Monthly Operating Rept for Aug 1985
ML20138R867
Person / Time
Site: Palo Verde Arizona Public Service icon.png
Issue date: 08/31/1985
From: Richardson M, Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Barry L
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
References
ANPP-33486-EEVB, NUDOCS 8511190165
Download: ML20138R867 (6)


Text

.

NRC MONTHLY OPERATING REPORT DCCKET NO. 5Q-[28 UNIT NAME OVNG@;l DATE ?f92/85 ,

COMPLETED BY M. O n Bigharq390 TELEPHONE 6Qg:23g-Oge0 Ed it 6D23 OBEBBIIbG SIBI95 '

1. Unit Names Palo Vgtqq Nggigar QgDgte11DO @kO112On 9011 1
2. Recorting Period Oggggt 12@D
3. Licensed Thermal Power (MWt): 3@0@
4. Nameolate Rating (Gross MWe): 13@4 ,
5. Design Electrical Rating (Net MWe): 1@Z@  !
6. Maximum Decencable Cacacity (Gross MWe) Tg be ggtgrmined
7. Maximum Decondable Caoacity (Net MWe): Tg bg qqtgrrglegd
8. If Changes Cecur In Cacacity Ratings (Items Number 3  ;

(

Througn 7) Since Last Reoort, Give Reasons: __________________ l Nfg _______________________________  !

9. Power Level To Wnien Restricted, If Any (Net MWe) _NQNg____
10. Reasons For Restrictions. If Anyt __________________________

l' This Month Yr.-to-Date Cumulativ i

11. Hours In Recortina Period ___744____ ___5832___ ._5832____
12. Number Of Hours Reactor Was Critical

__ _ 12 2_ _ _ _ ____1214___ _ U 14_ _ _ _ i

13. Reactor Reserve Shutdown Hours _____0____ _____0____ ____0____

14 Hours Generator On-Line

____58____ ____ 726_._ __J26.___

15. Unit Reserve Shutdown Hours _____0____ 0 ____0____
16. Gross Thermal Energy Generated ___83645__ 90125 3 _ _901253 (MWH) .
17. Gross Electrical Energy Generated __17,800.._ 213.000__ _213.000 (MWH)
18. Net Electrical Energy Generated __14.641__ _141.302__ _141,302_

(MWH) .

19. Unit Service Factor ___N/A____ ___N/A.___ __N/A____
20. Unit Availability Factor ___N/A____
21. Unit Cacacity Factor (Using MDC ___N/A____ __N/A____

Net)

___N/A____ ___N/A____ __N/A,___

22. Unit Capacity Factor (Using DER ___N/A____ ___N/A____ __N/4,___

i Net) {

23. Unit Forced Outace Rate ___N/A____ ,__N/A____ __N/A_,,,
24. Shutdowns Scheduled Over Next 6 Months (Tvoe. Date. and {

Duration of Each) .___________________

_____________None____________________________________________________

25. If Shutdown At End Of Reoort Period. Estimated Date of Startuos _____

~~ ~

l i

26. Un5tE~ln Te$t Status (Prior To Commercial Ooeration):

Forncast Achieved INITIAL CRITICALITY ___5/85,____

INITIAL ELECTRICITY ___5/25/85___ 3 COMMERCIAL OPERAT!nN

___6/85_____ ___6/10/85 __

__11/85,____ _____N/A__

? -bE

n 4

AVERAGE DAILY UNIT POWER LEVEL

, DOCKET NO. 00-Q28 UNIT ______PVN_GS_-1________

DATE g/08/8Q________

l t

i COMPLETED BY_M_._P s _ _R _1 h_____a rd uo_

l I

T E L E P H O N E _ 6 _0 6 _- 9 _3 @ _ _5 3 --0 0 f

! Ext t _ 6D_93_____ i t

3 i

M_O_N__T : August 1985

,f DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL ,

(MWe-Net) (MWe-Net) 1

___________0______________ 17 ___________0______________

t i, 2 ___________0______________ 18 ___________0________-___-_

i 1

3 ___________0______________ 19 ___________0______________

t a

i 4 ___________0______________ 20 ___________0______________

l l

5 ___________0______________ 21 ___________0______________ t i

i, G ___________0______________ 22 ___________0______________ '

7 ___________0______________ 23 ___________0______________

l i

. 8 ___________0______________ 24 ___________0______________ l s,

9 ___________0______________ 25 ___________0______________ i e

1 I 1 10 ___________0______________ 26 ___________0______________

11 ___________0______________ 27 ___________0______________

1 i

! 12 ___________0______________ 28 ___________0______________

a 1

1, 13 ___________0______________ 29 __________23______________

14 ___________0______________ 30 _________267_____________

l 15 ___________0______________ 31 _________319______________

l i

16 __... ______0______________

4 1

4 i

}

l e

k

a SUMMOBX QE 9E589IING EXEg81ENGE Eg8 Idg MQNIS DOCKET NO.___;0-D2B___________

UNIT _________PMNQS-1__________

, DATE_________240gleg__________

COMPLETED BY_McEt Righardsog__

TELEPHONE __602-233-gg00_______

__Eut t 6523__________

C/01 0138 - Plant in Mode 5 O/02 2038 - Plant in Mode 4 O/18 1050 - Declared PASS System operable.

O/18 1324 - Comoleted Mode change checklist to enter Mode 3.

C/18 1651 - Entered Mode 3 C/19 2149 - Entered Mode 4 C/24 1937 - Entered Mode 3 8/26 2205 - Entered Mode 2, Reactor critical, increased reactor power to *2%.

8/28 0010 - Unit in Mode 2, reactor at *4% power.

0/29 0416 - Entered Mode 1 O/29 0450 - Reactor power at *10% cower.

8/29 0729 - Flashed field and OMcited Main Generator for Subsynchronous Resonance testing.

8/29 1411 - Unit on line at 34MW.

8/29 2112 - Reactor oower *20%.

8/30 0604 - Reactor power at 36%.

0/31 2058 - Reacter power at 50%.

l l

C4'T 58MIT00WIIS Asso POWER lit 00CTIONS DOCatti NO. _ En 47A -

UtilT NAMC P1/ W I -

CATC un voro)

COMPLETED BV H . t' . R e cha rder ,

T[Lt P:10fdC ~ 4 D-5 UlfI

.Pye (A ril I

Method er Shutting Down System Component Cause er Corrective 1 Duretten 2 3 f.[R 4 5 Action to Me. Date Type (tsours) Reason Reactor No. Code Code Prevent Recurrence 8 8/08/85 F 686.2 H 4 During shtudown from previous period, condenser tube leak repairs and PASS modifications were performed.

I 2 3 T=Terced Bestant Yetttod:

as 5-schosured A-touipeent raf fisre (f= plain) 1-Manual tuhlblt V = lnstructions for 1*rnparation os cata B-Maintenance or Test 2-Manien t Scram. Entry sr cets for Licensee c-Reruesing D-fteguestory stest riction 3-Anto*a tic scras. Event Report (Lta) rise t-c.s.rmtor vr in 4-cantiaiAtton rrom (NunCC 0161)

T-Ac=inistretsw en, a tscense rusninetton crevsoies ponth 5-tiedise s son or 20% 5 c-crerationas trrer (twasein)

H-Ottier (Emplain) or crestar in the Exhibit H-Seme Source rast 24 flours 9-Other(Explain)

4 . .-

i. e REFUELING INFORMATION i

l DOCKET NO._QQ-Qg@__________ .

I UNIT _______EVN@S-1_____ q e

i 4

DATE_______24Q@feQ_____

j COMPLETED BY_M.2_ _ Righards90 7 i

j TELEpHONT._@@@-232-53@@____ l

__ Jute 6523_______

l 1. Scheduled date for next refueling shutdown. .

i I 03/01/87

2. Scheduled date for restart following refueling. l l

I

04/19/87 > l l 3. Will refueling or resumption of operation thereafter require a Technical Specification change or other license amendment' '

i Not Yet Determined

] What will th7se be?

I

] Not Yet Determined i 4. Scheduled date for submitting proposed licensing action and i supporting information.

l I

Not Yet-Determined f 5. Important Licensing considerations associated with refueling, ,

1 e. g. new or different fuel design or supplier, unreviewed

! design or performance analysin. methods, significant changes in  !

fuel design, new operating procedures. f lj 1

Not Yet Determined  ;

6. The number of fuel assemblies.  :

!' a) In the core._g41___________ ,

I '

j b) In the spent fuel storage pool.____ 0_______

i i l 7. Licensed spent fuel storage capacity.____1322______

i

{ Intended change in spent fuel storage capacity.._UGDU______

[

} '

4

) 8. Projected date of last refueling that can be discharged to  !

I spent fuel storage pool assuming present capacity.

i

2002 (w/ annual reloads and full core discharge capability).  ;

2

( e .

l  !

i

)

l l - - _ _ _ . - _ . _ _ - - _ - - - _ - _ _ _ _ _ - _ _ _ _ - _

} .

Arizona Nuclear Power PrcJect P O Box 52034

  • PHOENIX, ARIZONA 85072-2034 Learned W. Barry, Director September 17, 1985 Office of Resource Management ANPP-33486-EEVB/GEC U.S. Nuclear Regulatory Commission Washington, D. C. 20555

Subject:

Palo Verde Nuclear Generating Station (PVNGS)

Unit 1 Docket No. STN 50-528, License No. NPF-41 August Monthly Operating Report File: 85-056-026: G.I.01.10

Dear Mr. Barry:

Attached please find the August 1985 Monthly Operating Report prepared and submitted pursuant to Specification 6.9.1.6 cf Appendix A (Technical Specifications) to the Palo Verde Nuclear Generating Station, Unit 1 Operating License. By copy of this letter, we are also forwarding a copy of the Monthly Operating Report to the Regional Administrator of the Region V Office.

If you have any questions or concerns, please contact me.

Very truly yours,

(, Cll q U A- (;

E. E. Van Brunt, Jr.

Executive Vice President Project Director EEVB/GEC/sih Attachments cc J. B. Martin (all w/a)

R. P. Zimmerman E. A. Licitra A. C. Gehr t