YANKEE ATOMIC NUCLEAR POWER STATION MONTHLY STATISTICAL REPORT 86-10 FOR THE MONTH OF OCTOBER, 1986 O
4 e
e 8701290385 861031
~
$DR ADOCK 05000029 PDR
OPERATIN6 DATA REPORT DOCKET ii0. 50-29 DATE B61106 COMPLETED BY S. NHIPPLE TELEPHONF (6171 872-B100 OPERATING STATUS 1.
Unit Nase Yankee Rose 2.
Reporting Period October,1986 3.
Licensed Thereal Power (Mt):
600
~
4.
Naseplate Rating (6ross NNe):
105 5.
Design Electrical Rating (N ' ?.ne):
175 6.
Maxieue Dependable Capacity (6ross Me): 180 7.
Maxieue Dependable Capacity (Net Me):
167 8.
If Changes Occur in Capacity Ratings (Itees Number 3 Through 7) Since Last Report, Give Reasons 9.
Power Level To Nhich Restricted. If Any (Net Me):
- 10. Reasons For Restrictions. If Any This Month Yr.-to-Date Cueulative
- 11. Hours In Reporting Period 745.00 7,296.00
- 12. Number of Hours Reactor Nas Critical 719.66 6,884.77 182,406.25
- 13. Reactor Reserve Shutdown Hours 0.00 0.00 0.00
- 14. Hours Generator On-Line 713.56 6,868.36 177,527.07
- 15. Unit Reserve Shutdown Hours 0.00 0.00 0.00
- 16. Gross Thereal Energy Generated ( MH) 417,174.00 4,047,632.00 96,728,248.52
- 17. Gross Electrical Energy Generated (MH) 125,287.90 1,225,994.60 29,308,682.40 IB. Net Electrical Energy Generated (M H)
!!7,251.31 1,148,257.89 27,424,477.05
- 19. Unit Service Factor 95.78 94.14 77.99
- 20. Unit Availability Factor 95.78 94.14 77.99
- 21. Unit Capacity Factor (Using MDC Net) 94.24 94.24 74.03 l
l
- 22. Unit Capacity Factor (Using DER Net) 89.93 89.93 70.55
- 23. Unit Forced Outage Rate 4.22 5.86 5.27
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and. Duration of Each):
- 25. If Shutdown At End of Report Period, Estimated Date of Startup:
- 26. Units In Test Status (Prior to Coseercial Operation):
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY I
CCMERCIAL OPERATION
AVERA6E DAILY WIT PONER LEVEL 80CKET NO.
50-29 WIT YANKEE RONE 8 ATE M1106 CohrdTED OY S. WIPFLE TELEPHONE (617) 872-8100 MONTH OCTOBER,1986 DAY AVERA6E MILY PONER LEVEL DAY AVERA6E DAILY PONER LEVEL (MNe-Net)
(Me-Net) i 167.3 17 168.7 2
167.1 18 168.9 3
167.1 19 169.0 4
67.2 20 169.1 5
48.1 21 169.0 6
135.7 22 169.0 7
153.4 23 169.0 8
168.5 24 168.7 9
168.4 25 168.8 l
10 168.3 26 168.6 11
. 168.4 27 169.3 12 168.5 28 169.6 13 168.5 29 169.6 14 168.3 30 169.6 15 168.5 31 89.6 16 168.7 INSTRUCil0NS On this format, list the average daily unit power level in We-Net for each day in the reporting conth.
Compute to the nearest whole negawatt.
l I
Wii SHUTDOWS AND POWER REDUCTIONS DOCKET NO.
50-29 WIT YANKEE RONE REPORT NONTH. OCTOBER, 1986 DATE 861106 COMPLETED BY S. MIPPLE TELEPHONE (617) 872-8100 Method Licensee Cause & Corrective Duration 2 Of Shutting Event Systes Coeponent Action to
. No.
Date Type (Hours) Reason Down Reactor 3 Report I Code 4 Code 5 Prevent Recurrence 86-5 10/4/86 F
21.74 6/A 3
86-12 LD PS Control air pressure switch failed and was replaced. Operating pro-cedures mare clarified.
86-6 10/31/86 F
9.7 A
1 86-14 N/A N/A Pressurizer wide range level channel failed and was repaired.
l I
2 3
4 F: Forced Reason:
Methods Exhibit 6-Instructions S: Scheduled A Equipeent Failure (Explain) 1-Manual for Freparation of Data FMaintenance or Test 2-Manual Scrae.
Entry Sheets for License l
C-Refueling 3-Automatic Scras.
Event Report (LER) File D-Fegulatory Restriction 4-Other (Explain)
(NURE6-016tl E-Operator Training & Licensed Esasination F-Administrative 5
i 6-Operational Error (Explain)
Exhibit 1 - Saee Source H-Other (Explain)
e DOCFET NO.
50-29 UNIT YANKEE RONE MTE 0611 %
COMPLETED BY S. NHIPPLE TELEPHONE 417) 872-BlH REPORT MONTH OCTOBER,1986 SUMARY OF OPERATIN6 EXPERIENCES 10/4/06 Reactor scras on low Steae Generator levels due to loss of control air.
10/31/86 Manuel shutdown due to loss of pressurizer level channel, per T.S. 3.3.1 i
t t
e
-m
-.-r.
~,%-
,m-m-.,_,,,_v
.,-y.
-_.--,m-r-,_v
._._,_,-.._3_____-.
I-YANKEE ATOMIC ELECTRIC COMPANY T*'epho"' (6 ") * ' ' 00 TWX 710-380-7619 3960-g79 O
1671 Worcester Road Framingharn, Massachusetts 01701 DCC 86-173 17.R4.2
,YAN KEE he November 6, 1986 FYR 86-109 United States Nuclear Regulatory Commission Director, Office of Management Information and Program Control Washington, D.C. 20555
Dear Sir:
Submitted herewith is the Monthly Statistical Report for the Yankee Atomic Power Station for the month of October,1986.
Very truly yours, YANKEE ATOMIC ELECTRIC COMPANY
/d LY H. Hdider Vice President / Manager of Operations LHH/kmw Enclosure p