Notice of Violation from Insp on 850709-0812
ML20135D584
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 08/28/1985
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML20135D575 List:
References
50-269-85-20, 50-270-85-20, 50-287-85-20, NUDOCS 8509160106
Download: ML20135D584 (2)


See also: IR 05000709/2008012

Text

- _ . ._ _ - _ _ . = ._ - - - ~

'

,  !

-

-

.

, .

< i

i  !

,

ENCLOSURE 1 5

NOTICE OF VIOLATION

t

.

Duke Power Company Docket Nos: 50-269, 50-270, 50-287 i

Oconee Nuclear Station License Nos: DPR-38, DPR-47, DPR-55 l

,

i,

'

The following violations were identified during an inspection conducted on

July 9 - August 12, 1985. The Severity Levels were assigned in accordance with .

the NRC Enforcement Policy (10 CFR Part 2, Appendix C).  !

t

1. Technical Specifications (TS) 3.5.5-1 and 3.5.5-2 require the Licensee to L

maintain a minimun number of liquid and gaseous effluent monitors in an ,

operable condition or to take compensatory samples. The TS also require  !

'

j best efforts to be made to return the instruments to operable status within T

30 days and, if unsuccessful, to explain in the next Semiannual Radioacitve j

Effluent Report why the inoperability was not corrected in a timely manner. '

>

Contrang to these requirements, the monitors listed below were out of l

service for the periods shown but were not addressed in the Semiannual

Radioactive Effluent Report for the period of July 1 - December 31 , 1984.  !

,

Compensatory sampling was performed as required.

l

l (a) Low Pressure Service Water (LPSW) monitors i

'

i. 1RIA-35 inoperable beginning 11/9/84 through 7/1/85.

ii. 3RIA-35 inoperable beginning 11/25/84 through 7/1/85. i

-

L

(b) Gaseous Waste Decay Tank monitors  :

! I

l' A minimum of one of either RIA-37 or RIA-38 is required operable during l

gas releases. RIA-37 is always inoperable during a release because the l

instrument always goes offscale and is overridden. Therefore when  !

RIA-38 is inoperable the minimum is not met and compensatory actions  !

are required. 1RIA-38 has been inoperable since 10/12/84.  !

>

This is a Severity Level V violation (Supplement 1). j

.

<

2. 10 CFR 50.71 (4) requires that revisions to the FSAR shall be filed no less [

frequently than annually and shall reflect all changes up to a maximun of  !

six months prior to the date of filing.  ;

i

Contrary to the above requirement, changes to the Oconee FSAR for the period

, ending December 31, 1984 were not filed by July 1,1985, noe was a request  :

j for extension filed or an extension granted as of July 1,198C.  ;

This is a Severity Level V violation (Supplement 1).

,

t

i

i

8509160106 850828

PDR

I

i

G ADOCK 05000269 *

,

pg '

!

1

,~. , , ~ . .. , , , - - . . . _ , , - - . . - , , - - _ _ - - - - _

__ _ _ _ .

'

.

'

.

e

'

Du'ke Power Company Docket Nos: 50-269, 50-270, 50-287

Oconee Nuclear Station 2 License Nos: DPR-38, DPR-47, DPR-55

Pursuant to 10 CFR 2.201, you are required to submit to this office within 30 .

days of the of this Notice, a written statement of explanation in reply,

including: (1) admission or denial of the alleged violations; (2) the reasons

for the violations if admitted; (3) the corrective steps which have been taken

and the results achieved; (4) corrective steps which will be taken to avoid

further violations; and (5) the date when full compliance will be achieved.

Security or safeguards information should be submitted as an enclosure to

facilitate withholding it from public disclosure as required by 10 CFR 2.790(d)

or 10 CFR 73.21.

Date: AUG 3 8 ISIS

,