Text
.
NRC MONTHLY OPERATING REPORT DCCKET NO.
5Q-[28 UNIT NAME OVNG@;l DATE
?f92/85 COMPLETED BY M. O Bigharq390 n
TELEPHONE 6Qg:23g-Oge0 E it 6D23 d
OBEBBIIbG SIBI95 1.
Unit Names Palo Vgtqq Nggigar QgDgte11DO @kO112On 9011 1 2.
Recorting Period Oggggt 12@D 3.
Licensed Thermal Power (MWt): 3@0@
4.
Nameolate Rating (Gross MWe): 13@4 5.
Design Electrical Rating (Net MWe): 1@Z@
6.
Maximum Decencable Cacacity (Gross MWe) Tg be ggtgrmined 7.
Maximum Decondable Caoacity (Net MWe):
Tg bg qqtgrrglegd 8.
If Changes Cecur In Cacacity Ratings (Items Number 3
(
Througn 7) Since Last Reoort, Give Reasons:
l Nfg _______________________________
9.
Power Level To Wnien Restricted, If Any (Net MWe)
_NQNg____
- 10. Reasons For Restrictions. If Anyt l'
This Month Yr.-to-Date Cumulativ i
- 11. Hours In Recortina Period
___744____
___5832___
._5832____
- 12. Number Of Hours Reactor Was Critical
__ _ 12 2_ _ _ _
____1214___
_ U 14_ _ _ _ i
- 13. Reactor Reserve Shutdown Hours
_____0____
_____0____
____0____
14 Hours Generator On-Line
____58____
____ 726_._
__J26.___
- 15. Unit Reserve Shutdown Hours
_____0____
0
____0____
- 16. Gross Thermal Energy Generated
___83645__
90125 3
_901253 (MWH)
- 17. Gross Electrical Energy Generated
__17,800.._
213.000__
_213.000 (MWH)
- 18. Net Electrical Energy Generated
__14.641__
_141.302__
_141,302_
(MWH)
- 19. Unit Service Factor
___N/A____
___N/A.___
__N/A____
- 20. Unit Availability Factor
___N/A____
___N/A____
__N/A____
- 21. Unit Cacacity Factor (Using MDC
___N/A____
___N/A____
__N/A,___
Net)
- 22. Unit Capacity Factor (Using DER
___N/A____
___N/A____
__N/4,___
{
i Net)
- 23. Unit Forced Outace Rate
___N/A____
,__N/A____
__N/A_,,,
{
- 24. Shutdowns Scheduled Over Next 6 Months (Tvoe. Date. and Duration of Each)
_____________None____________________________________________________
- 25. If Shutdown At End Of Reoort Period. Estimated Date of Startuos _____
l i
- 26. Un5tE~ln Te$t Status (Prior To Commercial Ooeration):
~~
~
Forncast Achieved INITIAL CRITICALITY
___5/85,____
___5/25/85___
INITIAL ELECTRICITY 3
___6/85_____
___6/10/85 __
COMMERCIAL OPERAT!nN
__11/85,____
_____N/A__
?
-bE
n 4
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
00-Q28 UNIT ______PVN_GS_-1________
DATE g/08/8Q________
l t
i COMPLETED BY_M_._P
_R _1 h_ a rd uo_
s l
I T E L E P H O N E _ 6 _0 6 _- 9 _3 @ _ _5 3 0 0 f
Ext 6D_93_____
i t _
t i
M_O_N__T :
August 1985 3
,f DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 1
___________0______________
17 ___________0______________
t i,
2
___________0______________
18 ___________0________-___-_
i 3
___________0______________
19 ___________0______________
1 t
a i
4
___________0______________
20 ___________0______________
l l
5
___________0______________
21 ___________0______________
t i
i, G
___________0______________
22 ___________0______________
7
___________0______________
23 ___________0______________
l i
8
___________0______________
24 ___________0______________
l s,
9
___________0______________
25 ___________0______________
i e
1 I
1 10 ___________0______________
26 ___________0______________
11 ___________0______________
27 ___________0______________
1 12 ___________0______________
28 ___________0______________
i a
1 1,
13 ___________0______________
29 __________23______________
14 ___________0______________
30 _________267_____________
l 15 ___________0______________
31 _________319______________
l 16 __... ______0______________
i 4
1 4
i
}
l e
k
a SUMMOBX QE 9E589IING EXEg81ENGE Eg8 Idg MQNIS DOCKET NO.___;0-D2B___________
UNIT _________PMNQS-1__________
DATE_________240gleg__________
COMPLETED BY_McEt Righardsog__
TELEPHONE __602-233-gg00_______
__Eut 6523__________
t C/01 0138 - Plant in Mode 5 O/02 2038 - Plant in Mode 4 O/18 1050 - Declared PASS System operable.
O/18 1324 - Comoleted Mode change checklist to enter Mode 3.
C/18 1651 - Entered Mode 3 C/19 2149 - Entered Mode 4 C/24 1937 - Entered Mode 3 8/26 2205 - Entered Mode 2, Reactor critical, increased reactor power to *2%.
8/28 0010 - Unit in Mode 2, reactor at *4% power.
0/29 0416 - Entered Mode 1 O/29 0450 - Reactor power at *10% cower.
8/29 0729 - Flashed field and OMcited Main Generator for Subsynchronous Resonance testing.
8/29 1411 - Unit on line at 34MW.
8/29 2112 - Reactor oower *20%.
8/30 0604 - Reactor power at 36%.
0/31 2058 - Reacter power at 50%.
l l
C4'T 58MIT00WIIS Asso POWER lit 00CTIONS DOCatti NO. _ En 47A UtilT NAMC P1/ W I
CATC un voro)
COMPLETED BV H. t'. R e cha rder T[Lt P:10fdC ~ 4 D-5 UlfI
.Pye (A ril I
Method er Shutting Down System Component Cause er Corrective 1
Duretten 2
3 f.[R 4
5 Action to Me.
Date Type (tsours)
Reason Reactor No.
Code Code Prevent Recurrence 8
8/08/85 F 686.2 H
4 During shtudown from previous period, condenser tube leak repairs and PASS modifications were performed.
I 2
3 as T=Terced Bestant Yetttod:
tuhlblt V = lnstructions 5-schosured A-touipeent raf fisre (f= plain) 1-Manual for 1*rnparation os cata B-Maintenance or Test 2-Manien t Scram.
Entry sr cets for Licensee c-Reruesing 3-Anto*a tic scras.
Event Report (Lta) rise D-fteguestory stest riction 4-cantiaiAtton rrom (NunCC 0161) t-c.s.rmtor vr in T-Ac=inistretsw en, a tscense rusninetton crevsoies ponth 5-tiedise s son or 20%
5 c-crerationas trrer (twasein) or crestar in the Exhibit H-Seme Source H-Ottier (Emplain) rast 24 flours 9-Other(Explain)
4 i.
e REFUELING INFORMATION i
l DOCKET NO._QQ-Qg@__________
I UNIT _______EVN@S-1_____
q e
i DATE_______24Q@feQ_____
4 j
COMPLETED BY_M.2_ _ Righards90 7
i j
TELEpHONT._@@@-232-53@@____
l
__ Jute 6523_______
l 1.
Scheduled date for next refueling shutdown.
i I
03/01/87 l
2.
Scheduled date for restart following refueling.
l I
04/19/87 >
l l
3.
Will refueling or resumption of operation thereafter require a Technical Specification change or other license amendment' i
Not Yet Determined
]
What will th7se be?
I
]
Not Yet Determined i
4.
Scheduled date for submitting proposed licensing action and i
supporting information.
l I
Not Yet-Determined f
5.
Important Licensing considerations associated with refueling, 1
- e. g.
new or different fuel design or supplier, unreviewed design or performance analysin. methods, significant changes in lj fuel design, new operating procedures.
f 1
Not Yet Determined 6.
The number of fuel assemblies.
a) In the core._g41___________
I j
b) In the spent fuel storage pool.____ 0_______
i i
l 7.
Licensed spent fuel storage capacity.____1322______
i
{
Intended change in spent fuel storage capacity.._UGDU______
[
}
4
)
8.
Projected date of last refueling that can be discharged to I
spent fuel storage pool assuming present capacity.
i 2002 (w/ annual reloads and full core discharge capability).
2
(
e l
i
)
l l
}
Arizona Nuclear Power PrcJect P O Box 52034
- PHOENIX, ARIZONA 85072-2034 Learned W. Barry, Director September 17, 1985 Office of Resource Management ANPP-33486-EEVB/GEC U.S. Nuclear Regulatory Commission Washington, D. C.
20555
Subject:
Palo Verde Nuclear Generating Station (PVNGS)
Unit 1 Docket No. STN 50-528, License No. NPF-41 August Monthly Operating Report File: 85-056-026: G.I.01.10
Dear Mr. Barry:
Attached please find the August 1985 Monthly Operating Report prepared and submitted pursuant to Specification 6.9.1.6 cf Appendix A (Technical Specifications) to the Palo Verde Nuclear Generating Station, Unit 1 Operating License. By copy of this letter, we are also forwarding a copy of the Monthly Operating Report to the Regional Administrator of the Region V Office.
If you have any questions or concerns, please contact me.
Very truly yours, q U A- (;
(,
Cll E. E. Van Brunt, Jr.
Executive Vice President Project Director EEVB/GEC/sih Attachments cc J. B. Martin (all w/a)
R. P. Zimmerman E. A. Licitra A. C. Gehr t