Interim Deficiency Rept DER 84-40 Re Auxiliary Feedwater Pump Corrosion.Initially Reported on 840605.Due to Extensive Investigation & Evaluation Required,Next Rept Delayed Until 841023
ML20108C410
Person / Time
Site: Palo Verde Arizona Public Service icon.png
Issue date: 10/23/1984
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Bishop T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
ANPP-3093-TDS, DER-84-40, NUDOCS 8411160556
Download: ML20108C410 (1)


Text

' 1 Arizona Public Service Company -

October 23, 1984 ANPP-30930-TDS /1RB U. S. Nuclear Regulatory Commission Region V Creekside Oaks Office Park 1450 Maria Lane - Suite 210 Walnut Creek, California 94596-5368 s Attention: Mr. T. W. Bishop, Director Division of Reactor Safety and Projects

Subject:

Time Extension For Report - DER 84-40 A 50.55(e) Potentially Reportable Deficiency Relating To Unit 2 Auxiliary Feedwater Pump Has Corrosion.

File: 84-019-026; D.4.33.2

, Ref erence : ( A) Telephone conversation between J. Ball and T. Bradish on June 5, 1984 (B) ANPP-29867, dated June 29, 1984 (Interim Report)

(C) ANPP-30566, dated September 19, 1984 (Time Extension)

Dear Sir:

The NRC was notified of a potentially reportable deficiency in Reference ( A), an Interim Report was transmitted by Ref erence (B), and a Time Extension was requested by Reference (C). At that time, it was estimated that a Final Report would be available by October 24, 1984.

Due to the extensive investigation and evaluation required, it is now expected that this information will be finalized by November 23, 1984, at which time a complete report will be submitted.

There is no new inf ormation or change to the Interim Report at this time.

Very truly yours,

, CCLl qLLC E. E. Van B runt, Jr.

APS Vice President Nuclear Production ANPP Project Director EEVB/TRB/nj 49 cc: See Page Tao 8411160556 841023 gDRADOCK 05000529 9 PDR

.ZE-A7

p ,,

I Mr. T. W. Bishop DER 64-40

-Page Two-cc: Richard DeYoung, Director Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555 T. G. Woods, Jr.

D. B. Karner W. E. Ide D. B. Fasnacht A. C. Rogers L. A. Souza D. E. Fowler T. D Shriver C. N. Russo J. Vorees J. R. Bynum J. M. Allen A. C. Gehr W. J. Stubblefield W. G. Bingham R. L. Patterson R. W. Welcher H. D. Foster D. R. Hawkinson R. P. Zimmerman L. Clyde M. Woods ,

T. J. Bloom j Records Center Institute of Nuclear Power Operations 1100 Circle 75 Parkway, Suite 1500 Atlanta, CA 30339 s

t

,_ _ ._ - - - . . . ~ . _ , - .,_. , - _. . . . . -