ML20136E550

From kanterella
Revision as of 04:09, 19 June 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Revised Testimony for Facility Design QA Hearing to Conform to Std Format Requirements
ML20136E550
Person / Time
Site: Diablo Canyon, 05000000
Issue date: 10/12/1983
From: Haass W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
To: Knight J
Office of Nuclear Reactor Regulation
Shared Package
ML20136B092 List:
References
FOIA-84-293 NUDOCS 8311030366
Download: ML20136E550 (1)


Text

. .

OCT 121953 James P. Knight, Afs'i'stirit'Ui' rector y

MEMORANDUM FOR:

Components and Structures Engineering Division of En'gineering, NRR FROM: Walter P. Haass, Deputy Chief

  • Quality Assurance Branch -

Division of Quality Assurance, Safeguards, and Inspection Programs, IE W

SUBJECT:

. REVISED TESTIMONY FOR DESIGN QA HEARING -

DIABLO CANYON l-5 Enclosed is my revised testimony for the Diablo Canyon Design QA hearing

~

to conform to your standard format requirements. -

Walter P. Haass, Deputy Chief -

Quality Assurance Branch Division of Quality Assurance, Safeguards, and Inspection Programs Office of Inspection and Enforcement

Enclosure:

Revised Testimony Distribution:

E. L. Jordan, IE M Partlow, IE W. P. Haass, IE IE Files IE Reading ~

QASIP Reading QUAB Reading WPHaass Reading ,

DC[p' -

IP:IE ,

W444.1 s

]E /83 "" -

pog-t4-293 l

/

I

__a y _ ,