E 4
YANKEE ATOMIC NUCLEAR POWER STATION MONTHLY STATISTICAL REPORT 85-08 FOR THE MONTH OF AUGUST 1985 s
- .g 1
b %
4
t OPERATIN6 DATA REPOR!
DOCKET NO.
50-29 DATE 850905 COMPLETED Bf S. WilPPLE TELEPHONE (617) 872-8100 OPERATING STATUS 1.
Unit Nase: Yankee Rose 2.
Reporting Period: August,1985 3.
Licensed Thereal Power (Int):
600 f
4.
Naseplate Rating (Gross MWe):
185 5.
Design Electrical Rating (Net MWel:
175 6.
Marisue Dependable Capacity (Bross Mue): 100 i
7.
Marisue Dependable Capacity (Net Muel:
167 8.
If Changes occur in Capacity Ratings (itees Nueber 3 Through 7) Since Last Report, Give Reasons:
9.
Poser Level to Which Restricted. If Any (Net Muel:
- 10. Reasons For Pestrictions. IfAny:
l This Month Yr.-to Date Cueulative
- 11. Hours in Reporting Period 744.00 5,831.00
- 12. Nueber of Hours Reactor Nas Critical 744.00 5,831.M 173,754.10
- 13. Reactor Reserve Shutdoen Hours 0.00 0.00 0.00
- 14. Hours Generator On-Line 744.00 5,831.00 169,015.42
- 15. Unit Reserve Shutdoen Hours 0.M 0.00 0.00 i
- 16. Gross Thereal Energy Generated (MuH) 415,026.M 3,409,H8.00 91,900,320.52 i
- 17. Gross Electrical Energy Generated (MuN) 124,49.70 1,032,706.30 27,851,509.60 II. Net Electrical Energy Senerated (mum) 116,510.31 967,930.96 26,062,481.41
- 19. Unit Service Factor 100.M IM.M 77.74
- 20. UnitAvailabilityFactor IM.M IM.M 71.74
- 21. Unit Capacity Factor (Using MDC Net) 93.77 99.40 73.75
- 22. Unit Capacity Factor (Using DER Net) 89.49 94.84 10.29
- 23. Unit Forced Outage Rate 0.M 0.M 5.29
- 24. Shutdoens Scheduled Over Nest 6 Months IType, Date, and Duration of Each):
Core Ivill Refueling - Octo6er 19,1905 - 6 seets I
- 25. If Shutdoen At End of Report Period, Estiested late of Startup:
l
- 26. Units la fest $tates (Prior to Coseercial Operation):
Forecast Achieved e
IN11!ALCRlitCAllif INiilALELECTRitlif COMMERCIAL OPERAil0N
?
AVERAGE DAILY UNIT POWER LEVEL EOCKET NO.
50-29 UNIT YANKEE R0WE DATE 850905 COMPLETEDBY S. WHIPPLE TELEPHOME (617) 872-8100 MONTH AUGUST,1985 DAY AVERAGE DAILY PCwER LEVEL DAY AVERAGE DAILY PCWER LEVEL (MWe-Net)
IMWe-Net) 1 169.9 17 115.6 2
169.8 18 161.3 3
170.0 19 154.9 4
169.0 20 154.3 5
167.9 21 153.4 6
166.9 22 152.7 7
165.9 23 151.9 8
165.1 24 150.9 9
164.2 25 147.7 10 163.2 26 143.6 11 162.2 27 147.8 12 161.0 28 147.0 13 160.2 29 144.0 14 159.1 30 145.4 15 158.3 31 144.8 16 157.4 INSTRUCilCNS On this forsat, list the average daily unit po er level in MWe Net for each day in the reporting scrith.
Compute to the nearest whole negasatt.
c W IT SNUT90 mS AND PONER REDUCTIONS HCKET NO.
50-29 WIT YANKEE RONE REPORT HONIN AUGUST,1995 MTE B50905 CONPLETER SY S. M IPPLE TELEPHONE (617) 872-8100 t
Method Licensee Cause & Corrective 1
Duration-2 Of Shutting Event Systee Component Action to No.
Date Type (Hours) Reesen loss Reactor 3 Report 4 Code 4 Code 5 Prevent Recurrence 85-9 8/IT/95 S
27 3
i N/A N/A N/A N/A (Reduced load for throttle valve test.)
F f
L r
r 1
i I
a i
l t
2 3
4 I
F: Forced Resten:
Methed:
Eshibit6 Instructions S: kheduled A4gsipeent Failure (Esplais) 1-flenal for Prepwatten of Bata B fleintenance or feet 2-Hansel kree.
EntrySheetsforLicense C#efwling 3 Autsestic kras.
Event Report (LER) File 9-Asgelatory Restriction 44ther (Esplein)
INUpt04161) l E Operator Training & Licensed Esasination 5
F Adelaistrative 5
6-Operettenal Error (Esplain)
Eshibit 1 lese leurte
~
N 4ther (Esplain) l f
L i
m
I
- o. -
DOCKET NO.
50-29 UNIT YANKEE R0mE DATE 850905 COMPLETED BY S. Wi!PPLE TELEPHONE (617) 872-8100 REPORT MONTH AUGUST,1995
$UMARY OF OPERAi!NG EXPERIENCES 8/17/65 Reduced load for throttle valve testing.
r V YANKEE ATOMIC ELECTRIC COMPANY Te'epho"' ") 'o TWX 710 380 7619 i',
~
1671 Worcestcr Roact Framingham, Afassachusetts 01701
/.2,,
)
, 4 /.1'J K C e, '
September 5, 1985 17.R.4.2 FYR 85-96 United States Nuclear Regulatory Commission Director, Of fice of Management Information and Program Control Washington, D.C. 20555
Dear Sir:
Submitted herewith is the Monthly Statistical Report for the Yankee Atomic Power Station for the month of August 19f s.
Very truly yours, YANK E ATOMIC ELECTRIC COMPANY f
L. !!. Heider Vice President / Manager of Operations Li!H/ba cc: Region 1 Office of Inspection and Enforcement y
-.