ML20136B272

From kanterella
Jump to navigation Jump to search
Discusses IE Programmatic Insps for Design During Const, Including Quantitative Data on Insps Performed
ML20136B272
Person / Time
Site: Diablo Canyon, 05000000
Issue date: 10/28/1981
From: Bishop T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Crews J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
Shared Package
ML20136B092 List:
References
FOIA-84-293 NUDOCS 8601020502
Download: ML20136B272 (5)


Text

i

( -

, i

', OCT 2 B 1981

.y . .... .

MEMORANCUM FOR: J. L'. Crews', Director,' Division of Resident. '

Reactor Projects and Engineering Inspection

~

THRU:

B. H. Faulkehberry, Chief, Reactor Construction '

Projects Branch FROM:

T. W. Bishop. Chief, Reactor Projects Section 1 '

~ S (UBJECT:

' . [,; ~ REVIEW OF NRC:IE PROGRAMATIC INSPECTIGHS FOR DESIGN!

DURING THE PERIOD OF DIABLO CANYON UNIT 1 CONSTRUCI Diablo Canyon Unit 1 Construction Permit was issued in April 1968 with

' construction effectively mdenray in 1969. The information provided below is a swraary of the IE program requirements relating to inspections of design activities and includes quantitative data on inspections performed.

IE:RY files. The infomation was compiled from material available from Pre-1968:

Requirements for pre-CP design-related inspections could not be reconstructed from information available in the Regional Office. '

However, based upon information contained in later inspection .

. design-related inspections w)ere required.' instructions (PI-380 1968-1975: . ~

During this time frame, inspections we$e performed under PI-3800 and PI-4000. PI-4000 could not be reconstructed from Regional files, but, from references to PI-4000 it appears that the inspection guidance centered on verifying that a QA program had been established.

PI-3800, Design Review: paragraph F.3 contained some specific guidance regarding

" Design Review <

This is an area for which the Cmpliance inspection program is currently limited to a detemination as to whether the licensee part of hishas QAaprogram.

system for the independent review of design as Possible deficiencies in design may be detected during the course of routine Compliance inspection; but, of theatCompliance present, design is not spot-checked or reviewed as part function.- When possible design deficiencies are found, they are . referred to DRL for appropriate action."

RV -

. t '

TWBishop:m Faulkenberry Fo / A -N-2-13 in/ /n1 10/ /nl. 8601020502 851125 -

PDR FDIA I 'l LEIGHTO84-293 PDR

/-/- A R

J. L. Crews 4- . i

~

3 ,, -

1 Based upon this PI, it appears that' the program 'was limited to j verifying "that an independent' review system was established. The

~ PI-3800 program did not make any other~ specific references to I design type inspections. - -

),

?

l In 1973 a TI-4000 series wa issued. This series'did include some raquirement for inspecting  !

sign controls, but the TI also contained l an applicability statement. This statement required the TI to be performed on plants whose construction permit application was dated after September 1,1973.' This TI was, therefore, not applicable to Diablo (CP issued April 1968)..

During the 1968-1975_(inclusive) time frame our fil's e indicate six inspections were performed which reference some specific inspection-of design control (Report Nos. 69-04770-01,70-02,

1. 75-07, 75-11 and,75-14 .

' reviews and followup on)some specific design changes.These inspec

' .1_975-Present

- }' .

In 1975 the IE module system was ' issued. Design-related inspections were specified in four MC 2511 series modules (35003. 35004, 35016, 4

- and 35018). These modules were issued in May 1975 and were identified

.* for use on Pre-CP inspections (again Diablotoould have been excluded s

. from inspection toder these modules). .

In 1975 Diablo Canyon Unit was heavily involved)re-operational testing. Construct. ion was considered to be approaching completion (although the HOSGRI issue was lingering). The MC 2512 modules. j issued. originally in March and May 1975, relating to QA reviews ,

(35100 and 35200) included some refined instructions on inspecting ~

design controls, but were not considered applicable since Diablo ~

construction was so advanced. - -

In October 1976 inder MC 2514 (Pre-ops) a module was issued relating to design changes and modifications (35744).. This module was performedfer Diablo Unit 1 and is doctanented in report No. 77-15 (as 901 complete).

In August 1977 the NRC issued a series of nine modules (37900's) - A specifically relating to design to be administered under the LCVIP f, program. These modules were never applied to Diablo Canyon since .

PG&E was their own A/E and was not inspected under the LCVIP.

\ .~ -

?

In 1977 the inspection requirements for the HOSGRI modifications were defined by Reg'on V (Kirsch /Vorderbrueggen memorandum to Spencer, dated December 20,1977). While no specific modules were

/

' identified it was stated that design control, review. verification. /

i

' and docisnentation would be inspected. IE Inspection Reports for .

Diablo Unit 1 indicate inspections of this nature were performed (Nos. 78-01, 79-01, 79-06, 79-23, 80-02, 80-05, and 80-10). 766 ,

information shows that these inspections were performed using the y 92700 series modules (followups) and TI-2515/29 (IEB 79-14 followup). '

L&. J i!

J. L. Cmws ,

-- 3-In 1980 three new.MC 2512 modules were issued which required some design inspection,s (37051, 37055, and 35061). These modules were '

not applied to Diablo Canyon Unit I since construction was essentially complete at this time. -

\ .

. were Alsoisrued in October which tilated 1980, to threa design MC 37700, 251$37701,

((operations 37702). phase)

-These imdules inspections have not yet been performed at Diablo Canyon Unit 1, since the operating license was just recently issued.

./\ .

\' During the post 1975-present time period, our files-indicate-ten -

i

. inspections were perfomed which reference some specific inspectipn

\ . . i' cf design control (Report No . 77-12, 77-15, 78-01, 79-01,79-06_,

i 79-23, 80-02, 80-06 10, and 81-10). ;These inspections included '

. progrannatic reviews and followup on specific design issues.

lk -

T. W. Bishop. Chief Reactor Projects Section 1 y _

so

. g l

- f p e-

%g ,

4

. 4

- - - - - , p- *g--ty 9 --g+w-y -my,%-- ,-g. y n g y-m ,m- - vy,- +ny y- -p y w,-<r--g-w-,,y- --w --ew-

. a a

f j'

') -

NUCLEAR REGULATORY COMMISSION Region V ,

1990 N. California Blvd., Suite 202 Walnut Creek, California 94596 FACSIMILE SERVICE REQUEST Date J///7fff Mzassge to: acdgeo ( ,, g e ff. ,/p . p /,, ,

/

No.'of pages M plus instruction sheet TO4eeepy numhet . _ -

Verification number: I'/~E7/ 7'/ *

4:ssage from: _ .g ufsgja,f

/ ' / '

Verification number: Vd' .~5- 3 7pP Name: %d,JJ b, Rapifax

,3M VRC Automatic Special Instructions: ~~

Ted .' ..

$i,5 fu <dd m.or.1<l b/ Dft/ftD7mfdr~ W $ J/fercod hod.e.4**s fgga,g/mper$ , o4s .N/"rfb' M S/Jdk bfv'fa) ifNo hin dLo W)AW, Qips }gf//1460 fEu fd## l "If

  • MM, o E</dfxdr '

p gaegy sy- fhrfHr 3d* W UJJ~ D lou sp ~77tc

& 74 [,,,,,,,,,gg (CNd.ff/Js C.ML llfAA'U# #"

AbVJ"J'b $.

ks //d.sf}

IE:V Form 216B

.., e eh r.tv - y 4 ' - .

@ i Wri -W

, i .

i l l.

i

_[

BulLDlij6 PC6 kin r

,sriwvfD 0 UND - 1.'MECIAL TVol'. ,,.i  ;

(S1tLYSTCitTilEE '

6fEC1 TEA o rggtp, p,WM DATA '

' PIRN6 Ml4d i Co4NITRIT&.tAtr LAYOUT,M4,ETC.

  • 0FrfATlH4 D4YlO1.

"E "' "

fAllt.DillG ANALYS$ MATEcrAL rroP.

M arlow g

, _ ,coMFuTEC COf4TAINMENT BIM MOTION ID W

'TURDINE > EQUIPMENT ANALYSIS AFFu(A5U' rit's AUXILIARY + gyms ^" ' PIPING

      • PIPING

~

lHTAKE. STstlicTucE + ANALYSIS llVAC y

. FUEL llANDLING + _ _ _

gpggg 4 ggg OTHEllS +

t 1(C y HSSS V OTilEt EmlFMENT y

' Yl V G PIS( u m W ty TURDtME H6 file tcAI5

  • MYE WELErgn BLt4. STCucy LDADS W'

. ETc.

MISMIC Y toros FicilicE 1. lLLUSTCATION OF A PORTIOM OF A SEISMIC DESIGM PCOCESS ,

_ _ _ _ _ _ _ _ . _ _ _ _ - _ ~

.