yankee and Vermont Yankee plants take exception to the requirement that skids and runners shall be used on boxes with a J i

                                                    . gross weight of 100 pounds or more.                                                           1 l

ALTERNATIVE: Skids or runners shall be used on boxes with a gross weight of. 100 pounds or more if practical. JUSTIFICATION: Storage methods and container design frequenti, are such that ! runners or skids are not feasible. l C. EXCEPTION: l Subsection 5.2.1 ShiDDino Damaae Inspection l The Yankee and Vermont Yankee plants'take exception to the requirement that a preliminary visual inspection or examination be' performed prior to unloading. J ALTERNATIVE: j t . The Yankee and Vermont Yankee plants shall perform those required inspections after unloading. In special instances, preunloading j inspections shall be performed.  ! I i

Title:

Appendix B. Exceptions Page: 10 of 26 [ Rev.: 27 L Date: December 20, 1996 j l 1

            ~-- .                                       .           ,

YANKEE ATOMIC ELECTRIC COMPANY l APPENDIX B (continued) JUSTIFICATION: l Post unloading inspection'is adequate to determine any damage that  ! may have been incurred during shipping and handling. D. EXCEPTION: Subsection 5.2.2 - Item inspection The Yankee and Vermont Yankee plants take exception to the requirement, that "The inspections shall be performed in an area equivalent to the level of storage requirements for the item." ALTERNATIVE: The Yankee and Vermont Yankee plants shall perform receiving inspection in a manner and in an environment which do not endanger the requisite quality of the item: however, receiving area environmental controls may be less stringent than storage ) environmental controls for that item. When inspections are j performed in receiving areas with environmental controls less I stringent than storage area environmental controls, a time limit

                                                                                                                 )

shall be established on a case basis for retention of items in the receiving area. Retention time shall be such that deterioration  ! is prevented and applicable manufacturer recommendations are addressed. I JUSTIFICATION: Receipt inspection activities are for a much shorter duration and therefore should not be subjected to the same stringent requirements as required for storage.

Title:

Appendix B, Exceptions Page: 11 of 26 Rev.: 27 Date: December 20, 1996

i l YANKEE ATOMIC ELECTRIC COMPANY APPENDIX B (continued) E. EXCEPTION: Subsection 5.2.3 - Special Insoection The Yankee and Vermont Yankee plants take exception to attaching special inspection procedures to the item or container. ALTERNATIVE: Special inspection procedures shall be readily available to personnel performing inspections. JUSTIFICATION: Procedures are subject to less abuse and more stringent controls when maintained on file and not attached to the item. Inspection status is maintained by tagging and procedure control. F. EXCEPTION: I 1 Subsection 6.1.2 - Levels of Storace The Yankee and Vermont Yankee planti take exception to two specific requirements associated with fuel storage (classified Level A). I ALTERNATIVE: The Yankee and Vermont Yankee plants shall meet the requirements of Level A storage for new fuel with the exception of special air filtering: and temperature and humidity controls.

Title:

Appendix B Exceptions Page: 12 of 26 Rev.- 27 Date: December 20, 1996

              . _ _ _ - . - . -                   - . . ~ . . _ - . -          - . - _~ - ._ -- -. - ..

L ! I

                                                                                                          \

i ,

                                ~ YANKEE ATOMIC ELECTRIC COMPANY                                         j APPENDIX B                                          )

(continued) l 1 JUSTIFICATION: i The existing storage conditions at the Yankee operating plants are consistent with the protection provided to the fuel while in l storage at the manufacturer (vendor) and/or while in transit to l the plant site and are judged to pr < ide adequate protection to' I the fuel assembly structure which is of highly corrosion resistant  ! materials. We believe that the above listed requirements are intended for application at the manufacturing facility (vendor) . where the. uranium pellets may be exposed to the atmosphere.and not l in its fully encapsulated, and therefore, fully protected form in j a completed fuel assembly. j l G. EXCEPTION: j r ADDendix A-3 Subsection A3.5.1(1) - Caos A Pluas The Yankee and Vermont Yankee plants take exception to the. l requirement that nonmetallic plugs and caps shall be brightly j col ored. ALTERNATIVE: Nonmetallic plugs and caps shall be of a contrasting color. JUSTIFICATION: The purpose of utilizing brightly colored plugs and caps is to assist in assuring obstructions are not inadvertently placed in operating components or systems. By using plugs and caps of a contrasting color this objective can be achieved.

Title:

Appendix B. Exceptions Page: 13 of 26 Rev.: 27 Date: December 20, 1996 j

YANKEE ATOMIC ELECTRIC COMPANY APPENDIX B (continued) H. EXCEPTION: Appendix A-3 Subsection A3.9(1) - Second Group. Markinos The Yankee and Vermont Yankee plants take exception to the requirement that container markings shall appear on a minimum of two sides. ALTERNATIVE: Containers shall be adequately marked to provide identification and retrievability. JUSTIFICATION: l l Containers are tagged to provide identification and. inspection l status. Employment of two tags on small containers adds bulk and confusion and does not provide for better identification or traceability. ) l I. EXCEPTION: Anoendix A-3. Subsection A.3.9(4) - Second Group. Markinq l l The Yankee and Vermont Yankee plants take exception to the requirement that container markings shall be no less than 3/4" high, container permitting. j ALTERNATIVE: 1 I Container markings shall be of a size which permits easy I recognition. I 1

Title:

Appendix B. Exceptions l Page: 14 of 26  : Rev. 27 Date: December 20, 1996

YANKEE ATOMIC ELECTRIC COMPANY APPENDIX B (continued) JUSTIFICATION: Markings were intended to provide identification and instructions. The criteria should be that the markings clearly provide the same. J. EXCEPTION: Appendix A-3 Subsection A.3.9(6) - Second Group. Markina , l The Yankee and Vermont Yankee plants take exception to the information required for container marking. l ALTERNATIVE: I Marking shall be adequate in each case to provide identification, traceability and instructions fcr special handling, as applicable. JUSTIFICATION: The information required is excessive. Cluttering a container with excessive markings only reduces the main objectives, maintaining identification and establishing special controls. l l l I

Title:

Appendix B, Exceptions Page: 15 of 26  ; Rev.: 27 l Date: December 20, 1996 l

?' i i YANKEE ATOMIC ELECTRIC COMPANY

                                                                              ' APPENDIX B l                                                                               (continued)                                                                                ,

VI. ANSI N45.2.6 - l'978, Qualification of InsDection. Examination and [ Testina Personnel for Nuclear Power Plants  ! t A. EXCEPTION: -i The Yankee and Vermont Yankee plants take exception to the application.of the Standard to all Yankee.and Vermont Yankee -l personnel performing inspection, examination and testing. l ALTERNATIVE: l Yankee and Vermont Yankee personnel identified in ANSI N18.1-1971 l who perform inspection, examination and testing will be qualified l to ANSI N18.1-1971.  ! i Yankee and Vermont Yankee' personnel not identified in ANSI N18.1-1,971 who perform inspection, examination and testing will be l qualified to ANSI N45.2.6-1978. l T h r I

Title:

Appendix B, Exceptions Page: 16 of 26 Rev.: 27 Date: December 20, 1996

l l YANKEE ATOMIC ELECTRIC COMPANY APPENDIX B (continued) VII. Regulatory Guide 1.26. Rev. 3. (2/76), Quality Group Classifications and Standards for Water . Steam- and Radioactive-Waste-Containing Components of Nuclear Power Plants A. EXCEPTION: 1 The Yankee and Vermont Yankee plants take exception to the Regulatory Guide in its entirety. l ALTERNATIVES: j I Yankee Yankee shall continue to classify structures, components and systems in accordance with ANSI Standard N18.2, January 1973,

                 " Nuclear Safety Criteria for the Design of Stationary Pressurized Water Reactor Plants", as in the past.

l Vermont Yankee i l Vermont Yankee shall continue to classify structures, components and systems in accordance with ANS-22 Draf t No. 4, Rev.1, 1 May 1973, " Nuclear Safety Criteria for the Design of Stationary Boiling Water Reactor Plants", as in the past. i l

Title:

Appendix B, Exceptions Page: 17 of 26 Rev.: 27 f Date: December 20, 1996 l l

        . _    -_        -                    .           _ ~      .      .   . __

YANKEE ATOMIC ELECTRIC COMPANY APPENDIX B (continued) VIII. Regulatory Guide 1.29, Rev. 3, (9/78), Seismic Desian Classification A. EXCEPTION: The Yankee and Vermont Yankee plants take exception to the , application of Regulatory Guide 1.29 Rev. 3. (9/78). ALTERNATIVES: Yankee Yankee shall apply Regulatory Guide 1.29, Rev. 3 (9/78), to those structures, systems and components as determined by the USNRC System Evaluation Program. Vermont Yankee The seismic design classification of structures, systems, and components at Verr..ont Yankee shall be as defined in the Vermont Yankee FSAR.

Title:

Appendix B Exceptions Page: 18 of 26 Rev.: 27 Date: December 20, 1996

l l 1 YANKEE ATOMIC ELECTRIC COMPANY l APPENDIX B j (continued) IX. ANSI N18 .7-1976, Administrative Controls and Quality Assurance for the . Operational Phase of Nuclear Power Plants A. EXCEPTION (Vermont Yankee Plant only) Subsection 4.5 - Audit Program The Vermont Yankee Operating Plant takes exception to the j requirement that audits of all safety-related functions shall be  ! completed within a period of two (2) years. l l Alternative: i Audits of selected aspects of operational phase activities shall be performed with a frequency commensurate with their safety significance and in such a manner as to assure that an audit of all safety-related functions is completed within a period of no 4 less than three (3) years, based upon the results of an annual j Functional Area Assessment. I The Annual Functional Area Assessment is a documented analysis of l functional areas important to safety. The purpose is to identify strengths and weaknesses (if applicable) to determine the level j and focus of independent oversight activities for the upcoming j year. The basis for the assessment shall include the results of 0A Audits and Surveillance, NRC Inspections, Event Reports,  ! Nonconformance Reports, Corrective Action Reports, and Self-Assessments. Other indicators such as Personnel Changes, change / increase in functional area responsibilities, Industry findings, and INP0 evaluations will also be considered. Each area will be assigned a rating with a comparison to previous years.

Title:

Appendix B. Exceptions Page: 19 of 26 Rev.: 27 Date: December 20, 1996

YANKEE ATOMIC ELECTRIC COMPANY APPENDIX B (continued) This assessment will be reviewed and approved by OA and Plant Management. This document is considered a OA record and will be i available for NRC review. Justification: To utilize quality oversight resources more effectively, senior I management desires the flexibility to direct resources to areas which have perceived weaknesses. The two-year audit cycle has not ensured that the frequericy, scope and associated resources are based on the risk associated with the audit area. Vermont Yankee proposes to adjust the audit schedule based on empirical data and performance history to complete audits of safety-related functions within a period of three years. This modification meets the intent of published regulatory requirements involving activities important to safety. B. EXCEPTION: l l Subsection 5.2.15 - Review, Aporoval and Control of Procedures l Yankee Atomic Electric Company and the Vermont Yankee Operating j Plant take exception to the following paragraph- i l l

              " Plant procedures shall be reviewed by an individual                 ;

knowledgeable in the area affected by the procedure no less frequently than every two years to determine if changes are i necessary or desirable". l l

Title:

Appendix B. Exceptions Page: 20 of 26 Rev.: 27 Date: December 20. 1996 i i

i i

YANKEE ATOMIC ELECTRIC COMPANY 3- .

j: APPENDIX B  !

(continued)
                                                                                                                                                                ?

Alternative:

  • 1 1  :

~ Plant procedures will be periodically reviewed in accordance with  ! i administrative controls. These controls will establish a schedule { j for these periodic reviews. All applicable plant procedures will be reviewed following an unusual incident, unexpected transient,  ; } operator error, or equipment failure (malfunction), and following i a modification to a system. i i Nonroutine procedures such as Emergency Operating Procedures, !~ Emergency Plan Implementing Procedures, or other procedures whose  :' i use may be event driven, will be reviewed every two years. ?  : However. if a nonroutir.e procedure is fully exercised and there is a' detailed scrutiny of the entire procedure as part of a  ! . documented training pragram, this may serve as the biennial review l of the procedure used, i {~ ' i  : At least every two years, the Quality Assurance (or other , j independent) organization shall audit a representative sample of - l routine plant procedures that are used more frequently than every  ? i two years. The audit is to ensure the acceptability of the i procedures and verify that the procedure review and revision ] program is being implemented effectively. . The root cause of ] significant deficiencies is to be determined and corrected. { l' j. Routine plant procedures that have not been used for two years l ]- will be reviewed before use to determine if changes are necessary I 4 or desirable. a 3 i i-' j

Title:

Appe-M 7 a Exceptions ] Page: 21 t.* Rev.: 27 j Date: December 20, 1996 i I i - _ ~

YANKEE ATOMIC ELECTRIC COMPANY  ! APPENDIX B (continued) Justification: The current requirement to review each safety-related procedure on a biennial cycle results in the expenditure of significant technical and administrative resources. Programmatic controls and practices are in place to provide adequate reviews, including the following:  ;

          . The plant modification processes require that procedures affected by the modification be identified during the design change preparation, and revised prior to closure of the modification package.

2

          . The Operating Experience Program involves the review of USNRC, INP0, and vendor supplied information for applicability and determination of further action. This review includes an evaluation of applicable documents such as procedures and the initiation of required changes.
          . Administrative controls currently exist requiring that if a procedure cannot be performed as written, a procedure change    ,

must be completed prior to continuation of the procedure. l

          . Temporary changes are occasionally generated during, or prior to procedure use. Current administrative controls require that those changes that are permanent shall be           !

incorporated into the procedure via the procedure revision l process. l

          . As part of the audit and surveillance pro'.ess. procedures are evaluated as to adequacy, ease of use, proper technical      j content, and compliance with applicable plans and programs.

Title:

Appendix B, Exceptions Page: 22 of 26 Rev.: 27 Date: December 20, 1996 l I

YANKEE ATOMIC ELECTRIC. COMPANY APPENDIX B (continued)

            ..      The corrective action process (Event Reports) requires that a root cause ' analysis be performed for events, violations -

and nonconforming conditions. Where identified as contributing factors, procedure changes are initiated.

             -      Changes to Technical Specifications and the FSAR are reviewed for potential impact on, and initiation of-changes to plant procedures.

Plant procedures are approved by appropriate personnel prior-to initial use. Current administrative controls also require pre-job briefings for procedures identified as infrequent. This modification meets the intent of published regulatory requirements involving activities impor tant to safety. C. EXCEPTION- (Vermont Yankee Plant only)

            . Subsection 5.3.9 The< Vermont Yankee Operating Plant takes exception to the requirements that detail Emergency Procedures be in accordance with Paragraph 5.3 9.

Alternative: Vermont Yankee Emergency Operating Procedures are written in accordance with the Symptom / Function-Based Guidelines developed by-the BWR Owners Group and accepted by the NRC. These Symptom / Function Based Procedures, mandated by the NRC in NUREG-0737. have format and content different from the Event-Oriented Emergency Procedures described in ANSI N18.7-1976.

Title:

Appendix B. Exceptions Page: 23 of 26 Rev.: 27 Date: December 20, 1996

YANKEE ATOMIC ELECTRIC COMPANY APPENDIX B (continued) Justification: NUREG 0737 supersedes ANSI N18.7-1976 in the area of Emergency Operating Procedures. Changes to procedure format are required in order to develop Symptom / Function-Based Procedures.  ; l l l 1

Title:

Appendix B. Exceptions Page: 24 of 26 Rev.: 27 i Date: December 20, 1996

_m - - _ _ _m L YANKEE ATOMIC ELECTRIC COMPANY APPENDlX B (continued) X. Reaulatory Guide 1.33. Revision 2. Quality Assurance Reauirements , (Operational) A. EXCEPTION: (Vermont Yankee Plant only) Subsection 4.5 - Audit Proaram The Vermont Yankee Operating Plant takes exception to the following: 6

                 .       Section 4.5 states that "all audits of safety related functions are completed within a two (2) year period".
                 .       Paragraph 4.a.   "The results of actions taken to correct    ,

deficiencies that affect nuclear safety and occur in ' facility equipment, structures, systems, or method of operations - shall be audited at least once per 6 months".

                  .      Paragraph 4.b.    "The conformance of facility operation to provisions contained within the technical specifications and applicable license conditions - shall be audited at least once per 12 months."
                   . Paragraph 4.c.   "The performance, training, and qualifications of the facility staff - shall be audited at least once per 12 months."

Alternative: Audits of selected aspects of the functional areas listed above, shall be performed within a frequency commensurate with their safety significance and will be completed within a period of no

Title:

Appendix B, Exceptions Page: 25 of 26 Rev.: 27 Date: December 20, 1996

YANKEE ATOMIC ELECTRIC COMPANY APPENDIX B (continued) less than three (3) years, based upon the results of an annual functional area assessment. Justification: To utilize quality oversight resources more effectively, senior management desires the flexibility to direct resources to areas which have perceived weaknesses. The two-year audit cycle has not ensured that the frequency, scope and associated resources are based on the risk associated with the audit area. Vermont Yankee proposes to adjust the audit schedule based on empirical data and performance history to complete audits of safety-related functions within a period of three years. This modification meets the intent of published regulatory requirements involving activities important to safety. l 1 l 1

                                                                                )

1 l I l l l

Title:

Appendix B, Exceptions ) Page: 26 of 26 i Rev.: 27 Date: December 20. 1996 I

l I YANKEE ATOMIC ELECTRIC COMPANY l APPENDIX C

                                                                                 )

Vermont Yankee Classification of Structures. Components, and systems i l lI NOTE- A comprehensive listing is in the Vermont Yankee Safety Classification Manual. ) 1 l l l 1 1 l i I d

Title:

Appendix C, Vermont Yankee Classification Page: 1 of 1 Rev.: 27 Date: December 20, 1996

YANKEE ATOMIC ELECTRIC COMPANY APPENDIX D Yankee Classification of Structures. Components, and Systems NOTE: A comprehensive listing is in the Yankee Safety Classification of Systems Manual.

Title:

Appendix D Yankee Classification Page: 1 of 1 , Rev.: 27 l' Date: December 20, 1995

YANKEE ATOMIC ELECTRIC COMPANY OPERATIONAL QUALITY ASSURANCE PROGRAM Y00AP-I-A tif PREPARED BY: Wak mak h ala4aAll

                 ' Walter K. Peterson-Manager, Quality Assessment Services Department APPROVED BY:                                       s

(. Russell Clark Executive Director, Quality Assurance h&S \ Donald A. Reid l Vice President, Operations Vermont Yankee

                       ~

b

  • Stephen P. Schulti j Vice President, Engineering Sciences l Yankee l
               ' Jay K. Thayer Vice President Proje[ cts      [/ '[

Yankee I l

Title:

Y00AP-1-A Page: I Pev.: 27 Date: December 20, 1996

I t YANKEE ATOMIC ELECTRIC COMPANY l Y00AP-1-A TABLE OF CONTENTS /INDEX Section No. Title Revision AMENDMENT / REVISION 27 POLICY STATEMENT 27 I ORGANIZATION 27 II OVALITY ASSURANCE PROGRAM 27 I Ill DESIGN CONTROL 27 l l l IV PROCUREMENT DOCUMENT CONTROL 27 l 1 l l V INSTRUCTIONS, PROCEDURES, AND 27 DRAWINGS I l l VI DOCUMENT CONTROL 27 VII CONTROL OF PURCHASED MATERIAL, 27 EQUIPMENT, AND SERVICES VIII IDENTIFICATION AND CONTROL OF 27 , MATERIAL, PARTS, AND COMPONENTS 1 IX CONTROL 0F SPECIAL PROCESSES 27 X INSPECTION 27 XI TEST CONTROL 27 l l XII CONTROL OF MEASURING AND TEST 27 EQUIPMENT XIll HANDLING, STORAGE, AND SHIPPING 27 XIV INSPECTION, TEST, AND OPERATING 27 STATUS l l

Title:

Table of Contents l Page: 11 Rev. 27 Date: December 20, 1996 i

_ _ .. _._.m._ _ _ . . . _ _ _ _ _ _ . _ . . . . . _ . . _ . _ _ _ . _ _ . . _ _ _ _ . . _ . _ . _ _ . - _ . _ i 1  ! ! I j- l l

YANKEE ATOMIC ELECTRIC COMPANY l i YOOAP-I-A l i-TABLE OF CONTENTS /INDEX ,

j (Continued)  !' i i l Section No. Title Revision  ! . XV- NONCONFORMING MATERIALS, PARTS, 27 9 AND COMPONENTS XVI CORRECTIVE ACTION 27 f I XVII 00ALITY ASSURANCE RECORDS 27 i j XVill. AUDITS 27 i l APPENDIX A QUALIFICATION REQUIREMENTS 27 , l . APPENDIX B EXCEPTIONS 27 i

APPENDIX C VY CLASSIFICATION 27 i F

! APPENDIX 0 YR CLASSIFICATION 27 i ^ J l

                                                                                                                          -1 i'                                                                                                                            i e

I i = l 4 ,

              .Ti tl e :  Table of Contents

-1 Page: Ill  !

Rev,: 27 Date: December 20, 1996

I l l i YANKEE ATOMIC ELECTRIC COMPANY l Y00AP-1-A AMEN 0 MENT / REVISION SHEET Revision No. Date Reason 0 (Amendment 1) 12/10/76 To address questions submitted by letter from NRC (K. R. Goller) to L. H. Heider (11/1/76). 0 (Amendment 2) 1/13/77 To address questions submitted by letter from i NRC (K. R. Goller) to L. H. Heider (12/28/76). I 1 9/15/77 To address organizational, programmatic, and editorial changes. 2 11/01/77 To address organizational changes. 3 11/25/77 To address organizational changes at Vermont Yankee. 4 1/13/78 To address combined inspection numbers 50-29/77-20; 50-271/77-15: and 50-309/77-16 unresolved item 4.a. 5 1/30/78 To address change in exception for ANSI N45.2.3-1973. 6 10/19/78 To address exceptions to ANSI N45.2.2-1972. 6 (Amendment 1) 3/29/79 To resolve items submitted by letter from NRC (W. P. Haass) to L. H. Heider (3/6/79). 7 9/11/79 To address changes to Yankee Rowe (Appendix D) and Vermont Yankee (Appendix E) Safety Classifications. 8 4/04/80 To address organizational changes. 9 3/09/81 To address organizational changes. 10 4/03/81 To add " Packaging of . Radioactive Materials" and

                                     " Fire Protection of Safety-Related Areas" to "Other Items Requiring Quality Assurance"

Title:

Amendment / Revision Sheet Page: IV Rev.- 27 Date: December 20, 1996

_ _ . . _ _ _ _ _ . . _ _ _ _ . m -_...- _. _ . . _ _ _ _ . _ _ . . . _ _ _ . _ _ - _ _ . . - - ! ( ( l' YANKEE ATOMIC ELECTRIC COMPANY { Y00AP-I-A l AMENDMENT / REVISION SHEET i (Continued) i Revision No. Date Reason ]- 11 3/01/82 To resolve items submitted by. letter from NRC (W. P. Haass) to W. P. Johnson (6/10/81).  ; 12 3/11/83 To.a'ddress organizational changes. I i 13 To address organizational and programmatic changes. 1 - [ 14 10/12/83 To address organizational changes. I i' 15 2/15/84 To address programmatic changes. P 16 10/31/85 To address organizational and programmatic changes.  ; 17 12/05/86 To address organizational and programmatic changes.

f i

17A 8/14/87 To clarify surveillance activities.and change VP-M00 responsibilities for the level of i deficiencies requiring evaluation, j 18 4/29/88 To address organizational and programmatic  ! changes. 19 10/02/89 To address organizational and responsibility changes and deletion of Appendix C. 19A 6/01/90 To update organizational chart (for VY) to be _ j consistent with Proposed Change No. 157 and to  ; address organizational changes at Vermont ~ j Yankee. ' 20 12/21/90 To update organizational changes at Yankee and  ! change OAD's responsibility from reviewing ,

                                                                                                                                  'l
       -Title:      Amendment / Revision Sheet Page:     V Rev.:     27                                                                 ,

Date: December 20, 1996

   .  -     - -.__ _ _._ . . . _ _ _ . - . _ . _ . . . _ _ _ _ _ _ - . _ _ _ _ _ . _ ~ _ _ _

1 t- . l  ! YANKEE ATOMIC ELECTRIC COMPANY  : i Y00AP-I-A- - i AMEN 0 MENT / REVISION SHEET .l (Continued). l i Revision No. Date Reason

l. design documents to auditing those documents j for inclusion of quality requirements.

L 21 11/15/91 .To update organizational changes at Yankee and l Vermont' Yankee and change 0AD responsibility  ; i from revising recommendations to prevent recurrences of significant condition adverse to  ; l quality to providing the option to review i and/or audit recommendations. , t 22 4/15/92 To delete Appendix 0 l' isting and reference l Yankee Safety Classification 'f o Systems Manual. , 23 9/30/92 To address organizational and responsibility i changes.  ! 24 12/15/93 To address organizational changes, and .  : 00A/NSARC reporting clarifications for Vermont Yankee. I 25 12/15/94 To address organizational changes made at the i , Yankee Nuclear Power Station addressing the decommissioning organization. Clarifications  : in the revised corrective action process at Vermont Yankee, and to address an exception to Regulatory Guide 1.64, and to clarify responsibilities between the Yankee and Vermont Yankee Plants. i 26 12/21/95 To address organizational changes at the Yankee { Nuclear Power Station and the Vermont Yankee

                                                                                                                                        ~

Nuclear Power Station. To address exceptions , to ANSI 18,7 and Regulatory Guide 1.33. 27- 12/20/96 To address organizational changes. l

Title:

Amendment / Revision Sheet Page: VI Rev.: 27 Date: December 20. 1996 l l L. .- . . _ _ - . _ .-.

l l

                                                                                    \

YANKEE ATOMIC ELECTRIC COMPANY i i l POLICY STATEMENT OPERATIONAL QUAllTY ASSURANCE PROGRAM

                                                                                    ]
                                                                                  .i It is the policy of those organizations operating under this Quality-Assurance Program to strive for excellence in all aspects of nuclear power plant operation. This goal can only be attained if each individual recognizes that Quality is everyone's responsibility.        Each worker, supervisor, and manager has a role to play in achieving the goal of "doing it right the first        ;

time." Only if we recognize that Quality is of paramount importance can we continue to provide for the safe and reliable generation of power. The function of the Ouality Verification Program is to assess the-adequacy, content, and appropriateness of the work being performed and to facilitate continuous enhancements. This function supports the line  ! organizations and provides management with needed feedback. However, supervision and management should not rely solely upon the efforts of the Quality Assurance Groups for quality verification; they must also take an active role in self-assessment of those activities under their control to j identify quality problems. As previously noted, the ultimate responsibility l for quality lies with each individual. Under the program, the Yankee Atomic Electric Company President is the final management authority responsible for assuring that this policy statement and the Quality Assurance Program are implemented within the Yankee Atomic Electric Cor.pany. The Vermont Yankee Vice President, Operations, is the final management authority responsible for assuring that the Quality Assurance Program is implemented within the Vermont Yankee Nuclear Power Corporation. l The President or a Vice President is responsible for implementing the program for those departments under his (or her) direction. The Director of Quality Assurance is responsible for establishment, control, and distribution of the Quality Assurance Program and revisions thereto, and shall establish policies under which the Quality Assurance Department operates. The Quality Assurance staff shall have the authority and organizational freedom to meet the requirements of 10CFR50, Appendix B.

Title:

Policy Statement Page: 1 of 2 Rev.: 27 Date: December 20, 1996

YANKEE ATOMIC ELECTRIC COMPANY -j j The ' Plant Superintendent / Manager shall be responsible for the day-to-day l implementation of the program's procedural requirements at the plant, i The Nuclear Safety Audit and Review Committee shall review the adequacy t - and effectiveness:of this program. Any discrepancies and/or recommendations  ! for corrections or enhancements shall be reported to the Cognizant Corporate. - Officer. The safe and reliable generation of power can only be achieved with the  ; cooperation and support of all personnel. We expect that every individual will perform his or her task with the skill, professionalism, and dedication necessary to achieve this goal.

                                                                                      .}

A c. h j I Andrew C. Kadak  : President  ! I l

                                                                                      -l l

l i

Title:

Policy Statement Page: 2 of 2 Rev.: -27 Date: December 20, 1996 __ _______ _ _ _l

YANKEE ATOMIC ELECTRIC COMPANY

1. ORGANI7ATION A. SCOPE l 1

1 i is section of the Operational Quality Assurance Program j describes the duties and responsibilities of the personnel involved in establishing and executing the Operational Quality Assurance Program. 1 4 B. RESPONSIBILITY i The responsibility for design, redesign, evaluation, and operation of the Plant rests with the Yankee Atomic Electric ) Company Nuclear Services Division and Vermont Yankee Nuclear l Power Corporation. The responsibility for developing and ^ implementing the Operational Quality Assurance Program within the Yankee Nuclear Services Division and the Yankee Site is vested in the President of the Yankee Atomic Electric Company. The

- responsibility for implementing the Operational Quality Assurance 4

Progren within Vermont Yankee is vested in the Vice President,  ! Operations, of Vermont Yankee Nuclear Power Corporation. They I I have delegated certain areas of authority for the development and l 2 implementation of certain phases of the Program as set forth in l the following paragraphs of this section. The Nuclear Services Division Quality Assurance Department, reporting to the President for NSD for the Yankee Site and i reporting to the VY VP, Operations, for Vermont Yankee, has the i organizational responsibility for the continuing review and audit of the implementation of the Operational Quality Assurance Program. l C. ORGANIZATIONAL RELATIONSHIPS The lines of authority of all personnel involved in the implementation of the Operational Quality Assurance Program are shown in Figures 1 and 2. Integration between the Yankee Site

Title:

Section I, Organization Page: 1 of 43 Rev.: 27 Date: December 20, 1996 e

I s YANKEE ATOMIC ELECTRIC COMPANY and the Yankee Nuclear Services Division activities is provided I by the Decommissioning Manager. Interfacing between the Vermont Yankee plant and the Yankee Nuclear Services Division is provided by the Vermont Yankee Vice President, Operations, and his staff. l . D. QUAllTY ASSURANCE PROGRAM RESPONSIBillTIES i

1. Yankee - Nuclear Services Division .
a. President  ;

i

1. Assumes and maintains overall responsibility for the Operational Quality Assurance Program. ,

i

2. Delegates to the Director of Quality Assurance the responsibility for establishment, control and distribution of the Operational Quality Assurance Program, and revisions thereto.
3. Establishes and enforces company policies in j the area of Operational Quality Assurance.  ;
4. Establishes and implements an organization <

capable of and directed toward a proper Operational Quality Assurance Program.

5. Resolves disputes between Quality Assurance /~ l Quality Control personnel and other organizations, involving quality. .for the Yankee Site and the NSD organization.
6. The President or his/her designee appoints the NSAR Committee members including Chairman for Yankee.
7. Responsible for. Yankee Site nuclear safety.

Title:

Section I, Organization Page: 2 of 43 Rev.: 27 Date: December 20, 1996 i u_ .-. _ . _ _ _. .

A l ! YANKEE ATOMIC ELECTRIC COMPANY j i i b. Vice Presidents l

1. Report to the President. i j J j' 2. Provide for implementation of'the Program

[ within their respective departments. i

3. Review and approve all changes to the Operational Quality Assurance Program.
4. Provide for independent review and acceptance  !

for selected plant repairs and engineering j changes. i

5. Ensure that applicable Program procedures are j implemented.
c. Executive Dirdctor of Quality Assurance
1. Reports directly to the President.
2. Establishes the qualification requirements for the principal Quality Assurance management positions to assure competence commensurate with responsibility. See Appendix A.

l

3. Approves all changes to the Operational Quality j Assurance Program. l
4. Reviews or provides company policy relative to Quality Assurance practices conducted at the Site and Yankee Nuclear. Services Division. j
5. Authorizes personnel performing Quality Assurance functions to have direct access to management levels which will assure accomplishment of quality-affecting activities.

Title:

Section I, Organization i Page: 3 of 43 Rev.: 27 Date: December 20, 1996

L

                        . YANKEE ATOMIC ELECTRIC COMPANY
6. Establishes policies under which Nuclear Services Division Quality Assurance Department functions.
7. Provides- for establishment of,- and control ~and distribution of the Operational Quality Assurance Program and revisions thereto.

l' I' . . . I 8. Provides for implementation of the Program within the Quality Assurance Department.

9. Provides to NSARC a periodic review of the Operational Quality Assurance Program to determine the adequacy and effectiveness of the Program. Provide for evaluations of changes to the Quality Assurance Program to the requirements of 10CFR50.54(a)(3).
10. Provides, through the Quality Assurance Department, for independent verification of site operation by individuals or groups who do not have direct responsibility for performing the work, to assure that applicable approved procedures, specifications, licenses and safety regulations are satisfied.
11. Ensures that personnel performing. Quality Assurance functions have sufficient authority and organizational freedom to:
a. identify quality problems, 1
b. initiate, recommend, or provide solutions through designated channels, and

! c. verify implementation of solutions.

Title:

Section I, Organization l- Page: 4 of 43 . i Rev.: 27 ! Date: December 20, 1996

l l t i YANKEE ATOMIC ELECTRIC COMPANY

12. Provides for review of and compliance with federal and state regulations and standards for j nuclear power facilities.

i 13. As directed by the-Vermont Yankee Vice Presider , Operations, assures that the 0A Program is effectively implemented.

14. Appoints the NDE and N45.2.6 Level III Examiner
d. Trainina Coordinator
1. Reports to the Human Resources Manager.
2. Responsible for implementation of training  ;

programs at NSD. )

3. Assists the company in accomplishing its goals l

through development of skills and knowledge. ' 4 Ensures that personnel are provided with both the technical and professional skills required to solve problems, work together effectively,  ! present information, and respond to sponsor needs, i

5. Provides training needs assessments to ensure i that organizationally relevant training is provided.
6. Conducts training evaluations to determine when desired objectives are obtained.

I

Title:

Section 1. Organization Page: 5 of 43 Rev.: 27 ( Date: December 20, 1996

I YANKEE ATOMIC ELECTRIC COMPANY

e. Decommissionina Manager and Manager of Operations
1. Reports to the President.
2. Directs engineering, licensing, cost control and planning, and site decommissioning activities.

I

3. Coordinates YAEC resources to meet l decommissioning needs.
4. Provides for implementation of Operational  ;

Quality Assurance Program within the l Decommissioning Organization. l S. Ensures that applicable Program procedures are implemented within the Decommissioning Organization. i I

6. Provides for independent review and acceptance for selected plant repairs and all safety-related engineering design changes for

! the site a.5 decommissioning work packages.

7. Provides for review of material service purchase requests, drawings, specifications,

! and appropriate procedures. l 8. Provides, through the Decommissioning Organization, for independent review and/or approval for all changes.

9. Provides, through the Decommissioning Organization, for review and approval of vendor-provided training programs for site staff; the procedures and purchase requests.

i

Title:

Section 1. Organization Page: 6 of 43 Rev.. 27 l Date: December 20, 1996 l

YANKEE ATOMIC ELECTRIC COMPANY

10. Provides, through the Decommissioning Organization, for integration between the Yankee Site and the Yankee Nuclear Services Division.
11. Evaluates the site's position of specified in-plant audit discrepancies and prepares
                                " Implementation Directives" for the site.

f, Pro.iect Manaaers

1. Reports to a Vice President.
2. Provides for implementation of the Program  !

within their respective project. I i

3. Ensures that applicable Program procedures are implemented within their respective project.

l

4. Provides for independent review and acceptance for selected plant repairs and all safety-related engineering design changes for their l respective plant. l l

S. Provides for selected review of material service purchase requests, drawings, specifications and appropriate procedures.

6. Coordinates engineering requirements necessary l

to support changes related to the operation of the plant.

7. Provides, through Engineering, for the Quality l Assurance /0uality Control Standards and/or requirements on all applicable documents.

Title:

Section 1. Organization Page: 7 of 43 Rev.: 27 Date: December 20, 1996 l l

j YANKEE ATOMIC ELECTRIC COMPANY I'

8. Provides direction to the Project Engineering Managers,
g. Manaaement of Quality Assurance l

Quality Assurance is divided into two (2) departments. They are the Quality Support Department

                                                                                                  )

I and the Quality Assessment Department. The Quality ) Assessment Department performs audits and j j surveillances at Vermont Yankee and audits', l l surveillances, inspections at the Yankee Site, and ' l audits at the Corporate Engineering office. The Quality Support Department performs audits and ( surveillances at vendor facilities.

1. The Manager of each department reports directly to the Executive Director of Quality Assurance.
2. Assures that the Operational Quality Assurance Program satisfies the requirements of 1)CFR50  ;

Appendix B and ANSI N18.7-1976.

3. Provides for the audit of design changes and specifications to verify adequacy of quality requirements. (Independent review shall be performed by an uninvolved, but technically knowledgeable person in the engineering discipline.)
4. Provides for the audit, inspection and/or surveillance of contractor / vendor activities for operating plants to assure the effectiveness of contractual interfaces and compliance with the applicable criteria of l 10CFR50 Appendix B and ANSI N18.7-1976.

Title:

Section I, Organization l Page: 8 of 43 Rev.: 27

  'Date:       December 20, 1996
  .__. _ -... _ - . _ . _ . _ _ _ _ . . ~ . _ _ _ _ _ . _ _ _ _ _ _ . . _ . . _ _ . . _ . _ _ _ _ _ . . _ . _

i YANKEE ATOMIC ELECTRIC COMPANY

5. Provides for tLe inspection, surveillance and/or. audit of activities pertaining to plant
  • or site repairs, and/or changes.
6. Provides for the training and retraining of I Quality Assurance personnel in quality assurance and' audit techniques, j
7. Ensures through verification'that the Program  !

is implemented for all activities requiring l Quality Assurance. 1 l

8. Provides for the stoppage of unsatisfactory )

work: and for the control .of further processing I or delivery of nonconforming material.

9. Directs the independent verification of plant or site operational activities to assure that )

applicable approved procedures, specifications, I licenses, and safety regulations are satisfied. 1 l

10. Ensures that the'0A Program is modified and/or i revised as standards, regulations and experience dictate.
h. Director of Enoineerina Services l
1. Reports to the President,  !
2. Provides for implementation of the Program within his function.

l

3. Ensures that applicable Program procedures are implemented within his function, l

Title:

Section I, Organization  ; l Page: 9 of 43 I Rev.: 27- I Date: December 20, 1996

YANKEE ATOMIC ELECTRIC COMPANY

4. Coordinates Yankee technical requirements necessary to support activities related to outside engineering services.
1. Director of Environmental Erqineerino
1. Reports directly to a Vice President.
2. Provides for the review and follow of radiation protection programs and activities at the plant or site.
3. Provides for technical assistance to the plant or site on matters of radiological protection, radiological engineering and environmental protection.
4. Coordinates the implementation and maintenance of radiological environmental surveillance programs concerning radioactive effluents from tne plant.
5. Supports the implementation and maintenance of the Emergency Plan pursuant to state and federal regulatory requirements.

1

6. Provides for the review of plant meteorological monitoring data.
7. Coordinate the radiological and environmental engineering requirements necessary to support changes related to operation of the plant or site.

Title:

Section 1. Organization Page: 10 of 43 Rev.: 27 Date: December 20, 1996

I I YANKEE ATOMIC ELECTRIC COMPANY , j. Director of Fuel Management

                                                                                     \
1. Reports directly to a Vice-President.  ;

i i 2. Performs fuel cycle and economic studies to improve power costs and as requested by management. l

3. Provides for the general supervision and l coordination of all core component design and procurement, nuclear material and services procurement and fuel cycle economic activities.
4. Ensures that the Operational Quality Assurance j Program and the applicable procedures are implemented within the department.
5. Issues bid invitations, evaluates proposals, and negotiates contracts for fuel cycle ]

i services and related material requirements.

6. Coordinates the fuel cycle requirements i necessary to support changes related to  !

operation of the plant.

7. Provides support of spent fuel storage activities at the Yankee Site.
k. Director of Environmental Laboratory
1. Reports directly to a Vice President.
2. Provides for the radiochemical processing of environmental, effluent, and waste samples.
3. Provides for the processing and internal dosimetric evaluation of bioassay samples.

Title:

Section 1, Organization Page: 11 of 43 Rev.: 27 Date: December 20, 1996

_ . _ . _ ...m.. _ _ . _ - _ _ . . - _ - _ . _ _ _ _ _ . . . . _ - . _ . _ . _ _ _ . . _ . . _ . . _ _ _ . . _ _ _ _ . _ - l l

                                                                                                                                                       'I YANKEE ATOMIC ELECTRIC COMPANY                                                         ,
                                                                                                    ~
4. Provides- for the' routine in situ measurements  ;

in support of, environmental Technical j Specifications as well as ad hoc emergency .; response in situ measurements or' emergency l response laboratory sample measurements;

  • i S. Provides and coordinates technical quality j assurance programs in the areas of plant i chemistry (radiological only) and whole body 4

{ counting. l

6. Provides for .the processing of personnel, j extremity, and environmental dosimetry needed j to support NRC and plant radiological l assessment requirements.
7. Provides for the necessary special radiation -{

flux measurements.

8. Provides for on-site support during outages in {

the personnel dosimetry, whole body counting, i and health physics areas. l

9. Provides for the general engineering and l technical support in the broad areas of  !

radiation measurements, health physics, l radiochemistry, and quality assurance. i

l. Director of Nuclear Enaineerino i
1. Reports directly to a Vice President.
2. Performr. nuclear engineering and economic ]

studies requested by management. ]

3. Provides for the general supervision and l coordination of reactor physics, safety I

Title:

Section I, Organization Page: 12 of 43 Rev.: 27 Date: December 20, 1996 e -- . , . --+ - - . . , ,-.

l i l YANKEE ATOMIC ELECTRIC COMPANY f l assessment, transient analysis, and loss of I coolant analysis activities.  !

4. Ensures that the Operational Quality Assurance '!

Program and the applicable procedures are  ; implemented within the department.

  .                         5. Coordinates engineering analysis requirements      l necessary to support changes related to          .l operation of the plant or site.                    !

l

m. Plant Suocort Department Manaaer i
1. Reports directly to a Vice President. l
2. Provides for the general supervision and  !

coordination in the areas of materials  ; evaluation, operational services (including l construction services), and drafting / design' l support. i

                                                                                     )
3. Provides for the Plant Support review of design  ;

changes.  ; i

4. Provides engineering services to the Projects  !

Departments, upon request.  ; i

5. Responsible for the administration of the -J NDE/ ANSI N45.2.6 Training and Certification  ;

Programs. (To maintain the lndependence of the  ! NDE/ ANSI N45.2.6 training and certification process, overall responsibility for appointing l the NDE/ ANSI N45.2.6 Level III Examiner will remain with the Director of Quality Assurance. 1 All requirements for certification shall be met l prior to appointment as Level Ill Examiner.) l I l l

Title:

Section 1. Organization  ! Page: 13 of 43 Rev.: 27 Date: December 20. 1996

_ _ _m . b YANKEE ATOMIC ELECTRIC COMPANY

n. Engineerina and Licensino Manaaer
1. Reports to the Decommissioning Manager and Manager of Operations.
2. Responsible for coordination of activities pertaining to State, Federal, and license requirements.
3. Provides for independent review and acceptance for selected plant repairs, all safety-related engineering design changes and decommissioning work packages for the site.
4. Provides for review of material service purchase requests, drawings, specifications, and appropriate procedures.
5. Coordinates and directs engineering services necessary to support the decommissioning of the site.
6. Assures coordination and implementation of the Emergency plan.
7. Assures engineering activities are conducted in accordance with the Quality Assurance Program.
8. Assures the Quality Assurance /0uality Control standards and/or requirements are provided on  ;

all applicable documents.  ! l i i

Title:

Section I. Organization Page: 14 of 43 Rev.: 27 Date: December 20, 1996

                                                         . -    . ~ . . . ~ - - . . . - _ - . . - .

I

                     ' YANKEE ATOMIC ELECTRIC COMPANY.                                                  l
                                                                                                      .l i
o. Cost Control and Plannino Manaaer l
1. Reports to the Decommissioning Manager and Manager of Operations. ,
2. Coordinates and monitors Decommissioning fund  ;

expenditures. ]

3. Responsible for preparation of the ' annual Decommissioning budget. ,
4. ' Responsible for tracking services and materials associated with. Decommissioning activities.

1

5. Responsible for developing strategic plans for l Decommissioning activities. I
6. Acts as Assistant Site Manager.
p. Automation Technoloov Department ( ATD) Manaaer
1. Reports to a Vice President.
2. Provides engineering software development and support services to IISD departments, sponsor j plants,'and other clients, as requested or )

l coitracted.

3. Provides automated plant systems development and support services for sponsor plants and  !

other clients, as requested or contracted.

4. Provides and implements advanced analytical and j computational methods and systems to NSD, ]

sponsors, and other clients. l I l

Title:

Section I, Organization ) Page: 15 of 43 i Rev.: 27 Date: December 20. 1996 i l i

i l YANKEE ATOMIC ELECTRIC COMPANY f l

2. Plant - Yankee j
a. Site Manaaer (Site Manager. is Plant Manager j referenced to in Technical Specifications.) {
1. Reports directly to the Decommissioning Manager l.

and Manager of Operations. i

2. . Acts as' Chairman of the Plant Operation Review f Committee with authority and responsibility as j established 'in the Technical Specifications of [

the Site license. i l.

3. Directly responsible for the safe orderly and  ;

efficient operation of the site, and for -! compliance.with the requirements of the' license i and applicable State and Federal laws and l regulations. l

4. Responsible for the on-site implementation of
                                                     .the Operational Quality Assurance Program, Security Program and Fire Protection Program.

i

5. Responsible for Site maintenance and repair. ,
6. Responsible for the control and surveillance of l all special nuclear material at the site. j
7. Provides information and reports to the Yankee Nuclear Services Division and the Nuclear Safety Audit and Review Committee as required and as directed by the Decommissioning Manager.
8. Provides for and coordinates review of industry operating problems with the aim of minimizing likelihood of occurrence at the plant.

1 1

Title:

Section I, Organization j Page: 16 of 43 Rev.: 27 Date: December 20, 1996

l 1 0 YANKEE ATOMIC ELECTRIC COMPANY [ i i i

9. Designates an alternste to the Site Manager i I

j during his absence with the authority and j responsibilityfthereof. l l t

10. Maintains communicatiors with the Training .

l Coordinator involving plant training needs. j i

b. Operations Manaaer
1. Reports directly to the Site Manager.

l

2. Responsible for the safe, orderly, and l l efficient operation of the Site for compliance  ;

l with the requirements of the license and { applicable State and Federal laws and j regulations. i r

3. Responsible for shift supervisors and  ;

l operations support. - t e L 4. Administration of the Certified Fuel Handlers l l Training Program. j - l 5. Administration of the Equipment Operators Training Program. i L 6. Coordinates Plant Quality Assurance activities with the Manager of Operations and-Decommissioning Manager, i

7. Coordinates Plant Fire Protection activities, i including Fire Protection Training.

l

8. Coordinates testing of plant hydro requirements.

l-l-

Title:

Section I, Organization i Page: 17 of 43 Rev.: 27 Date: December 20, 1996

YANKEE ATOMIC ELECTRIC COMPANY

9. Maintains core component history file of al.1 fuel, control rods, sources and incore detectors. l
10. Accounts for all special nuclear material at the plant site.
c. Shift Supervisor '
1. Reports directly to the Operations Manager. ,
2. Responsible for plant operations in accordance with approved documents and specifications.
3. Responsible for preparing documents outlining system functions and operating modes.
4. Responsible for ensuring that personnel under his supervision perform their duties according to applicable licenses, specifications, safety rules, regulations, and certifications.
5. Responsible for ensuring that maintenance requests are provided for the repair or replacement of defective parts and/or components.
6. Responsible for verifying the operability of systems and/or components following maintenance or changes by providing for t'.e performance of written test documents which incorporate the requirements and acceptance criteria contained in applicable design documents.
7. Responsible for ensuring that fuel handling operations are safely performed in accordance with approved procedures.

Title:

Section I. Organization Page: 18 of 43 Rev.: 27 Date: December 20, 1996

I i YANKEE ATOMIC ELECTRIC COMPANY l

j. 8. Responsible for coordination and performance of hydrotesting.
                                                                                                                                 )

l d. Maintenance and Construction Manaaer  ; l i ! 1. Reports directly to the Site Manager. l

2. Directs the activities.of Mechanical and  ;

Electrical Maintenance', Instrumentation and  ; !- Control, and Maintenance Engineering. l l l ! 1

3. Coordinates the review and update of plant  !

drawings and specifications.  ; l

4. Directs plant maintenance, repairs, and design changes and assures compliance of maintenance ,

[ activities to applicable State Federal, and j license requirements.

5. Prescribes and directs schedules, and programs. -)

l as necessary, to assure the safe l ! decommissioning of the site. l-

6. Provides for' major contractor decommissioning l support including establishment of appropriate l contractual arrangements.

l

7. Ensures that contractor decommissioning activities are performed in a safe manner.
8. Directs on-site engineering and craft support of decommissioning activities.

! 9. Coordinates and transmits information concerning Plant changes to the Manager of Operations and Decommissioning Manager. I f

Title:

.Section I, Organization i Page: 19 of 43 Rev.: 27 Date: December 20, 1996-i i i 1

l. , , - _ , _ _,_

YANKEE ATOMIC ELECTRIC COMPANY

e. Trainino Coordinator
1. Reports directly to the Site Man ~ager.
2. Responsible for scheduling and documentation of plant general employee training.
3. Responsible for administration of all plant staff training.
4. Maintains lines of communication with the .

Site Manager on Plant Training Programs.

f. Site Services Supervisor
1. Reports directly to the Site Manager.
2. Supervises the Store Supervisor.

a) Preparation of requisition for purchase orders. b) The receipt, handling, and storage of , materials and equipment. I 1 c) Administering a system of material and l equipment identification. ) l l d) Maintaining a system which provides i traceability and retrievability of Quality Assurance documentation for purchased materials. l l

3. Coordinates the review, revision,'and I distribution of procedures. l l

Title:

Section I, Organization Page: 20 of 43 Rev. 27 Date: December 20, 1996

l J YANKEE ATOMIC ELF.CTRIC COMPANY j .4. Responsible for the operations of the Plant Document Control Center for the retention of I specified'0uality Assurance records, reports, 4 and personnel records.

s

! 5. ' Maintains and disseminates information j regarding codes, criteria, standards, guidelines., and policy to applicable plant personnel.

6. Supervises Plant Administrative personnel.
7. Responsible for the Fitness for Duty Program.

l g. Plant Radiation Protection and Chemistry Manaaer I l '. 1. Reports directly to the Site Manager. i ~

2. Directs maintenance of water conditioning on

~ the site as per specifications and/or documented and authorized recommendations.

3. Directs a program to ascertain the l radioactivity levels of' liquids, gases and j solids as required.
j. 4. Directs the review and interpretation of chemistry test results.
5. Directs the documentation and maintenance of j chemistry.and radiation protection records.

! 6. Responsible for the development and i implementation of the Radiation Protection l Program (including ALARA), assuring that these

programs meet site standards and State and 1

Federal license requirements.  ; 1

Title:

Section I, Organization ,

;         Page:   21 of 43                                                                            !
Rev.: 27 i Date: December 20, 1996  !

t

YANKEE ATOMIC ELECTRIC COMPAt!Y

7. Directs the maintenance of the Personnel Exposure Record System.
8. Directs radioactive material shipments and receipts pursuant to site and government regulations.
9. Maintain stop work authority when radiological safety is jeopardized or when unnecessary personnel exposure is occurring,
h. Health and Safety Supervisor
1. Reports directly to the Site Manager.
2. Directs the plant Medical Services Program and acts a plant management's point of contact relative to medical matters in coordination with the Plant Medical Consultant.
3. Directs the maintenance of personnel medical records.
4. Responsible for the development and implementation of the plant Occupational Safety programs, assuring that these programs meet site standards and Federal OSHA requirements.
5. Responsible for review and communication of plant safety policies through the plant safety manual and safety meetings.
6. Responsible for work site inspections by safety department personnel.
7. Acts to safeguLrd worker health and safety.

Title:

Section 1. Organization Page: 22 of 43 Rev.: 27 Date: December 20. 1996

l YANKEE ATOMIC ELECTRIC COMPANY

8. Directs the review and interpretation of occupational safety exposure monitoring.

1

9. Directs the. maintenance of personnel exposure monitoring record system.
3. Vermont Yankee Nuclear Power Corporation
a. Vice President. Operations
1. Reports to the President - Vermont Yankee Nuclear Power Corporation.
2. Ensures the 0A Program is effectively implemented.
3. Evaluates disposition of In-Plant Audits and prepares concurrence directives to the plant.

l

4. Ensures that applicable programs and procedures effectiv ly implement .the OA Program.

l 5. Reviews and approves all changes to the

Operational Quality Assurance Program.

l l 6. Appoint's the N5. 'ommittee mt?.bers including , l Chairman and Vict 1 airman. l l

7. Acts as the Manager of Operations.

l b. Director of Enaineerina l

1. Reports to the Vice President. Operations.
2. Responsible for the engineering support area.

Oversees the planning, scheduling. and \ l

Title:

Section I, Organization j Page: 23 of 43 , t Rev.: 27 j

Date
December 20, 1996 l l

4

t YANKEE ATOMIC ELECTRIC COMPANY  ; direction of activities of employees engaged in design changes and alterations. i

3. Reviews and approves safety-related design change documents, selected plant programs and i policies.
4. Provides for review and approval of drawings and specifications.
5. Provides for interfacing between the Plant and the Yankee Nuclear Services Division.
c. Trainina Manaaer
1. Reports to the Vice President, Operations.
2. Establishes and maintains all operator and plant training programs.
3. Remains current on all regulatory requirements concerning training and qualifications of plant ,

personnel and ensures that Plant training programs and procedures are revised in a timely manner in response to changing needs and regulations.

4. Provides overall coordination and supervision for the Technical Support Training Supervisor, the Engineering and Maintenance Training Supervisor, the Operations Training Supervisor, and the Training Support Supervisor in carrying out their duties.  ;
5. Evaluates the effectiveness of the training l programs and the performance of the individuals participating in the training. l

Title:

Section 1, Organization Page: 24 of 43 Rev.- 27 Date: December 20, 1996

-      - . - . . .- . - -                         . - . . - . -                 . - - - - . . . _ - . ~ . - . - . . - - - . - . . _ . . - ~ -
                                                                                                                                                    .{

i

  ,                                                                                                                                                   i
                                                             ' YANKEE ATOMIC ELECTRIC COMPANY                                                         !

1 1 7

4. Plant - Vermont Yankee i i

4 a. Plant Manaaer ( t

                                                                                                                                                    -I
                                                                -1.       Reports to the Vice President Operations.                                   j i                                                                                                                                                      i j                                                                 2.       Directs the on-site implementation of the                                   j j                                                                          Operational Quality Assurance Program.

i

3. Prescribes and directs the development of Plant j procedures, instructions, schedules, and j j programs as necessary to assure the safe and j l- dependable operation of the facility. l j .

j 4. Maintains a thorough knowledge of, and assures j i compliance with, the regulatory requirements l I for operating a nuclear power plant. l [ j j 5. Directs the preparation and maintenance of  ! power plant records, reports, and logs, f

6. Acts as Chairman of the Plant Operations Review-  ;
j. Committee with authority and responsibility as.  ;

J established in the Technical Specifications of # i the plant operating license.

7. Provides information and reports to the Yankee Nuclear Services Division as directed by the l Vice President. Operations.

4

8. Provides information and reports to the Nuclear i Safety Audit and Review Committee as required i

i and as directed by the Vice President. ): Operations.

;                                                                 9.       Directs the control and surveillance of all j                                                                           special nuclear material on site.

Title:

Section I, Organization i Page: 25 of 43 Rev.: 27 i Date: December 20, 1996 l I _ _ _ __ . . - - - . - ~ . - - __ _ _ _ _:

YANKEE ATOMIC ELECTRIC COMPANY

10. Assure the implementation of training / retraining programs as required by the .

Plant license, regulations, or applicable standards; and as necessary to assure safe work practices and compliance with standard operating practices, license and Technical Specifications, safety rules, and applicable regulations.

b. Operations Superintendent
1. Reports to the Plant Manager.
2. Oversees planning, scheduling, coordination, and direction of activities of employees engaged in the installation, operation, inspection, and maintenance of all equipment, buildings, and structures as appropriate, is responsible for the Operations, Maintenance, and Instrumentations and Control areas.
3. Assists in the development of Plant procedures, instructions, schedules, and programs as necessary to assure the safe and dependable operation of the facility.
4. Maintains a thorough knowledge of, and assures compliance with, the regulatory requirements for operating a nuclear power plant.
5. Acts as Vice Chairman of the Plant Operations Review Committee with responsibilities as established in the Technical Specifications of the plant operating license.

Title:

Section 1, Organization Page: 26 of 43 Rev.: 27 Date: December 20, 1996

f YANKEE ATOMIC ELECTRIC COMPANY

6. Directs the preparation and maintenancelof power plant records, reports, and logs as- >

applicable. -

                                .                               7.           Provides information, reports, and records as        ;

directed by the Plant Manager.  !

8. Assists in directing the establishment of safe  ;

work practices, and the training and

.. instruction of plant personnel in the (

observance of standard operating practices, NRC license and Technical Specifications, ssfety rules and regulations.

c. Technical Services Superintendent
1. Reports to the Plant Manager.
2. Responsible for the Reactor Engineering.

Security, Radiation Protection, and Chemistry Departments. '

3. Assists in the development of Plant procedures, t instructions, schedules, and programs as  !'

necessary to assure the safe and dependable I operation of the facility and the safe conduct of refuel operations.

4. Maintains a thorough knowledge of, and assures compliance with, the regulatory requirements of a nuclear power plant.

l-l 5. Acts as Vice chairman of the Plant Operations Review Committee with responsibilities'as L established in the Technical Specifications of the plant operating license.

Title:

Section I, Organization y Page: 27 of 43

;            Rev.:           27 Date:            December 20, 1996

YANKEE ATOMIC ELECTRIC COMPANY

6. Directs the preparation and maintenance of power plant records, reports, and logs as applicable.
7. Provides information, reports, and records as directed by the Plant Manager.
8. Assists in directing the establishment of safe work practices, and the training and instruction of plant personnel in the observance of standard operating practices, NRC license and Technical Specifications, safety rules and regulations.
d. Proiect Enaineerina Manaaer
1. Reports to the Director of Engineering. l '
2. Oversees and manages the Project Engineering efforts necessary to support emergency needs of the plant.

I

3. Provides for the generation of project plans, schedules budget, manloadings, etc. necessary to support field activities.
4. Manage the contracts, contractors used to l accomplish projects, and oversee project implementation.
5. Develop maintenance and oversight of implementation of programs and procedures associated with Project Engineering.
6. Maintain formal documentation of Project Engineering activities for required operation and license requirements.

Title:

Section I, Organization Page: 28 of 43 Rev.: 27 Date: December 20, 1996

   . - - . . .. ..     . _ _ - - . _ -               ._ ~ .   .. - . --. .-         .. .- -       .-. . --

I YANKEE ATOMIC ELECTRIC COMPANY. i i

7. Fulfills other responsibilities common to all l supervisory positions and carries out other duties and responsibilities as may be assigned by the Director of Engineering. ,

j e. Technical SUDD0rt Manager i i

1. Reports to the Director of Engineering.

l 2. Oversee and manage programs associated with the technical / administrative supports areas.

3. Maintain formal documentation associated with l the technical and administrative activities for l required operational and licensee documentation.
4. Fulfills other responsibilities common to all '

l supervisory positions and carries out other I duties and responsibilities as may be assigned

                                                  ' by the Director of Engineering.                        >
5. Oversee and manage Fire Protection Program.
f. Performance Enaineerino Manager  ;

l l 1. Reports.to the Vice President, Operations. l

2. Provides engineering support to Operations and Maintenance departments. '
3. Assess the performance of plant systems and make recommendations for improvement.

l 4 .. Oversee and manage programs associated with the i performance engineering function.

Title:

Section I, Organization Page: 29 of 43 i Rev.: 27 Date: December 20, 1996 l l < l l

_ _ _ _ . _ _ . . ~ _ . . . _ _ _ . -. _ . - - . . _ .-___ __ _ v.._ _ _ . .. .. - -... _ ._.. _. I l i l l YANKEE ATOMIC ELECTRIC COMPANY

l. I j .

l

5. Maintain formal documentation associated with l l performance ~ engineering programs for required .

operational and license requirements. L f

6. Fulfills other responsibilities common to all l supervisory positions and carries out other duties and responsibilities as may be assigned by the Director of Engineering.
g. Nuclear Services Manecer l

l , 1. Reports to the Director of Engineering. l 2. Oversees and manages programs associated with nuclear services including the areas of nuclear i and environmental engineering and fuel l 1 management. ' I i -! l 3. Maintains formal documentation associated with - l nuclear services for required operational and l license requirements. t

4. Provides administrative support for NSD .

t employees . at the plant site. l ! .i 1 5. Fulfills other responsibilities common to'all supervisory positions and carries out other duties and responsibilities as may be assigned by the Director Engineering. i l

h. Desian Enaineerina Manaaers
1. Reports to the Director of Engineering.
2. Oversee and manage the electrical /l&C/ -

mechanical / fluid systems engineering efforts i {

Title:

Section I. Organization

Page: 30 of 43 Rev.: 27 Date: December 20, 1996

YANKEE ATOMIC ELECTRIC COMPANY necessary to support the normal and emergent-needs of.the plant.

3. Oversee and manage programs associated with design engineering.
4. Provide for the generation of design change and installation documents, and support for the installation of these design changes and the close-out of associated documentation.
5. Maintain formal documentation of plant design basis and design change activities for required operational and license requirements.
6. Fulfills other responsibilities common to all supervisory positions and carries out other duties and responsibilities as may be assigned by the Director of Engineering.
i. Operations Manaaer
1. Reports-to the Operations Superintendent.
2. Fulfills duties and responsibilities similar to and/or as described in the FSAR and is directly in charge of the Operations Department.
3. Has the responsibility and authority for insuring the safe and efficient operation of the plant and its supporting systems in accordance with applicable station licenses, Technical Specifications, procedures, instructions, established company polic) and safety rules.

Title:

Section I, Organization Page: 31 of 43 Rev.: 27 Date: December 20_, 1996 l

1 l YANKEE ATOMIC ELECTRIC COMPANY

4. Consistent-with plant policies and applicable .

instructions, institutes necessary programs,  ! issues instructions, originates procedures and . ' insures that-department' administrative systems exist such that the responsibilities assigned to the Operations Department are executed effectively and efficiently in accordance with company intent. Insures that necessary documentation is prepared, reviewed, approved, and properly processed to verify that department activities meet all established , requirements. 5 '. Maintains current status of Operations Department activities r:nd rcquirements. i Prepares'and maintains, plans and schedules for { department commitments such as personnel. l training, retraining and qualification.

6. Insures that all records. tests, reports, and logs maintained by.the Operations Department t are properly reviewed and approved.
7. Insures that all Operations Department j personnel in a' training status are actively l pursuing the. established program and that their {

performance is being adequately evaluated. i

8. Reviews all Operations Department procedures to insure that they are current, accurate, and approved.
9. Implements aspects of the Plant Quality Assurance Program which relate to the activities of the Operations Department.

l

Title:

Section 1, Organization Page: 32 of 43 Rev.: 27 Date: December 20, 1996

I I YANKEE ATOMIC ELECTRIC COMPANY  ; l-l j. Instrument & Control Manaaer

                                                                            '1.          Reports to the Operations Superintendent.               !
2. Fulfills duties and responsibilities similar.to  !

j and/or as described in the FSAR and is directly j l in charge of the Instrument and Control i Department. l l > l 3. Plans, schedules and supervises the activities  ! of the Instrumentation- and Controls Department. j Such activities to include: installation. j , f inspection, calibration, adjustment. maintenance, and repair of the plant instrumentation and controls. i l 4. Coordinates the activities of the Instrument f L and Controls Department with all other plant  ! functions. -

5. Establishes and directs a program of preventive I maintenance, calibration, and surveillance testing as required by the plant license, l

L approved plant procedures, or other plant  ; requirements. l 6. Establishes calibration techniques, , frequencies, and records as necessary to assure l reliable indication and control for plant system parameters. f' 7. Establishes and directs a program of l departmental training that will assure a staff I of Instrumentation and Controls personnel capable of safely and efficiently performing their duties in accordance with established practices, procedures, and regulations.

Title:

Section I, Organization Page: 33 of 43 Rev,: 27 I Date: December 20, 1996  ;; l

                                                      --- .                . - _ -     -         .    - .._ -    _=        -          .   ---
 .-. _ ._-_ _ _ _ _ -   _                   m l

4 l YANKEE ATOMIC ELECTRIC COMPANY

8. Prepares and/or supervises the preparation of reports, logs, and historical records -as l required.  ;
                                          '9. Implements those aspects of the Plant. Quality    j Assurance Program which relate to the-            I activities of 'the Instrumentation. and Controls  f Department.                                       i
10. Develops and maintains, in accordance with l approved plant procedures, the procedural j

controls necessary to fulfill the above j responsibilities.  !

k. Maintenance Manaaer (

l

1. Reports to the Operations Superintendent. l
2. Fulfills duties and responsibilities similar to l and/or as described in the FSAR and is directly l in charge of the Maintenance Department, j
3. Is responsible for all electrical and ,

mechanical. maintenance activities throughout i the Plant with the exception of Instrumentation  ; and Control maintenance activities.  ; i j

4. Consistent with plant policies and applicable instructions, institutes necessary programs, issues instructions, originates procedures, and )
                                                   . insures that department administrative systems  i exist such that the responsibilities assigned to the Maintenance Department are executed effectively and efficiently in accordance with company intent. Insures that necessary documentation is prepared, reviewed, approved.

Title:

Section I, Organization Page: 34 of 43 Rev.: 27 Date: December 20, 1996 l

YANKEE ATOMIC ELECTRIC CGMPANY and properly filed to establish that department activities meet all requirements.

5. Consistent with plant policies and applicable instructions, organizes department functions and activities, assigns duties, and schedules personnel to accomplish department requirements. Reviews and supervises all department assignments.
6. Maintains current status of department activities and requirements. Prepares and maintains long-range plans and schedules for department commitments such as personnel l training and qualification, preventive '

maintenance, material procurement, plant

     -                        modifications, etc.
7. Staffs and trains Maintenance Department i personnel.
8. Establishes and maintains equipment history records.
9. Selects and orders materials and spare parts in areas of assigned responsibility.
10. Implements aspects of the- Pl' ant Quality Assurance Program which relate to the activities of the Maintenance Department.
11. Reviews mechanical and electrical equipment failure frequency and evaluates equipment reliability.
12. Assumes responsibility for the condition, maintenance, and reliability of all plant

Title:

Section I, Organization Page: 35 of 43 Rev.: 27 l Date: December 20, 1996

Y/NKEE ATOMIC ELECTRIC COMPANY electrical and mechanical equipment other than that specifically assigned to other departments.

1. Chemistry Manaaer
1. Reports to the Technical Services Superintendent.
2. Fulfills duties and responsibilities similar to and/or as described in the FSAR and is directly in charge of the Chemistry Department.
3. Consistent with the policies and applicable

, instructions, institutes necessary programs, issues instructions, originates procedures, and insures that department administrative systems exist such that the responsibilities assigned to the Chemistry Department are executed effectively and efficiently in accordance with > company intent. Insures that necessary documentation is prepared, reviewed, approved, and properly filed to establish that department activities meet all requirements.

4. Consistent with plant policies and applicable instructions, organizes department functions and activities, assigns and schedules personnel to accomplish department requirements. Reviews and supervises all department assignments.
5. Maintains current status of department activities and requirements. Prepares and maintains long-range plans and schedules fo'r
                                  ' department commitments such as personnel training and qualification, preventive

Title:

Section I, Organization Page: 36 of 43 Rev.: 27 Date: December 20, 1996

f YANKEE ATOMIC ELECTRIC COMPANY  ! h maintenance, material procurement, plant. l modifications, etc. j t

6. Assumes responsibility for providing the I necessary administrative supervision and _

required personnel to meet the needs of the established Radiological Environmental Monitoring Programs. I

7. Prescribes and maintains chemistry conditions  !

and purification of coolants within applicable limits.  !

8. Develops and maintains records of all chemistry j and radiochemistry aspects of the plant.
m. Radiation Protection Manaaer i
1. Reports to the Technical Services  ;

Superintendent.  !

2. Fulfills duties and responsibilities similar to  :

and/or as described in the FSAR and is directly  ; in charge of the Radiation Protection i Department.

3. Consistent with the policies and applicable  ;

instructions, institutes necessary programs, , issues instructions, originates procedures, and i insures that department administrative systems exist such that the responsibilities assigned , to the Radiation Protection Department are executed effectively and efficiently in accordance with company intent. Insures that necessary documentation is prepared, reviewed. l

                                                                                                                              ~

j approved.. ana properly filed to establish that l department activities meet all requirements.

Title:

Section I, Organization ~ !' Page: 37 of 43

_ Rev.
27 Date: December 20, 1996 i

i YANKEE ATOMIC ELECTRIC COMPANY I

4. Consistent with plant policies and applicable  !

instructions, organizes department functions  ! and activities, assigns and schedules personnel l

                                             ' to accomplish department requirements. Reviews                           ;

and supervises all department assignments. l t

5.
  • Maintains current status of department. l activities and requirements. Prepares and  !

maintains long-range plans and schedules for 'f department commitments such as personnel  ! training and qualification, preventive I maintenance, material procurement, plant j I modifications, etc.

6. Develops and maintains records of all radioactive waste shipments. l
7. Develops work and housekeeping practices in j radiologically controlled areas of the plant to minimize personnel exposure and the spread-of radioactive contamination. i i
8. Assumes responsibility for receipt, storage, i shipment, a'nd disposal of radioactive material .

utilizing proper Federal and State regulations '! (other than nuclear fuel).

n. Reactor Enaineerina Manaaer
1. Reports to the Technical Services  ;

Superintendent.

2. Fulfills duties and responsibilities similar to and/or as described in the FSAR and is directly in charge of the Reactor. Engineering .;

Department. , i

Title:

Section I, Organization Page: 38 of 43 Rev.: 27 Date: December 20, 1996

YANKEE ATOMIC ELECTRIC COMPANY

3. Plans, schedules, and supervises the activities of the Reactor Engineering Department. Such j activities to include: nuclear and thermal j

, core analysis, planning and scheduling of fuel rearrangements and fuel cycling, rod withdrawal sequences, rod patterns, and reactor maneuvering during plant startup. i 4. Coordinates the activities of the Reactor Engineering Department with all other plant functions.

5. Establishes and dir ects a program of Nuclear l Performance Monitoring and Surveillance Testing
                                                                                      )

as required by the plant license, approved plant procedures, or other plant requirements.

6. Establishes a program of control, accountability and record keeping as required to maintain an accurate inventory of licensed special nuclear material.
7. Establishes and directs a program of '

departmental training that will assure a staff of Reactor Engineering personnel capable of l safely and efficiently performing their duties l

;                                      in accordance with established practices, procedures, and regulations.
8. Prepares and/or supervises the preparation of reports. logs, and historical records as required.
9. Implements those aspects of the Plant Quality Assurance Program which relate to the activities of the Reactor Engineering Department.

Title:

Section I., Organization Page: 39 of 43 Rev.: 27 Date: December 20, 1996

YANKEE ATOMIC ELECTRIC COMPANY

10. Develops and maintains, in accordance with approved plant procedures, the procedural controls necessary to fulfill the above requirements.

E. REVIEW AND AUDIT Two committees have been established for Yankee and the Vermont Yankee plants whose objectives are to insure the plant is operated safely, utilizing good engineering practices. The committees are charged with making recommendations to modify operational methods or safety precautions. The Plans Operations Review Committee, is made up of Plant personnel. The Nuclear Safety Audit and Review Committee for Vermont Yankee, shall have no more than three members selected from the organization reporting to the Manager of Operations.  ; The Yankee Nuclear Safety Audit and Review Committee shall not be members of the plant staff. 1

1. Plant Ocerations Review Committee
a. Yankee Plant - See Section 6.5 " Review and Audit" of Appendix A Technical Specifications to the Operating j License DPR-3.
b. Vermont Yankee Plant - See Section 6.2. A " Review and Audit" of Appendix A Technical Specifications to the Operating License DPR-28.
2. Nuclear Safety Audit and Review Committee
a. Yankee Plant - See Section 6.5 " Review and Audit" of Appendix A Technical Specifications to the Operating License DPR-3. .

Title:

Section I, Organization Page: 40 of 43 Rev.: 27 Date: December 20, 1996

l l l l YANKEE ATOMIC ELECTRIC COMPANY

5. Vermont Yankee Plant l 1. See Section 6.2.B " Review and Audit" of ,

Appendix A Technical Specifications to the Operating License DPR-28. i L 2. The NSAR Committee shall be responsible for

j. evaluating changes to the Vermont Yankee l organizational chart (Figure 2 to Section 1).

l l l 1 1 I l I l l-l

Title:

Section I, Organization Page: 41 of 43 Rev.: 27 f Date: December 20, 1996

                                                                                                           - .. .-~..., _ . _ -                       . - . . , . . ~ . . . . . . = - .                 - . . . . .. . . .                                      . . . . , - .     . -

O l10 T ~4 t m it & a C E. .". W.. . g E"A&# 2 E-2 a o"$3 YANKEE ATOMIC ELECTRIC COMPANY t E, a

  • 8 PRESIDENT J m

w e,o . .-. i - E  : 5 N DIRECTOR VICE DECOMMISSIONING NUCLEAR SAFETY EXECUTIVE DIRECTOR, l $ 0 o ENGINEERING PRESIDENT (S) MANAGER AND MANAGER OF OPERATIONS AUDIT AND REVIEW COMMITTEE- QUALITY ASSURANCE

         =                             SERVICES                                                                                                                                                                                                                                          !

x FUEL ENVIRONMENTAL ENGINEERING PROJECT COST / SCHEDULE ENGINEERING

                                                                                                                                                                                         & LICENSING OA                       N m

MANAGEMENT LABORATORY MANAGERS CONTROL . MANAGER , MANAGERS MANAGER DIRECTOR DIRECTOR y l

                                                                                                                                                                                                                                                                              -A E

E , m i r- i ORA _Tf _ ____ _ _ ,,_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ ,,_ _ _ _ ,_ _ ___________________________ _______] e n 0A SURVEILLANCE n

                                                                                                                                           ,SI,TE 83 a,                     g
                                                  ?                                                                                                                                                                                                                           y          ?

2 PLANT OPERATIONS REVIEW [ COMMITTEE f I HEALTH & MAINTENANCE 8 OPERATIONS RP/ CHEMISTRY SITE SERVICES TRAINING t ASSISTANT CONST N SITE MANAGER . MANAGER MANAGER SUPERVISOR COORDINATOR  ! SU OR nANAGER t FUNCTIONAL '[

                                                                                                                                                                                                  ---------- - COMMUNICATIONS

_ _ _ . . - . _ -. . . - _ - . _ . . - - . - _ - . - . _ _ _ _ - _ - _ _ - = - - _ _ _ _ _ _ _ _ _ _ _ _ , - _ . _ _ . _ _ _ - . _ _ _ _ _ _ . - _ - - - - - _

                                                                                                             . - . . - - . .             .- . .. . -                                  .    ..m.    ..........m-                      . .. , . . - . _ _ .                 .    .

o m ~o -e a e to e c+ < c c+

    <D
  • co "1 VERMONT YANKEE ORGANIZATION PRESIDENT o ro A < '1(n & CHIEF
    *"W*        **                                                            EXECUTIVE n        ,en co    oeer                                                                 OFF CER                                                                                                                                                                                  ,          ,

3 -% o 7 " YANKEE ATOMIC 7 3 *O ELECTRIC < co ae s .------==- - _ ___-------.

                                                                                                                                     . COMPANY                                                                                                                  ,
             -< - -                                                                                                                  PRES DENT ro       m       -

o s

    -        7e                                                          I                      l                                                                                                                                                                                 ,
  • VICE PRESIDENT y VICE VICE I e ADMINISTRATION / PRESIDENT - - - - - -

e o FINANCE & OPERATIENS (1) PRESIDENT (S) EXECUTIVE Ch

             ]

TREASURER DIRECTOR QUALITY ASSURANCE j SAF AUDIT E INE I TRAINING 9 pgg u MANAGER- REVIEW MANAGERS OA C0pm. (4) 3 MANAGERS m m.

                                                                                                                                                                                                                                                                          >        i
                      ----------------.------_--- - --                                  .-----------------------------                       --------------------------                                         . TL.

i  ! e-a

  • DIRECTOR OF
  • PLANT ENGINEERIM l MANAGER OA ' m PERFORMANCE (2).(3) ------------ ----------------- SURVEILLANCE l Q ENGINEERING GROUP e p }
                                                                                                                                                                                                                                                                          ~

MANAGER l n  ! e O i I i TECHNICAL e OP DNS S R > SU NT {2 (4 (2),(4) 00pmITTEE . i l E i

                                                 ,             ,                   ,                  I                                             I                                   I                         l 1

MAINTENANCE INSTRUMENT RADIATION CHEMISTRY REACTOR ' OPERATIONS & CONTROL PROTECTION EMINEERIM , MANAGER MANAGER MANAGER MANAGER a' MANAGER MANAGER 4 I I i l l 8 PROJECT -TECHNICAL e NUCLEAR DESIGN " EMINEERIM SUPPORT  ! SERVICES ENGINEERING MANAGER MANAGER j MANAGER MANAGERS i a i Notes: (1) Responsible for fire protection. -* f (2) ANSI 18.1-1971 Re: License. (3) In Health Physics matters, the Radiation Protection Manager has direct access to the Plant Manager. * (4) The committee membership and its Chairman and Vice Chairman shall be appointed by the Verernt Yankee Vice President. Operations. coeonwm32 t _-__ _ - - _ _ _ _ _ - ___ _ _ _ - -- = _ _ . . _ _ - _ _ _ _ - _ _ _ _

YANKEE ATOMIC ELECTRIC COMPANY

11. 00ALITY ASSURANCE PROGRAM A. SCOPE This. section establishes the criteria to be applied to systems requiring Quality Assurance which prevent or mitigate the consequences of postulated. accidents which could cause undue risk to the health and safety of the public. The structures, systems, components and.other items requiring quality assurance are listed in the Yankee Safety Classification of Systems Manual for the Yankee plant. A listing for the Vermont. Yankee plant is provided' in the Vermont Yankee Safety Classification Manual.

B. RESPONSIBILITIES

1. Compliance with the requirements of the Operational Quality Assurance Program - based on the criteria of Title 10 of the Code of Federal Regulations, Part 50, Appendix B, and ANSI N18.7-1976 - shall be the responsibility of all personnel-involved with activities affecting operational safety. Each facility shall have a matrix of major quality' assurance procedures cross referenced to each applicable criteria of 10CFR50 Appendix B. The. performance of quality-related activities shall be accomplished with specified equipment under suitable environmental conditions.

Note: Each criterion section for the Program incorporates the designation of specific organizational responsibilities.

2. Individuals having direct responsibilities for establishment / distribution control / implementation of the Operational Quality Assurance Program are delineated in Section I " Organization" of the Program.

Title:

Section II, Quality Assurance Program Page: 1 of 7 Rev.: 27 Date: December 20, 1996

       . .         ._.      ._.       . . _ . - _ . - .           . _ _ _ .- _ _ . _ _           _ . _ -   _..m__.___      m t

l YANKEE ATOMIC ELECTRIC COMPANY C. IMPLEMENTATION l' l Establishment of an effective Operational Quality Assurance I Program is assured through consideration of and conformance with , the Regulatory Position in the below listed Regulatory Guides a' l modified in Appendix B. Implementation of this Program is l assured'through Quality Assurance procedures derived from Quality  ! Assurance policies, goals and objectives. Qu'ality Assurance  ! shall review Quality Assurance program procedures to assure their derivation from the policies, goals and objectives established by  ; the President. <

1. Title 10 of the Code of Federal Regulations, Part 50,.

Appendix B, Quality Assurance Criteria for Nuclear Power i Plants  : i

2. ANSI N18.7-1976, Administrative Controls and Quality l Assurance for the Operational Phase of Nuclear Power Plants ,

(Endorsed by Regulatory Guide 1.33, Revision 2) l [

3. ANSI N45.2.1-1973, Cleanina of Fluid Systems and Associated l

ComDonents Durina Construction Phase of Nuclear Power j Plants (Endorsed by Regulatory Guide 1.37, March 16,1973)' i 4

4. ANSI N45.2.2-1972, Packaaina. Shiocina. Receivina. Storace j and Handlina of items for Nuclear Power Plants (Endorsed by l Regulatory Guide 1.38, Revision 2)  ;
  • 5. ANSI N45.2.3-1973. Housekeepina Durina the Construction i Phase of Nuclear Power Plants (Endorsed by Regulatory Guide 1.39. Revision 2)'

l

6. ANSI N45.2.4 1972, Installation.-Insoection and Testina Reauirements for Instrumentation and Electric Eauioment Ourina the Construction of Nuclear Power Generatina Plants (Endorsed by Regulatory Guide '1.30, August 11, 1972)

Title:

-Section II, Quality Assurance Program Page: 2 of 7 Rev.: 27 Date: December 20, 1996

1 i l YANKEE ATOMIC ELECTRIC COMPANY i i

7. ANSI N45.2.5-1974, Sucolementary Quality Assurance Reauirements for installation. Inspection and Testino of
Structural Concrete and Structural Steel Durina the Construction Phase of Nuclear Power Plants (Endorsed by Regulatory Guide 1.94 Revision 1)
8. ANSI N45.2.6-1978,- Qualification of Inspection.

Examination, and Testina Personnel for the Construction Phase of Nuclear Power Plants (Endorsed by' Regulatory i Guide 1.58, Revision 1) I

9. ANSI N45.2.8-1975, Sucolementary Ouality Assurance Reauirements for Installation. Inspection and Testina of l Mechanical Eauioment and Systems for the Construction Phase

, of Nuclear Power Plants (Endorsed by Regulatory Guide 1.116 Revision 0-R)

  • 10. ANSI N45.2.9-1974, Reauirements for Collection. Storaae.

and Maintenance of Quality Assurance Records for Nuclear l Power Plants (Endorsed by Regulatory Guide 1.88, l Revision 2)

  • 11. ANSI N45.2.10-1973, Quality Assurance Terms and Definitions j

1 l ' 12 . ANSI N45.2.11-1974, Quality Assurance Reauirements for the Desian of Nuclear Power Plants (Endorsed by Regulatory Guide 1.64. Revision 2)

13. ANSI N45.2.12-1977, Reauirements for Auditino of Quality j Assurance Program for Nuclear Power Plants (Endorsed by Regulatory Guide 1.144. Revision 1)
14. ANSI N45.2.13-1976, Quality Assurance Re" j rements for .

Control of Procurement of items and Serviros for Nuclear Power Plants (Endorsed by Regulatory Guide 1.123 Revision 1) i

Title:

Section II, Quality Assurance Program l

!       Page:        3 of 7 4        Rev.:        27

. Date: December 20, 1996 1

YANKEE ATOMIC ELECTRIC COMPANY

15. ANSI N45.2.23-1978. Qualification of Quality Assurance ,

Proaram Audit Personnel for Nuclear Power Plants (Endorsed by Regulatory Guide 1.146, August 1980)

16. ANSI N18.1-1971, Selection and Trainina of Nuclear Power Plant Personnel (Endorsed by Regulatory Guide 1.8, Revision 1-R)
17. Regulatory Guide 1.26, Revision 3, Quality Group Classifications and Standards for Water . Steam , and Radioactive-Waste-Containino Comoonents of Nuclear Power Plants
18. Regulatory Guide 1.29, Revision 3, Seismic Desian Classificetion
,                    Notes:       1)    When conflicts in similar. requirements contained in Technical Specifications and     j the above documents exist, the requirements contained in Technical Specifications override those in the documents. Requirements in the documents will be considered when they supplement       ,

and are not in conflict with similar l requirements in Technical Specifications. l

2) Revisions to the above listed documents will be considered for applicability to the Yankee Operational Quality Assurance Program upon written direction thereof by the Regional Administrator, Nuclear Regulatory Commission - Office of Inspection and Enforcement - Region I.
3) Only those documents listed above shall be considered applicable to the Yankee and Vermont Yankee plants. Documents

Title:

Section 11. Quality Assurance Program Page: 4 of 7 Rev.: 27 Date: December 20, 1996

re a - A 2 YANKEE ATOMIC ELECTRIC COMPANY further referenced by the above listed documents shall not be considered applicable. They may, however, be considered as guidelines.

  • Exceptions and alternatives to the provisions contained in this Standard / Guide are detailed in Appendix B.
4) This Program shall be applicable to those activities requiring quality assurance which occur commencing within 90 days after acceptance of the Program by the l Nuclear Regulatory Commission.
5) The NRC shall be notified of changes, that reduce commitments in the accepted description of the OA program, for their review and acceptance prior to implementation. Acceptance will be assumed 60 days after submittal unless notified otherwise.
6) Changes that do not reduce OA program l commitments shall be submitted to the NRC I at least annually.
7) Editorial changes or personnel reassignments of a nonsubstantive nature do not require NRC notification.

Title:

Section 11 Quality Assurance Program - Page: 5 of 7 Rev.: 27 Date: December 20, 1996

  . - - . . _ _ - - . - . . -                                    . - _ - . . ~ - . -

i YANKEE ATOMIC ELECTRIC COMPANY i D, tANAGEMENT EVALUATION , The Cognizant Corporate 0fficer directs a thorough evaluation of the established Operational Quality Assurance Program by  : assigning the Nuclear Safety Auoit and _ Review Committee the task .l of reviewing for compliance with and evaluating the effectiveness . of quality. related activities. . E. TRAINING i

1. The Vice President (s) and Manager of Operations are_

responsible for the indoctrination and training of'their i staffs involved with activities affecting quality during l plant operation .and/or license commitment.

2. The Training Manager at Vermont Yankee is responsible for the indoctrination and training of plant staff personnel performing activities affecting operations or requiring l quality assurance, and of the operators who are formally  ;

licensed or qualified. l 3. The Training Coordinator at the Yankee Site is responsible for indoctrination and training of site staff personnel performing activities affecting license requirements.

4. Within YNSD, each department Director / Manager is responsible for the indoctrination and training of department personnel performing activities affecting quality in applicable design and engineering, test, I

operational, construction, or quality phases. 5 .. The indoctrination and training programs shall provide the following:

a. Instruction as to the purpose, scope, and  ;

implementation of quality-related manuals, l instructions, and procedures. l

Title:

Section 11. Quality Assurance Program i Page: 6 of 7 l- Rev.: 27 l Date: December 20, 1996

YANKEE ATOMIC ELECTRIC COMPANY

b. Training and qualification in the principles and techniques of the activity being performed.
c. Documentation of the scope, objective, and method of '

implementing the program,

d. Maintenance of personnel proficiency by retraining, re-examining, and/or recertifying.

't

e. Documentation of the training sessions including content, attendance, dates, and results where applicable.

j l 1 l l Tit'e: Section I . Quality Assurance Program Page: 7 of 7 Rev.: 27 Date: December 20, 1996

1 YANKEE ATOMIC ELECTRIC COMPANY III. DESIGN CONTROL A. SCOPE This section of the Operational Quality Assurance Program establishes measures to assure that the design of and changes to structures, systems, and components covered by the Operational 4 Quality Assurance Program are controlled. B. RESPONSIBil1 TIES

1. The Nuclear Services Division Quality Assurance Department shall be responsible for auditing design documents and j engineering specifications to verify that quality  !

requirements, such as inspection requirements and acceptance criteria, have been included by the responsible l I parties. The Nuclear Services Division Engineering / Project

2. l Departments / Plants shall be responsible for:  !
a. The design and control of design activities (including design interfaces) for the change of structures, systems, or components including the requirement for independent review. This NRC i mandated review shall be performed by an uninvolved, but technically knowledgeable, person in the-engineering discipline.
b. Identification, documentation, and control of deviations from specified design requirements and/or quality standards.
c. Design analysis and delineation of acceptance criteria for inspections and tests.

Title:

Section III, Design Control 2 Page: 1 of 4 Rev.: 27 Date: December 20, 1996

YANKEE ATOMIC ELECTRIC COMPANY l i

d. Verification of the adequacy of a specific design feature by implementation of a prototype test when required.  !
e. Review of inspection and test data for compliance  !

with established engineering criteria. I

3. The Plant Operations Review Committee shall be responsible for:
a. Review of all proposed plant changes and recommending their approval or disapproval to the Plant Superintendent / Manager.
b. Determination of whether proposed changes involve unreviewed safety questions.
4. The Plant Site Manager shall be responsible for:
a. Review of the recommendations of the Plant Operations Review Committee.
b. Review and approval of proposed piant changes.

l S. The Nuclear Safety Audit and Review Committee shall be j responsible for the review of pitint changes. I

6. The Vice President (s) and Manager of Operations and their staf f shall be responsible for:

l

a. Approval of procedures for processing plant design changes and engineering design changes.
b. Review, approval and distribution of plant change documents. l l

Title:

Section 111. Design Control l Page: 2 of 4

Rev.
27 l Date: December 20, 1996

l YANKEE ATOMIC ELECTRIC COMPANY

7. The Nuclear Services Division Plant Support Department shall be responsible for the distribution of design change documents to the contractor performing the work where contract administration responsibilities have been assigned. I C. IMPLEMENTATION ,

l

1. Satisfaction of this criterion shall be assured through the implementation of the Nuclear Services Division and/or {

plant actions listed below: l 1 I

a. Correct translation of applicatie regulatory requirements and design bases into specifications, I drawings and written documents.
b. Application of suitable design controls to such activities as reactor physics; seismic, stress, l thermal, hydraulic, radiation, and accident analyses- l compatibility of materials: and accessibility for  !

inservice inspection, maintenance and repair.

c. Design reviews to assure that design characteristics can be controlled, inspected and tested.
d. Performance of proper selection and accomplishment of design verification or checking process such as design reviews, alternate calculations, qualification l testing or test programs. Wher a test program is used to verify the adequacy sf a design, a l qualification test of a prototype unit under the most adverse design conditions sha'l be used. The responsibilities and qualifications of the verifier, the areas and features to be verified, the pertinent considerations to be verified, and the extent of documentation are identified in procedures.

l

Title:

Section III Design Control Page: 3 of 4 Rev..

      -     27 Date:    December 20, 1996 l

1 L I l l i  ; YANKEE ATOMIC ELECTRIC COMPANY l l Procedures will provide the criteria that specify ) when verification should be by test. If the 1 i verification method is by test only. prototype, l component, or feature testing is performed in 1 accordance with written procedures prior to relying-  : upon the component, system, or structure to perform its function. l l 1 l - j_ e. Subjection of design and specification changes,  ! including those originating "on-site", to th'e same , , _ design controls and approvals that were applicable to l the original design unless designated in writing to l another responsible organization. l l

f. Documentation of errors and deficiencies in the design process that adversely affect safety classified structures, systems, and components:  ;

performance of corrective action to preclude  ! repetition.  ;

g. ' Review of standard "off-the-shelf" comm'ercial or j previously approved materials, parts, and equipment.

that.are essential to'the. safety functions of { structures, systems, and components, for suitability j of application prior to selection. j i -

h. Selection of suitable materials, parts, equipment, i and processes for safety classified structures, I systems, and components.  !

l

1. Establishment of procedures to assure that conputer programs are verified and validated for a patticular i application. l

Title:

Section III, Design Control Page: 4 of 4 Rev.: 27 i Date: December 20, 1996 l

l YANKEE' ATOMIC ELECTRIC COMPANY I l IV. PROCUREMENT DOCUMENT CONTROL l A. SCOPE l This section of the Operational Quality Assurance Program ) l establishes the measures necessary to assure that applicable regulatory requirements, design bases and other requirements which are necessary to assure adequtte quality, are suitably l included or referenced in the documents for procurement of l material, equipment and services. * ! B. ' RESPONSIBILITIES ,

1. The Nuclear Services Division Quality Assurance Department shall be responsible for review of procurement requisitions initiated by the Plant and the Yankee Nuclear Services Division, except for Vermont Yankee who may request such reviews. The Vermont Yankee staff shall be responsible for j the Procurement Requisition reviews.
2. The Plant or their corporate staffs shall be responsible j
l. for:
a. The preparation, review, issue, and control of l

purchase documents, j L l b. ' Preparation of detailed procedures as to how purchase documents are prepared, reviewed, approved, issued, and controlled. l l c. Review of plant procurement requisitions (Vermont-Yankee plant only). j

3. The Nuclear Services Division Engineering and/or Project Departments shall be responsible for: '

Title:

Section IV, Procurement Document Control l

Page: 1 of 3  ;

! Rev.: 27 > Date: December 20, 1996 f

l YANKEE ATOMIC ELECTRIC COMPANY l .a. Preparation of engineering specifications which detail the technical and quality requirements for material, equipment and services.

b. Initiation and/or review (Yankee plant only) of '

purchase documentation for material, equipment, and l- services required for Plant changes. I l

4. The Nuclear Services' Division Plant. Support Department' l shall be responsible for initiation and/or review (Yankee  ;

plant only) of purchase documentation for construction services.~ including contractor supplied material and l l equipment required for plant. changes where contract j administration' responsibilities have been assigned. l [

5. For YNSD, the Vice President (s) and Manager of Operations f and their staff shall be responsible for the. review and  :

approval of procurement documents. For Vermont Yankee, j this function is performed by the Vermont Yankee staff.

                                                   'C.                    IMPLEMENTATION                                                                                          ;

l j 1. Satisfaction of the criterion shall be assured through the , implementation of the Nuclear Services Division and/or plant actions' listed below: l 1. l .

a. Documentation of the review and approval of procurement documents prior to release and .;

I i availability of this documentation for verification.

b. Identification of-the vendor's appl ~icable quality ,

assurance requirements of 10CFR50, Appendix B and/or ANSI N18.7, and/or other' applicable codes, standards or regulatory documents referenced'in procurement documents which are to be reviewed-by the qualified personnel knowledgeable in quality assurance. For

Title:

Section IV, Procurement Document Control l Page: 2 of 3 4 Rev.: 27 Date: December 20, 1996' J

                                                                                                                                      -                         - - - + - - , -,

i l . ! YANKEE ATOMIC ELECTRIC COMPANY l l l . . Vermont' Yankee, this function will be the l responsibility of the Vermont Yankee staff.

c. Identification in the procurement documents.of the I documentation to be prepared, maintained, and/or submitted to~the purchaser prior.to use, such as:

Drawings, specifications, procedures:

                                                               ' 1.
                                                               .2.               Inspection and fabrication plans:
3. Inspection and test records:
4. Personnel and procedure qualifications:

l 5. Chemical and physical test results of material:

l. and
. 6 '. Quality Assurance Department's right of the .

i access to the vendor's facilities and records for surveillance and/or audit to procurement  ; documentation. ,

d. Review and approval of changes and revisions to l procurement documents at least equivalent to those L for the original document.

l l e. Control of procurement documents for spare and replacement parts at least equivalent to that used i for the original equipment. < I

  • i

[

Title:

Section IV, Procurement Document Control Page: '3 of 3. j Rev.: 27 , Date: December 20, 1996 i i e i '4

_ _. - . _.._._.m _ .-. ... _ . _ . _ _ . _ _ . _ _ _ _ _ _ _ _ _ . _ _ _ . _ . _ _ _ _ . _ _ _ _ i i ) i

f. . YANKEE ATOMIC ELECTRIC COMPAN'Y
I
l. 'V . INSTRUCTION

S. PROCEDURE

S.'AND' DRAWINGS , l

A. SCOPE f

l

                                                                                            .                                                       l 4                                  This section of the Operational Quality Assurance Program
establishes the measures for prescribing, and accomplishing i activities requiring quality assurance in accordance with l
: approved crawings, instructions, or procedures. l l

B. RESPONSIBillTIES , Within Yankee Nuclear Services Division, each Department  ; j' Director / Manager is responsible for establishing ~and complying i j with applicable procedures governing the activities affecting  ; quality. i Persons preparing andlapproving documents are responsible for ._ assuring that specifications, instructions, procedures, and I drawings include appropriate quantitative or qualitative f [ acceptance criteria for determining that activities have been j satisfactorily accomplished; assuring that the applicable

criteria of 10CFR50 Appendix B and/or ANSI N18.7 are specified
;
and assuring that the documents are kept current. In addition, i p the following departments have the distinct responsibilities l delineated below.

i'

1. The Nuclear services Division Quality Assurance Department

! shall be responsible for review of all Plant Quality

          ^

Assurance procedures.

2. The Plant shall be _ responsible for .the preparation.

approval, maintenance, and implementation of all I inst' ructions and procedures associated with plant ] activities. I

3. The Nuclear Services Division Engineering and/or Project Departments shall be responsible for

i

Title:

Section V. Instructions, Procedures, and Drawings 5

             .Page:    1 of 2 1

Rev.: 27 , i Date: December 20, 1996 ! H

 ._.-.__.m_.._..          . - . . _ _ _ . _ _ . _ _ _ - . _ . . _ _ . - _ _ _ _                                  _ _ _ _ . _      _. _ . .

l YANKEE ATOMIC ELECTRIC COMPANY

a. Preparation and approval of engineering drawings and i L instructions, welding and nondestructive examination L

procedures, and procedures for Engineering Design Control. l 'b. Updating and control of original drawings and l distribution of copies thereof.

4. .The Plant Operations Review Committee shall be responsible

, for reviewing procedures affecting nuclear safety prior to  ! l their approval by the Plant Superintendent / Manager.

5. The Nuclear Services Division Plant Support Department shall be responsible for the preparation,. approval..

! maintenance, and implementation of all instructions and i procedures associated with Construction Services activities. C. IMPLEMENTATION

1. Satisfaction of this criterion shall be assured through the  ;

implementation of the Nuclear Services Division and/or  ; plant actions listed below-

a. Establishment of provisions which clearly delineate the sequence of actions to be accomplished in the preparation . review,-approval, and' control of instructions, procedures, and drawings.
b. Review of inspection plans; test, calibration, special process, maintenance and repair procedures; drawings and specifications; and changes thereto by -i the Quality Assurance Department or other personnel knowledgeable in quality assurance.

Title; Section V, Instructions, Procedures, and Drawings Page: 2 of 2 Rev.: 27: Date: December 20. 1996 l l'

_ . _ . _ _ _ . _ . - _ - _ . . _ _..._~ _ ._ _- . _ _ . _ - . . . _ _ _ _ . _ . . _ _ - - . _ . . _ l I YANKEE ATOMIC ELECTRIC COMPANY l VI. DOCUMENT CONTROL i A. SCOPE I This section of the Operational Quality Assurance Program j establishes the measures for controlling the issuance of , documents, including revisions-thereto, which affect quality activities, l j l B. RESPONSIBILITIES- l l l

1. All participating departments shall establish document control measures which provide for the following:
                                                                                                                                                          'I
a. Identification of organizations responsible for ]

l-preparatien, review, approval, and control of documents. l j b. Identification of documentation to be used in j performing the activity. l j l-L c. Coordination and control of interface' documents.

                                                                                               ~
d. Establishment of distribution lists.
e. Action to be taken for obsolete or superseded l documents.

l In addition, the.following organizations have the unique responsibilities delineated below.

2. The Plant shall be responsible for:

l a. Controlling the issuance of plant operating, , maintenance, repair, refueling, inspection and test, l

                                                                     'and change documents.                                                                 !

1

Title:

Section VI. Document Control  ; j Page: 1 of 4 l 3 Reva: 27 I Date: December 20, 1996 l [ I

YANKEE ATOMIC ELECTRIC COMPANY

b. Distribution and maintenance of all plant approved and/or revised documents assuring quality at the location where the activity is performed.
c. Review and distribution of drawings.
3. The Nuclear Services Division Engineering and/or Project Departments shall be responsible for:
a. Controlling the issuance of engineering drawings, specifications, welding and nondestructive examination documents.
b. Revision and distribution of welding and nondestructive examination documents.
c. Maintenance and distribution of engineering specifications and drawings.
4. The Vice President (s) and Manager of Operations and their staff shall be responsible for;
a. A system of review and approval of Plant drawings and specifications.
b. Controlling the Nuclear Services Division Operational Support quality assurance documents.
5. The Director of Quality Assurance shall be responsible for establishing the means for the control and distribution of the Operational Quality Assurance Program and Approved Vendors List and revisions thereto.

Title:

Section VI. Document Control Page: 2 of 4 Rev.: 27 Date: December 20. 1996

l YANKEE ATOMIC ELECTRIC COMPANY l C. IMPLEMENTATION

1. Satisfaction of this criterion shall be assured through the implementation of the Nuclear Services Division and/or plant actions listed below:
a. Review and approval of document changes by the same organizations that performed the original review and approval cLr_ by other responsible organizations delegated by the controlling authority,
b. Inclusion of approved changes in instructions, drawings, and other applicable documents prior to placing the system in operating status.  !
c. Provision of availability of documents at the l

location where the activity is to be performed prior to commencing the work. I

d. Establishment, revision, and distribution of a master list or equivalent to identify the current revision number of instructions, specifications, drawings, procurement documents, or other quality assuring documents.
e. Control of documents identified as follows:
1. Design documents (i .e. , Engineering / Plant Design Change Requests, Specifications, Calculations, etc.):
2. Design, manufacturing, construction, and installation drawings;
3. Procurement documents:

Title:

Section VI, Document Control Page: 3 of 4 Rev.: 27 Date: December 20, 1996

1 l l i YANKEE ATOMIC ELECTRIC COMPANY i l l 4. Operational Quality Assurance Program, i maintenance, and operating procedures:  !

5. Manufacturing, inspection and test instructions:
6. Test documents:
7. Design changes: and
8. Nonconformance reports.
9. Event reports (Vermont Yankee).
f. Appendices to the Operational Quality Assurance  !

Program are considered to be part of the Program and I are reviewed and approved in accordance with the Program, a--d' l l 1

Title:

Section VI, Document Control Page: 4 of 4 Rev.: 27 Date: December 20. 1996 1

P YANKEE ATOMIC ELECTRIC COMPANY VII. CONTROL OF PURCHASED MATERIAL. EQUIPMENT. AND SERVICES A. SCOPE This section of the Operational Quality Assurance Program establishes measures to assure that purchased material, equipment and services, whether purchased directly or through contractors and subcontractors, conform to the procurement documents. I B. RESPONSIBILITIES

1. The Nuclear Services Division Quality Assurance Department shall be responsible for:
a. Audits and Commercial Surveys of vendor quality assurance programs.
b. Surveillances of vendor activities.
c. Maintenance of the Yankee Atomic Electric Company Approved Vendors List.
2. The Nuclear Services Division Quality Assurance, Engineering, and/or Project Departments shall be responsible for evaluating vendor manufacturing and technical capabilities upon request.
3. The Plant shall be responsible for:
a. Receipt inspection and control of material and l equipment.
b. Evaluation of purchased services during and/or after completion of the service.  !
c. The Plant Services / Administrative Department at the Yankee plant and the Material Manager at i i

Title:

Section Vil, Control of Purchased Material, Equipment, and Services , Page: 1 of 4 Rev.: 27 1 Date: December 20, 1996 j l

YANKEE ATOMIC ELECTRIC COMPANY Vermont Yankee shall be responsible for the control of purchased material, parts and components until issued for installation or use. C. IMPLEMENTATION

1. Satisfaction of this criterion shall be assured through the implementation of the Nuclear Services Division and/or plant actions listed below:
a. Audits and Commercial Surveys of vendors based on one or more of the following, as appropriate to the scope of procurement activities:
1. When required in order to verify vendor capabilities to comply with the applicable criteria of 10CFR50, Appendix B. ANSI N18.7, or other quality program baselines.
2. When required based on the results of review and evaluation of vendor performance history.
3. When required in order to observe vendor facilities / service activities to assure conformance to purchase specifications,
b. Surveillances of vendors which provide for:
1. Specification of applicable quality controls, processes to be witnessed or verified, documentation required, and personnel responsible for performing the surveillance.
2. Verification that the vendor complies with the quality requirements specified in procurement documents by observation of in-process work.

Title:

Section Vll, Control of Purchased Material Equipment, and Services Page: 2 of 4 Rev.: 27 Date: December 20, 1996

YANKEE ATOMIC ELECTRIC COMPANY

c. Transfer of the following records from the vendor to the plant:
1. Documentation that identifies the purchased material / services and compliance with the applicable procurement document requirements.

I

2. Documentation that identifies any deviation (s) from procurement requirements, including a i description of those deviations dispositioned
                              " accept as is" or " repair".                   I l
d. Review and acceptance of vendor documentation by a responsible quality assurance individual. I
e. Receipt inspections of vendor furnished material / services, in accordance with predetermined  !

instructions, to assure: )

1. Material is identified and conforms with receiving documentation.
2. Material and documentation are determined acceptable prior to use.
3. Inspection records or certificates of conformance attesting to material acceptability are on-site prior to use.
4. Items are identified as to their inspection status prior to release for controlled storage, installation or further work.

Title:

Section VII Control of Purchased Material, Equipment, and Services Page: 3 of 4 Rev.: 27 Date: December 20, 1996

       .  .            . - - - .                      -.        .     .-                      . ~_

YANKEE ATOMIC ELECTRIC COMPANY

f. Evaluations of vendor effectiveness to control quality is performed at intervals consistent with the importance, complexity and quality of the item / services, I

l t b

Title:

Section Vil, Control of Purchased Material Equipment, and Services Page: 4 of 4 Rev.: 27 Date: December 20, 1996

_ . . . - . _ . ._ ~. _ .-_ - _ . _ . _ . _ . . - - - - _ - _ . _ . _ . . . ... _ _ _ . _ _. - _ .- >> _ ... j 1

                                                                                                                                                )

YANKEE ATOMIC' ELECTRIC COMPANY l Vill. IDENTIFICATION AND CONTROL OF MATERIAL PARTS. AND COMPONENTS l l A. SCOPE i i This-section of the Operational Quality A'ssurance' Program ) establishes the measures for identification and control necessary  ; to prevent the'use of incorrect or defective material, parts,-and j components, j l B. RESPONSIBILITIES I

1. The Nuclear Services Division Quality Assurance Department shall be responsible for review, evaluation, or verification (audit commercial survey or surveillance) of )

vendor quality controls and work processes for traceability I of materials through the use of heat number, part number, or serial number, either on the item or on records traceable to the items.

2. The Plant shall be responsible for:
a. Preparation and approval of documents for the identification and control of materials, parts, components and storage of lubricants and other consumable materials.

l

b. Maintenance of traceability of materials, parts, and l components received, stored, installed, and used at the Plant.
3. The Nuclear Services Division Engineering and/or Project Departments and/or the Vermont Yankee staff shall be j responsible for assuring that specifications contain l appropriate requirements for the identification and control of materials, parts, and components.

' Section VIII, Identification and Control of

Title:

l Materials, Parts, and Components i Page: 1 of 2 Rev.: 27 i . Date: December 20, 1996 i ( I

YANKEE ATOMIC ELECTRIC COMPANY i

4. For YNSD, the Vice President (s) and Manager of Operations  :

and their staff shall be responsible for providing review and approval of documentation for the purchase of materials, parts, and components. For Vermont Yankee, this function is performed by the Vermont Yankee staff. C. IMPLEMENTATION

1. Satisfaction of this criterion shall be assured through the implementation of the Nuclear Services Division and/or plant actions listed below:
a. Traceability of the identification of materials and parts to the appropriate documentation such as drawings, specifications, purchase orders, manufacturing and inspection documents, deviation reports, and Physical and Chemical Material Test Reports.
b. Identification of the item in a location and with a method which does not affect its fit, function or quality.
c. Documented verification of correct identification of materials, parts, and components prior to release for use.

i l l l l l l

Title:

Section VIII, Identification and Control of l Materials, Parts, and Components Page: 2 of 2 Rev.: 27  ! Date: December 20, 1996 i

l I l YANKEE ATOMIC ELECTRIC COMPANY IX. CONTROL OF SPECIAL PROCESSES A. SCOPE P l l This section of the Operational Quality Assurance Program establishes the measures necessary to assure that special processes, including welding, heat treating, and nondestructive l testing, are controlled and accomplished by qualified personnel ! in accordance with applicable codes, standards, specifications, I criteria and other special requirements. B. RESPONSIBILITIES l 1. The Nuclear Services Division Quality Assurance Department l shall be responsible for: l l l a. Surveillance of certain nondestructive tests in I accordance with " Yankee Atomic Electric Company Welding and Nondestructive Examination Procedures". '

b. Review of special process documents, as requested, generated by the Nuclear Services Division l Engineering / Project Departments and vendors for use l l

on-site and when otherwise specified.

2. The Nuclear Services Division Engineering and/or Project Departments shall be responsible for:
a. Preparation of documents for welding, heat treating, filler metal control, and nondestructive examinations.

I l b. Review and approval of special process documents provided by the vendor for use on-site and when otherwise specified. 1

Title:

Section IX, Control of Special Processes Page: 1 of 2 Rev.- 27 i Date: December 20, 1996 l

YANKEE ATOMIC ELECTRIC COMPANY

3. The Plant Support Department shall be responsible for training, qualification, and requalification of personnel in nondestructive testing, such as liquid penetrant examination.
4. The Plant shall be responsible for:
a. Assurance that maintenance and change work involving special processes are performed by qualified personnel in accordance with approved documents.
b. Control of material used in speci: processes by plant personnel.
5. For YNSD, the Vice President and Manager of Operation and staff shall be responsible for review and approval of purchase documentation for special process material . For Vermont Yankee, this function is performed by the Vermont Yankee staff.

C. IMPLEMENTATION l

1. Satisfaction of this criterion shall be assured through the  ;

implementation of the Nuclear Services Division and/or plant actions listed below:

a. Completion of qualification records of documents, equipment, and personnel connected with special processes in accordance with applicable codes, standards, and specifications.
b. Performance of special processes accomplished in accordance with written process sheets or equivalent with recorded evidence of verification.
c. Maintenance and updating of qualification records of special process documents, equipment, and personnel .

Title:

Section IX, Control of Special Processes Page: 2 of 2 Rev.- 27 Date: December 20, 1996

YANKEE ATOMIC ELECTRIC COMPANY X. INSPECTION A. SCOPE' j This section of the Operational Quality Assurance Program  ; establishes measures for inspection of activities requiring j quality assurance to verify conformance with approved procedures, l drawings, specifications and instructions. l 1 i B. RESPONSIBILITIES

                                                                                         ]
              .1. The Nuclear Services Division Quality Assurance Department shall be responsibic for:
a. Surveillance of documentation pertinent to the Inservice Inspection and Test Program-(for Vermont Yankee only). 'l I
b. Surveillance of vendor inspection activities and personnel.
c. Review of Installation and Test Procedures and' Maintenance Requests to ascertain the extent of any required QA serveillances and OC inspections (Yankee Plant only). 1 l
d. Incorporation of mandatory notification / hold points for plant / vendor / service group activities into the 0A surveillances and mandatory hold points for inspections (Yankee Plant only).
e. Writing, reviewing and approving quality control i inspection checklists. (Yankee Plant only.)

i

f. Perform QC inspection activities to assure that  !

predetermined requirements have been met. (Yankee Plant only.)

Title:

Section X, Inspection l Page: 1 of 3 Rev.: 27 Date: December 20, 1996 j i

i l l 1 YANKEE ATOMIC ELECTRIC COMPANY i i

2. The Plant shall be responsible for:
a. Writing and approving inspection instructions and check lists,
b. Assuring that activities requiring quality assurance meet predetermined requirements.
c. Providing qualified personnel and necessary equipment for inspections to assure quality work,
d. Perform inspection activities to assure that predetermined requirements have been met.
e. Hold points incorporation where applicable.

C. IMPLEMENTATION

1. Satisfaction of this criterion shall be assured through the implementation of the Nuclear Services Division and/or plant actions listed below:
a. Independence of personnel performing the inspection from the personnel performing the activity being l inspected.

1

b. Use of instructions or check lists which incorporate l the details listed in Section XVII Item C.I.a.
c. Use of necessary drawings and specifications when  !

performing inspection operations. I

d. Inspection of repairs and replacements in accordance with the approved design and inspection requirements or acceptable alternatives.

Title:

Section X. Inspection Page: 2 of 3 Rev. 27 Date: December 20. 1996

YANKEE ATOMIC ELECTRIC COMPANY

e. Surveillance of processing methods, equipment, and personnel when direct inspection is not possible.
f. Qualification of inspectors in accordance with applicable codes, standards, and company training programs; and maintenance of qualifications and certifications.
g. Review of maintenance documents by qual'.fied personnel knowledgeable in quality assurance to determine the need for inspection, identification of inspection personnel, and documenting inspection resul ts .

l l l

Title:

Section X, inspection Page: 3 of 3 Rev.. 27 Date: December 20, 1996 1

 ._ _. ._ _ . _ _ . - _ . _ . . . _ _ _ _ . ~ - . . _ _ . _ . _                                      - _ _ . _ . _ . . - . . . . _ . _ _ _ _ _ > > _ . _ . _ .

i 4 YANKEE ATOMIC ELECTRIC COMPANY  ! i XI. TEST CONTROL  : A. SCOPE l r This section of the Operational Quality Assurance Program , establishes the measures for a test program to demonstrate'that ' structures, systems, and components will perform' satisfactorily , in service. B. RESPONSIBILITIES

1. The Nuclear Services Division Quality Assurance Department shall be responsible for: ,

I

a. Surveillance of vendor test program activities.  !

l

b. Surveillance of the documentation generated.during I the test program. 3
2. The Nuclear Services Division Engineering / Project Departments / Plants shall be responsible for-1
a. Determination of when testing is required following I plant changes,
b. Establishment of specifications, requirements, and acceptance criteria for testing following plant changes,
c. Development of test documents, performance of tests, and documentation, evaluation, and approval of test results.
d. Provision of qualified personnel and calibrated equipment for testing.

Title:

Section XI, Test Control Page: 1 of 3 Rev.: 27 Date: December 20, 1996

YANKEE ATOMIC ELECTRIC COMPANY

3. The Nuclear Safety Audit and Review Committee shall be responsible for reviewing proposed tests or experiments which involve an unreviewed safety question as defined in 10CFR50.59,
4. The Plant Operations Review Committee shall be responsible for the review of all test documents and test results for special tests.

C. IMPLEMENTATION

1. Satisfaction of this criterion shall be assured through the implementation of the Nuclear Services Division and/or plant actions listed below:
a. Assurance that changes, repairs, and replacements are tested in accordance with the approved design and testing requirements or acceptable alternatives.
b. Review of written test documents for incorporation or reference of the following:  ;
1. Requirements and acceptance limits contained in applicable design and procurement documents.
2. Instructions for performing the test.
3. Test prerequisites, such as:

a) Calibrated instrumentation; b) Adequate and appropriate equipment; c) Trained, qualified, and I licensed / certified personnel: d) Completeness of item to be tested:

Title:

Section XI. Test Controi Page: 2 of 3 Rev.: 27 Date: December 20. 1996 l l

l YANKEE ATOMIC ELECTRIC COMPANY e) Suitable and controlled environmental conditions; and f) Provisions for data collection and storage.

4. Mandatory inspection hold points for witness by owner, contractor or inspector, when applicable.
5. Acceptance and rejection criteria.
6. Method of documenting test data and results.
c. Procedures shall provide for specification of test equipment with suitable accuracy. The criteria for determining the accuracy requirements of v. t equipment shall be provided when identification of  !

specific equipment is not practical. l l 1 I

Title:

Section XI, Test Control  ; Page: 3 of 3 , Rev.: 27 Date: December 20, 1996  ! l ? l

l l l YANKEE ATOMIC ELECTRIC COMPANY Xil. CONTROL OF MEASURING AND TEST EOUIPMENT A. SCOPE This section of the Operational Quality Assurance Program establishes the measures for the control, calibration and periodic adjustments of tools, gages, instruments, and other measuring and test devices used to verify conformance to established requirements. B. RESPONSIBILITIES l

1. Each Plant Department shall be responsible for: I 1
a. Development of the implementing documents for control of measuring and test equipment including ,

identification and calibration for equipment under

                                                                                      ]

their control.

                                                                                      )1

< b. Provision of calibrated tools, gages and instruments necessary to perform required measurements and tests.

c. Maintenance of calibration records,
d. Preparation and review of specifications for measuring and test equipment, such that all
,                               applicable requirements are satisfied.

C. IMPLEMENTATION

1. Satisfaction of this criterion shall be assured through the I

implementation of the Nuclear Services Division and/or

,                        plant actions listed below:
a. Identification and traceability of measuring and test equipment to the calibration test data.

Title:

Section XII. Control of Measuring and Test Equipment Page: 1 of 2 Rev.: 27 Date: December 20, 1996 l

l i 1 YANKEE ATOMIC ELECTRIC COMPANY

b. Labeling or tagging of measuring and test equipment to indicate due date for calibration.
c. Calibration of measuring and test equipment at specified intervals based on required accuracy, purpose, degree of usage, stability characteristics, and other conditions affecting the measurement.
d. Documentation of measures taken to determine the validity of previous inspections performed when measuring and test equipment is found to be out of calibration.
e. Use of calibration standards having an uncertainty (error) requirement of no more than 1/4 of the tolerance of the equipment being calibrated.

Calibration standards limited by the

                          " state-of-the-art" may have a greater acceptable uncertainty.
f. Documentation and maintenance of the status of all

! items under the calibration system.

g. Traceability of reference and transfer standards to nationally recognized standards; or, documentat'on of the basis for calibration where national standards j are nonexistent.

I i 1 l l l l i

Title:

Section XII. Control of Measuring and Test Equipment Page: 2 of 2 l Rev.: 27 1 Date: December 20, 1996 1

  -. - . ~._         ..    ... ...- ~ - ~ - .               - - .         ~..- . -   - - . _ _ - - . - . - .   . . -

f I j

i

, YANKEE ATOMIC ELECTRIC COMPANY  ! i  ! 2 i X111. HANDLING. STORAGE AND SHIPPING V i i i A. SCOPE j i ] This section of the Operational Quality Assurance Program

                                                                                                                      ]

l establishes measures to control the handling, storage, shipping,

cleaning and preservation of material and equipment to prevent damage or deterioration.

[ [ B'. RESPONSIBILITIES j 1. The Plant shall be responsible for: i

a. Development of the implementing documents for i handling, storage and shipping of materials and equipment.

1 i b. Provisions of suitable facilities and equipment for handling, storage, and. shipping of materials. l j- c. Inspection and test of special- handling tools and

equipment.

t ) C. IMPLEMENTATION

- 1. Satisfaction of this criterion shall be assured through the j implementation of the Nuclear Services Division and/or 3 i Plant actions listed below
)

[ i

a. Specification and accomplishment of special handling.

l preservation, storage, cleaning, packaging, and shipping requirements by qualified individuals in ) accordance with predetermined work and inspection ] instructions.

i
b. Preparation of instructions in accordance with design
;                                                   and specification requirements which control the i

j

Title:

Section XIll Handling, Storage, and Shipping i Page: 1 of 2

)            Rev.:      27

} Date: December 20, 1996 i

YANKEE ATOMIC ELECTRIC COMPANY cleaning, handling, storage, packaging, shipping and preservation of safety classified materials, components and systems to preclude damage, loss or deterioration by environmental conditions such as temperature or humidity. I l I l

Title:

Section X111, Handling. Storage, and Shipping Page: 2 of 2 Rev.: 27 Date: December 20, 1996

  . _ . _ . _      ___ _-_..._.__.._-_____.._...___.__.m                                         _ _ . . _ . _ . . _, m..  .. _ _ . .

YANKEE ATOMIC ELECTRIC COMPANY j i XIV. INSPECTION, TEST AND OPERATING STATUS l 1

  • 1 A. SCOPE This section of'the Operatiunal Quality Assurance Program l establishes the measures for indicating the status of items l undergoing inspections and tests (via tags', labels, logs, data- l sheets, etc.)..to prevent the unintentional bypass of. required tests. In addition, this section establishes measures for-indicating the operating status of components and systems to prevent their inadvertent operation. )

B. RESPONSIBILITIES j I

1. The Plant shall be responsible for- I l
a. Ensuring indication of the status of operating- l equipmen.t or systems to be removed from service for  ;

! maintenance, test, inspection, repair or change.  ;

b. Designation of personnel who are responsible for l directing the status change of equipment and systems. l C. IMPLEMENTATION'

! 1. Satisfaction of this criterion shall be assured through the implementation of the Nuclear Services Division and/or plant actions listed below:

a. Notification of affected organizations for chenges in the inspection, test and operating status of structures, systems, and components,
b. Procedural control of the bypassing of required

, inspections, tests and other critical operations with the concurrence of the Quality Assurance Department. 1

Title:

Section XIV, inspection, Test, and Operating Status . [~ Page: 1 of 2 Rev.: 27 j Date: December 20, 1996 , l

    ..              ~                                -      .             .    .                                         -

YANKEE ATOMIC ELECTRIC COMPANY

c. Procedural control of the application and removal of inspection and status indicators such as tags, markings, labels and stamps.

I 1 I i 1 l l l

Title:

Section XIV, inspection, Test, and Operating Status Page: 2 of 2 Rev.: 27 Date: December 20, 1996

YANKEE ATOMIC ELECTRIC COMPANY XV. NONCONFORMING MATERIALS. PARTS. AND COMPONENTS A. SCOPE This section of the Operational Quality Assurance Program establishes the measures to control materials, parts, components, or any other activities which do not conform to requirements, in order to prevent their inadvertent use. B. RESPONSIBillTIES

1. The Nuclear Services Division Quality Assurance Department shall be responsible for:
a. Review of nonconformance reports to determine repetitive nonconforming conditions and to verify resolution of significant conditions adverse to quality to preclude recurrence (for Yankee Plant  :

only).

b. Review of Event Reports to verify resolution of significant conditions adverse to quality (Vermont Yankee only).
c. Establishment of feedback system between Yankee Atomic Electric Company and vendor representatives in regard to nonconforming material or services.
d. Initiation of nonconformance reports (Yankee Plant and Event Reports for' Vermont Yankee) when conditions are found which may adversely affect the quality of plant systems, structures, activities, or components.

I l '

Title:

Section XV, Nonconforming Materials, Parts, and Components Page: 1 of 3 Rev.- 27 Date: December 20, 1996 l

YANKEE ATOMIC ELECTRIC COMPANY '

2. The Nuclear Services Division Engineering and/or Project Departments shall be responsible for:
a. Review of nonconforming services or items which cannot be corrected by vendor action,
b. Preparation ir approval of implementing documents for repair and/or -awork of nonconforming items.
3. The Vice President (s) and their staff shall be responsible for the evaluation of significant plant-initiated nonconforF ng item, service, or activity dispositions.
4. The Plant shall be responsible for:
a. Writing implementation documents for the identification, documentation, and corrective action for services, material, installation, testing, operation, and/or surveillance nonconformances'at the Plant.
b. Establishment of measures to provide for the j documented control of nonconforming materials, parts, and componcnts.
c. Establishment of feedback system between the plant and vendor representatives for the disposition of nonconforming services, materials, parts and compenents. l 1

C. IMPLEMENTATION

1. Satisfaction of this criterion shall be assured through the implementation of the Nuclear Services Division and/or plant actions listed below:

Title:

Section XV, Nonconforming Materials, Parts, and Components Page: 2 of 3 Rev.: 27 Date: December 20, 1996

YANKEE ATOMIC ELECTRIC COMPANY

a. Identification, disposition, inspection and segregation of nonconforming items or activities.
b. Identification of those individuals or groups delegated the responsibility and authority for the disposition and written approval of nonconforming items or activities. I
c. Inspection and test of reworked or repaired items
                                                                                  ]

which require reinspection and retest to original l methods or methods equivalent thereto. l

d. Inclusion of nonconformance reports dispositioned ,
                         " accept as is" or " repair" as part of the inspection   l records furnished to the plant.                          l 1
e. Periodic analysis of nonconformance reports to show j quality trends with the results reported to management fcr review and assessment.
2. The identification, description, disposition, inspection and signature approval of the disposition for nonconformance shall be documented in a nonconformance report.

Title:

Section XV, Nonconforming Materials, Parts, and Components Page: 3 of 3 Rev.- 27 Date: December 20, 1996 1

YANKEE ATOMIC ELECTRIC COMPANY XVI. CORRECTIVE ACTION A. SCOPE This section of the Operational Quality-Assurance Program establishes measures to assure that conditions' adverse to quality,. such as failures, malfunctions, deficiencies, deviations, defective material and equipment are promptly identified and corrected. B. RESPONSIBILITIES

1. The Nuclear Services Division Quality Assurance Department shall be responsible for review anM/or audit of recommendations to prevent recurre.1 e of a significant condition adverse to quality.
2. The Vice President (s) and their staff shall be responsible for:
a. Review of significant adverse conditions' reported.by the Plant including corrective actions taken.
b. Coordination of comments between the Nuclear Services Division Projects Departments and the Plant (for Yankee Plant only).
3. The Plant shall be responsible for:
a. Identification of causes of conditions adverse to quality.
b. Implementation of the corrective action.
c. Documentation of corrective action taken.

Title:

Section XVI. Corrective Action Page: 1 of 3 Rev.: 27 Date: December 20, 1996

    . ~ . . . .    , - - _  . - - _ . - - ~ _ . - . - . - - -                      .   . .  , - . . - _ - . . ~ . - . - - _ . . - . . . . . . . .

YANKEE ATOMIC ELECTRIC COMPANY p

d. Coordination of comments between the Nuclear Services Division Projects Departments and.the Plant (for ,

Vermont Yankee only). ,

4. The Nuclear Services Division Engineering and/or Project Departments shall be responsible for: 3
                                                                                                                                                  )
a. Review of conditions adverse'to quality which involve design deficiencies to determine the cause of the condition. )
b. Recommendations of corrective action to preclude repetition of design deficiencies.
5. The Plant Operations Review Committee shall be responsible for:

l a. Review of significant conditions adverse to quality and recommending corrective action, i ' l

b. ' Recommendations involving repetition of significant operating deficiencies.

C. IMPLEMENTATION {

1. Satisfaction of this criterion shall be' assured through the implementation of the Nuclear Services Division and/or plant actions listed below:
a. Initiation.of corrective action following the determination of a condition adverse to quality to l I- preclude recurrence.
b. Follow-up reviews to verify proper implementation of corrective actions and to close out the corrective action documentation.

i

Title:

Section XVI Corrective Action

Page
2 of 3

+ Rev.: 27 Date: -December 20, 1996

l l l I l YANKEE ATOMIC ELECTRIC COMPANY

c. Reporting of significant conditions adverse to quality, the cause of the conditions, and the l

l correction action implemented to the cognizant levels of management for review and assessment, both "off-site" and "on-site". l l l l l l l l l I l l 1 l l

Title:

Section XVI, Corrective Action

;   Page:  3 of 3 Rev.:  27 Date:  December 20, 1996 l                                                             _         _

YANKEE ATOMIC ELECTRIC COMPANY XVil. QUALITY AS RANCE RECORDS l A. SCOPE l

1. This section of the Operational Quality Assurance Program establishes the measures for maintenance of records which 1 provide documentary evidence of the quality of items ana the activities affecting quality. Requirements shall be established for identification, transmittal, retrievability and retention of quality assurance records including duration, location, protection and assigned responsibility. l
2. The quality assurance records shall include, but not be limited to, plant history; operating logs: principal I maintenance; design change activities; reportable occurrences: nonconformance reports; results of reviews, i inspections, tests, audits and material analyses: l monitoring of work performance; qualification of personnel, l documents and equipment; drawings; specifications; l procurement documents: calibration documents and reports; and corrective action reports.

B. RESPONSIBILITIES

1. The Nuclear Services Division Quality Assurance Department l I

l shall be responsible for:

a. Maintenance of qualification / certification records for Quality Assurance Department personnel, j b. Maintenance of audit, surveillance and inspection records of quality assurance activities generated by l the Quality Assurance Department personnel or their designates.

Title:

Section XVil, Quality Assurance Records Page: 1 of 3 Rev.: 27 Date: December 20, 1996 (, l l

 .           - .-      -=                             .  -      _-.     .

t YANKEE ATOMIC ELECTRIC COMPANY

2. The Plant shall be responsible for:
a. Writing implementation documents for the  ;

establishment and maintenance of Plant Operational l Quality Assurance records.  ;

b. Designating individuals and establishing requirements for the control of plant design, procurement, and -

operational records involving quality assurance.

c. Provision of facilities to prevent deterioration or loss of documentation.
d. Provision of a system for the review, approval and I retention of plant prepared documents such as rept table occurrences, technical reports, required records and the meeting minutes of official l

committees.

3. The Nuclear Services Division Engineering and/or Project Departments shall be responsible for establishing a system of review, approval and retention of documents relating to quality assurance for the operation of the departments. -
4. The Director of Quality Assurance shall be responsible for control and distribution of the Operational Quality Assurance Program and revisions thereto.

C. IMPLEMENTATION

1. Satisfaction of this criterion shall be assured through the implementation of the Nuclear Services Division and/or plant actions listed below:

i

a. Specifying the details required for inspections and test records including the following as applicable:

4

Title:

Section XVII, Quality Assurance Records Page: 2 of 3 Rev.: 27 Date: December 20, 1996 l l l

YANKEE ATOMIC ELECTRIC COMPANY

1) Description of the type of observation.
2) Evidence of completion and verification of manufacturing, inspection, or test operations.
3) The date and results of the inspection or test.
4) Information related to conditions adverse to quality.
5) Inspector or data recorder identification.
6) Evidence as to the acceptability of the results.
7) Acceptance and rejection criteria.
8) Identification of required procedures, drawings, and specifications and revisions.
9) Specification of the necessary measuring and test equipment including accuracy requirements.
10) Spent fuel storage records,
b. Providing for record administration, receipt, storage, preservation, safekeeping, retrieval and final disposition,
c. Construction, location and security of record storage facilities to prevent destruction of the records by fire, flooding, theft, and deterioration by environmental conditions such as temperature or humidity. Duplicate records shall be stored in a separate remote location when the type of document is not included in the record storage facility.

Title:

Section XVII, Quality Assurance Records Page: 3 of 3 Rev.: 27 Date: December 20, 1996

                                                   -     .=. - .              ..   .

l YANKEE ATOMIC ELECTRIC COMPANY XVill. AUDITS A. SCOPE This section of the Operational Quality Assurance Program establishes the measures for a comprehensive system of planned and documented audits and in-plant surveillances to verify l' compliance with all aspects of the Program and to assess the effectiveness of the Program. B. RESPONSIBILITIES

1. The Nuclear Services Division Quality Assurance Department shall be responsible fo.r:

I

a. Providing objective evidence for audits /surveillances  !

I of activities encompassed by the 18 criteria of 10CFR50 Appendix B, and ANSI N18.7.

b. Training of audit and surveillance personnel.
c. Scheduling, coordinating, and implementing the formal In-Plant Audit / Surveillance Programs performed on l activities covered in Sections III through XVII of l this document.

l Preparing information regarding the In-Plant Audit d. Program for review by the Nuclear Safety Audit and Review Committee.

e. Performing audits of vendors.
f. Following up of discrepancies discovered during
audits / surveillance. I i

l 1

Title:

Section XVill, Audits Page: 1 of 4 Rev.: 27 4 Date: December 20, 1996 l

YANKEE ATOMIC ELECTRIC COMPANY

g. Making recommendations to preclude possible audit / surveillance discrepancy repetition (for the Yankee Plant only).
h. Performing periodic audits of all YNSO Departments having responsibilities under the Quality Assurance Program.
2. The Vice President (s) and Manager of Operations and their staff shall be responsible for:
a. Evaluate disposition of In-Plant Audits and prepares concurrence directives to the plant.
3. The Plant anall be responsible for:  ;
a. Documentation of the plant position concerning any  ;

outstanding item resulting from an audit requiring a response (for the Yankee Plant only).

b. Implementation of action to be taken as directed by the Vice President and Manager of Operations,
c. Disposition of any outstanding items resulting from an audit (for Vermont Yankee only),
d. Implusqtation of any corrective actions resultant fron .it identified Event Reports (for Vermont Yankee only).
4. The Nuclear Safety Audit and Review Committee shall be responsibic for:
a. Evaluation of the Operational Quality Assurance Program to determine its overall effectiveness.

Title:

Section XVIII, Audits Page: 2 of 4 Rev.: 27 Date: December 20, 1996

 . _. _ _._         ..m    _ . - . . . .   . _._._ _ . _ . _ __.. _ _ _ _. _ _ . _ .- _ _ . . _ _.. _ . . ._.._.. .

YANKEE ATOMIC ELECTRIC COMPANY -

b. Reporting results of Program reviews and recommendations resulting therefrom to the cognizant corporate officer.
5. The Nuclear Services Division Departments shall be responsible for:
a. Documentation'of the department position concerning any outstanding item resulting from an audit.
b. Implementation of action to be taken to correct deficiencies revealed by an audit.

i C. IMPLEMENTATION

1. Satisfaction of this criterion shall be assured through the implementation of plant and/or Nuclear Services Division documents.

I

2. The implementing documents shall provide for the following:
a. Documentation of audit / surveillance results and review with management having responsibility in the area.

l

b. Necessary action to be taken by responsible I l management to correct deficiencies revealed by the i audit / surveillance.

J

c. Re-audit of deficient areas until corrections have )

i been accomplished to preclude recurrence of the deficiencies.

d. Inclusion of an objective evaluation of j quality-related practices, procedures, instructions and the effectiveness of implementation in the audit.

t

Title:

Section XVIII, Audits l Page: 3 of 4 l Rev.: 27  ; Date: December 20, 1996 j l

YANKEE ATOMIC ELECTRIC COMPANY

e. Inclusion of an objective evaluation of work areas, activities, processes and items and the rrview of documentation in the audit,
f. Performance of audits in the below listed areas where the requirements of Appendix B to 10CFR Part 50 and ANSI N18.7 are being implemented:
1) Operation, maintenance and repairs.
2) The preparation, review, approval, and control of designs, specifications, procurement documents, instructions, procedures, and drawings.
3) Receiving and plant inspections.
4) Indoctrination and training programs.
5) Implementation of operating and test l procedures,
6) Calibration of measuring and test equipment. '
g. Scheduling of audits regularly on the basis of the status and safety importance of the activities being l performed. l l

l 1 l l l

Title:

Section XVIII Audits . Page: 4 of 4 Rev.: 27 Date: December 20, 1996 T

l l YANKEE ATOMIC ELECTRIC COMPAliY l l APPENDIX A l l Qualification Reauirements for l Management of Quality /.ssurance Management of Quality Assurance must meet the below listed qualification I requirements:  ! A. EDUCATION: l Bachelor's degree in Science or Engineering, or the equivalent in j practical experience. i B. EXPERIENCE- i

1. Four years experience in the field of Quality Assurance, or
2. Equivalent number of years of nuclear plant experience in a supervisor,y position preferably at an operating nuclear power plant or a combination of the two.

a) At least one year of this four years experience shall be nuclear power plant experience in the implementation of the Quality Assurance Program, and b) Six months of the one year experience shall be obtained within a Quality Assurance organization. i l 1 l l l l

Title:

Appendix A. Qualifications Requirements Page: 1 of 1 , Rev.: 27 I Date: December 20, 1996 I t

F l l l i. i YANKEE ATOMIC ELECTRIC COMPANY i 1 l - APPENDIX B  ! ? 4

.                                                                                                                                        l

< Exceptions 1 , i i

                                                                                         -                                               I The sub-categories of this Appendix summarize the exceptions noted in                                                           l l-        Section II of'the Yankee Atomic Electric Company Operational Quality Assurance                                                   l j-        Manual.

[ Appendix B 4 Sub-Cateaorv - Standard / Guide Title l I. ANSI N45.2.3-1973 Housekeeping During the { Construction Phase of Nuclear

Power Plants I II. ANSI N45.2.9 1974 Requirements for Collection,
Storage, and Maintenance of
Quality Assurance Records for Nuclear Power Plants 1

III. ANSI N45.2.10-1973 Quality Assurance Terms and Definitions-t j IV. R.G. 1.64 Rev. 2 Quality Assurance Requirements for the Design of Nuclear Power Plants j V. ANSI N45.2.2-1972 Packaging, Shipping Receiving, Storage and Handling of Items for Nuclear Power Plants l VI. ANSI N45.2.6-1978 Qualification of Inspection, Examination and Testing Personnel for the Construction Phase of Nuclear Power Plants VII. R.G. 1.26, Rev. 3 Quality Group Classifications and  : Standards for Water . Steam- and Radioactive-Waste-Containing Components of Nuclear Pcwer Plants VIII. R.G. 1.29, Rev. 3 Seismic Design Classification

Title:

Appendix B, Exceptions Page: 1 of 26 Rev.: 27 Date: December 20, 1996

l l l l l YANKEE ATOMIC ELECTRIC COMPANY APPENDIX _B (contint:ed) l L i l I l Appendix B l Sub-Category Standard / Guide Title i

                                                                                               'l IX.             ANSI N18.7-1976                 Administrative Controls and Quality Assurance for the Operational Phase of Nuclear Power Plants X.              R.G. 1.33, Rev. 2                Quality Assurance Program              ,

Requirements (Operations) t l l l l l

Title:

Appendix B, Exceptions Page: 2 of 26

,  Rev.-     27 Date:     December 20, 1996

YANKEE ATOMIC ELECTRIC COMPANY APPENDIX B (continued)

1. ANSI N45.2.3 - 1973, HousekeeDino Durino the Construction Phase of Nuclear Power Plants A. EXCEPTION: l Subsection 2.1 - Planninq
                                                                                       )

I The Yankee and Vermont Yankee plants take exception to the five-zone requirements specified in the subject standard. I ALTERNATIVE: The Yankee and Vermont Yankee plants shall establish as a minimum a three zone program as follows: Zone 111 Zone III criteria shall be applied to major portions of the reactor coolant system which are opened for inspection., maintenance or repair.

1. Access control over personnel shall be required.
2. Cleanliness shall be maintained, commensurate with the work being performed, so as to preclude the entry of foreign material to the Reactor Coolant System.
3. A documented cleanliness inspection shall be performed immediately prior to closure.

Note: The Zone III requirements may be expanded for certain maintenance repair activities if deemed appropriate by plant

Title:

Appendix B, Exceptions Page: 3 of 26 Rev.: 27 Date: December 20, 1996

YANKEE ATOMIC ELECTRIC COMPANY APPENDIX B (continued) management. In such instances applicable sections of-Zones I & II shall be specified. Zone IV Zone IV criteria shall be applied to the radiation control areas of the plant.

1. Standard janitorial and work practices shall be utilized to maintain a level of cleanliness commensurate with company policy in the areas of Housekeeping, Plant and Personnel Safety and Fire Protection.
2. Additional housekeeping requirements shall be implemented as required for the control of radioactive contamination.
3. Smoking and eating shall be controlled consistent with good health physics practices and to maintain cleanliness.

Zone V Zone V criteria shall be applied to the remainder of the plant.

1. Standard janitorial and work practices shall be utilized to l maintain a level of cleanliness commensurate with company policy in the areas of Housekeeping, Plant and Personnel Safety and Fire Protection.

Title:

Appendix B, Exceptions Page: 4 of 26 Rev. 27 Date: December 20, 1996

YANKEE ATOMIC ELECTRIC COMPANY APPENDIX B (continued) B. EXCEPTION: Subsection 3.2 - Control of Facilities The Yankee and Vermont Yankee plants take exception to the control of tools, equipment, materials and supplies used in Zone Ill. ALTERNATIVE:

The Yankee and Vermont Yankee plants shall verify control for Zone 111 as indicated in Exception A of this sub-category.

l I l l

                                                                                      )

Title:

Appendix B, Exceptions Page: 5 of 26 Rev.: 27 Date: December 20, 1996 1 1

l l l l YANKEE ATOMIC ELECTRIC COMPANY: APPENDIX B (continued)  ; ! 1 I l

11. ANSI N45.2.9 1974, Reauirements 'for Collection. 'Storace, and  !

Maintenance of Quality Assurance Records for Nuclear Power Plants l t  ! l A. EXCEPTION: l Subsection 5.6(3) Facility 1 The Yankee and Vermont Yankee plants take exception to

                                     " structures, doors, frames, and hardware should be Class A fire j

rated with a recommended four hour minimum rating."  ! l ALTERNATIVE:

                                     " Doors, structures, frames, and hardware shall be designed to comply with the requirements of a minimum two (2) hour fire                                                   ;

rating, meeting NFPA No. 232 guidelines." i JUSTIFICATION: The two (2) hour rating has been endorsed by the NRC Standard Review Plan NUREG-0800. Revision 2 dated July 1981.

Title:

Appendix B, Exceptions l Page: 6 of 26 j Rev.: 27  ; Date: December 20, 1996  ;

1 l YANKEE ATOMIC ELECTRIC COMPANY APPENDIX B (continued) 111. ANSI N45.2.10 - 1973, Quality Assurance Terms and Definitions A. EXCEPTION: ) I t Subsection 2 - Terms and Definitions The. Yankee and Vermont Yankee plants take exception to the definitions of " Certificate of Conformance" and " Certificate of Compliance".

                                                                                    ]

ALTERNATIVE: 1 The Yankee and Vermont Yankee plants -shall reverse the definitions I of the above terms so our Program will be in compliance with the . implied definitions in the ASME B&PV Code and Yankee ~ specifications.

                                                                                   ]

I i l

Title:

Appendix B. Exceptions Page: 7 of 26 Rev.: 27 l Date: December 20, 1996

YANKEE ATOMIC ELECTRIC COMPANY APPENDIX B (continued) , t IV. Regulatory Guide 1.'64, Revision 2, " Quality ' Assurance Reauirements for + the Desian of Nuclear Power Plants"  : l A. EXCEPTION: Subsection c.2 i l The Yankee and Vermont-Yankee plants take exception to the regulatory guide position on the exclusion of supervisors performing design verification. ALTERNATIVE: l The Yankee and Vermont Yankee plants will continue the accepted practices for independent design verification in accordance with l the provisions of ANSI N45.2.11-1974, Ser. tion 6.1. ! i l JUSTIFICATION: , l The exclusion of line supervision to perform design verification j has proven'to be an unnecessary burd?n on the resources within the l engineering organizations of the company, and counterproductive ] l during heightened periods of engineering activities. ANSI N45.2.11 contains specific limitations on the situations in which a supervisor is permitted to perform decign verification. The standard states, "This verification may De performed by the originator's supervisor provided the supervisor did not specify a l singular design approach, or rule out certain design considerations and did not establish the design inputs used in the design, or if the supervisor is the only individual in the organization competent to perform the verification." This control was developed through realistic evaluation of the practicable limits that restrictions impose on engineering organizations by the working group that developed ANSI N45.2.11. l l

Title:

Appendix B, Exceptions Page: 8 of 26 Rev.: 27 i Date: December- 20, 1996 j i t  : E _ _ _ __ _ , _ _ _

                                       . . _ - - . . . - - . _ - . . - . - - . . . .. ~ .-~ ~ .. - - . -. - . . - _ ~                    - - - . -

S 1 YANKEE ATOMIC ELECTRIC COMPANY i' APPENDIX B (continued) {

V. ANSI N45.2.2 - 1972,. Packagina. ShiDDina. Receivina. Storaae & Handlina  ;

j of items for Nuclear Power Plants i j A. EXCEPTION: {- Subsection 3.7.1 & A3.7.1 - Containers - j The Yankee and Vermont Yankee plants take exception to the f' specific requirements for containers.  ; j-  ; i ALTERNATIVE: i f

Containers shall be of suitable construction to assure material is I. received undamaged.

i j JUSTIFICATION:  : I Containers shipped by closed carrier, stored inside and not

subjected to a wet environment do not require weather resistant fiberboard, therefore, this is an unnecessary expense.

Additionally, numerous vendors utilize shipping containers that do , f not comply with the specific requirements of this section, i.e., l

flaps overlap. The acceptance criteria for a shipping container ,

I should be established based on the capability of the container to j maintain the component material in a safe condition. Technology has advanced beyond the standard. 1 I ( -j k s

;                                                                                                                                                       i i

i 3 i

j.

Title:

Appendix B, Exceptions Page: 9 of 26 i Rev.: 27 j Date: December 20, 1996 ~ i i I n , - , . , . , .- -- ,ev. ,

__ _ . _ _ . _ _ _ _ _ . _ . . . . ._ . ._._..________.m. . _ _...__.. _ _. _._ ._ ._._. i l l l YANKEE ATOMIC ELECTRIC COMPANY  ; APPENDIX B- j (continued) l B. EXCEPTION: 1 Subsection 3.7.2 - Crates and Skids l The Yankee and' Vermont Yankee plants take exception to the requirement that skids and runners shall be used on boxes with a gross weight of 100 pounds or more. ALTERNATIVE: Skids or runners shall be used on boxes with a gross weight of [ 100 pounds or more if practical. JUSTIFICATION: . l Storage methods and container design frequently are.such that runners or skids are not feasible. l

                - C.                    EXCEPTION:

Subsection 5.2.1 - Shippino Damace Inspection  ! The Yankee and Vermont Yankee plants take exception to the  ; requirement that a preliminary visual inspection or examination be 3 performed prior to unloading.  ! i ALTERNATIVE: The Yankee and Vermont Yankee plants shall perform those required inspections after unloading. In special instances, preunloading l inspections shall be performed. t

                                                                                                                                       )

Title:

Appendix B Exceptions  ! Page: 10 of 26 Rev.: 27  ; Date: December 20, 1996 .l

     ,      ,s.-..        - - - . . - .        - . _ , , ,.        - _ _ . _ -          . . . _ _ . _
                                                                                                                                                 )

YANKEE ATOMIC ELECTRIC COMPANY

                                                                    -APPENDIX B (continued)

JUSTIFICATION: l Post unloading inspection is adequate to determine any damage that may have been incurred during shipping and handling. D. EXCEPTION: Subsection 5.2.2 - Item Insoection l The Yankee and Vermont Yankee plants take exception to the requirement, that "The inspections shall.be performed in an area equivalent to the level of storags requirements for the item." ALTERNATIVE: The Yankee and Vermont Yankee plants shall perform receiving inspection in a manner and in an environment which do not endanger the requisite quality of the item: however, receiving area environmental controls may be less stringent than storage l l environmental controls for that item. When inspections are performed.in receiving areas with environmental controls less stringent than storage area environmental controls, a time limit  ! shall be established on a case basis for retention of items in the

                                                                                                           ~

i receiving area. Retention time shall be such that deterioration is prevented'and applicable manufacturer recommendations are l addressed. JUSTIFICATION: 1 l' , Receipt inspection activities are for a much shorter duration and l therefore should not be subjected to the same stringent ! requirements as required for storage. l~ t ,

Title:

Appendix B. Exceptions Page: 11 of 26 j Rev.: 27 i Date: December 20. 1996

l l l YANKEE ATOMIC ELECTRIC COMPANY l APPENDIX B l l (continued) i l i E. EXCEPTION l Subsection 5.2.3 - Special Inspection The Yankee and Vermont Yankee plants take exception to attaching special inspection procedures to the item or container. j ALTERNATIVE: Special inspection procedures shall be readily available to personnel performing inspections. JUSTIFICATION: , Procedures are subject to less abuse and more stringent controls when maintained on file and not attached to the-item. Inspection status is maintained by tagging and procedure control. F. EXCEPTION: Subsection 6.1.2 - Levels of Storaae The Yankee and Vermont Yankee plants take exception to two specific requirements associated with fuel storage (classified Level A). ALTERNATIVE: The Yankee and Vermont Yankee plants shall meet the requirements of Level A storage for new fuel with the exception of special air filtering; and temperature and humidity controls.

Title:

Appendix B, Exceptions Page: 12 of 26 Rev.: 27 Date: December 20, 1996

YANKEE ATOMIC ELECTR COMPANY ' APPENDIX B (continued) JUSTIFICATION: The existing storage conditions at the Yankee operating plants are consistent with the protection provided to the fuel while in storage at the manufacturer (vendor) and/or while in transit to the plant site and are judged to provide adequate protection to the fuel assembly structure which is of highly corrosion resistant materials. We believe that the above listed requirements are intended for application at the manufacturing facility (vendor) where the uranium pellets may be exposed to the atmosphere and not in its fully encapsulated, and therefore, fully protected form in a completed fuel assembly. G. EXCEPTION: Appendix 3 Subsection A3.5.1(1) - Caps & Pluas The Yankee and Vermont Yankee plants take exception to the requirement that nonmetallic plugs and caps shall be brightly colored. ALTERNATIVE: Nonmetallic plugs and caps shall be of a contrasting color. JUSTIFICATION: The purpose of utilizing brightly colored plugs and caps is to assist in assuring obstructions are not inadvertently placed in operating components or systems. By using plugs and caps of a contrasting color this objective can be achieved. l

Title:

Appendix B, Exceptions ! Page: 13 of 26 Rev.. 27 Date: December 20, 1996

YANKEE ATOMIC ELECTRIC COMPANY APPENDIX B (continued) H. EXCEPTION: l l ADDendix A-3 Subsection A3.9(1) - Second Grouo. Markinos l The Yankee and Vermont Yankee plants take exception to the requirement that container markings shall appear on a minimum of -l two sides.  ! ALTERNATIVE: , t Containers shall be adequately marked to provide identification .

                                             .and retrievability.                                                                                                      !

l JUSTIFICATION: Containers are tagged to provide identification and inspection l status. Employment of two tags on small containers adds bulk and  ; confusion and does not provide for better identification or traceability, i

1. EXCEPTION: ,

1 Appendix A-3. Subsection A.3.9(4) - Second Group. Markino The Yankee and Vermont Yankee plants take exception to the requirement that container markings shall be no less than 3/4" high, container permitting. 1 ALTERNATIVE: Container markings shall be of a size which permits easy recognition.

Title:

Appendix B, Exceptions Page: 14 of 26 Rev.: 27 Date: December 20, 1996

 -, u#y. a,,-.                ._ _                                             y                                   -                                           --

YANKEE /,70MIC ELECTRIC COMPANY } APPENDIX B , (continued) { JUSTIFICATION: '! Markings were intended to provide identification and instructions. ' The criteria should be that the markings clearly provide the same. J. EXCEPTION: i , Accendix A-3 Subsection A.3.9(6) - Second Group. Markina The Yankee and Vermont Yankee plants take exception to the information required for container marking.  ! i ALTERNATIVE: Marking shall be adequate in each case to provide identification, traceability and instructions for special handling, as applicable. t

                            ' JUSTIFICATION:                                                                                           I

! The information required is excessive. Cluttering a container t with excessive markings only . reduces the main objectives, maintaining identification and establishing special controls. I i i j '

Title:

Appendix B, Exceptions Page: 15 of 26 . Rev.- 27

Date
December 20, 1996 l-J
                             . _ . . _ . . ~ . .     .._.__..._.__._._.-_.__.__.m              . . _ - - _ - -

b YANKEE ATOMIC ELECTRIC COMPANY APPENDIX B , (continued) , l VI. ' ANSI N45.2.6 - 1978, Qualification of Inspection. Examination and l Testina Personnel for Nuclear Power Plants A. EXCEPTION: The Yankee and Vermont Yankee plants take exception to the application of the Standard to all Yankee and Vermont. Yankee personnel performing inspection. examination and testing. ALTERNATIVE: Yankee and Vermont Yankee personnel identified in ANSI N18.1-1971 who perform inspection, examination and testing will be qualified-to ANSI N18.1-1971. , Yankee and Vermont Yankee personnel not identified in. ANSI N18.1 - 1,971 who perform inspection. examination and testing will be qualified to ANSI N45.2.6-1978.

Title:

-Appendix B. Exceptions .Page: 16 of 26 'Rev.: 27 Date: December 20. 1996

   -_ _-.      -~_ ._.. _ . _ _ _ _ _ _ . . _ ._ - _ _ . _ _ _ . _ . _ ._. _ _ _ _ .- . _ . ,                              ..

1 l ' YANKEE ATOMIC ELECTRIC COMPANY t t 1 APPENDIX B l (continued)

          'Vli.        Regulatory Guide 1.26. Rev. 3 (2/76). 0uality Group Classifications and                                J l                       Standards for Water . Steam- and Radioactive-Waste-Containino Components of Nuclear Power Plants                                                                                )

l l A. EXCEPTION: l . The Yankee and Vermont Yankee plants take exception to the L Regulatory Guide in its entirety. ALTERNATIVES: i Yankee Yankee shall continue to classify structures, components and l- systems in accordance with ANSI Standard N18.2, January 1973, ! " Nuclear Safety Criteria for the. Design of. Stationary Pressurized l Water Reactor Plants", as in the past. Vermont Yankee h Vermont Yankee shall continue to classify structures, components and systems in accordance with ANS-22, Draft No. 4 Rev. 1,

                                          'May 1973, " Nuclear Safety Criteria for the Design of Stationary l                                            Boiling Water Reactor Plants", as in the past.

I i

Title:

Appendix B. Exceptions Page: 17 of 26 j[. Rev.: 27

Date
December 20, 1996

_ _ _ _ . . _ . _ . _ _ _ _ . - _ . . _ _ ._ __. _ - . ~ - . . . . - . _ . _ _ . . _ _ _ _ _ _ . . - . . . _ _ . . . _ i

                                                                                                                                                         'I YANKEE: ATOMIC ELECTRIC COMPANY i

t t APPENDIX B < (continued) [ t

          . Vill . Regulatory Guide 1.29, Rev. 3. (9/78), Seismic Desian Classification                                                                    !

A. I EXCEPTION: The Yankee and Vermont Yankee plants take exception to the application of Regulatory Guide 1.29, Rev. 3, (9/78). ALTERNATIVES: Yankee- i Yankee shall apply Regulatory Guide 1.29, Rev. 3, (9/78), to those structures, systems and components as determined by the USNRC ~' System Evaluation Program. Vermont Yankee . I I The seismic design classification of structures, systems, and components at Vermont Yankee shall be as defined in the Vermont Yankee FSAR. l

Title:

Appendix B Exceptions Page: :18 of 26 Rev.: 27 Date: December 20. 1996

_ .. __ _ _ . ~ . _ _ _ _ . - _ . _ . . . _ _ _ .

                                                                                                       }

l 1 YANKEE ATOMIC ELECTRIC COMPANY APPENDIX B (continued) l l IX. ANSI N18 .7-1976,1 Administrative Controls and Quality Assurance for the ' l Operational Phase of Nuclear Power Plants I A. EXCEPTION (Vermont Yankee Plant only) Subsection 4.5 - Audit Proaram The Vermont Yankee 06erating Plant takes exception to the requirement that audits'of all safety-related functions shall be completed within a period of two (2) years. Alternative: l Audits of selected aspects of operational phase activities shall be performed with a frequency commensurate with their safety significance and in such a manner as to assure that an audit of all safety related functions is completed within a period of no less than three (3) years, based upon'the results of an annual Functional Area Assessment. 1 l The Annual Functional Area Assessment is a documented analysis of l functional areas important to safety. The purpose is to identify  ! strengths and weaknesses (if applicable) to determine the level and focus of independent oversight activities for the upcoming year. The basis for the assessment shall include the results of 0A Audits and Surveillance, NRC Inspections,. Event Reports, ) Nonconformance Reports, Corrective Action Reports, and i Self-Assessments. Other indicators such as Personnel Changes, l change / increase in functional area responsibilities, Industry i Findings, and.INP0 evaluations will also be considered. Each area ; will be assigned a rating with a comparison to previous years. l l i

Title:

Appendix B, Exceptions Page: 19 of 26 Rev.: 27  ! Date: December 20, 1996 )

                                                                                                                                                     -i t

l t YANKEE ATOMIC ELECTRIC COMPANY  ! APPENDIX B 'j (continued)  ! i l This assessment will be reviewed and. approved by 0A and Plant  ! Management. This' document is considered a 0A record and will be  ! available for NRC review. 'f I Justification: To utilize <,a:dity oversight resources more effectively, senior j , management desires the flexibility to direct resources to areas 'i which have perceived weaknesses. The two year audit cycle has not 'i ensured that the frequency, scope and associated resources are based on the risk associated with the audit area.

                                                                                                                                                      ]

Vermont Yankee proposes to adjust the audit schedule based on empirical data and performance history to complete audits of 'l safety-related functions within a period ~of three years. This j modification meets the intent of published regulatory requirements l involving activities important to safety.  ! f B. EXCEPTION:  ! l Subsection 5.2.15 - Review. Approval and Control of Procedures Yankee Atomic Electric Company and the Vermont Yankee Operating Plant take-exception to the following paragraph: P

                                          " Plant procedures shall be reviewed by an individual knowledgeable in the area affected by the procedure no less
                                        ' frequently than every two years to determine if changes are                                                   ;

necessary or desirable".

Title:

Appendix B. Exceptions Page: 20 of 26 Rev.: 27 Date: -December 20, 1996

i l YANKEE' ATOMIC ELECTRIC COMPANY APPENDIX B (continued) ) Alternative:  ! l l Plant procedures will be periodically reviewed in accordance with administrative controls. These controls will establish a schedule ! ' for these periodic reviews. All applicable' plant procedures will l be reviewed following an unusual incident, unexpected transient, i operator error, or equipment failure (malfunction), 'and following  !' l a modification to a system. l Wonroutine procedures such as Emergency Operating Procedures, l Emergency Plan Implementing Procedures, or other procedures whose l use may be event driven, will be reviewed every two years. I t However, if a nonroutine procedure is fully exercised and the're is i

l. a detailed scrutiny of'the entire procedure as part of a l l

documented' training program,.this may serve as the biennial review l of the procedure used. ,i At least every two years, the Quality Assurance (or other  ; independent) organization shall audit a representative sample of  : routine plant procedures that are used more frequently than'every } two years. The audit is to ensure the acceptability of the j procedures and verify that the procedure review and revision program is being implemented ef fectively. The root cause of significant deficiencies is to be determined and corrected. , Routine plant procedures that have not been used for two years will be reviewed before use to determine if changes are necessary l l or desirable. l l i

Title:

Appendix B. Exceptions ! Page: 21 of 26 i Rev.: 27 Date: December 20, 1996 i i i,

                                                                                              . . ~ .

l YANKEE' ATOMIC ELECTRIC COMPANY ) l APPENDIX B  ! (continued) l l Justification: i The current requirement to review each safety-related procedure on f l a biennial cycle results in the expenditure of significant i technical and administrative resources. Programmatic controls and l L practices are in place to provide adequate reviews',-including the l following: l ! - The plant modification processes require that procedures  ! affected by the modification be identified during the design change preparation, and revised prior to closure of the modification package. , l I

                                                 ..      The Operating Experience Program involves the review of                               !

USNRC, INP0, and vendor supplied information for applicability and determination of further action. This review includes an evaluation of applicable documents such as procedures and the initiation of required changes,  ; i

                                                   . Administrative controls curre'ntly exist requiring that if a                          {

procedure cannot be performed as written, a procedure change j must be completed prior to continuation of the procedure. ) l l.

                                                   . Temporary changes are occasionally generated during, or l                                                         prior to procedure use.         Current administrative controls require that those changes that are permanent shall be incorporated into the procedure via the procedure revision process.
                                                   . As part of the audit and surveillance process, procedures are evaluated as to adequacy, ease of use, proper technical content, and compliance with applicable plans and programs.

Title:

Appendix B. Exceptions Page: 22 of 26 Rev.: 27 Date: December 20, 1996

                                        ._                                                                 ,                                 u
                     - _ . _            __     _ _ _ _ _ . - _ _._. ~   . . _ _ . . _.- . - _ _ . _

I l l l l l YANKLc ATOMIC ELECTRIC COMPANY l l 1 APPENDIX B l (continued)

               .           The corrective action process (Event Reports) requires that              l a root cause analysis be performed for events, violations                )

and nonconforming conditions. Where identified as i contributing factors, procedure changes are initiated. I l

               .           Changes to Technical Specifications and the FSAR are                     l reviewed for potential impact on, and initiation of changes to plant procedures.
               .           Plant procedures are approved by appropriate personnel prior to initial use. Current administrative controls also                     i require pre-job briefings for procedures identified as                  l infrequent.                                                             l This modification meets the intent of published regulatory requirements involving activities important to safety.

C. EXCEPTION: (Vermont Yankee Plant only) 4 Subsection 5.3.9 l The Vermont Yankee Operating Plant takes exception to the j requirements that detail Emergency Procedures be in accordance with Paragraph 5.3.9. Alternative: 1 Vermont Yankee Emergency Operating Procedures are written in accordance with the Symptom / Function-Based Guidelines develcped by the BWR Owners Group and accepted by the NRC. These Symptom / Function Based Procedures, mandated by the NRC in NUREG-0737, have format and content different from the Event-l l Oriented Emergency Procedures described in ANSI N18.7-1976. l

Title:

Appendix B Exceptions  ! Page: 23 of 26  ! Rev.- 27 Date: December 20, 1996 i l l i

1

                                                                                    )

l l l l l l YANKEE ATOMIC ELECTRIC COMPANY l APPENDIX B (continued) Justification: NUREG 0737 supersedes ANSI N18.7-1976 in the area of Emergency Operating Procedures. Changes to procedure format are required in order to develop Symptom / Function-Based Procedures. l i. 1 J i f l I I i l l

Title:

Appendix B, Exceptions , Page: 24 of 26 l Rev.: 27 l Date: December 20, 1996 l

YANKEE ATOMIC ELECTRIC COMPANY APPEN01X B (continued) X. Reaulatory Guide 1.33. Revision 2.'Ouality Assurance Reauirements (ODerational) A. EXCEPTION: (Vermont' Yankee Plant only) Subsection 4.5 - Audit Proaram The Vermont Yankee Operating Plant takes exception to the following:

            .       Section 4.5 states that "all audits of safety related functions are completed within o two (2) year period".
            .-      Paragraph 4.a.     "The results of actions taken to correct deficiencies that affect nuclear safety and occur in facility equipment,' structures, systems, or method of operations     shall be audited at least once per 6 months".
            .       Paragraph 4.b.      "The conformance of facility operation to provisions contained within the technical specifications and applicable license conditions - shall be audited at least once per 12 months."
             .      Paragraph 4.c.     "The performance, training, and qualifications of the facility staff - shall be audited at        i least once per 12 months."

Alternative: Audits of' selected aspects of the functional areas listed above, shall be performed within a frequency commensurate with their safety significance and will be completed within a period of no l

Title:

Appendix B, Exceptions Page: 25 of 26 i Rev.: 27 Date: December 20, 1996 - -

YANKEE ATOMIC ELECTRIC COMPANY APPENDIX B ! (continued) l less than three (.1) years, based upon the results of an annual functional arer. assessment.

           ,J u st i fi ca t i on :

i To utilize quality oversight resources more effectively, senior management desires the flexibility to direct resources to areas which have perceived weaknesses. The two-year audit cycle has not ensured that the frequency, scope and associated resources are based on the risk associated with the audit area. Vermont Yankee proposes to adjust the audit schedule based on empirical data and performance history to complete audits of safety-related functions within a period of three years. This modification meets the intent of published regulatory requirements involving activities important to safety. l l 1 l

Title:

Appendix B. Exceptions l Page: 26 of 26 i Rev.. 27 l Date: December 20, 1996

YANKEE ATOMIC ELECTRIC COMPANY APPENDIX C Vermont Yankee P Classification of Structures, Components, and Systems NOTE: A comprehensive listing is in the Vermont Yankee Safety Classification Manual. l

Title:

Appendix C Vermont Yankee Classification Page: 1 of 1 . Rev.: 27  ! Date: December 20, 1996

YANKEE ATOMIC ELECTRIC COMPANY APPENDIX 0 Yankee Classification of Structures. Components, and Systeml NOTE: A comprehensive listing is in the Yankee Safety Classification of Systems Manual.

Title:

Appendix D, Yankee Classification Page: 1 of 1 Rev., 27 Date: December 20. 1996

YANKEE ATOMIC ELECTRIC COMPANY l I OPERATIONAL QUALITY ASSURANCE PROGRAM Y00AP-1-A gif ma i PREPARED BY: WAIIk N h HMMVI l

                   ' Walter K. Peterson-                            !

Manager, Quality Assessment Services Department APPROVED BY: s (, Rulsell Clark l Executive Director. Quality Assurance l Donald A. Reid Vice President, Operations l Vermont Yankee ' 1 -

                          ~

Stephen P. Schultz " Vice President, Engineering Sciences

                                                                    )

Yankee Jay K. Thayer Vice President. Proje[ cts, [/ '/ Yankee l i l l

Title:

Y00AP-1-A , Page: 1 Rev.: 27 Date: December 20, 1996 I i l

YANKEE ATOMIC ELECTRIC COMPANY Y00AP-I-A TABLE OF CONTENTS /INDEX Section No. Title Revision AMENDMENT / REVISION 27 POLICY STATEMENT 27 I ORGANIZATION 27 II OVALITY ASSURANCE PROGRAM 27 III DESIGN CONTROL 27 IV PROCUREMENT DOCUMENT CONTROL 27 V INSTRUCTIONS, PROCEDURES, AND 27 DRAWINGS VI DOCUMENT CONTROL 27 VII CONTROL 0F PURCHASED MATERIAL, 27 EQUIPMENT, AND SERVICES VIII IDENTIFICATION AND CONTROL OF 27 MATERIAL, PARTS, AND COMPONENTS IX CONTROL OF SPECIAL PROCESSES 27 X INSPECTION 27 XI TEST CONTROL 27 XII CONTROL OF MEASURING AND TEST 27 EQUIPMENT XIII HANDLING, STORAGE AND SHIPPING 27 XIV INSPECTION, TEST, AND OPERATING 27 STATUS

Title:

Table of Contents Page: II Rev., 27 Date: December 20, 1996 l I

                                                                  . m .

4 YANKEE' ATOMIC ELECTRIC COMPANY YOOAP-I-A TABLE OF CONTENTS /INDEX (Continued) Section No. Title Revision XV NONCONFORMING MATERIALS, PARTS, 27 AND COMPONENTS d , XVI CORRECTIVE ACTION 27 XVII QUALITY ASSURANCE RECORDS 27 XVIII AUDITS 27 . APPENDIX A QUALIFICATION REQUIREMENTS 27 APPENDIX B EXCEPTIONS 27 APPENDIX C VY CLASSIFICATION 27 I APPENDIX D YR CLASSIFICATION 27 I l i

Title:

Table of Contents Page: III Rev.: 27 Date: December 20, 1996

l YANKEE ATOMIC ELECTRIC COMPANY i Y00AP-I-A AMENDMENT / REVISION SHEET Revision N,o u Date Reason 0 (Amendment 1) 12/10/76 To address questions submitted by letter from , NRC (K. R. Goller) to L. H. Heider (11/1/76). l 0 (Amendment 2) 1/13/77 To address questions submitted by letter from NRC (K. R. Goller) to L. H. Heider (12/28/76). 1 9/15/77 To address organizational, programmatic, and editorial changes. 2 11/01/77 To address organizational changes.  ; 3 11/25/77 To address organizational changes at Vermont Yankee. l 4 1/13/78 To address combined inspection numbers 1 50-29/77-20: 50-271/77-15; and 50-309/77-16 l unresolved item 4.a. 5 1/30/78 To address change in exception for ANSI N45.2.3-1973. 6 10/19/78 To address exceptions to ANSI N45.2.2-1972. 6 (Amendment 1) 3/29/79 To resolve items submitted by letter from NRC (W. P. Haass) to L. H. Heider (3/6/79). 7 9/11/79 To address changes to Yankee Rowe (Appendix D) and Vermont Yankee (Appendix E) Safety Classifications. 8 4/04/80 To address organizational changes. 9 3/09/81 To address organizational changes. 10 4/03/81 To add " Packaging of Radioactive Materials" and

                                         " Fire Protection of Safety-Related Areas" to "Other items Requiring Quality Assurance".

Title:

Amendment / Revision Sheet Page: IV Rev.: 27 Date: December 20, 1996

 . - , . . .     .         . - . . - . . - ..- . .                . . -- -.-- . - . - ~ . - .            .
                                                                                                            ~  ~ . -

l l YANKEE ATOMIC ELECTRIC COMPANY Y00AP-i-A AMENDMENT / REVISION SHEET (Continued) , Revision No. Date Reason < I 11 3/01/82 To resolve items submitted by letter from NRC (W. P. Haass) to W. P.' Johnson (6/10/81). 12 3/11/83 To address organizational. changes. 13- To address organizational and programmatic changes. 14 10/12/83 To address organizational changes. 15 2/15/84 To address programmatic changes. 16 10/31/85 To address organizational and programmatic , changes. 17 12/05/86 To address organizational and programmatic  : changes 17A 8/14/87 To clarify surveillance activities' and change VP-M00 responsibilities for the level of deficiencies requiring evaluation. , l 18 4/29/88 To address organizational and programmatic 3 changes.  ; i 19 10/02/89 To address organizational and responsibility changes and deletion of Appendix C. j 19A 6/01/90 To update organizational chart (for VY) to be j consistent with Proposed Change No. 157 and to ' address organizational changes at Vermont Yankee. 20 12/21/90 To update organizational changes at Yankee and change 0AD's responsibility from reviewing i I i

Title:

- Amendment / Revision Sheet ' . 'Page: V l Rev.: 27 l Date: December 20, 1996 ) l l

I YANKEE ATOMIC ELECTRIC COMPANY l Y00AP-1-A  ; AMENDMENT / REVISION SHEFT l (Continued) i Revision No. Date Reason design documents to auditing those documents for inclusion of quality requirements. 21 11/15/91 To update organizational changes at Yankee and Vermont Yankee and change OAD responsibility from revising recommendations to prevent recurrences of significant condition adverse to quality to providing the option to review and/or audit recommendations. 22 4/15/92 To delete Appendix D listing and reference Yankee Safety Classification of Systems Manual. 23 9/30/92 To address organizational and responsibility changes. 24 12/15/93 To address organizational changes, and DOA/NSARC reporting clarifications for Vermont Yankee. 25 12/15/94 To address organizational changes made at the Yankee Nuclear Power Station addressing the decommissioning organization. Clarifications in the revised corrective action process at Vermont Yankee, and to address an exception to Regulatory Guide 1.64, and to clarify responsibilities between the Yankee and Vermont Yankee Plants. 26 12/21/95 To address organizational changes at the Yankee Nuclear Power Station and the Vermont Yankee l Nuclear Power Station. To address exceptions  ; to ANSI 18.7 and Regulatory Guide 1.33. 1 27 12/20/96 To address organizational changes. l

Title:

Amendment / Revision Sheet Page: VI l Rev.- 27 Date: December 20, 1996 , 1 1 I I

  . . - _ _ .          ... _ . _ ._ _ _   _ - _ . _ _ _ _ . _ _ _ _ . _ _ . .                        __m       __ _ ., .

i YANKEE ATOMIC ELECTRIC COMPANY POLICY STATEMENT i OPERATIONAL OVALITY ASSURANCE PROGRAM lt is the policy of those organizations operating under this Quality Assurance Program to strive for excellence in all aspects of nuclear power l plant operation. This goal can only be attained if each individual recognizes. that Quality is everyone's responsibility. Each worker, supervisor, and manager has a role to play in achieving the goal of "doing it right the first time." Only if we recognize that Quality is of paramount importance can we continue to provide for the safe and reliable generation of power. j l The function of the Quality Verification Program is to assess the , adequacy, content, and appropriateness of the work being performed and to f facilitate continuous enhancements. This function supports the line organizations and provides management with needed feedback. However. l supervision and management should not rely solely upon the efforts of the l Ouality Assurance Groups for quality verification: they must also take an

active role in self-assessment of those activities under' their control to identify quality problems. As previously noted, the ultimate responsibility for quality lies with each individual.

Under the program, the Yankee Atomic Electric Company President is the l final management authority responsible for assuring that this policy statement i l and the Quality Assurance Program are implemented within the Yankee Atomic l Electric Company. The Vermont Yankee Vice President, Operations, is the final management authority responsible for assuring that the Quality Assurance l Program is implemented within the Vermont Yankee Nuclear Power Corporation. l The President or a Vice President is responsible for implementing the program for those departments under his (or her) direction. The Director of  ! Quality Assurance is responsible for establishment, control. and distribution of the Quality Ass'n ance Program and revisions thereto, and shall establish policies under which the Quality Assurance Department operates. The Quality Assurance staff shall have the authority and organizational freedom to meet l- the requirements of 10CFR50, Appendix B.

Title:

Policy Statement Page: 1 of 2 Rev.: 27 Date: December 20, 1996 l !~

YANKEE ATOMIC ELECTRIC COMPANY The-Plant Superintendent / Manager shall be responsible for the day-to day implementation of the program's procedural requirements at the plant. The Nuclear Safety Audit and Review Committee shall review the adequacy and effectiveness:of this program. Any discrepancies and/or recommendations for corrections or. enhancements shall be reported to the Cognizant Corporate Officer. The safe and reliable generation of power can only be achieved with the cooperation and support of all personnel, We expect that every individual will perform his or her task with the skill, professionalism, and dedication necessary to achieve-this goal. L c. m Andrew C. Kadak President

Title:

Policy Statement Page: 2 of-2 Rev.: 27 Date: December 20, 1996

YANKEE ATOMIC ELECTRIC COMPANY I. ORGANIZATION A. SCOPE This section of the Operational Quality Assurance Program describes the duties and responsibilities of the personnel involved in establishing and executing the Operational Quality Assurance Program. B. RESPONSIBILITY The responsibility for design, redesign, evaluation, and operation of the Plant rests with the Yankee Atomic Electric Company Nuclear Services Division and Vermont Yankee Nuclear Power Corporation. The responsibility for developing and implementing the Operational Quality Assurance Program within the Yankee Nuclear Services Division and the Yankee Site is vested in the President of the Yankee Atomic Electric Company. The responsibility for implementing the Operational Quality Assurance Program within Vermont Yankee is vested in the Vice. President. Operations, of Vermont Yankee Nuclear Power Corporation. They have delegated certain areas of authority for the development and implementation of certain phases of the Program as set forth in the following paragraphs of this section. The Nuclear Services Division Quality Assurance Department, reporting to the President for NSD for the Yankee Site and I reporting to the VY VP, Operations, for Veroont Yankee, has the organizational responsibility for the continuing review and audit l of the implementation of the Operational Quality Assurance j Proqram. C. ORGANIZATIONAL RELATIONSHIPS The lines of authority of all personnel involved in the implementation of the Operational Quality Assurance Program are shown in Figures 1 and 2. Integration between the Yankee Site

Title:

Section I, Organization Page: 1 of 43 Rev.: 27 Date: December 20, 1996

i i t l- 1 i I I l . YANKEE ATOMIC ELECTRIC COMPANY and the Yankee Nuclear Services Division activities is provided I by the Decommissioning Manager. Interfacing between the Vermont l Yankee plant and the Yankee Nuclear Services Division is provided by the Vermont Yankee Vice President, Operations, and his staff. l l D. QUALITY ASSURANCE PROGRAM RESPONSIBILITIES i

1. Yankee - Nuclear Services Division I
a. President
1. Assumes and maintains overall responsibility for the Operational Quality Assurance Program.
2. Delegates to the Director of Quality Assurance the responsibility for establishment, control and distribution of the Operational Quality Assurance Program, and revisions thereto.
3. Establishes and enforces company policies in the area of Operational Quality Assurance.
4. Establishes and implements an organization capable of and directed toward a proper Operational Quality Assurance Program.
5. Resolves disputes between Quality Assurance /

Quality Control personnel ana other organizations, involving quality, for the I Yankee Site and the NSD organization. I I

6. The President or his/her designee appoints the l NSAR Committee members including Chairman for l Yankee.
7. Responsible for Yankee Site nuclear safety.

Title:

Section 1, Organization Page: 2 of 43 Rev.: 27 , Date: December 20, 1996 l i l

  . . . - . .        . - . . _ _ _ _ .    ._    ._ _ _. _ _. . _ _ .. _ . _ _ _ ..._ = _ ._ ..-_ _ ._ _.

YANKEE ATOMIC ELECTRIC COMPANY ,

b. Vice Presidents
1. Report to the President. l l
2. Provide for implementation of the Program '

within their respective departments, j

l. l
3. Review and approve all changes to the >

Operational Quality Assurance Program. ]

4. Provide for independent review and acceptance for selected plant repairs and engineering changes.
                                                                                                                                 ]

i I l 5. Ensure that applicable Program procedures are l implemented. l l l~ c. Executive Director of Quality Assurance

1. Reports directly to the President.
2. Establishes the qualification requirements for l the principal Quality Assurance management '

l positions to assure competence commensurate l with responsibility. See Appendix A. L j

3. Approves all changes to the Operational Quality
Assurance Program, t

4 Reviews or provides company policy relative to , Quality Assurance practices conducted at the Site and Yankee Nuclear Services Division. 1 L 5. Authorizes personnel performing Quality l Assurance functions to have direct access to management levels which will assure accomplishment of quality-affecting activities.

Title:

Section 1. Organization Pr e: 3 of 43 kt. . . : 27 Date: December 20, 1996

I YANKEE ATOMIC ELECTRIC COMPANY  : !- 1 l 6. Establishes policies under which the Nuclear. I Services Division-Quality Assurance Department j functions. )

7. Provides for establishment of, and control and ,

distribution of.the Operational Quality l Assurance Program and revisions thereto. j- 8. Provides for implementation of the Program within the Quality Assurance Department. [

9. Provides to NSARC a periodic review of the Operational Quality Assurance Program to determine the adequacy and effectiveness of the
                                                                                                                                                       )'

l i Program. Provide for evaluations of changes to the Quality Assurance Program to the requirements of 10CFR50.54(a)(3).  ; l

10. Provides, through the Quality. Assurance l Department, for independent verification of'

[ site operation by individuals or groups who do i not have direct responsibility fo'r performing l

j. the work, to assure that applicable approved I l procedures, specifications, licenses and safety" regulations are satisfied.
11. Ensures that personnel performing Quality Assurance functions have sufficient authority and organizational freedom to:

i

a. identify quality problems,
b. initiate, recommend, or provide . solutions through designated channels, and i .
c. verify implementation of solutions.

[

Title:

Section I, Organization , j Page: 4 of 43 l

Rev.
27 I Date: December 20, 1996 l
                   .._.s,..-    . --        _.

_ . , , _ . . , - , , . _ y , _ ,

YANKEE ATOMIC ELECTRIC COMPANY

12. Provides for review of and compliance with federal and state regulations and standards for l nuclear power facilities.
13. As directed by the-Vermont Yankee Vice President, Operations, assures that the OA Program is effectively implemented.
14. Appoints the NDE and N45.2.6 Level III Examiner l
d. Trainino Coordinator i
1. Reports to the Human Resources Manager.  !

l

2. Responsible for implementation of training programs at NSD.

1

3. Assists the company in accomplishing its goals )

through development of skills and knowledge.

4. Ensures that personnel are provided with both the technical and professional skills required to solve problems, work together effectively, present information, and respond to sponsor needs.
5. Provides training needs assessments to ensure that organizationally relevant training is provided.
6. Conducts training evaluations to determine when desired objectives are obtained.

Title:

Section I, Organization Page: 5 of 43 Rev.: 27 Date: December 20, 1996 i l

l YANKEE ATOMIC ELECTRIC COMPANY' f I

e. Decommissionina Manager and Manaaer of Operations
1. Reports to the President.
                      '2. Directs engineering, licensing, cost' control and planning, and site decommissioning activities.

i

3. Coordinates-YAEC resources to meet  ;

decommissioning needs.

4. Provides for implementation of Operational Quality Assurance Program within the l Decommissioning Organization.  !
5. Ensures that applicable Program procedures are ,

implemented within the. Decommissioning l Organization. l

6. Provides for independent review and acceptance for selected plant repairs and all.

l safety-related engineering design changes for the site and decommissioning work packages.

7. Provides for review of material service  :

purchase requests, drawings, specifications,  ! and appropriate procedures.

8. Provides, through the Decommissioning Organization, for independent review and/or ,

approval for all changes.

9. Provides, through the Decommissioning l Organization, for review and approval of vendor-provided training programs for site staff; the procedures and purchase requests.

Title:

Section I. Organization Page: 6 of 43 Rev.: 27 Date: December 20, 1996

4 YANKEE ATOMIC ELECTRIC COMPANY

10. Provides, through the Decommissioning  !

Organization, for integration between the Yankee Site and the Yankee Nuclear Services Division.

11. Evaluates the site's position of specified in-plant audit discrepancies and prepares "linplementation Directives" for the site,
f. Pro.iect Managers
1. Reports to a Vice President.
2. Provides for implementation of the Program within their respective project.
3. Ensures that applicable Program procedures are implemented within their respective project.
4. Provides for independent review and acceptance for selected plant repai's and all safety-related engineering des'gn changes for their respective plant.
5. Provides for selected review of material service purchase requests, drawings, specifications and appropriate procedures.
6. Coordinates engineering requirements necessary to support changes related to the operation of the plant.
7. Provides, through Engineering, for the Quality Assurance /0uality Control Standards and/or requirements on all applicable documents.

l

Title:

Section I, Organization Page: 7 of 43 Rev.: 27 Date: December 20, 1996 l l l l

a_ e 4 x 4- JsM#F Jr -a e +4 -r~n- e.aa44- -*h-AA h- J -+s>eA.-.,A w aa x.J a-4aE :...s,s. 4.,es4 Fa_# a ._ 4_J_2 l YANKEE ATOMIC ELECTRIC COMPANY

8. Provides direction to the Project Engineering Managers,
g. Manaaement of Quality Assurance l

1 Quality Assurance is divided into two (2)

                                                                                                                                         ]

departments. They are the Quality Support Department ) and the Quality Assessment Department. The Quality

  • Assessment Department performs audits and 1 surveillances at Vermont Yankee and audits. l surveillances, inspections at the Yankee Site, and l '

audits at the Corporate Engineering office. The Ouality Support Department performs audits and surveillances at vendor facilities. l

1. The Manager of each department reports directly to the Executive Director of Quality Assurance.
2. Assures that the Operational Quality Assurance  !

Program satisfies the requirements of 10CFR50 Appendix B and ANSI N18.7-1976.

3. Provides for the audit of design changes and  :

specifications to verify adequacy of quality requirements. (independent review shall be performed by an uninvolved, but technically knowledgeable person in the engineering discipline.)

4. Provides for the audit, inspection and/or surveillance of contractor / vendor activities for operating plants to assure the i effectiveness of contractual interfaces and compliance with the applicable criteria of 10CFR50, Appendix B and ANSI N18.7-1976.

Title:

Section I, Organization Page: 8 of 43 Rev.: 27 Date: December 20, 1996 l i

YANKEE ATOMIC ELECTRIC COMPANY l

5. Provides for the inspection, surveillance  ;

andi/or audit of activities pertaining to plant j or site repairs, and/or changes. l

6. Provides for the training and retraining of Quality Assurance personnel in quality l assurance and audit techniques. I
7. Ensures through verification that the Program is implemented for all activities requiring l

Quality Assurance.  ! l l

8. Provides for the stoppage of unsatisfactory ]

work; and for the control of further processing l or delivery of nonconforming material, i

9. Directs the independent verification of plant j or site operational activities to assure that applicable approved procedures, specifications, licenses, and safety regulations are satisfied.

i

10. Ensures that the 0A Program is modified and/or
                                                                . revised as standards, regulations and experience dictate.

I

h. Director of Enaineerina Services l
1. Reports to the President.
2. Provides for implementation of the Program within his function.

L 3. Ensures that applicable Program procedures are implemented within his function. l

Title:

Section I, Organization i Page: 9 of 43 i Rev.: 27

Date: December 20, 1996 l

l _ - -

l YANKEE ATOMIC ELECTRIC COMPANY f 1

4. Coordinates Yankee technical requirements necessary.to support' activities related to [

outside engineering services. l

i. Director of Environmental Enaineerina- f 1
1. Reports directly to a Vice President.

2 .. Provides for the review and follow of radiation , protection programs .and activities at the' plant  ; or site. l

3. Provides for technical assistance to the plant or site 'on matters-of radiological protection',

radiological engineering and environmental  ; protection.

4. Coordinates the implementation and maintenance ,

of radiological environmental surveillance programs concerning radioactive effluents from the plant. i 1

5. Supports the implementation and maintenance of I the Emergency Plan pursuant to state and federal regulatory requirements.
6. Provides for the review of plant meteorological monitoring data.

l

7. Coordinate the radiological and environmental engineering requirements necessary to support j changes related to operation of the plant or I site. )

i

Title:

- Section I. Organization Page: 10 of 43 Rev.: 27 Date: December 20, 1996 N- a+ w ew-w- .+ ,w---- .we c -- , -- g---

 . ~      _   _  _.      . . _ .      ..__.._-_m._..                . . . . ..._ _ . - ._ _ _ . ~ _ . _ . . _ _ . . _ . . .

YANKEE ATOMIC ELECTRIC COMPANY J. Director of Fuel Management

                                                                                                                            ~
1. Reports directly to a Vice-President.
2. Performs fuel cycle and economic studies to
                                                . improve power costs and as requested by management.
3. Provides for the general supervision and  ;

coordination of all core component design and l procurement, nuclear material and services procurement and fuel. cycle economic activities. l 4. Ensures that the Operational Quality Assurance Program and the applicable procedures are implemented within the department.

5. Issues bid invitations, evaluates proposals.
                                   .               and negotiates contracts for fuel cycle-services and related material requirements.
                                                                                                                              -1
6. Coordinates the fuel cycle requirements i necessary to support changes related to operation of the plant.
7. Provides support of spent fuel storage activities at the Yankee Site.
k. Director of Environmental Laboratory
1. Reports directly to a Vice President.

2 ., Provides for the radiochemical processing of l environmental, effluent, and waste samples. , 1 \

3. Provides for the processing and' internal l dosimetric evaluation of bioassay samples. l L

Title:

Section I, Organization 2 Page: 11 of 43 , Rev.: 27

     -- Date:   December 20, 1996 I

\ t -

YANKEE ATOMIC ELECTRIC COMPANY

4. Provides for the routine in situ measurements in support of environmental Technical Specifications as well as ad hoc emergency response in situ measurements or emergency response laboratory sample measurements.
5. Provides and coordinates technical quality assurance programs in the areas of plant chemistry (radiological only) and whole body counting.  !
6. Provides for the processing of personnel, ,

extremity, and environmental dosimetry needed to support NRC and plant radiological  ; assessment requirements.  ;

7. Provides for the necessary special radiation -

flux measurements.

8. Provides for on-site support during outages in the personnel dosimetry, whole body counting, and health physics areas.
9. Provides for the general engineering and technical support in the broad areas of radiation measurements, health physics, radiochemistry, and quality assurance. I
1. Director of Nuclear Engineerino i
1. Reports directly to a Vice President.

l

2. Performs nuclear engineering and economic studies requested by management.  !
3. Provides for the general supervision and coordination of reactor physics, safety

Title:

Section I, Organization Page: 12 of 43 , Rev.: 27 Date: December 20, 1996

1 YANKEE' ATOMIC ELECTRIC COMPANY f assessment, transient analysis, and loss of-coolant analysis activities. l

4. Ensures that.the Operational Quality Assurance l Program and the applicable procedures are j l

implemented within the department. I

5. Coordinates engineering analysis requirements  ;

necessary to support changes related to operation of the plant or site.

m. Plant SuDDort DeDartment Manaaer
1. Reports directly to a Vice President.

l 2. Provides for the general supervision and [ coordination in the areas of materials !- evaluation, operational services (including construction services), and drafting / design support. l

3. Provides for the Plant Support review of design changes.
4. Provides engineering services to the Projects Departments, upon request. i
5. Responsible for the administration of the NDE/ ANSI N45.2.6 Training and Certification Programs. (To maintain the independence of the NDE/ ANSI N45.2.6 training and certification process, overall responsibility for appointing the NDE/ ANSI N45.2.6 Level III Examiner will l l remain with the Director of Quality Assurance.

All requirements.for certification shall be met j i prior'to appointment as Level III. Examiner.) J 1 2

Title:

Section I, Organization , ~ Page: 13 of 43  ! Rev.: 27 - Date: December 20, 1996

      , , ,                                 _             .         ,,u,             c.,       --...-%   . . , -..-- .          .. , , ,

_ . _ _ _ . _ . . _ _ . . _ . _ . _ _ _ . _ . ~ . _ _ _ _ . . - . - _ _ _ . _ _ _ . _ _ l f 6 t YANKEE ATOMIC ELECTRIC COMPANY l i i

n. Enoineerina and Licensina Manaaer j
1. Reports to the Decommissioning Manager and i Manager of Operations. l
2. Responsible for coordination of activities pertaining to State, Federal, and license requirements.  !
3. Provides for independent review and acceptance -!

for selected plant repairs, all safety-related-engineering design changes and decommissioning work packages for the site.

4. Provides for review of material service -j purchase requests, drawings, specifications.

and appropriate procedures.

5. Coordinates and directs engineering services necessary to support the decommissioning of the  !

site. i

6. Assures coordination and implementation of the j Emergency plan.
7. Assures engineering activities are conducted'in accordance with.the Quality Assurance Program.

l l

8. Assures the Quality Assurance /0uality Control j standards and/or requirements are provided on j all applicable documents.

( I

Title:

Section I, Organization l Page: 14 of 43 Rev.: 27 Date: December 20, 1996

                                                                                                                                     )

YANKEE' ATOMIC ELECTRIC COMPANY  ! t 1

o. Cost Control and Plannino Manager
1. Reports to the Decommissioning Manager and j l'anager of Operations. j I
2. Coordinates and monitors Decommissioning fund i expenditures.
3. Responsible for preparation of the annual i Decommissioning budget. I f
4. Responsible for tracking services and materials  !

associated with Decommissioning activities. l l r

5. Responsible for developing strategic plans for i Decommissioning activities.

l

6. Acts as Assistant Site Manager.

p, Automation Technoloav DeDartment ( ATD) Manaaer i

                                                                                                                              .     .I
1. Reports to a Vice President. i i
2. Provides engineering software development and  !

i support services to NSD departments, sponsor plants, and other clients, as requested or j contracted. l

3. Provides automated plant systems development j and support services for sponsor plants and j other clients, as requested or contracted. l j 4. Provides and implements advanced analytical and computational methods and systems to NSD -  !

I sponsors, and other clients. t

Title:

Section I. Organization - i Page: 15 of 43 t Rev.: 27  : Date: December 20, 1996

                                  . _ . .  .               ~                . -

YANKEE ATOMIC ELECTRIC COMPANY

2. Plant - Yankee ,
a. Site Manaaer (Site Manager is Plant Manager  !

referenced to in Technical Specifications.) ,

1. Reports directly to the Decommissioning Manager and Manager of Operations.
2. Acts as Chairman of the Plant Operation Review Committee with authority and responsibility as established in the Technical Specifications of thc Site license.
3. Directly responsible for the safe, orderly and efficient operation of the site, and for  :

compliance with the requirements of the license and applicable State and Federal laws and  ; regulations.

4. Responsible for the on-site implementation of the Operational Quality Assurance Program, Security Program and Fire Protection Program. l
5. Responsible for Site maintenance and repair. j
6. Responsible for the control and surveillance of ,

all special nuclear material at the site. l

7. Provides information and reports to the Yankee Nuclear Services Division and the Nuclear Safety Audit and Review Committee as required and as directed by the Decommissioning Manager. l
8. Provides for and coordinates review of industry  !

operating problems with the aim of minimizing likelihood of occurrence at the plant.

Title:

Section I, Organization Page: 16 of 43 Rev.: 27 Date: December 20, 1996

, . _ . _ _ , _ . _ _ . . . . _ - ~ _ _ _ _ . _ _ _ _ _ . . . . . - . . . ~ . . _ . . _ _ . . _ _ . _ . _ . . _ . . . . - _ . _ .-._ _ . I s I i t YANKEE ATOMIC ELECTRIC COMPANY-t

9. ' Designates an alternate to the Site Manager l during 'his ahsence with the authority and l responsibility thereof. j
10. Maintains communications with the Training I Coordinator involving plant training needs. l t

l

b. Operations Manaaer j
1. Reports directly to the Site Manager.  ;

i

2. Responsible for the ,afe, orderly, and '

efficient operation of the Site for compliance l with the requirements of the license and j applicable State and Federal laws and regulations. l

3. Responsible for shift supervisors and- l operations support.

l I

4. Administration of the Certified Fuel Handlers l l Training Program. l
5. Administration of the Equipment Operators l Training Program.  !

I , 6. Coordinates Plant Quality Assurance activities i L with the Manager of Operations and Decommissioning Manager.

7. Coordinates Plant Fire Protection activities.

including' Fire Protection Training.

8. Coordinates testing of plant hydro j requirements.

I

Title:

Section I. Organization { Page: 17 of 43

Rev.
27 Date: December 20, 1996 i

i

i l l 1 4 I YANKEE ATOMIC ELECTRIC COMPANY ! 9. Maintains core component history file of all fuel, control rods, sources and incore detectors. l l

10. Accounts for all special nuclear material at  ;

the plant site. l

c. Shift Supervisor.
1. Reports directly to the Operations Manager.
2. Responsible for plant operations in accordance with approved documents and specifications.
3. Responsible for preparing documents outlining system functions and operating modes.
4. Responsible for ensuring that personnel under his supervision perform their duties according to applicable licenses, specifications, safety

, rules, regulations, and certifications. l

5. Responsible for ensuring that maintenance requests are provided for the repair or replacement of defective parts and/or components.
6. Responsible for verifying the operability of systems and/or components following maintenance ,

or changes by providing for the performance of written test documents which incorporate the . requirements and acceptance criteria contained l in applicable design documents.  ; I

7. Responsible for ensuring that fuel handling l

operations are safely performed in accordance with approved procedures.

Title:

Section I, Organization  ! Page: 18 of 43 Rev.: 27 Date: December 20, 1996 l

YANKEE ATOMIC ELECTRIC COMPANY

8. Responsible for coordination and performance of l hydrotesting. i t
d. Maintenance and Construction Manaaer f
1. Reports directly to the Site Manager. 6 i
2. Directs the-activities'of Mechanical and'  ;

Electrical Maintenance. Instrumentation and Control, and Maintenance Engineering.

3. Coordinates the review-and update of plant l drawings and specifications. [
4. Directs plant maintenance, repairs, and design l

changes and assures compliance of maintenance activities to applicable State, Federal, and license requirements.

5. Prescribes .and dir~ects schedules, and programs, as necessary, to assure the safe decommissioning of the site.
6. Provides.for major contractor decommissioning support including establishment of appropriate contractual arrangements.
7. Ensures'that contractor decommissioning activities are performed in a safe manner.
8. Directs on-site engineering and craft support of decommissioning activities.
9. Coordinates and transmits information conceri ng Plant changes to the Manager of Operations and Decommissioning Manager.

Title:

Section I, Organization Page: 19 of 43 Rev.: 27 Date: December 20, 1996

l YANKEE ATOMIC ELECTRIC COMPANY l l e. Trainino Coordinator

1. Reports directly to the Site Manager.
2. Responsible for scheduling and documentation of plant general employee training.
3. Responsible for administration of all plant staff training.
4. Maintains lines of communication with the Site Manager on Plant Training Programs.
f. Site Services Supervisor
1. Reports directly to the Site Manager.
2. Supervises the Store Supervisor, a) Preparation of requisition for purchase orders. ,

b) The receipt, handling, and storage of materials and equipment. c) Administering a system of material and equipment identification. l l d) Maintaining a system which provides l traceability and retrievability of  ! Quality Assurance documentation for purchased materials.

3. Coordinates the review, revision, and distribution of procedures, i

Title:

Section I, Organization Page: 20 of 43 i Rev.: 27 Da e: December 20, 1996

I t i YANKEE ATOMIC ELECTRIC COMPANY l I L 4. . Responsible for the operations of the Plant j l Document Control Center for the retention of j ( specified Quality Assurance records, reports. I and personnel records. i l

5. Maintains and disseminates information  ;

regarding codes, criteria, standards, l guidelines, and policy to applicable plant  ! personnel.  ; i i

6. Supervises Plant Administrative personnel.
7. Responsible'for the Fitness for Duty Program. f
g. Plant Radiation Protection and Chemistry Manaaer l
1. Reports directly to the Site Manager.  !
2. Directs maintenance of water conditioning on I the site as per specifications and/or i documented and authorized recommendations.  ;
3. Directs a program to ascertain the j radioactivity levels of liquids, gases and i solids as required.  !
4. Directs the review and interpretation of )

chemistry test results. l

5. Directs the documentation and maintenance of chemistry and radiation protection records.
6. Responsible for the development and implementation of the Radiation Protection Program (including ALARA), assuring that these
                                    . programs meet site standards and State and Federal license requirements.

Title:

Section I, Organization Page: 21 of 43 Rev.: 27 Date: December 20, 1996 i

                     .        _                   . _ _ - - -     -           _- . _ _ .   ._ _   l

i i YANKEE ATOMIC ELECTRIC COMPANY  ! I

7. Directs the maintenance of the Personnel i Exposure Record. System.
8. Directs radioactive material shipments and i L receipts pursuant to site and g)vernment  ;

regulations.

                                                                                                                                                                            }
9. Maintain stop work authority.when radiological safety is jeopardized or when unnecessary personnel exposure is occurring. ,
h. Health and Safety Supervisor , I l

t

1. Reports directly to the Site Manager. j i
2. Directs the plant Medical Services l'rogram and L acts a plant management's point of contact relative to medical matters in caordination l with the Plant Medical Consultant. ]i
3. Directs the maintenance of personnel medical l records. l
4. Responsible for the development and ,

implementation of the plant Occ'upational safety .l programs, assuring that these programs meet j site standards and Federal OSHA requirements.

5. Responsible for review and commuaication of.

plant safety policies through the plant safety manual and safety meetings.

6. Responsible for work site inspections by safety
                                                                                                                                                                             )

department personnel.

7. Acts to safeguard worker health and safety.

Title:

Section 1. Organization Page: 22 of 43 i Rev.: 27 . l Date: December 20, 1996 1

                                                                                                                                                                             )
  - - - _ _ . , __ ._ _.._._                   _.____...~. _._._.                   _ . _ . _ _ . _ _ _ . _ _ _ .._ __   _

i i l YANKEE ATOMIC ELECTRIC COMPANY- l

8. Directs the review and interpretation of  ;

occupational safety exposure monitoring. ]

9. Directs the maintenance of personnel exposure -

monitoring record system.

3. Vermont Yankee Nuclear Power Corporation i'
a. Vice President.' Operations
1. Reports to the President'- Vermont Yankee  !

Nuclear Power Corporation.  ;

2. Ensures the 0A Program is effectively j implemented. J l

i

3. Evaluates disposition of In-Plant Audits and l prepares concurrence directives to the plant.  !

l l

4. Ensures that applicable programs and procedures l effectively implement the 0A Program, l l \

Ope ona 0 1t Assura ce Prog am l

6. Appoints the NSAR Committee members including Chairman and Vice Chairman.
7. Acts as the Manager of Operations,
b. Director of Enaineerina
1. Reports to the Vice President, Operations.  ;

1 i l 2. Responsible for the engineering support area. 'l

Oversees the planning, scheduling, and 1

I fitle: Section I, Organization j Page: 23 of 43 i Rev.: 27 j Date: December 20, 1996 i I t

  . . - -..       ..~ - . - -                               - . - . .      . . . . _ - _ - . .    -     . . - - . -    .   . _ . - -

1 i I YANKEE aiOMIC ELECTRIC COMPANY i direction of' activities of employees engaged in 5 design changes and alterations. I f , . I

3. Reviews and approves safety-related design  !

change documents, selected plant programs and' f policies. i [ t

4. Provides for review and approval of drawings  ;

and specifications.  ;

                                                                                                                                         -1
5. Provides for interfacing between the Plant and  !

the Yankee Nuclear Services Division.  ! I  !

- c. Trainina Manaaer i i
1. Reports to the Vice President, Op'erations.
2. Establishes and maintains all operator and plant training programs. .i i
3. Remains current on all regulatory requirements  ;

concerning training and qualifications ,of plant l personnel and ensures that Plant training I programs and procedures are revised in a timely manner in response to changing needs and  ! regulations.  ! I

4. Provides overall coordination and supervision f for the Technical Support Training Supervisor,  !

the Engineering and Maintenance Training .l Supervisor, the Operations Training Supervisor,  ! and the Training Support Supervisor.in carrying { out their duties.

5. Evaluates the effectiveness of the training l programs and the performance of the individuals  !

participating in the training. j

Title:

Section 1, Organization Page: 24-of 43 Rev.: 27  ; Date: December 20, 1996  : q f a

YANKEE ATOMIC ELECTRIC COMPANY j

4. Plant - Vermont Yankee
a. Plant Manager
1. Reports to the Vice President. Operations.
2. Directs the on-site implementation of the Operational Quality Assurance Program.

l

3. Prescribes and directs the development of Plant procedures, instructions, schedules, and programs as necessary to assure the safe and dependable operation of the facility.
4. Maintains a thorough knowledge of, and assures compliance with, the regulatory requirements j for operating a nuclear power plant.
5. Directs the preparation and maintenance of power plant records, reports, and logs.

l

6. Acts as Chairman of the Plant Operations Review l Cc mittee with authority and responsibility as estoblished in the Technical Specifications of the plant operating license.

l

7. Provides information and reports to the Yankee
                                                                                      ]

Nuclear Services Division as directed by 'he Vice President. Operations.

8. Provides information and reports to the Nuclear Safety Audit and Review Committee as required j and as directed by the Vice President.

Operations. l

9. Directs the coritrol and surveillance of all special nuclear material on site.

Title:

Section 1, Organization 1 Page: 25 of 43 Rev.: 27 Date: December 20. 1996

  - .. - - - . . = .                . - -     - ~.        .-. - - - - - - -.---~~~-                       ---

t YANKEE ATOMIC ELECTRIC COMPANY j L

10. Assure the implementation of  ;

training / retraining programs as required by the j Plant. license . regulations, or applicable- l standards: and as necessary to assure safe work i practices and compliance with standard f operating practices license and Technical  : Specifications, safety rules, and applicable , regulations.

b. Operations Superintendent '
1. Reports to the Plant Manager.

l

2. Oversees planning, scheduling, coordination, i and direction 'of activities of employees l engaged in the installation, operation, j
                                                     ' inspection, and maintenance of all equipment,             f buildings, and structures as appropriate. Is               j responsible for the Operations, Maintenance,               ;

and Instrumentations and Control areas. i

3. Assists in the development of Plant procedures, o instructions, schedules, and programs as necessary to assure the safe and dependable operation of the facility.
4. Maintains a thorough knowledge of, and assures compliance with, the regulatory requirements for operating a nuclear power plant.
5. Acts as Vice Chairman of the Plant Operations Review Committee with responsibilities as established in the Technical Specifications of the plant operating license.

Title:

Section I, Organization Page: . 26 of 43 Rev.: 27 Date: December 20, 1996 l l

                                                                                                              - i

L 4 i YANKEE ATOMIC ELECTRIC COMPANY l r

6. . Directs the preparation and maintenance of ,

power plant records, reports, and logs as applicable.

7. Provides information reports, and records as  ;

directed by the Plant Manager.  ;

8. Assists in directing the establishment of. safe ,

work practices, and the training and instruction of plant personnel in the l

                                                        ~ observance of standard operating practices NRC              1 license and Technical Specifications, safety rules and regulations.
c. Technical Services Superintendent
1. Reports to the Plant Manager.
2. - Responsible for the Reactor Engineering, Security Radiation Protection, and Chemistry Departments.
3. Assists in the development of Plant procedures, instructions, schedules, and programs as necessary to assure the safe and dependable operation of the facility and the safe conduct of refuel operations.
4. Maintains a thorough knowledge of, and assures compliance with, the regulatory requirements of I a nuclear power plant.

I

5. Acts as Vice chairman of the Plant Operations Review Committee with responsibilities as established in the Technical Specifications of j L the plant operating license. i l

Title:

Section I, Organization Page: 27 of 43 Rev.: 27 Date: December 20, 1996

- l YANKEE ATOMIC ELECTRIC COMPANY l

6. Directs the preparation and maintenance of l power plant records, reports, and logs as {

applicable. l

7. Provides information, reports, and records as  !

directed by the- Plant Manager. l i

8. Assists in directing the establishment of safe work practices, and the training and instruction-of plant personnel in the observance of standard operat.ing practices, NRC
                                                             ' license and Technical Specifications, safety rules and regulations.

I

d. Pro.iect Enaineerina Manaaer
1. Reports to the Director of Engineering. l '

i

2. Oversees and manages the Project Engineering efforts necessary to support emergency needs of i the plant. l
3. Provides.for the generation of project plans, f

schedules budget, manloadings, etc. necessary  ! to support field activities.

4. Manage the contracts, contractors used to accomplish projects, and oversee project implementation.
5. Develop maintenance and oversight of implementation of programs and procedures associated with Project Engineering.

i

6. Maintain formal documentation of Project  :

Engineering activities for required operation  ; and license requirements.

                                                                                                                                          ~

I

Title:

Section I, Organization Page: 28 of 43 Rev.: 27 Date: December 20, 1996

1 i
+

1 YANKEE ATOMIC ELECTRIC COMPANY i l 7. Fulfills other responsibilities common to all supervisory positions and carries out other- ' ] dudies-and responsibilities _as may'be assigned by the Director of Engineering. l

e. Technical Support Manager

! l

1. Reports to the Director of Engineering.
2. Oversee and manage programs associated with the

[ + technical / administrative supports areas. i i 3. Maintain formal documentation associated with 1 the technical and administrative activities for. i required operational and licensee documentation.

                                                                     .4.      Fulfills other responsibilities ' common to all j                                                                              supervisory positions and carries out other i                                                                              duties and responsibilities as may be assigned by the Director of Engineering.

1 j 5. Oversee and manage Fire Protection Program. i

f. Performance Enoineerino Manaaer i

', 1. Reports to the Vice President. 0perations. 1 i

2. Provides engineering support to Operations and Maintenance departments, i
3. Assess the performance of plant systems and i make recommendations for improvement.
4. Oversee and manage programs associated with the ]

performance engineering function. )

                                                                                                                                                                   )

Title:

Section 1. Organization

'.                          Page:     29 of 43                                                                                                                     1 Rev.:     27 j                            Date:     December 20, 1996 1

i

                                              - - - , ,           r     .-
                           .  - ...-.-....- .-- - .- . - - ..- - ~ ._~. - . -

P d YANKEE ATOMIC ELECTRIC COMPANY , i

5. Maintain formal documentation associated with .:
                               -performance engineering programs for required       l operational and license requirements.

6. Fulfills other responsibilities common to all supervisory positions and carries out other duties and responsibilities as may be assigned ~  ! by the Director of Engineering. >

g. Nuclear Services Manager ,
1. Reports to the Director of Engineering, ,

i

2. Oversees and manages programs associated with nuclear services including the areas of nuclear  !

and environmental engineering and fuel- . management.  !

4. Maintains formal documentation associated with nuclear services for required operational and license requirements.
4. Provides administrative support for NSD employees at the plant site,
5. Fulfills other responsibilities common to all 1 supervisory positions and carries out other duties and responsibilities as may be assigned by the Director Engineering.
h. Desian Enoineerino Manaaers
1. Reports to the Director of Engineering, i 2. Oversee and manage the electrical /l&C/

mechenical/ fluid systems engineering efforts i

Title:

Section I. Organization Page: 30 of 43 Rev.: 27 Date: December 20, 1996

YANKEE ATOMIC ELECTRIC COMPANY necessary to support the normal and emergent needs of the plant.

3. Oversee and manage programs associated with '

design engineering.  ! i 1 . 4. Provide for the generation of design change and l l . installation documents, and support for'the - installation'of these design changes and the . I close-out of associated documentation. [ l

5. Maintain formal documentation of plant design  !

, basis and design change activities for required operational and license requirements.

6. Fulfills other responsibilities common to all 3

supervisory positions and carries out other duties and responsibilities as may be assigned I !' by the Director of Engineering. l l h

1. Operations Manaaer '
1. Reports to the Operations Superintendent. l l
2. Fulfills duties and responsibilities similar to j

and/or as described in^the FSAR and is directly in charge of the Operations Department.

3. Has the responsibility and authority for insuring the safe and efficient operation of the plant and its supporting systems in accordance with-applicable station licenses.

Technical Specifications, procedures, instructions, established company policy and ( safety rules. 1 4

Title:

Section I, Organization 1 Page: 31 of 43 Rev.: 27 Date: December 20, 1996  !

, i i l YANKEE ATOMIC ELECTRIC COMPANY '

4. Consistent with plant policies and applicable i instructions, institutes necessary programs, I issues instructions, originates procedures and .

l insures that department administrative systems t exist such that the responsibilities assigned to the' Operations Department are executed I effectively and efficiently in accordance with company intent. Insures that necessary , , documentation is prepared, reviewed, approved, { and properly processed to verify that l department activities meet all established j requirements. 1

5. Maintains current status of Operations'  ;

Department activities and requirements. Prepares.and maintains, plans and schedules for i department commitments such as personnel  ; training, retraining and qualification. I l

6. Insures that all records, tests, reports, and  ;

logs maintained by the Operations Department I are properly reviewed and approved. i

7. Insures that all Operations Department ]

personnel in a training status are actively I pursuing-the. established program and that their performance'is being adequately evaluated.

8. Reviews all Operations Department procedures to insure that they are current, accurate, and approved.
9. Implements aspects of the Plant Quality Assurance Program which relate to the activities of the Operations Department. l

, i l l

Title:

Section 1, Organization

Page
32 of 43 Rev.: 27 i Date: December 20, 1996 1
   -       . . . -,      ,-                 ,,     m,                                                  .--

YANKEE ATOMIC ELECTRIC COMPANY A

j. Instrument & Control Manaaer
1. Reports to the Operations Superintendent.
2. Fulfills duties and responsibilities similar to and/or as described in the FSAR and is directly -

in charge of the Instrument and Control Department.

3. Plans, schedules end supervises the activities of the Instrumentation and Controls Department.

Such activities to include; installation, inspection, calibration, adjustment, maintenance, and repair of the plant instrumentation and controls.

4. Coordinates the activities of the Instrument and Controls Department with all other plant i functions. )

l

5. Establishes and directs a program of preventive maintenance, calibration, and surveillance testing as required by the plant license, approved plant procedures, or other plant requirements.
6. Establishes calibration techniques, frequencies, and records as necessary to assure j reliable indication and control for plant l l system parameters.

l

7. Establishes and directs a program of departmental training that will assure a staff of Instrumentation and Controls personnel capable of safely and efficiently performing their duties in accordance with established practices, procedures, and regulations.

Title:

Section I, Organization Page: 33 of 43 Rev.: 27 Date: December 20, 1996 4

t YANKEE ATOMIC' ELECTRIC COMPANY - t i s

8. Prepares and/or supervises the preparation of j reports, logs. and historical records as l' required.

i

9. Implements those aspects of the-Plant Quality l Assurance Program which relate to the  !

activities of the Instrumentation and Controls Department. I

10. Develops and maintains, in accordance with approved plant procedures, the procedural controls necessary to fulfill the above j responsibilities.
k. Maintenance Manaaer
1. _ Reports to the Operations Superintendent.  !

i

2. Fulfills duties and responsibilities similar to  ;

and/or as described in the FSAR and is directly I in charge of the Maintenance Department.

3. Is responsible for all electrical and mechanical maintenance activities throughout the-Plant with the exception of Instrumentation and Control maintenance activities.
4. Consistent with plant policies and applicable instructions, institutes necessary programs.

issues instructions, originates procedures, and insures that department administrative systems exist such that the responsibilities assigned to the Maintenance Department are executed effectively and efficiently in accordance with ~ company intent, insures that necessary documentation is prepared. reviewed. approved.

Title:

Section 1. Organization Page: 34 of 43  ! Rev.: 27 ' Date: December 20, 1996 l l m , . - , - . ,, _ - - _ _ _ - . . - . . , _ , _ , . . . _ -

YANKEE ATOMIC ELECTRIC COMPANY and properly filed to establish that department activities meet all requirements.

5. Consistent with plant policies and applicable '

instructions, organizes department functions and activities, assigns duties, and schedules personnel to accomplish department l requirements. Reviews and supervises all department assignments.

6. Maintains current status of department l activities and requirements. Prepares and maintains long-range plans and schedules for department commitments such as personnel training and qualification, preventive maintenance, material procurement, plant l modifications, etc. l l
7. Staffs and trains Maintenance Department personnel. )
8. Establishes and maintains equipment history l records. l
9. Selects and orders materials and spare parts in areas of assigned responsibility.
10. Implements aspects of the Plant Quality Assurance Program which relate to the activities of the Maintenance Department.
11. Reviews mechanical and electrical equipment failure frequency and evaluates equipment reliability.
12. Assumes responsibility for the condition, l

maintenance, and reliability of all plant

Title:

Section I, Organization Page: 35 of 43 Rev.: 27 Date: December 20, 1996 l l l

_ . - . _ _ . _ . _ _ _ _ - - _._._._.__.m.__ . _ _ _ . _ .

                                                   . YANKEE ATOMIC ELECTRIC COMPANY electrical and mechanical equipment other than                  j that specifically assigned to other.                            j departments.                                                    ,

i a

1. Chemistry Manager 1
1. Reports to the Technical Services Supe ri ntendent'.
2. Fulfills duties. and responsibilities similar to  ;

and/or as described in the FSAR and is directly in charge of the Chemistry Department. , l

3. Consistent'with the policies and applicable l
                                                            ' instructions, institutes necessary' programs, issues instructions, originates. procedures,.and insures that department administrative systems exist such that the responsibilities assigned to the Chemistry Department are executed effectively and efficiently in accordance with company intent. - Insures that necessary documentation is prepared, reviewed, approved, and properly filed to establish that department activities meet all requirements.
4. Consistent with plant policies and applicable instructions, organizes department functions and activities, assigns and schedules personnel to accomplish department requirements. Reviews and supervises all department assignments.
5. Maintains current status-of' department l activities.and requirements. Prepares and maintains long-range plans and schedules for department commitments such as personnel  :

training and qualification, preventive  ;

Title:

Section I Organization Page: 36 of 43 Rev.: 27 Date: December 20, 1996

YANKEE ATOMIC ELECTRIC COMPANY maintenance, material procurement, plant modifications, etc. l

6. Assumes responsibility for providing the L

necessary administrative supervision and required personnel to meet the needs of the established Radiological Environmental Monitoring Programs. i

7. Prescribes and maintains chemistry conditions and purification of coolants within applicable limits.
8. Develops and maintains records of all chemistry and radiochemistry aspects of the plant.
m. Radiation Protection Manager
1. Reports to the Technical Services Superintendent.
2. Fulfills duties and responsibilities similar to and/or as described in the FSAR and is directly in charge of the Radiation Protection Department.
3. Consistent with the policies and applicable instructions, institutes necessary programs, issues instructions, originates procedures, and insures that department administrative systems exist such that the responsibilities assigned to the Radiation Protection Department are executed effectively and efficiently in accordance with company intent, insures that necessary documentation is prepared, reviewed, approved, and properly filed to establish that

! department activities meet all requirements.

Title:

Section I, Organization Page: 37 of 43 . Rev.: 27 Date: December 20, 1996 l t l I

I YANKEE ATOMIC ELECTRIC COMPANY

4. Consistent with plant policies and applicable instructions, organizes department functions and activities, assigns and schedules personnel to accomplish department requirements. Reviews and supervises all department assignments.
5. Maintains current status of department activities and requirements. Prepares and maintains long-range plans and schedules for ,

department commitments such as personnel training and qualification, preventive maintenance, material procurement, plant j modifications, etc.

6. Develops and maintains records of all radioactive waste shipments.
7. Develops work and housekeeping practices in i radiologically controlled areas of the plant to minimize personnel exposure and the spread of radioactive contamination.  ;
8. Assumes responsibility for receipt, storage.  ;

shipment, and disposal of radioactive material utilizing proper Federal and State regulations (other than nuclear fuel).

n. Reactor Enoineerino Manager
1. Reports to the Technical Services Superintendent.
2. Fulfills duties and responsibilities similar to and/or as described in the FSAR and is directly in charge of the Reactor Engineering Department.

Title:

Section I, Organization Page: 38 of 43 Rev.: 27 Date: December 20, 1996

                                                                                        )

l YANKEE ATOMIC ELECTRIC COMPANY ' l l

3. Plans, schedules, and supervises the activities of the. Reactor Engineering Department. Such activities to include: nuclear and thermal ~

core analysis, planning and scheduling of fuel rearrangements and fuel cycling, ' rod withdrawal sequences, rod patterns, and reactor maneuvering during' plant startup.

4. Coordinates the activities of the Reactor Engineering Department with all other plant functions.
5. Establishes and directs a program of Nuclear i Performance Monitoring and Surveillance Testing j as required by the plant license, approved plant procedures, or other plant requirements. ,

1 i

6. Establishes a program of control, accountability and record keeping as required to. maintain an accurate inventory. of licensed special nuclear material.
7. Establishes and directs a program of-departmental training that will assure a staff j of Reactor Engineering personnel capable of safely and efficiently performing their duties in accordance with established practices, procedures, and regulations.
8. Prepares and/or supervises the preparation of reports, logs, and historical records as required.
9. Implements those aspects of the Plant Quality Assurance Program which. relate to the activities of the Reactor Engineering Department.

Title:

Section 1, Organization Page: 39 of 43 Rev.: 27 Date: December 20, 1996

l l YANKEE ATOMIC ELECTRIC COMPANY

10. Develops and maintains, in accordance with approved plant procedures, the procedural controls necessary to fulfill the above requirements.

E. REVIEW AND AUDIT Two committees have been established for Yankee and the Vermont Yankee plants whose objectives are to insure the plant is operated safel,y, utilizing good engineering practices. The committees are charged with making recommendations to modify operational methods or safety precautions. The Plant Operations Review Committee, is made up of Plant personnel. The Nuclear Safety Audit and Review Committee for Vermont Yankee, shall have no more than three members selected from the organization reporting to the Manager of Operations. The Yankee Nuclear Safety Audit and Review Committee shall not be members of the plant staff.

1. Plant ODerations Review Committee
a. Yankee Plant - See Section 6.5 " Review and Audit" of Appendix A Technical Specifications to the Operating License DPR-3.
b. Vermont Yankee Plant - See Section 6.2. A " Review and Audit" of Appendix A Technical Specifications to the Operating License DPR-28,
2. Nuclear Safety Audit and Review Committee
a. Yankee Plant - See Section 6.5 " Review and Audit" of Appendix A Technical Specifications to the Operating License DPR-3.

l

Title:

Section 1. Organization Page: 40 of 43 Rev.: 27 Date: December 20, 1996

YANKEE ATOMIC ELECTRIC COMPANY

b. Vermont Yankee Plant
1. See Section 6.2.B " Review and Audit" of -

Appendix A Technical Specifications to the Operating License DPR-28.

2. The NSAR Committee shall be responsible for )

evaluating changes to the Vermont Yankee organizational chart (Figure 2 to Section 1). I l l 1

Title:

Section 1. Organization Page: 41 of 43 P.ev . : 27 Date: December 20, 1996

EEI 2 C E. .* %..

       . ..                                                       n

, EOO2 2W 2 e o 57 3 YANKEE ATOMIC ELECTRIC COMPANY E a **E PRESIDENT

                               " ? ." ._.

3 2 - 1 5 5 DIRECTOR VICE DECOMMISSIONING NUCLEAR SAFETY AUDIT AND REVIEW EXECUTIVE DIRECTOR. l

       $                                  C                                                  ENGINEERING               PRESIDENT (S)

MANAGER AND MANAGER OF OPERATIONS COMMITTEE QUALITY ASSURANCE g SERVICES sz FUEL ENVIRONMENTAL ENGINEERING PROJECT COST / SCHEDULE ENGINEERING gg Q MANAGEMENT LABORATORY & LICENSING MANAGER M MANAGERS MANAGERS CONTROL MANAGER OIRECTOR DIRECTOR y 3 n

                                                                                                                                                                                                                                                                    ?

CORPO _ 3 g7 _RA_T_E _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ ___________________________ _______m n 5 o OA SURV ILLANCE n SITE __________________________ MANAGER INSPECTION GROUP x s' x PLANT OPERATIONS REVIEW COMMITTEE HEALTH & MAINTENANCE & OPERATIONS RP/ CHEMISTRY SITE SERVICES TRAINING A53ISTANT N SITE MANAGER MANAGER MANAGER SUPERVISOR COORDINATOR SU OR MANAGER FUNCTIONAL

                                                                                                                                                                                                     ----------                     COMMUNICATIONS

awo ~ f ca o ce - g?* 2

                                          .                                                                                                                            VERMONT YANKEE ORGANIZATION PRESIDENT C2 N * < m in                                                                                          & CitIEF                                                                                                                                                                                                                                     .
  • "W*g* EXECUTIVE OFFICER e oaer~ " "
  • B "O YANKEE ATOMIC ,

a5 0 ......................... EL TR C  ; t

        - < - **                                                                                                                                                                        PRES' DENT m        cm                                .

o 3

i

- x l I

  • VICE PRESIDENT  !*

ADMINISTRATION / VICE VICE l e T ' e o FINANCE & OP U) PRESIDENT (S) EXECUTIVE m TREASURER

        ]

DIRECTOR OUALITY ASSURANCE E "EERI _< TRAINING SAFE Y AUDIT D PARTp(u > MANAGER REVIEW COMM.(4) MANAGERS gg g MANAGERS m

                                                                                                                                                                                                                                                                                                                                                   )
                                                                                                                                                                                                                                                                  ~

x l l E DIRECTOR OF " PLANT ENGINEERING l MANAGER PERFORMANCE (2).(3) ------------ ----------------- SURVE LANCE ENGINEERING GROUP e m MANAGER g

                                                                                                                                                                                                                                                               !                                                                             O l                            I                                                                                              IECHNICAL OP            S                                                                                   SUP            ENT SU                        NT I2I*I#I                     C0pNtITTEE                                     .                                                         i                                                  l                                                                             E
                                                 .                        .                                                                       I                                               I                       I                                    l INSTRUMENT                         RADIATION                                                                    REACTOR OPERATIONS         MAINTENANCE
                                                                                                   & CONTROL                       PROTECTION CHEMISTRY MANAGER ENGINEERING                                    '!

MANAGER MANAGER MANAGER MANAGER MANAGER l l l l i I i e e DESIGN PROJECT TECHNICAL NUCLEAR ENGINEERING SUPPORT l SERVICES ENGINEERING MANAGER MANAGER e MANAGER MANAGERS l Notes: (I) Responsible for fire protection. (2) ANSI 18.1-1971 Re: License. (3) In Health Physics matters, the Radiation Protection Manager has direct access to the Plant Manager. (4) The committee membership and its Chairman and Vice Chairman shall be appointed by the Vermont Yankee Vice President. Operations. CD80ZETWWRG2

YANKEE ATOMIC-ELECTRIC' COMPANY , 1

                                                                                                               ]

II. QUAllTY ASSURANCE PROGRAM J A. SCOPE  ! l This section establishes the criteria to be applied to systems f requiring Quality Assurance which prevent or mitigate the l consequences of postulated accidents which could cause undue risk j to the health and safety of the public. The structures, systems, l components and other items requiring quality assurance are listed l in the Yankee Safety Classification of Systems Manual for the Yankee plant. A listing for the Vermont Yankee plant is provided  ; in the Vermont Yankee Safety Classification Manual. l B. RESPONSIBILITIES i

1. Compliance with the requirements of the Operational Quality  ;

Assurance Program - based on the criteria of Title 10 of _ i the Code of Federal Regulations, Part 50, Appendix B. and ANSI N18.7-1976 - shall be the responsibility of all j personnel involved with activities affecting operational l safety. Each facility shall have a matrix of major quality  ! assurance procedures cross referenced to each applicable criteria of 10CFR50 Appendix B. The. performance of  ; quality-related activities shall be accomplished with i specified equipment under suitable environmental conditions. Note: Each criterion section for the Program incorporates the designation of specific organizational responsibilities.

2. Individuals having direct responsibilities for establishment / distribution control / implementation of the Operational Quality Assurance Program are delineated in Section 1 " Organization" of the Program.

Title:

Section II, Quality Assurance Program Page: 1 of 7 Rev.: 27 Date: December 20, 1996 i l l

YANKEE ATOMIC ELECTRIC COMPANY C. IMPLEMENTATION Establishment of an effective Operational Quality Assurance Program is assured through consideration of and conformance with the Regulatory Position in the below listed Regulatory Guides as modified in Appendix B. Implementation of this Program is assured through Quality Assurance procedures derived from Quality Assurance policies, goals and objectives. Quality Assurance shall review Quality Assurance program procedures to assure their derivat.on from the policies, goals and objectives established by the President.

1. Title 10 of the Code of Federal Regulations, Part 50, Appendix B, Quality Assurance Criteria for Nuclear Power
  • Plants
2. ANSI N18.7-1976, Administrative Controls and Quality Assurance for the ODerational Phase of Nuclear Power Plants (Endorsed by Regulatory Guide 1.33. Revision 2)
3. ANSI N45.2.1 1973, Cleanina of Fluid Systems and Associated f Components Durina Construction Phase of Nuclear Power Plants (Endorsed by Regulatory Guide 1.37, March 16,1973)
4. ANSI N45.2.2-1972, Packaaina. Shippina. Receivina. Storace and Handlina of items for Nuclear Power Plants (Endorsed by Regulatory Guide 1.38, Revision 2) ,
5. ANSI N45.2.3-1973, Housekeepino Durina the Construction Phase of Nuclear Power Plants (Endorsed by Regulatory Guide 1.39 Revision 2)
6. ANSI N45.2.4-1972, Installation, inspection and Testina Reauirements for Instrumentation and Electric Eauipment Durina the Construction of Nuclear Power Generatina Plants (Endorsed by Regulatory Guide 1.30. August 11. 1972)

Title:

Section II, Quality Assurance Program Page: 2 of 7 Rev.: 27 Date: December 20, 1996

YANKEE ATOMIC ELECTRIC COMPANY

7. ANSI N45,2.5-1974 Supplementary Ouality Assurance Reauirements for installation, inspection and Testina of Structural Concrete and Structural Steel Durina the Construction Phase of Nuclear Power Plants (Endorsed by Regulatory Guide 1.94, Revision 1)
8. ANSI N45.2.6-1978, Qualification of Inspection.

Examination. and Testina Personnel for the Construction Phase of Nuclear Power Plants (Endorsed by Regulatory Guide 1.58. Revision 1)

9. ANSI N45.2.8-1975, Supplementary Quality Assurance Reauirements for Installation, inspection and Testina of Mechanical Eauipment and Systems for the Construction Phase of Nuclear Power Plants (Endorsed by Regulatory Guide 1.116. Revision 0-R)
10. ANSI N45.2.9-1974 Reauirements for Collection. Storace.

and Maintenance of Quality Assurance Records for Nuclear Power Plants (Endorsed by Regulatory Guide 1.88, Revision 2) a

11. ANSI N45.2.10-1973. Quality Assurance Terms and Definitions
12. ANSI N45.2.11-1974, Quality Assurance Reauirements for the Desian of Nuclear Power Plants (Endorsed by Regulatory Guide 1.64. Revision 2)
13. ANSI N45.2.12-1977, Reauirements for Auditina of Quality l Assurance Procram for Nuclear Power Plants (Endorsed by Regulatory Guide 1.144, Revision 1)
14. ANSI N45.2.13-1976, Quality Assurance Reauirements for Control of Procurement of items and Services for Nuclear Power Plants (Endorsed by Regulatory Guide 1.123.

Revision 1)

Title:

Section II, Quality Assurance Program Page: 3 of 7 i Rev.: 27 1 Date: December 20, 1996

YANKEE ATOMIC ELECTRIC COMPANY

15. ANSI N45,2.23-1978, Qualification of Quality Assurance Procram Audit Personnel for Nuclear Power Plants (Endorsed by Regulatory Guide 1.146, August '1980)
16. ANSI N18.1-1971, Selection and Training of Nuclear Power Plant Personnel (Endorsed by Regulatory Guide 1.8, Revision 1-R)
17. Regulatory Guide 1.26 Revision 3, Quality Group Classifications and Standards for Water . Steam . and Radioactive-Waste-Containino Componer:ts_ of Nuclear Power Plants
18. Regulatory Guide 1.29, Revision 3, Seismic Desian Classification Notes: 1) When conflicts in similar requirements contained in Technical Specifications and the above documents exist, the requirements contained in Technical >

Specifications override those in the documents. Requirements in the documents will be considered when they supplement and are not in conflict with similar requirements in Technical Specifications.

2) Revisions to the above listed documents will be considered for applicability to the Yankee Operational Quality Assurance Program upon written direction thereof by the Regional Administrator, Nuclear Regulatory Commission - Office of Inspection and Enforcement - Region 1. l l
3) Only those documents listed above shall I be considered applicable to the Yankee I

and Vermont Yankee plants. Documents

Title:

Section II, Quality Assurance Program Page: 4 of 7 j Rev.: 27 i Date: December 20, 1996 i

l  !

                                                                                                                                      ~
                                           ' YANKEE ATOMIC ELECTRIC COMPANY
                                                                                                                                        .)
l.  !

[ further referenced by the above listed  ! l documents shall not be considered  ! I applicable. ~They may,.however, be { considered as guidelines'. li

  • Exceptions and alternatives to the l

provisions contained in this f l ! Standard / Guide are detailed in , t Appendix B. i

4) This Program shall be applicable to those activities requiring quality assuran:e-l which occur commencing within 90 dayr .

after acceptance of the Program by.the [ L Nuclear Regulatory Commission. i

5) The NRC shall be notified of changes. l that reduce commitments'in the accepted l description of the 0A program,' for their  ;

review and acceptance prior to l implementation. Acceptance will be l assumed 60 days after submittal unless notified otherwise.

6) Changes that do not reduce 0A program commitments shall be submitted to the NRC at least annually.
7) Editorial changes or personnel reassignments of a nonsubstantive nature l l

do not require NRC notification. j i l

Title:

Section II, Quality Assurance Program- l Page: 5 of 7 1 ! Rev.: 27 L Date: December 20, 1996 I l l 1 - -. . . . . . -

I YANKEE ATOMIC ELECTRIC COMPANY j l

0. MANAGEMENT EVALUATION ,

i The Cognizant Corporate Officer directs a thorough evaluation of the established Operational Quality Assurance Program by assigning the Nuclear Safety Audit and Review Committee the task 3 of reviewing for compliance with and evaluating the effectiveness of quality related activities. l E. TRAINING

1. The Vice President (s) and Manager of Operations are responsible for the indoctrination and training of their staffs involved with activities affecting quality during plant operation and/or iicense commitment.
2. The Training Manager at Vermont Yankee is responsible for the indoctrination and training of plant staff personnel performing activities affecting operations or requiring quality assurance, and of the operators who are formally licensed or qualified.
3. The Training Coordinator at the Yankee Site is responsible for indoctrination and training of site staff personnel performing activities affecting license requirements.

I

4. Within YNSD, each department Director / Manager is responsible for the indoctrination and training of department personnel performing activities affecting quality in applicable design and engineering, test, operational, construction, or quality phases.
5. The indoctrination and training programs shall provide the I following:
a. Instruction as to the purpose, scope, and implementation of quality-related manuals, instructions. and procedures.

Title:

Section II, Quality Assurance Program Page: 6 of 7 Rev.: 27 Date: December 20, 1996 l

l-u YANKEE ATOMIC ELECTRIC COMPANY l b. Training and qualification in the principles and techniques of the activity being performed.

c. Documentation of the scope, objective, and rethod of implementing the program.
d. Maintenance of personnel proficiency by retraining, re-examining, and/or recertifying,
e. Documentation of the training sessions including j content, attendance, dates, and results where l applicable. I i

j l l 1 i l l

Title:

Section II, Quality Assurance Program Page: 7 of 7 Rev.: 27 Date: December 20, 1996

YANKEE ATOMIC ELECTRIC COMPANY III. DESIGN CONTROL A. SCOPE This section of the Operational Quality Assurance Program establishes measures to assure that the design of and changes to structures, systems, and components covered by the Operational Quality Assurance Program are controlled. B. RESPONSIBillTIES

1. The Nuclear Services Division Quality Assurance Department shall be responsible for auditing design documents and engineering specifications to verify that quality requirements, such as inspection requirements and acceptance criteria, have been included by the responsible parties.
2. The Nuclear Services Division Engineering / Project Departments / Plants shall be responsible for: J
a. The design and control of design activities (including design interfaces) for the change of structures, systems, or components including the requirement for independent review. This NRC mandated review shall be performed by an uninvolved, but technically knowledgeable, person in the engineering discipline. l l

l

b. Identification, documentation, and control of I deviations from specified design requirements and/or quality standards.
c. Design analysis and delineation of acceptance  ;

criteria for inspections and tests.

Title:

Section Ill, Design Control Page: 1 of 4 Rev.: 27 Date: December 20, 1996

YANKEE ATOMIC ELECTRIC COMPANY

d. Verification of the adequacy of a specific design feature by implementation of a prototype test when required.
e. Review of inspection and test data for compliance with established engineering criteria.
3. The Plant Operations Review Committee shall be responsible for:
a. Review of all proposed plant changes and recommending their approval or disapproval to the . Plant Superintendent / Manager.
b. Determination of whether proposed changes involve unr:riewed safety questions.
4. The Plant Site Manager shall be responsible for:
a. He',iaw of the recommendations of the Plant Operations Review Committee.
b. Review and approval of proposed plant changes.
5. The Nuclear Safety Audit and Review Committee shall be responsible for the review of plant changes. l 1
6. The Vice President (s) and Manager of Operations and their staff shall be responsible for:

I

a. Approval of procedures for processing plant design l changes and engineering design changes. I
b. Review. approval and distribution of plant change documents.

Title:

Section III, Design Control Page: 2 of 4 Rev.: 27 Date: December 20, 1996

YANKEE ATOMIC ELECTRIC COMPANY

7. The Nuclear . Services Division Plant Support Department shall be responsible for_ the distribution of design change documents to the contractor performing the work where contract administration responsibilities have been assigned.

C. IMPLEMENTATION

1. Satisfaction of this criterion shall be assured through the implementation of the Nuclear Services Division and/or plant actions listed below:
a. Correct translation of applicable regulatory requirements and design bases into specifications, drawings and written documents.
b. Application of-suitable design controls to such activities as reactor physics; seismic, stress, thermal, hydraulic, radiation, and accident analyses; compatibility of materials: and accessibility for inservice inspection, maintenance and repair,
c. Design reviews to assure that design characteristics can_be controlled, inspected and tested,
d. Performance of proper selection 'and accomplishment of design verification or checking process such as design _ reviews, alternate calculations, qualification testing or test programs. When a test program is used to verify the adequacy of a design, a qualification test of a prototype unit under the most adverse design conditions shall be used. The responsibilities and qualifications of the verifier, the areas and features to be verified, the pertinent considerations to be verified, and the extent of documentation are identified in procedures.

Title:

Section Ill. Design Control Page: 3 of 4 Rev.: 27 Date: December 20, 1996

._- - . . - - - - - . . . - . . . - - - . . - . . - . . ~ . _ - . . . . . , l 1 I YANKEE ATOMIC ELECTRIC COMPANY

                                                                                                           .t Procedures will provide the criteria that specify.                l when verification should be by~ test. If the                   j verification method is by test only,' prototype,                  l component, or feature. testing.is performed in accordance with written procedures prior to relying            .}

upon the component, system, or structure to perform j its function. (

e. Subjection of design and specification changes,: l including'those originating "on-site", to the same {

design controls and approvals that were applicable to I the original design unless designated in writing to j another responsible organization.

f. Documentation of errors and deficiencies in'the .

design process that adversely affect safety I classified structures, systems, and components; , performance of corrective action to preclude l

                                         . repetition.                                                       l
g. Review of standard "off-the-shelf" commercial or i previously approved materials, parts, and equipment' )

that are essential to the safety functions of structures, systems,'and components for suitability , of application prior to selection.

h. Selection of suitable materials, parts, equipment, and processes for safety classified structures, systems, and components.
i. Establishment of procedures to assure that computer programs are verified and validated for a particular application. J
                                                                                                           -I

Title:

Section !!!', Design Control Page: 4 of 4 P,ev . : 27 i Date: December 20, 1996

  , ,. _m_._.-.        ._ _ . _ _ _ .        _~.___m            . . _ _ . _ - - _ _ _ . . - _ _ _ _ _ _ _ _ . _ _ _ _ _ .

i 5 i YANKEE ATOMIC ELECTRIC COMPANY  ; i IV. PROCUREMENT DOCUMENT CONTROL g i

A. SCOPE  !

L This section of the.0perational Quality Assurance Program establishes the measures necessary to assure that applicable l ~ regulatory requirements, design bases and other requirements  ! which are necessary to assure adequate quality, are suitably j included or referenced in the documents for procurement of- l material, equipment and services. B. RESPONSIBILITIES  ! i

1. The Nuclear Services Division Quality Assurance Department f shall be responsible for review of procurement requisitions initiated by the Plant and the Yankee Nuclear Services Division, except for Vermont Yankee who may request such reviews. The Vermont Yankee staff shall be responsible for.

the Procurement Requisition reviews.

2. The Plant or their corporate staffs shall be responsible for:

l

a. The preparation, review, issue, and control of {

purchase documents. I

b. Preparation of detailed procedures as to how purchase documents are prepared, reviewed, approved, issued, and controlled,
c. Review of plant procurement requisitions (Vermont Yankee plant only).
3. The Nuclear Services Division Engineering and/or Project Departments shall be responsible for:

(

Title:

Section IV, Procurement Document Control ! Page: 1 of 3 H ! Rev.: 27 L Date: December 20, 1996 l l l l l \ \

__ .. -. _ __ _ . . - _ _ . _ _ _ _ _ _ . ~ _ l l l YANKEE ATOMIC ELECTRIC COMPANY

a. Preparation of engineering specifications which'
  • detail the' technical and quality-requirements for material, equipment and services. q
b. Initiation and/or review (Yankee plantLonly) of f purchase documentation for material,. equipment, and l services required for' Plant changes,  ;
4. The Nuclear Services Division Plant Support Department
                                                         .                                                 l shall be responsible for initiation and/or review (Yankee l

plant only) of purchase documentation for construction services including contractor supplied material-and i equipment required for plant changes where contract l administration responsibilities have been assigned.

5. For YNSD, the Vice President (s) and Manager of Operations and their staff shall be responsible for the review and ,

approval _of procurement documents. For Vermont Yankee. l this function is performed by-the Vermont Yankee staff. I C. ' IMPLEMENTATION

1. Satisfaction of the criterion shall be assured through the j implementation of the Nuclear Services Division and/or '

plant actions listed below:

a. Documentation of the review and approval of procurement documents prior to release and availability of this documentation for verification.
b. Identification of the vendor's applicable quality assurance requirements of 10CFR50 Appendix B and/or ANSI N18.7, and/or other applicable codes, standards or regulatory documents referenced in procurement documents which are to be reviewed by the qualified personnel knowledgeable in quality assurance. For j 1

1 1

Title:

Section IV.. Procurement Document Control l Page: 2 of 3  ; -Rev.: 27-  ! Date: December 20, 1996

YANKEE ATOMIC ELECTRIC COMPANY Vermont Yankee, this function will be the responsibility of the Vermont Yankee staff.

c. Identification in the procurement documents of the documentation to be prepared, maintained, and/or submitted to the purchaser prior to use, such as: j
1. Drawings, specifications, procedures:  !

l

2. Inspection and fabrication plans:
3. Inspection and test records: l l
4. Personnel and procedure qualifications:
5. Chemical and physical test results of material; l and 6.. Quality Assurance Department's right of the access to the vendor's facilities and records j for surveillance and/or audit ic procurement l

documentation.  ;

d. Review and approval of changes and revisions to  !

procurement documents at least equivalent to those l for the original document.

e. Control of procurement documents for spare and replacement parts at least equivalent to that used for the original equipment.

Title:

Section IV. Procurement Document Control Page: 3 of 3 Rev.: 27 Date: December 20, 1996

i l YANKEE ATOMIC ELECTRIC COMPANY V. INSTRUCTION

S. PROCEDURE

S. AND DRAWINGS A. SCOPE This section of the Operational Quality Assurance Program establishes the measures for prescribing and accomplishing activities requiring quality assurance in accordance with approved drawings, instructions, or procedures. B. RESPONSIBillTIES Within Yankee Nuclear Services Division, each Department Director / Manager is responsible for establishing and complying with applicable procedures governing the activities affecting quality. Persons preparing and approving documents are responsible for assuring that specifications, instructions, procedures, and drawings include appropriate quantitative or qualitative acceptance criteria for determining that activities have been satisfactorily accomplished; assuring that the applicable criteria of 10CFR50 Appendix B and/or ANSI N18.7 are specified; and assuring that the documents are kept current, in addition, the following departments have the distinct responsibilities delineated below.

1. The Nuclear Services Division Quality Assurance Department shall be responsible for review of all Plant Quality Assurance procedures. l
2. The Plent shall be responsible for the preparation, j approval, maintenance, and implementation of all instructions and procedures associated with plant activities.
3. The Nuclear Services Division Engineering and/or Project Departments shall be responsible for:

Title:

Section V, instructions, Procedures, and Drawings Page: 1 of 2 Rev.: 27 Date: December 20, 1996 i

i i YANKEE ATOMIC ELECTRIC COMPANY' ,

a. Preparation and approval of engineering drawings andl -
                                                         . instructions, welding and nondestructive examination             ,

procedures, and procedures for Engineering Design i Control. l

b. Updating and control of-original drawings and l distribution of copies thereof.

i

4. .The Plant Operations Review Committee shall be responsible j for , reviewing procedures affecting nuclear safety prior to  ;

their approval by the Pl' ant Superintendent / Manager.  ;

5. The Nuclear Services Division Plant Support Department l shall be responsible for the preparation. approval, .

j maintenance, and implementation of all instructions and  ! procedures associated with Construction Services  ; activities. l C. IMPLEMENTATION '!

1. Satisfaction of this criterion shall be assured through the 1 implementation of the Nuclear Services Division' and/or ,

plant actions listed' below: l

a. Establishment of provisions which clearly delineate the sequence of actions to be accomplished in the preparation, review, approval, and control of l instructions, procedures, and drawings. l
b. Review of inspection plans: test, calibration, special process, maintenance and repair procedures:

drawings and specifications: and changes thereto by the Quality Assurance Department or other personnel knowledgeable in quality assurance.

Title:

Section V, Instructions, Procedures, and Drawings Page: 2 of 2 Rev.: 27 ) Date: December 20, 1996 l l l

YANKEE ATOMIC ELECTRIC COMPANY VI. DOCUMENT CONTROL l A. SCOPE This section of the Operational Quality Assurance Program establishes the measures for controlling the issuance of documents, including revisions thereto, which affect quality activities. i B. RESPONSIBillTIES

1. All participating departments shall establish document control measures which provide for the following:
a. Identification of organizations responsible for preparation, review, approval, and control of documents.

b, Identification of documentation to be used in performing the activity. l l C. Coordination and control of interface documents.

d. Establishment of distribution lists.

l e. Action to be taken for obsolete or superseded  ; documents.

                                                                                    ]}}