ML20137X693

From kanterella
Revision as of 16:37, 15 June 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Informs That on 950529-30,Region IV Will Host Workshop in Arlington,Tx on Test Item & Exam Development to Meet Agency Expectations of Facility licensee-developed Initial Licensing Exams.Tentative Workshop Agenda Attached
ML20137X693
Person / Time
Site: Callaway Ameren icon.png
Issue date: 04/16/1997
From: Howell A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Schnell D
UNION ELECTRIC CO.
References
GL-95-06, GL-95-6, NUDOCS 9704220134
Download: ML20137X693 (6)


Text

ict

@"%% UNITED STATES de f.t 'ft NUCLEAR REGULATORY COMMISSION REGloN tv 3 '

[ 611 HYAN PLAZA DalVE, SUITE 400

$ AR LINGTON, T E xAS 76011 8064 9.....,

APR I 61997 Donald F. Schnell, Senior Vice President - Nuclear Union Electric Company P.O. Box'66149 d

St. Louis, Missouri 63166-6149

SUBJECT:

OPERATOR LICENSING EXAMINATION DEVELOPMENT WORKSHOP

Dear Mr. Schnell:

,- In recent weeks, after an internal audit, Region IV has recognized the need for enhanced expectations for the quality of initial licenslag examinations developed under the pilot i process of Generic Letter 95-06 or the " Operator Licensing Examination Standards for Power Reactors," Interim Revision 8. These new expectations represent a significant increase in NRC expectations regarding initiallicensing examination quality than has been previously communicated by the Region to facility licensees. In several recent meetings

' with Region IV facility licensee representatives from operations and training organizations, regional management has presented these clarified expectations with regard to facility licensee-developed initial licensing examinations.

Additionally, chief examiners have been communicating these expectations at the staff level to individual facility licensee personnel for facility licensees that have initial' examinations schedu!ed to be administered over the next few months. The thrust of these expectations is that facility licensees will be held to a higher level of quality at the individual test item level than has been previously required. In response to these communications, facility licensee representatives have requested that the NRC provide a forum in which facility licensee personnel involved in examination development can better understand how these expectations translate into actual test items.

On May 29 and 30,1997, Region IV will host a workshop in its Arlington, Texas, office on test item and examination development to meet agency expectations of facility licensee-developed initiallicensing examinations. The workshop will start at 8:30 a.m. on May 29 and conclude by 1 p.m. on May 30. A tentative workshop agenda is attached. Comments are welcome. This workshop will be open to the public.

f 0m 9.0 O N 9704220134 970416 l PDR ADOCK 05000403

i-i i

I.

. Union Electric' Company ,

I l

You are invited and encouraged te send representatives from your organization who are likely to be directly involved in initiai licensing examination development. Our facility can '

- accommodate a large number of attendees. However, if you expect to send more than four attendees, please inform us so that we may ensure the room arrangement is appropriate. ,

Please direct comments or questions to John Pellet, Chief, Operations Branch, Division of l' Reactor Safety at (817)860-8159 or Stephen McCrory, Workshop Coordinator, Operations Branch at (817)860-8265, or via electronic ruail to jlp@nrc. gov and sim@nrc. gov, j respectively.  !

Sincerely, >

b0 abbV Arthur T. Howell lit, Director Division of Reactor Safety >

Docket No.: 50-483 License No.: NPF-30

Enclosure:

Tentative Workshop Agenda cc w/

Enclosure:

Professional Nuclear Consulting, Inc.

19041 Raines Drive Derwood, Maryland 20855 Gerald Charnoff, Esq. l Thomas A. Baxter,-Esq.  ;

Shaw, Pittman, Potts & Trowbridge i 2300 N. Street, N.W.  ;

Washington, D.C. 20037 l H. D. Bono, Supervising Engineer  ;

Site Licensing Union Electric Company

.P.O. Box 620 Fulton, Missouri 65251 i

G. L. Randolph, Vice President Nuclear Operations Union Electric Company P.O. Box 620  !

Fulton, Missouri 65251 ,

.f, 1

. Union. Electric Company' - -

3-I i

Manager - Electric Department l Missouri Public Service Commission 301 W. High P.O. Box 360

' Jefferson City, Missouri 65102_ i Ronald A. Kucera, Deputy Director-  ;

- Department of Natural Resources  :

P.O. Box 176 i Jefferson City, Missouri 65102 Otto L. Maynard, President and

Chief Executive Officer

- Wolf Creek Nuclear Operating Corporation P.O. Box 411 Burlington, Kansas 66839 Dan 1. Bolef, President Kay Drey, Representative l Board of Directors Coalition  !

for the Environment 6267 Delmar Boulevard j University City, Missouri 63130 Lee Fritz, Presiding Commissioner Callaway County Court House 10 East Fifth Street - .

Fulton, Missouri 65151 Alan C. Passwater, Manager ,

Licensing and Fuels Union Electric Company P.O. Box 66149 St. Louis, Missouri 63166-6149 J. V. Laux, Manager

~ Quality Assurance.

Union Electric Company P.O. Box 620 Fulton, Missouri 65251 1

y a , -

c ,

~ . .

m j iI.

.. ,t.

. . 1

i. p lJ" Union Electric Company. -4 . . 'l

-+- n

, j b'c'c tof DCD (IE42) .;g w ~

~

- bec distrib; by.RIV:

. j e .

Regional' Administrator ' Resident inspector -!

E DRP Director -: DRS-PSB -  !

. Branch' Chief (DRP/B) MIS System j Project Engineer (DRP/B). RIV File ,

Branch Chief (DRP/TSS)-

S Richards (MS 10D22) {

t

-t

, i E

l a

. I i

i e 'l I

4 v a i

.. DOCUMENT NAMER Rn CW\CWLT416.imb i To receive copy of Mr _. ^ Indicate in box: "C" = Copy wthout enclosures "E" = Copy with enclosures "N" = No copy  !

4 RIV:RE:OB -: m C:OB - .

D:DRS  !

SLMcCrory/imbylf5 JLPellet y7,, , ATHowell Ill,(g 1

, 04(6/97 -(N 04//f/97 T- 04//p97. 'gW ~

OFFIC.AL RECORD col'Y -j c q o

i, <

?. ,

'(

,j

e. a Union Electric Company bec to DCD (IE42)
  • ~

- bec distrib. by RIV: ,

Regional Administrator Resident inspector

' DRP Dire'ctor DRS-PSB Branch Chief (DRP/B)' MIS System Project Engineer (DRP/B)- RIV File r Branch Chief (DRP/TSS)

S. Richards (MS 10D22) .

3 d

I

)

b I

DOCUMENT NAME: R:\_CW\CWLT416. lmb To receive copy of document, indicate in box: "C" = Copy without enc 60sures ."E" = Copy with enclosures "N" = No copy  ;

RIV:RE:OB - _,

C:OB D:DRS SLMcCrory/imbj(jf' JLPellet gfj,, ATHowell lil/P  :

04((,/97 - f+v 04//f/97 f~ 04///,/97 'gW <

OFFICIAL RECORD COPY ,

I

e ENCLOSURE OPERATOR LICENSING EXAMINATION DEVELOPMENT WORKf. HOP AGENDA I

DAY 1 - MAY 29,1997 introduction (8:30-9 a.m.) I Session 1 (910 a.m.) Generic Attributes of Good Test items I

Session 2 (10:15-11:30 a.m.) Written Examination Questions Session 3 (12:30-2 p.m.) Open Reference Oral Questions (Job Performance Measure and Administrative) l Session 4 (2-3 p.m.) Administrative Job Performance Measures Session 5 (3:15-4:30) System Job Performanco Measures and Job Performance Measure Sets l Session 6 (4:30-5 p.m.) Questions and Answers j l

1 DAY 2 - MAY 30,1997 Session 7 (8:30-9:30 a.m.) Scenarios and Scenario Sets Session 8 (9:30-10:15 a.m.) Breadth, Depth, Overlap, and Examination Outlines ]

Session 9 (10:30-12 noon) Questions and An wers Closing Remarks (12-12:30 p.m.)

.