Category:CORRESPONDENCE-LETTERS
MONTHYEAR05000482/LER-1999-002, Forwards LER 99-002-00,re Identification of Surveillance Performed in Modes Other than Those Required by TS SR 4.6.3.2.a.Commitments Made by Util Are Encl1999-10-15015 October 1999 Forwards LER 99-002-00,re Identification of Surveillance Performed in Modes Other than Those Required by TS SR 4.6.3.2.a.Commitments Made by Util Are Encl 05000482/LER-1994-014, Forwards LER 94-014-00 Re Util Identification of Missed Surveillance Required by TS Prior to Changing Modes.List of Commitments Made by Licensee,Encl1999-10-15015 October 1999 Forwards LER 94-014-00 Re Util Identification of Missed Surveillance Required by TS Prior to Changing Modes.List of Commitments Made by Licensee,Encl ML20217F7481999-10-14014 October 1999 Informs That Based on Approval of Core Assessment Damage Guidance in WCAP-14696,rev 1 for Westinghouse Nuclear Power Plants,Licensee May Use WCAP-14696,rev 1 at Wolf Creek Generating Station ML20217F8701999-10-13013 October 1999 Provides Summary of Meeting on 991007 with Representatives of Wolf Creek Nuclear Station in Burlington,Kansas Re Status of Licensee Radiation Protection Program.List of Meeting Attendees & Licensee Presentation Encl ML20217C1721999-10-0707 October 1999 Forwards Insp Rept 50-482/99-09 on 990830-0903.No Violations Noted.Purpose of Insp to Perform Routine Operational Status Insp of Emergency Preparedness Program & to Resolve Questions Re Revised Emergency Plan ML20217A4881999-09-29029 September 1999 Forwards Changes to Plant Data Point Library,Iaw 10CFR50,App E,Section VI.3.a.ERDS Point Affected Is RDS0001 ML20216H9291999-09-29029 September 1999 Informs That Licensee Responses to GL 97-06, Degradation of Steam Generator Internals Acceptable & Did Not Identify Any New Concerns with Condition of SG Intervals at Plant ML20212G1681999-09-24024 September 1999 Notifies NRC of Change in Status of Licensed Individual at Plant,Per 10CFR50.74.RL Acree Holds License OP-42654 at Plant,But Has Been Permanently Reassigned from Position for Which Plant Has Certified Need for RO License ML20216F9591999-09-22022 September 1999 Forwards Withdrawal of Amend Request Re Ultimate Heat Sink Temp for Wolf Creek Generating Station ML20212G5641999-09-20020 September 1999 Forwards Insp Rept 50-482/99-13 on 990725-0904.Three Violations Being Treated as Noncited Violations 05000482/LER-1999-011, Forwards LER 99-011-00 Re Identification of Missed Surveillance Due to Exceeding Flow Rate Specified in TS for Ccps.List of Util Commitments Contained in Attachment I1999-09-17017 September 1999 Forwards LER 99-011-00 Re Identification of Missed Surveillance Due to Exceeding Flow Rate Specified in TS for Ccps.List of Util Commitments Contained in Attachment I 05000482/LER-1999-010, Forwards LER 99-010-00,re Failure to Correctly Perform TS Surveillance 4.3.3.6.Encl Identifies Actions Committed to by Util1999-09-16016 September 1999 Forwards LER 99-010-00,re Failure to Correctly Perform TS Surveillance 4.3.3.6.Encl Identifies Actions Committed to by Util ML20212D9381999-09-16016 September 1999 Informs That NRC Staff Completed Midcycle PPR of WCGS on 990818.Areas of EP & Engineering Warranted Increase in NRC Action.Nrc Plan to Conduct Add Insp Beyond Core Insp Program Over Next 7 Months to Address Listed Questions 05000482/LER-1999-006, Forwards LER 99-006-01,re Identification of Failure to Enter LCO for TS 3.6.1.1 While Taking Containment Atmosphere Samples During Power Operation.Commitments Made by Util Are Encl1999-09-15015 September 1999 Forwards LER 99-006-01,re Identification of Failure to Enter LCO for TS 3.6.1.1 While Taking Containment Atmosphere Samples During Power Operation.Commitments Made by Util Are Encl ML20212C9211999-09-15015 September 1999 Forwards NRC Form 536, Operating Licensing Examination Data, in Response to NRC Administrative Ltr 99-03 ML20216F1641999-09-14014 September 1999 Forwards Insp Rept 50-482/99-12 on 990816-20.No Violation Noted.Determined That Solid Radwaste Mgt & Radioactive Matls Transportation Programs Were Properly Implemented 05000482/LER-1999-009, Forwards LER 99-009-00 Re Util Identification of Fire Suppression Issue Affecting Safe Shutdown Components. Attachment I Identifies Actions Committed to by Licensee in Encl LER1999-09-10010 September 1999 Forwards LER 99-009-00 Re Util Identification of Fire Suppression Issue Affecting Safe Shutdown Components. Attachment I Identifies Actions Committed to by Licensee in Encl LER ML20212A5651999-09-10010 September 1999 Informs of Completion of Review of & Encl Objectives for Wolf Creek Generating Station 1999 Emergency Preparedness Exercise Scheduled for 991117.Determined Exercise Objectives Appropriate to Meet EP Requirements 05000482/LER-1999-008, Forwards LER 99-008-00,re Efsa at Plant.Attachment I Identifies Actions Committed to by Licensee in LER1999-09-0303 September 1999 Forwards LER 99-008-00,re Efsa at Plant.Attachment I Identifies Actions Committed to by Licensee in LER ML20211M7151999-09-0303 September 1999 Forwards Changes to Wolf Creek Generating Station Data Point Library.Emergency Response Data Sys Points Affected Are EJL0007 & EJL0008 ML20211N0081999-09-0202 September 1999 Informs That NRC Staff Has Reviewed Submittals & Concluded Util Adequately Addressed Actions Requested in GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power- Operated Gate Valves ML20211K8301999-09-0202 September 1999 Forwards marked-up TS Page Deleting Inequality Signs from Trip Setpoints in SR 3.3.5.3 & Reflecting Info on Calibr Tolerance Band,Per 990708 Application to Amend License NPF-42 ML20211K1941999-08-31031 August 1999 Forwards Rev 31 to WCGS Physical Security Plan,Safeguards Contingency Plan & Training & Qualification Plan,Iaw 10CFR50.54(p).Encl Withheld,Per 10CFR73.21 ML20211H1491999-08-26026 August 1999 Forwards Insp Rept 50-482/99-16 on 990809-13.No Violations Noted.Insp Focused on Low as Is Reasonably Achievable Program,Training Program for Contract Radiation Protection Personnel & Radiation Protection QA Program ML20211A8581999-08-18018 August 1999 Forwards Insp Rept 50-482/99-08 on 990316-0724.One Violation Being Treated as Noncited Violation ML20211G2201999-08-17017 August 1999 Forwards Exam Rept 50-482/99-301 on 990726-29.Exam Evaluated Six Applicants for SO Licenses & Three Applicants for RO Licenses ML20210U0991999-08-13013 August 1999 Forwards Insp Rept 50-482/99-11 on 990712-16.No Violations Noted.Insp Was to Review Radiological Environ Monitoring Program ML20210U9751999-08-13013 August 1999 Informs That Licensee Identified That Answer Key for One Question on 990720 Written Exam & Event Classification for on Job Performance Measure Required Mod.Description & Justification for Proposed Mod,Including Technical Ref,Encl ML20211A9501999-08-12012 August 1999 Discusses 990720-21 Workshop Conducted in Region IV Ofc,Re Exchange of Info in Area of Use of Risk Insights in Regulatory Activities.List of Attendees,Summary of Topic & Issues,Agenda & Copies of Handouts Encl ML20210R5621999-08-12012 August 1999 Forwards Monthly Operating Rept for July 1999 for Wolf Creek Generating Station,Per TS 6.9.1.8 & GL 97-02.Revised Repts for Apr,May & June 1999,correcting Number of Hours Reactor Critical,Encl ML20210P7491999-08-0909 August 1999 Ack Receipt of ,Which Transmitted Wolf Creek Radiological Emergency Response Plan 06-002,Rev 0,under Provisions of 10CFR50,App E,Section V ML20210N0061999-08-0303 August 1999 Forwards Response to NRC 990401 RAI Re GL 95-07, Pressure Locking & Thermal Binding of SR Motor-Operated Gate Valves ML20210L1461999-08-0303 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Requests Submittal of Ltr Identifying Individuals Taking Exam,Personnel Allowed Access to Exams & Mailing Address for Exams ML20210H2551999-07-29029 July 1999 Provides 180-day Response to NRC Request for Info Re GL 99-02, Lab Testing of Nuclear-Grade Activated Charcoal ML20210J1371999-07-29029 July 1999 Requests NRC Approval of Methodology for Determining RCS Pressure & Temp & Overpressure Mitigation Sys PORV Limits. Attachment I Provides Proposed Changes to Improved TS ML20210F5931999-07-27027 July 1999 Forwards semi-annual Fitness for Duty Performance Data Rept for Wcnoc,Per 10CFR26.71(d).Rept Covers Period of 990101- 0630 ML20210F5881999-07-23023 July 1999 Submits Response to Administrative Ltr 99-02, Operator Reactor Licensing Action Estimates, ML20210B8191999-07-20020 July 1999 Ack Receipt of ,Which Transmitted Wolf Creek EP Implementing Procedure 06-005,Rev 1.Implementation of Changes Will Be Subj to Insp to Confirm That Changes Does Not Decrease Effectiveness of EP ML20209H5411999-07-15015 July 1999 Forwards Insp Rept 50-482/99-07 on 990614-18.No Violations Noted.Insp Focused on Radiation Program During Normal Operating Conditions ML20209H0441999-07-14014 July 1999 Forwards Response to NRC 990326 RAI Re GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Movs. Summary of Util Commitments Provided in Attachment 2 ML20209H0751999-07-14014 July 1999 Forwards Monthly Operating Rept for June 1999 for Wolf Creek Generating Station,Per TS 6.9.1.8 & GL 97-02.Max Dependable Capacity Has Been Updated from 1163 to 1170,as Determined by Calculations Based on Capacity Test Results of July 1998 ML20209G9871999-07-14014 July 1999 Informs of Changes Affecting Wolf Creek Security Plan,Per 10CFR50.54(p)(2).Encl Provides Description of Changes & Justification for Changes ML20209E3581999-07-12012 July 1999 Discusses Util 980925 Response to GL 92-01,Rev 1,Suppl 1, Rv Structural Integrity, Issued on 950519 to Wolf Creek Generating Station ML20209E0611999-07-0808 July 1999 Forwards Addl Pages to Rev 12 of USAR & Commitment Changes, Inadvertently Omitted from 990311 Submittal ML20196K8231999-07-0606 July 1999 Submits Kansas Electric Power Cooperative,Inc Ltr Pursuant to Commission Direction in Memo & Order CLI-99-19.Addresses Disposition of Existing Antitrust Conditions Attached to License for Wolf Creek Unit 1 Re Proposed License Transfer ML20209C6031999-07-0606 July 1999 Provides Applicants View as Result of 990618 Memo & Order Directing Parties to Address Proper Disposition of Existing Antitrust License Condition Attached to OL for Facility Due to Planned Changes in Ownership of Facility.With Svc List ML20196K0501999-07-0202 July 1999 Forwards Insp Rept 50-482/99-06 on 990502-0612.Three Violations Occurred & Being Treated as Noncited Violations, Consistent with App C of Enforcement Policy ML20209B7131999-07-0101 July 1999 Submits Response to NRC Request for Info Re GL 98-01, Suppl 1, Y2K Readiness of Computer Sys at Npps. Response on Status of Facility Y2K Readiness Was Requested by 990701.Disclosure Encl ML20209A7461999-06-29029 June 1999 Informs of Changes in Project Mgt Staff Assigned to Wcgs. Effective 990628,J Donohew Will Assume PM Responsibilities ML20209B5151999-06-29029 June 1999 Informs That Util Completed Analyses & Modifications to Address Items Discussed in GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Conditions 1999-09-03
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEAR05000482/LER-1994-014, Forwards LER 94-014-00 Re Util Identification of Missed Surveillance Required by TS Prior to Changing Modes.List of Commitments Made by Licensee,Encl1999-10-15015 October 1999 Forwards LER 94-014-00 Re Util Identification of Missed Surveillance Required by TS Prior to Changing Modes.List of Commitments Made by Licensee,Encl 05000482/LER-1999-002, Forwards LER 99-002-00,re Identification of Surveillance Performed in Modes Other than Those Required by TS SR 4.6.3.2.a.Commitments Made by Util Are Encl1999-10-15015 October 1999 Forwards LER 99-002-00,re Identification of Surveillance Performed in Modes Other than Those Required by TS SR 4.6.3.2.a.Commitments Made by Util Are Encl ML20217A4881999-09-29029 September 1999 Forwards Changes to Plant Data Point Library,Iaw 10CFR50,App E,Section VI.3.a.ERDS Point Affected Is RDS0001 ML20212G1681999-09-24024 September 1999 Notifies NRC of Change in Status of Licensed Individual at Plant,Per 10CFR50.74.RL Acree Holds License OP-42654 at Plant,But Has Been Permanently Reassigned from Position for Which Plant Has Certified Need for RO License 05000482/LER-1999-011, Forwards LER 99-011-00 Re Identification of Missed Surveillance Due to Exceeding Flow Rate Specified in TS for Ccps.List of Util Commitments Contained in Attachment I1999-09-17017 September 1999 Forwards LER 99-011-00 Re Identification of Missed Surveillance Due to Exceeding Flow Rate Specified in TS for Ccps.List of Util Commitments Contained in Attachment I 05000482/LER-1999-010, Forwards LER 99-010-00,re Failure to Correctly Perform TS Surveillance 4.3.3.6.Encl Identifies Actions Committed to by Util1999-09-16016 September 1999 Forwards LER 99-010-00,re Failure to Correctly Perform TS Surveillance 4.3.3.6.Encl Identifies Actions Committed to by Util 05000482/LER-1999-006, Forwards LER 99-006-01,re Identification of Failure to Enter LCO for TS 3.6.1.1 While Taking Containment Atmosphere Samples During Power Operation.Commitments Made by Util Are Encl1999-09-15015 September 1999 Forwards LER 99-006-01,re Identification of Failure to Enter LCO for TS 3.6.1.1 While Taking Containment Atmosphere Samples During Power Operation.Commitments Made by Util Are Encl ML20212C9211999-09-15015 September 1999 Forwards NRC Form 536, Operating Licensing Examination Data, in Response to NRC Administrative Ltr 99-03 05000482/LER-1999-009, Forwards LER 99-009-00 Re Util Identification of Fire Suppression Issue Affecting Safe Shutdown Components. Attachment I Identifies Actions Committed to by Licensee in Encl LER1999-09-10010 September 1999 Forwards LER 99-009-00 Re Util Identification of Fire Suppression Issue Affecting Safe Shutdown Components. Attachment I Identifies Actions Committed to by Licensee in Encl LER 05000482/LER-1999-008, Forwards LER 99-008-00,re Efsa at Plant.Attachment I Identifies Actions Committed to by Licensee in LER1999-09-0303 September 1999 Forwards LER 99-008-00,re Efsa at Plant.Attachment I Identifies Actions Committed to by Licensee in LER ML20211M7151999-09-0303 September 1999 Forwards Changes to Wolf Creek Generating Station Data Point Library.Emergency Response Data Sys Points Affected Are EJL0007 & EJL0008 ML20211K8301999-09-0202 September 1999 Forwards marked-up TS Page Deleting Inequality Signs from Trip Setpoints in SR 3.3.5.3 & Reflecting Info on Calibr Tolerance Band,Per 990708 Application to Amend License NPF-42 ML20211K1941999-08-31031 August 1999 Forwards Rev 31 to WCGS Physical Security Plan,Safeguards Contingency Plan & Training & Qualification Plan,Iaw 10CFR50.54(p).Encl Withheld,Per 10CFR73.21 ML20210U9751999-08-13013 August 1999 Informs That Licensee Identified That Answer Key for One Question on 990720 Written Exam & Event Classification for on Job Performance Measure Required Mod.Description & Justification for Proposed Mod,Including Technical Ref,Encl ML20210R5621999-08-12012 August 1999 Forwards Monthly Operating Rept for July 1999 for Wolf Creek Generating Station,Per TS 6.9.1.8 & GL 97-02.Revised Repts for Apr,May & June 1999,correcting Number of Hours Reactor Critical,Encl ML20210N0061999-08-0303 August 1999 Forwards Response to NRC 990401 RAI Re GL 95-07, Pressure Locking & Thermal Binding of SR Motor-Operated Gate Valves ML20210J1371999-07-29029 July 1999 Requests NRC Approval of Methodology for Determining RCS Pressure & Temp & Overpressure Mitigation Sys PORV Limits. Attachment I Provides Proposed Changes to Improved TS ML20210H2551999-07-29029 July 1999 Provides 180-day Response to NRC Request for Info Re GL 99-02, Lab Testing of Nuclear-Grade Activated Charcoal ML20210F5931999-07-27027 July 1999 Forwards semi-annual Fitness for Duty Performance Data Rept for Wcnoc,Per 10CFR26.71(d).Rept Covers Period of 990101- 0630 ML20210F5881999-07-23023 July 1999 Submits Response to Administrative Ltr 99-02, Operator Reactor Licensing Action Estimates, ML20209G9871999-07-14014 July 1999 Informs of Changes Affecting Wolf Creek Security Plan,Per 10CFR50.54(p)(2).Encl Provides Description of Changes & Justification for Changes ML20209H0441999-07-14014 July 1999 Forwards Response to NRC 990326 RAI Re GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Movs. Summary of Util Commitments Provided in Attachment 2 ML20209H0751999-07-14014 July 1999 Forwards Monthly Operating Rept for June 1999 for Wolf Creek Generating Station,Per TS 6.9.1.8 & GL 97-02.Max Dependable Capacity Has Been Updated from 1163 to 1170,as Determined by Calculations Based on Capacity Test Results of July 1998 ML20209E0611999-07-0808 July 1999 Forwards Addl Pages to Rev 12 of USAR & Commitment Changes, Inadvertently Omitted from 990311 Submittal ML20209C6031999-07-0606 July 1999 Provides Applicants View as Result of 990618 Memo & Order Directing Parties to Address Proper Disposition of Existing Antitrust License Condition Attached to OL for Facility Due to Planned Changes in Ownership of Facility.With Svc List ML20196K8231999-07-0606 July 1999 Submits Kansas Electric Power Cooperative,Inc Ltr Pursuant to Commission Direction in Memo & Order CLI-99-19.Addresses Disposition of Existing Antitrust Conditions Attached to License for Wolf Creek Unit 1 Re Proposed License Transfer ML20209B7131999-07-0101 July 1999 Submits Response to NRC Request for Info Re GL 98-01, Suppl 1, Y2K Readiness of Computer Sys at Npps. Response on Status of Facility Y2K Readiness Was Requested by 990701.Disclosure Encl ML20209B5151999-06-29029 June 1999 Informs That Util Completed Analyses & Modifications to Address Items Discussed in GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Conditions ML20196G9681999-06-22022 June 1999 Informs NRC That BC Ryan Will Be Leaving Ks State Univ for Position with Wolf Creek Nuclear Operating Corp,Effective 990701 05000482/LER-1999-007, Forwards LER 99-007-00,re Condition in Which Wolf Creek Generating Station TS 3.3.2 Was Not Met.Commitments Made by Util Also Encl1999-06-18018 June 1999 Forwards LER 99-007-00,re Condition in Which Wolf Creek Generating Station TS 3.3.2 Was Not Met.Commitments Made by Util Also Encl ML20196A0251999-06-17017 June 1999 Requests That Written Exams for Reactor Operator & SRO for Plant Be Administered Beginning Wk of 990719 & Followed by Operating Exam During Wk of 990726 to Personnel Listed in Attachment.Proprietary Info Encl.Proprietary Info Withheld ML20195K0641999-06-15015 June 1999 Forwards MOR for May 1999 for Wolf Creek Generating Station & Corrected Page 2 of 2 of Apr 1999 Mor,Adding That Unit Entered Intomode 5 for Restart During Month of Apr & Correcting Shutdown Duration Hours from 672 to 671 ML20195G4391999-06-11011 June 1999 Provides Details for Missed Rept Re 10CFR50.46 Thirty Day Rept of ECCS Model Revs.Attachment I Provides Summary of Commitments Made in Submittal 05000482/LER-1999-005, Forwards LER 99-005-00,re Esfa.Commitments Made by Util Are Encl1999-06-11011 June 1999 Forwards LER 99-005-00,re Esfa.Commitments Made by Util Are Encl 05000482/LER-1997-027, Forwards LER 97-027-00 Re Identification of Missed Surveillance Required by TS 4.3.3.5.2.Encl 1 Identifies Actions Committed to by Util1999-06-0404 June 1999 Forwards LER 97-027-00 Re Identification of Missed Surveillance Required by TS 4.3.3.5.2.Encl 1 Identifies Actions Committed to by Util ML20195B9811999-05-26026 May 1999 Forwards 1998 Annual Repts for Ks Electric Power Cooperative Inc,Ks City Power & Light Co & Western Resources,Inc, Including Wholly Owned Subsidiary Kg&E Co ML20196L3361999-05-18018 May 1999 Forwards Rev 1 to Cycle 11 COLR for WCGS, IAW TS Section 6.9.1.9 05000482/LER-1999-004, Forwards LER 99-004-00 Re Failure to Maintain Containment Closure During Fuel Movement as Required by TS 3.9.4.c. Attachment I to Ltr Identifies Actions Committed to by Plant in Encl LER1999-05-12012 May 1999 Forwards LER 99-004-00 Re Failure to Maintain Containment Closure During Fuel Movement as Required by TS 3.9.4.c. Attachment I to Ltr Identifies Actions Committed to by Plant in Encl LER ML20206Q8141999-05-11011 May 1999 Requests NRC Work with Industry to Resolve Generic Changes to Allow Permanent Change to TSs Prior to June 2000.Encl Provides TS Limited Duration Action Statement Until 990930 05000482/LER-1999-003, Forwards LER 99-003-00,re Failure to Perform TS SR 4.9.2.c Prior to Entering Mode 6.Commitments Made by Util Are Encl1999-05-10010 May 1999 Forwards LER 99-003-00,re Failure to Perform TS SR 4.9.2.c Prior to Entering Mode 6.Commitments Made by Util Are Encl ML20206K5141999-05-0707 May 1999 Provides Info Re Number of Tubes Plugged in Each Sg,As Required by TS 4.4.5.5.ISI of SGs B & C Completed on 990424,resulting in Mechanical Plugging of One Tube in SG B & Five Tubes in SG C ML20206J0711999-05-0505 May 1999 Forwards Guarantees of Payment of Deferred Premiums for Owners of Wolf Creek Generating Station,As Required by 10CFR140.21 ML20206D9551999-04-29029 April 1999 Forwards 1999 Annual Radioactive Effluent Release Rept 22, for Reporting Period Jan-Dec 1998,per Section 6.9.1.7 of WCGS Ts.Attachment to Ltr Identifies Commitments Resulting from Correspondence ML20206C7321999-04-22022 April 1999 Provides Notification of Changes at WCGS Affecting Plant Physical Security Plan,Per 10CFR50.54(p).Changes Identified in Attachment I Will Be Incorporated Into Plan by 990831. Commitments Made by Util Are Included in Attachment II ML20206B2051999-04-20020 April 1999 Forwards Revs to RERP Implementing Procedures,Including Rev 1 to EPP 06-001, CR Operations, Rev 1 to EPP 06-002, TSC Operations, Rev 3 to EPP 06-004, Public Info Organization & Rev 1 to EPP 06-005, Emergency.. ML20205L7431999-04-0606 April 1999 Confirms 990401 Telcon with NRC Re Late Payment Notice That Util Received for Invoice RL0295-99.Licensee Understands Invoice to Be Cancelled ML20205F1601999-03-30030 March 1999 Forwards Rept Re Status of Decommissioning Funding for WCGS, Per 10CFR50.75.Kansas Gas & Electric Co Decommissioning Trust Agreement,Encl ML20205K9481999-03-26026 March 1999 Responds to NRC Ltr Re Violations Noted in Insp Rept 50-482/98-05.Corrective Actions:Training Was Provided to Mrep Members Through Use of Contract Individual Experienced in Maint Rule Programs.Change to Commitment Date,Encl ML20196K7261999-03-26026 March 1999 Forwards Certified Copy of ITS & ITS Bases,As Committed in Licensee to Nrc.Summary of Editorial Corrections, Also Encl ML20205A1961999-03-25025 March 1999 Provides Suppl 2 to 970515 Application for Amend to License NPF-42,providing Changes to TS Based on 990310 & 19 Discussions with NRC Re Conversion to Improved TS 1999-09-03
[Table view] |
Text
-
4 h
W@ NUCLEAR LF CREEK OPERATING COR John A Bailey
- vice Prwoent August 17, 1992 omranons NO 92 0246
- 11. S. Nuclear Regulatory Commission ATTN . Document Control Desk Hail Station P1-137 Washington, D. C. 20555
Reference:
Letter NO 92-02'47 dated August 17, 1992, from J. A. <
Bailey, WCNOC to the II . S. Nuclear Regulatory Cormisalon-
Subject:
Docket No. 50-482: Request for NRR Temporary Walver of Compliance- -
Technical Specification Surveillance Requirement 4.3.1.1 Gentlemetu The- purpose of_this letter _is to confirm the results of a teleconference on Friday . August 14, 1992 at approximately 1415 CDT, in which Wolf Creek Nuclear Operating Corporation-(WCNOC) requested and the NRC staff granted a Temporary Waiver of Compliance from the requirement - of Technical Specification Surveillance Requirement _4.3.1.1 Table 4.3-1. This waiver permits continued plant operation while an Emergency Technical E, cification change is considered by the NRC Staff. _
On August' 14 , - 1992, _ at -approximately-- 1130 CDT, -a review of industry
. operation experience and % :ussions with a_ plant similar to Wolf Creek Generating Station (WCGS) had determined- a need to request a Temporary Waiver-of Compliance for _the -above surveillance requirement. Current procedures independently test the-' shunt trip and undervoltage trip functions at the breakers but do not test _the control room manual reactor trip _ switch trip. shunt contact closure. -A review of WCGS procedures and plant records determined that it was likely that; no other surveillance procedures had accomplished the intended testing, The Attachment. provides WCNOC's evaluation of the- potential safety implications of.this temporary waiver of compliance and-concludes that there _
will be no significant decrease in plant safety or the level of protection
- afforded the health and safety of the public. This- proposed _ temporary- _
waiver of- compliance- has been reviewed and approved by the Plant Safety Review Committee. ,
nnnomn 9208210169 920817 f PDR ADOCK 05000482 gj P POR l PO, Box 411/ Burlington, KS 66639 i Phm.e; (316) 364 8831 a8 l
' An Equal opportunriy Employer M r HOYET 6
. 30 92-0246
- Page-?. of-2 The reference tranwitted a emergency Technical Specification change to sutvelliance requirement 4.3.1.1.
If you have any questions concerning this matter, please contact me or Hr. Kevin_J. Moles of my staff.
Very truly yours,
% [, 1/1 (,1 LIA %
John A. Bailey i
/
Vice President
. Operations- -
< JAB /jra Attachment cc A. T. Howell_(NRC), w/a
-J.=L. Hilhoan (NRC), w/a G.'A. Pick _(NRC), w/a W. D. Reckley (NRC). v/a k
r
+
m__ ind
l . Attachment to NO 92 0246 Page 1 of 3 REQUEST FOR T}MPORARY WAIVER OF COMPLIANCE SPECIFIC REQUIRFHENTS FOR WHICH A TEMPORARY WAIVER IS REQUIRED Technical Specification 3.3.1 and the associated Surveillance 4.3.1.1 provide surveillance requirements for the Reactor Trip System Instrumentation. Table 4.3-1, Functional Unit 1 (Manual Reactor Trip) requires a surveillance every 18 months to independently verify operability of the shunt trip and undervoltage trip circuits for the manual trip function. A review of the current surveillance procedures indicate that, although the undervoltage and shunt trip functions are independently verified at the breaker, the control room manual reactor trip switch shunt trip contact clo are is not specifically verified. The temporary waiver of compliance (TWOC) is necessary because Technical Specification 4.0.3 requires that failure to perform Surveillance Requirement 4.3.1 within the allowed surveillance interval constitutes a noncompliance with the operability requirements for a Limiting Condition for Operation of the reactor trip system. This would require the plant to be placed in Mode 3 Hot Standby, pursuant to Technical Specification 3.0.3, within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.
CIRCUMSTANCE LEADING TO NEED FOR TEMPORARY WAIVER On August 14, 1992 at approximately 1130 CDT, a review of industry cperation experience and discussions with a plant similar to Wolf Creek Generating Station (WCGS) had determined a need to request a Temporary Waiver of Compliance for the above surveillance requirement. Current procedures independently test the shunt trip and undervoltage trip functions at the breakers but do not test the control room manual reactor trip switch trip shunt contact closure. A review of WCGS procedures and plant records determined that it was likely that no other surveillance procedures had accomplished- the intended testing. Failure to-find sufficient information to indicate that the surveillance requirements had been met would have required the plant to be placed in Mode 3, pursuant to Technical Specification 3.0.3, within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.
COMPENSATORY ACTIONS There is no evidence that any manual reactor trip switch hardware is inoperable. The automatic reactor trip functions meet all current surveillance requirements. WCGS Emergency Operating Procedure FR-S1,
" Response to Nuclear Power Generation /ATWT," lists alternate means of manually tripping the reactor if the manual trip switches fail. All operating crews will perform essential reading to increase their awareness of this situation. Additionally, Anticipated Transient Without Scram (ATWS) training is included in annual licensed operator training on the plant simulator.
, Attachment to 110 92 024f Page 2 of 3
^
SAFETY SICNIFICANCE AND POTENTIAL CONSEQUENCES An Emergency Technical Specification change to defer the required nurveillance until the next planned or unplanned entcy inte Mode 3 in being subiaitted in the above referenced letter. The safety eveluetion for that change (Attachment I to letter NO 92-0247) is applicable t o this TWOC.
f.ince the requested action does not involve operation with deh eded or non-functional equipmer;t , the =afety impact is minimal. Independent verification of the manual shurt trip was performed during pre-operational testing. At leart once per 16 months, opening of both reactor trip breakers has been initiated by use of one of the two manual reactor trip switches in the Control Room. This operation Joes nut vtrify that both the shunt and undervoltage features function independertly. However, it does verify that the trip breakers would be opened by at least one of the two diverse means required. Credit for the manual trip is taken only as a back-up to the automatic reactor trip functions in Chapter 15 of the WCCS Updated Safety Analysis Report (USAR). Alternate means of shutting down the reactor if the manual switches oa main control board panels RbOO3 and RLOO6 do not I function, are listed in Emerp<.cy Operating Procedure FR-S1. These l includes manual operation ..'m che control room of the breakers supplying holding power to the control rods: local operations of the reactor trip breakers: manual rod insertions and immediate boration.
SIGNIFICANT HAZARDS CONSIDERATION DETFRMINATION The TWOC does not involve a significant hazards consideration because operation of WCGS in accordance with this change would not:
- 1. Involve a significant increase in the probability or consequences of an accident! previously evaluated.
The manual reactor trip function Trip Actuating Device Operational Test (TADOT) was correctly performed during pre-aperational testing (Pre-operational Test Procedure SU3-SB01). Since that time, due to procedural-inadequacy the manual trip surveillances did not verify the operation of control room -switch shunt contacts. Although the surveillance testing did not adequately test this portion of the manual reactor trip function, there is no reason te believe that any element of the manual trip function is not functional. If manual actuation of the shunt failed to operate, the diversity and redundancy of the reactor protection system would still enable it to perform its design function.
-The accidents evaluated in Chapter 15 of the WCGS USAR rely on the automatic trip function of the Reactor Protection System. No credit is assumed for the manual trip function. Furthermore, all surveillances performed on the automatic trip functions, with the independent verification of undervoltage trip attachment coil de-energization and shunt trip attachment energization vi.a the closing of the shunt trip relay contact, have been performri correctly. Therefore, since the response of the plant to an accident is un: hanged, there is no significant increase in either the probability or consequences of an accident previously evaluated.
,. Attachment to NO 02 0246 Page 3 of 3
- 2. Create the possibility of a new or different kind of accident from any previously evaluated.
The TWOC does not involve any design changes or harduate modifications ner will thero be any changes to the intended manner of plant operation or in the method by which any safety-related plant system performs its safety function. No new accident initiators, transient precursors, failure mechanisms, or limiting single failures are introduced as a result of this change.
l
- 3. Involve a significant reduction in a margin of safety.
The TWOC does not alter the manner in which safety limits or limiting safety system settings are determined. The TWOC will have no effect on those plant systems necessary to assure the accomplishment of protection functions and meet the accident analysis acceptance criteria in Chapter 15 of the WCGS USAR. There will be no impact on Departure from Nucleate 1
Bolling Ratio limits, F , F-delta-H. Loss of Coolant Accident-Peak Clad Temperature,oranyoth0rdefinedsafetymargin.
INVIRONMENTAh CONSEQUENCES The propased TWOC involves no environmental consequences. There is no impact to accident analysis or consequences, nor does it impact systems associated with control of radiological or non-radiological effluents.
DURATION Relief from the surveillance requirements of Technical Specification 4.3.1.1, Table 4.3-1, Functional-Unit 1 for the Control Room reactor trip switch shunt trip circuits is requested until an Emergency Technical Specification change is granted. That change would allow operation until the next entry into Mode 3 to perform the surveillance and would obviate the
-.eed for this waiver. As discussed above, there is minimal safety impact of continued operation without the surveillar.ce being current since tne undervoltage trip functions of the reactor manual trip switches are tested.
Additionally, the cross trip of the shunt trip on undervoltage trip is tested on a stagger'ed test basis as required per Technical Specifications.
A manual trip switch has been demonstrated to trip the RTBs during each refueling outage.
l 1