NRC MONTHLY OPERATING REPORT DCCKET NO.

5Q-[28 UNIT NAME OVNG@;l DATE

?f92/85 COMPLETED BY M. O Bigharq390 n

TELEPHONE 6Qg:23g-Oge0 E it 6D23 d

OBEBBIIbG SIBI95 1.

Unit Names Palo Vgtqq Nggigar QgDgte11DO @kO112On 9011 1 2.

Recorting Period Oggggt 12@D 3.

Licensed Thermal Power (MWt): 3@0@

4.

Nameolate Rating (Gross MWe): 13@4 5.

Design Electrical Rating (Net MWe): 1@Z@

6.

Maximum Decencable Cacacity (Gross MWe) Tg be ggtgrmined 7.

Maximum Decondable Caoacity (Net MWe):

Tg bg qqtgrrglegd 8.

If Changes Cecur In Cacacity Ratings (Items Number 3

(

Througn 7) Since Last Reoort, Give Reasons:

l Nfg _______________________________

9.

Power Level To Wnien Restricted, If Any (Net MWe)

_NQNg____

10. Reasons For Restrictions. If Anyt l'

This Month Yr.-to-Date Cumulativ i

11. Hours In Recortina Period

___744____

___5832___

._5832____

12. Number Of Hours Reactor Was Critical

__ _ 12 2_ _ _ _

____1214___

_ U 14_ _ _ _ i

13. Reactor Reserve Shutdown Hours

_____0____

_____0____

____0____

14 Hours Generator On-Line

____58____

____ 726_._

__J26.___

15. Unit Reserve Shutdown Hours

_____0____

0

____0____

16. Gross Thermal Energy Generated

___83645__

90125 3

_901253 (MWH)

17. Gross Electrical Energy Generated

__17,800.._

213.000__

_213.000 (MWH)

18. Net Electrical Energy Generated

__14.641__

_141.302__

_141,302_

(MWH)

19. Unit Service Factor

___N/A____

___N/A.___

__N/A____

20. Unit Availability Factor

___N/A____

___N/A____

__N/A____

21. Unit Cacacity Factor (Using MDC

___N/A____

___N/A____

__N/A,___

Net)

22. Unit Capacity Factor (Using DER

___N/A____

___N/A____

__N/4,___

{

i Net)

23. Unit Forced Outace Rate

___N/A____

,__N/A____

__N/A_,,,

{

24. Shutdowns Scheduled Over Next 6 Months (Tvoe. Date. and Duration of Each)

_____________None____________________________________________________

25. If Shutdown At End Of Reoort Period. Estimated Date of Startuos _____

l i

26. Un5tE~ln Te$t Status (Prior To Commercial Ooeration):

~~

~

Forncast Achieved INITIAL CRITICALITY

___5/85,____

___5/25/85___

INITIAL ELECTRICITY 3

___6/85_____

___6/10/85 __

COMMERCIAL OPERAT!nN

__11/85,____

_____N/A__

?

-bE

n 4

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

00-Q28 UNIT ______PVN_GS_-1________

DATE g/08/8Q________

l t

i COMPLETED BY_M_._P

_R _1 h_ a rd uo_

s l

I T E L E P H O N E _ 6 _0 6 _- 9 _3 @ _ _5 3 0 0 f

Ext 6D_93_____

i t _

t i

M_O_N__T :

August 1985 3

,f DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) 1

___________0______________

17 ___________0______________

t i,

2

___________0______________

18 ___________0________-___-_

i 3

___________0______________

19 ___________0______________

1 t

a i

4

___________0______________

20 ___________0______________

l l

5

___________0______________

21 ___________0______________

t i

i, G

___________0______________

22 ___________0______________

7

___________0______________

23 ___________0______________

l i

8

___________0______________

24 ___________0______________

l s,

9

___________0______________

25 ___________0______________

i e

1 I

1 10 ___________0______________

26 ___________0______________

11 ___________0______________

27 ___________0______________

1 12 ___________0______________

28 ___________0______________

i a

1 1,

13 ___________0______________

29 __________23______________

14 ___________0______________

30 _________267_____________

l 15 ___________0______________

31 _________319______________

l 16 __... ______0______________

i 4

1 4

i

}

l e

k

a SUMMOBX QE 9E589IING EXEg81ENGE Eg8 Idg MQNIS DOCKET NO.___;0-D2B___________

UNIT _________PMNQS-1__________

DATE_________240gleg__________

COMPLETED BY_McEt Righardsog__

TELEPHONE __602-233-gg00_______

__Eut 6523__________

t C/01 0138 - Plant in Mode 5 O/02 2038 - Plant in Mode 4 O/18 1050 - Declared PASS System operable.

O/18 1324 - Comoleted Mode change checklist to enter Mode 3.

C/18 1651 - Entered Mode 3 C/19 2149 - Entered Mode 4 C/24 1937 - Entered Mode 3 8/26 2205 - Entered Mode 2, Reactor critical, increased reactor power to *2%.

8/28 0010 - Unit in Mode 2, reactor at *4% power.

0/29 0416 - Entered Mode 1 O/29 0450 - Reactor power at *10% cower.

8/29 0729 - Flashed field and OMcited Main Generator for Subsynchronous Resonance testing.

8/29 1411 - Unit on line at 34MW.

8/29 2112 - Reactor oower *20%.

8/30 0604 - Reactor power at 36%.

0/31 2058 - Reacter power at 50%.

l l

C4'T 58MIT00WIIS Asso POWER lit 00CTIONS DOCatti NO. _ En 47A UtilT NAMC P1/ W I

CATC un voro)

COMPLETED BV H. t'. R e cha rder T[Lt P:10fdC ~ 4 D-5 UlfI

.Pye (A ril I

Method er Shutting Down System Component Cause er Corrective 1

Duretten 2

3 f.[R 4

5 Action to Me.

Date Type (tsours)

Reason Reactor No.

Code Code Prevent Recurrence 8

8/08/85 F 686.2 H

4 During shtudown from previous period, condenser tube leak repairs and PASS modifications were performed.

I 2

3 as T=Terced Bestant Yetttod:

tuhlblt V = lnstructions 5-schosured A-touipeent raf fisre (f= plain) 1-Manual for 1*rnparation os cata B-Maintenance or Test 2-Manien t Scram.

Entry sr cets for Licensee c-Reruesing 3-Anto*a tic scras.

Event Report (Lta) rise D-fteguestory stest riction 4-cantiaiAtton rrom (NunCC 0161) t-c.s.rmtor vr in T-Ac=inistretsw en, a tscense rusninetton crevsoies ponth 5-tiedise s son or 20%

5 c-crerationas trrer (twasein) or crestar in the Exhibit H-Seme Source H-Ottier (Emplain) rast 24 flours 9-Other(Explain)

4 i.

e REFUELING INFORMATION i

l DOCKET NO._QQ-Qg@__________

I UNIT _______EVN@S-1_____

q e

i DATE_______24Q@feQ_____

4 j

COMPLETED BY_M.2_ _ Righards90 7

i j

TELEpHONT._@@@-232-53@@____

l

__ Jute 6523_______

l 1.

Scheduled date for next refueling shutdown.

i I

03/01/87 l

2.

Scheduled date for restart following refueling.

l I

04/19/87 >

l l

3.

Will refueling or resumption of operation thereafter require a Technical Specification change or other license amendment' i

Not Yet Determined

]

What will th7se be?

I

]

Not Yet Determined i

4.

Scheduled date for submitting proposed licensing action and i

supporting information.

l I

Not Yet-Determined f

5.

Important Licensing considerations associated with refueling, 1

e. g.

new or different fuel design or supplier, unreviewed design or performance analysin. methods, significant changes in lj fuel design, new operating procedures.

f 1

Not Yet Determined 6.

The number of fuel assemblies.

a) In the core._g41___________

I j

b) In the spent fuel storage pool.____ 0_______

i i

l 7.

Licensed spent fuel storage capacity.____1322______

i

{

Intended change in spent fuel storage capacity.._UGDU______

[

}

4

)

8.

Projected date of last refueling that can be discharged to I

spent fuel storage pool assuming present capacity.

i 2002 (w/ annual reloads and full core discharge capability).

2

(

e l

i

)

l l

}

Arizona Nuclear Power PrcJect P O Box 52034

20555

Subject:

Palo Verde Nuclear Generating Station (PVNGS)

Unit 1 Docket No. STN 50-528, License No. NPF-41 August Monthly Operating Report File: 85-056-026: G.I.01.10

Dear Mr. Barry:

Attached please find the August 1985 Monthly Operating Report prepared and submitted pursuant to Specification 6.9.1.6 cf Appendix A (Technical Specifications) to the Palo Verde Nuclear Generating Station, Unit 1 Operating License. By copy of this letter, we are also forwarding a copy of the Monthly Operating Report to the Regional Administrator of the Region V Office.

If you have any questions or concerns, please contact me.

Very truly yours, q U A- (;

(,

Cll E. E. Van Brunt, Jr.

Executive Vice President Project Director EEVB/GEC/sih Attachments cc J. B. Martin (all w/a)

R. P. Zimmerman E. A. Licitra A. C. Gehr t