Monthly Operating Repts for Feb 1983
ML20071E851
Person / Time
Site: Brunswick  Duke Energy icon.png
Issue date: 03/08/1983
From: Harrison F
CAROLINA POWER & LIGHT CO.
To:
Shared Package
ML20071E833 List:
References
NUDOCS 8303150369
Download: ML20071E851 (9)


Text

I ,

APPENDIX B AVERAGE DAILY POWER LEVEL DOCKET NO. 050-0325 UNIT BRUNSWICK UNIT I DATE 03/08/83 COMPLETED BY FRANCES HARRISON TELEPHONE 919-457-9521 FEBUARY 83 DAY AVG. DAILY POWER LEVEL DAY AVG. DAI LY POWER LEVEL

( MWE-NE T) ( MWE-NET) 1 -4. I '7 -4.

2 -4. 18 -5.

3 -5. 19 -4.

4 -5. 20 -4 5 -5. 21 -4 6 -5. 22 -4 1 -4 23 -4 6 -5. 24 -4 9 -4. 25 -4.

10 -4. 26 -4.

II -5. 27 -4.

12 -4. 2u -4 13 -4.

14 -4.

15 -4.

16 -4

1. 15 -d 8303150369 830307 PDR ADOCK 05000324 R PDR .

l l

OPERATING DATA REPORT DOCKET NO. 050-0325 DATE 03/08 /83 COMPLETED BY FRANCES HARRISON TELEPHONE 919-457-9521 OPERATING STATUS

l. UNIT NAME: BRUNSWICK UNIT I I NOTES I
2. REPORTING PERIOD: FEBUARY 83 I I
3. LICENSED THERMAL POWER (MWT): 2435 I I
4. NAMEPLATE RATING (GROSS MWE): 867.0 I I S. DESIGN ELECTRICAL RATING (NET MWE): 821.0 I I
6. MAX DEPENDABLE CAPACITY (GROSS MNE): 815.0 I I
7. MAX DEPENDABLE CAPACITY (flET VWE): 790.0 ------ - - - - - - - -

- =

8. IF CHANGES OCCUR IN CAPACITY RATINGS ( I TEMS 3 THRU 7 ) SINCE LAST REPORT, GIVE REASONS:
9. POWER LEVEL TO WHICH RESTRICTED IF ANY (NET MNE): NONE
10. REASONS FOR RESTRICTION IF ANY:

THIS YR TO CUMUL MONTH DATE ATIVE

11. HOURS IN REPORTING PERIOD 672.0 1416.0 52177.0
12. NUMBER OF HOURS REACTOR WAS CRITICAL 0.0 0.0 33888.5
13. REACTOR RESERVE SHUTDOWN FOURS 0.0 0.0 1647.1
14. HOURS GENERATOR Otl LINE 0.0 0.0 31970.0
15. UNIT RESERVE SHUTDONN HOURS 0.0 0.0 0.0
16. GROSS THERMAL EtlERGY GENERATED UP!H) 0.0 0.0 63896014.3
17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 0.0 0.0 2l062188.0
18. NET ELECTRICI AL ENERGY GENERATED (MWH) -2933.0 -6929.0 20218190.0 19 UNIT SERVICE FACTOR 0.0 0.0 61.3
20. UNIT AVAILABILITY FACTUR O.0 0.0 61.3
21. UNIT CAP ACITY F ACIDR (USING MDC tlET) -0.6 -0 . 6 49.0
22. UNIT CAPACITY FACTOR (USING DER NET) -0.5 -0 . 6 47.2
23. UNIT FORCED OUTAGE RATE 0.0 n.0 24.1
24. SHU1 DOWNS SCHEDULED OVER NE XT 6 MJUTHS ( TYP E , DATE. AND DUR ATION OF EACH):
25. IF SHUTUOWN AT END OF REPORT PERIdD, ESTIMATED DATE OF START UP: 5/13/83
26. UNI TS I N TEST S TATUS (PRIOR TO Co lMERICI AL OPERATION): FORC AS T ACHEI VED INITI AL CRITICALITY --------- -----

INITI AL ELECTRICITY - - - - = --------

COMMERICI AL OPERATI0tl -- --- - - - -

1. 15 - 9

APPENDIX DOCKET NO.: 050-325 UNIT: Brunswick No. 1 DATE: March 1983 COMPLETED GY: Frances Harrison OPERATIONS

SUMMARY

BRUNSWICK UNIT NO. 1 Brunswick Unit No. I was shut down the entire month of February for a refueling / maintenance outage.

There are 948* BWR and 160 PWR spent fuel bundles in the Brunswick No. 1 fuel pool.

  • 472 bundles have been moved to spent fuel during refueling; of these, 160 will remain in the pool when the core is reloaded.

I a

a I

t, I

050-0325 DOCKETNO.

UNIT SilUTDOWNS AND POWER REDUCTIONS UNIT NAME #RUNSWICK 1

, DATE March 1983 j

. COMPLETED BY Frances Harrison -

REPORTMONTH Feb 1983 TELEPHONE 919-457-9521

":.: c

-, $? 'h $55 Licensee [g j{%

Cause & Corrective No. Date i 3g @ .s y 5 Event g mO Action to Prevent Recurrence H

35 5 3 gjj ,- Report # g .

O u~

83116 821211 S 627 C 4 NA .RC Fe-1 XX REFUELING OUTAGE i

4 I 2 3 2

4 F: Forced Reason: Method: Exhibit G -Instructions A Equipment Failure (Explain) 1-Manual for Preparation of Data S: Scheduled Entry Sheets for Licensee B Maintenance of Test 2 Manual Scram.

C Refueling 3. Automatic Scram. Event Report (LER) File (NUREG-D Regulatory Restriction 4 Continuations 0161)

E-Operator Training & License Examination , 5-Load Reductions F-Administrative 5 6-Other Exhibit I- Same Source G-Operational Error (Explain)

(9/77) li Other (Explain) *

\ -

i.

APPENDIX B AVERAGE DAILY POWER LEVEL DOCKET NO. 050-0324 UNIT BRUNSWICK UNIT 2 DATE 03/04/83 COMPLETED BY FRANCES HARRISON TELEPHONE 919-457-9521 FEBUARY 83 DAY AVG. DAILY POWER LEVEL DAY AVG. DAILY POWER LEVEL (MWE-NET) ( PME-NET )

1 589. 17 588.

2 565. 18 707.

3 6. 19 785.

4 -13. 20 782.

5 -il. 21 794.

6 -11. 22 792.

7 -11. 23 792.

8 -10. 24 793.

9 -11. 25 792.

10 -11. 26 771.

11 -12. 27 792.

12 -12. 28 793.

13 -12.

14 -14.

15 -10.

16 357.

1 1.16 - 8

I e

OPERATING DATA REFORT DOCKET NO. 050-0324 DATE 03/04/83 COMPLETED BY FRANCES HARRISON TELEPHONE 919-457-9521 OPERATING STATUS

1. UNIT NAME: BRUNSWICK UNIT 2 I NOTES I I
2. REPORTING PERIOD: FEBUARY 83 I I
3. LICENSED THERMAL POWER ('1WT) : 2436 I I
4. NAMEPLATE RATING (GROSS MWE): 867.0 I I
5. DESIGN ELECTRICAL PATING (NET MWE)* 821.0 I I
6. MAX DEPENDABLE CAPACITY (GROSS MWE): 815.0 I I
7. MAX DEPENDABLE CAPACITY (NET MWE): 790.0 -------------------------------
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THRU 7) SINCE LAST REPORT, GIVE REASONS:
9. POWER LEVEL TO WHICH RESTR3CTED IF ANY (NET MWE): NONE
10. REASONS FOR RESTR1CTION IF ANY:

THIS YR TO CUMUL MONTH DATE ATIVE

11. HOURS-IN REPORTING PERIOD 672.0 1416.0 64201.0
12. NUMBER OF HOURS REACTOR WAS CRITICAL 398.7 1120.0 39896.1
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
14. HOURS GENERATOR ON LINE 363.4 1077.3 37228.1
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
16. GROSS THERMAL ENERGY GENERATED (MWH) 783031.3 2135810.9 68432789.7
17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 265056.0 723200.0 22739892.0
18. NET ELECTRICIAL ENERGY GENERATED (MWH) 253S35.0 697192.0 21789118.0
19. UNIT SERVICE FACTOR 54.1 76.1 58.0
20. UNIT AVAILABILITY FACTOR 54.1 76.1 58.0
21. UNIT CAPACITY FACTOR (USING MDC NET) 47.8 62.3 43.0
22. UNIT CAPACITY FACTOR (USING DER NET) 45.9 60.0 41.3
23. UNIT FORCED OUTAGE RATE 0.0 2.7 16.6
24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPEr DATE, AND DURATION OF EACH):

DUAL OUTAGE- 3/28/83 THREE - FOUR WEEKS

25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START UP: 0/ O/ 0
26. UNITS IN TEST STATUS (PRIOR TO COMMERICI AL OPERATION): FORCAST ACHEIVED INITIAL CRITICALITY -------- --------

INITIAL ELECTRICIlY -------- --------

COMMERICIAL OPERATION -------- --------

1.16 - 9

~ ._. . _ . - . - . - -. _ . . - . . . . _. . . - __

I APPENDIX DOCKET NO.: 050-324 UNIT: Brunswick No. 2 DATE: March 1983 COMPLETED BY: Frances Harrison OPERATIONS

SUMMARY

4 BRUNSWICK UNIT NO. 2

Brunswick Unit No. 2 operated at 54.1% availability factor for the month of February with a 47.8% capacity factor. There was one off-line outage this month and cne power reduction.

i There are 424 BWR and 144 PWR spant fuel bundles in the Brunswick No. 2 fuel i

pool.

4

)

i

+

t t

1 i

. _ . _ , . . . - _ _ _ _ . ._._-.._..,_.._,_,._.,_,-__.___._.,..,,-.,_.,_,__m,.._

~

O

  • DOCKET NO.

050-0324

! UNIT SliUTDOWNS AND POWER REDUCTIONS BRUNSWICK II

/ UNIT NAME DATE Flarch 1983 I/. Frances Harrison -

Feb 1983 COMI'LETED BY REPORT MON 11( TELEPl!ONE 919-457-9521 "t. -

, 5_ g 3 kjh Licensee gg feo Cause & Corrective No. Date g 3g @ ,@s5 Event gy g3O Action to I- y5 5 j ;f, , Report a mO g . Prevent Recurrence ,

$ ,e -

83018 830203 F 308.6 a 1 NA CH Pump xx Unit separated from grid for

. rebuilding 2B reactor recire pump seals i

9

~

I l 2 3 8 4

F: Forced Reason: Method: Exhibit C-Instructions S: Scheduled A liguipment failure (Explain) . 1-Manual for Preparation of Data 11 Mainterunee of Test 2-Manual Scram. Entry Sheets for Licensee C Refucting 3 Automatic Scram. Event Report (LER) Fde(NUREC.

D Regulatory Restriction 4 Continuations 0161)

E-Operator Training & License Examination

  • 5-Load Reductions F Administrative ' 5 6- Other C-Operational Errur (Explain) - - Exhibit 1.Same Source -

19/77) li-Other (Explain) -

. 5 .

O-n .

o .

5

+

i DOCKET NO. 050-0324 L NITSHUTDOWNS AND POWER REDUC 110NS UNIT N OIE Brunawick II

, DATE hrch 19Al i 1

COMPLETED BY Frances llarrison REPORY MONT1f February 1983 TELEPif0NE (9191457-9521 C

. 1 -

i No. Date

- ,$g 3g 3

it 5

.g y 5

' ' Licensee Event Eg g?

f4 g3 Cause & Correceive Action to

[ .

mO O b

M c2 j5- Report # g . Prevent Recurrence ,

. d .

. b

.; 83-14 830201 F 0 A 5 NA Cll Pump xx

~

Reduced power because of 2B recirc

- pump seal problems.

d i

..{

{ ~

l * .

I i'

i . .

I 2 3' 4 - -

F: Forced Reason: .

. Method: Exhibis G. Instructions -

[

S: Scheduled A l'iinipment Failme(Explain) l Manual for Preparation of Data j ll M iinienance of Test 2 Manual Scram. Entey Sheets for Liecusee -

! . C Itefueling 3 Automatic Scram. Event Report (LER) File (NUREG.

-

  • D itegulatory Restriellon s 4 Continuations 0161) .

E-Operator Training & Ucense Examination 5-Load Reductions '

F-Administrative 5

{

6 Other Exhibit I.Same Source G-Operational Error (Explain)

  • H Other(Explain)

(9/77) '.

..-