Interim Deficiency Rept DER 84-09 Re Cad Welding for Cathodic Protection Ground Connection.Initially Reported on 840229.Due to Extensive Investigation & Evaluation Required, Final Rept Delayed Until 840731
ML20091S342
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 06/04/1984
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Bishop T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
ANPP-29647-TDS, DER-84-09, DER-84-9, NUDOCS 8406180202
Download: ML20091S342 (2)


Text

- .

r n n n - !

.- a a

.O-v ,t a:.mai = cy Arizona Public Service Company 3 '; P ,,

June 4, 1984 ANPP-29647-TDS/TRB U. S. Nuclear Regulatory Commission Region V Creekside Oaks Office Part 1450 Maria Lane - Suite 216 Walnut Creek, CA 94596-5368 Attention: Mr. T. W. Bishop, Director Division of Pesident Reactor Projects and Engineering Programs

Subject:

Time Exis.nsion For Report - DER 84-09 A 30.55(e) Potentially Reportable Deficiency P. elating To CAD Welding For Cathodic Protection Ground Connection File: 84-019-026; D.4.33.2

Reference:

(A) Telephone conversation between R. Dodds and T. Bradish on February 29, 1984 (B) ANPP-29142, dated March 23, 1984 (Interim Report)

(C) ANPP-29383, dated April 30, 1984 (Time Extension)

Dear Sir:

The NRC was notified of a potentially reportable deficiency in Reference (A), an Interim Report was tracamitted by Reference (B), and a Time Extension was requested by Reference (C). At that time, it was estimated that s Final Report would be avail.able by June 8,1984 Due to the extensive investigation and evaluation required, it is now expected that this information will be finalized by July 31,1984, a t which time a complete report will be submitted.

There is no new informat'on or change to the Interim Report at this time.

Very truly yours, h j E. E. Van Brunt, Jr.

APS Vice President Nuclear Production ANPP Project Director EEVB/TRB:ru cc: See Page Two 0406180202 840604 PDR ADOCK 05000529 s PDR

.TE47ep

, ,o Mr. T. W. Bishop DER 84-09 Page Two ec: Richard DeYoung, Director Office of Inspection and Enforcement U. S. Nuclear-Regulatory Commission Washington, D. C. 20555 T. G. - Wbods, Jr.

D. B. Karner W..E. Ide D. B. Fasnacht A. C. Rogers L. A. Souza B. S. Kaplan D. E. Fowicr T. D. Shriver J. Voreen J. R. Bynum J. M. Allen J. A. Erand A. C. Gehr W. J. Stubbleficid W. G. Binghaw R. L. Patterson R. W. Welcher H. D. Foster D. R. Hawkinson t L. E. Vorderbrueggen G. A. Fiore111

5. R. Frost J. Self D. Canady Records Center i- Institute of Nuclear Power Operations 1100 circle 75 Parkway, Suite 1500 Atlanta, GA 30339

_ _ . . _ _ _ _ , _ . . _ _ _ _ - , . ,.-