Interim Deficiency Rept DER 83-49 Re Broken Impeller Blades & Diffuser Bolts Broken/Loose in Reactor Coolant Pumps. Initially Submitted on 830715.Final Rept Will Be Submitted by 840815,not 840615 as Scheduled
ML20092G809
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 06/11/1984
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Bishop T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
ANPP-29713-TDS, DER-83-49, NUDOCS 8406250245
Download: ML20092G809 (2)


Text

-

y

,4 TECE m

~ r; Arizona Public Service Company 3 Ji I!! P? !: (r June 11, 1984._

ANPP-29713-TDS/IRB ' '

U. S. Nuclear Regulatory Commission Region V Creeksidg Oaks Office Park 1450 Maria Lane - Suite 210 Walnut Creek, CA 94596-5368 Attention: Mr. T. W. Bishop, Director Division of Resident Reactor Projects and Engineering Programs

Subject:

Time Extension For Report - DER 83-49 A 50.55(e) Potentially Reportable Deficiency Relating To Broken Impeller Blades And Diffuser Bolts Broken / Loose In Reactor Coolant Pumps.

~

File: 84-019-026; D.4.33.2

Reference:

(A) Telephone conversation between P. Narbut and R. Tucker on July 15, 1983 (B) Telephone conversation between T. Young and R. Tucker.on July 18, 1983 (C) ANPP-27593, dated August 19, 1983 (Interim Report)

(D) ANPP-28734, dated January 27, 1984 (DER 83-50 Interim Report, Revision 1)

(E) ANPP-28733, dated January 27,1984 (Interim Report, Revision 1)

(F) ANPP-28313, dated November 29, 1983 (Time Extension)

Dear Sir:

The NRC was notified of a potentially reportable deficiency in Reference (A) and (B), Interim Reports were transmitted by Reference (C),

(D) and (E) and a Time Extension was requested by Reference (F). At that time, it was estimated that a Final Report would be available by June 15, 1984.

Due to the extensive investigation, testing and evaluation required, it is now expected that this information will be finalized by August 15, 1984, at which time a complete report will be submitted.

There is no new information or change to the Interim Report at this time.

I Very truly our yo.,@tr

, GL g E. E. Van Brunt, Jr. i

  • APS Vice President 8406250245 840611 Nuclear Production DR ADOCK 05000528 PDR ANPP Project Director EEVB/IRB:db-cc: See Page Two 1

W-3

o

, g ka l, Mr. T. W. Bishop DER 83-49 Page Two e c: - Richard DeYoung, Director Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission

-Washington, D..C. 20555 T. G. Woods, Jr.

D. B. Karner W. E. Ide D. B. Easnacht A. C. Rogers L. A. Souza D. E. Fowler T. D. Shriver C.'N. Russo J. Vorees.

J. R. Bynum J. M. Allen J. A. Brand. '

A. C. Gehr W. J. StubblefieldL W. G. Bingham R. L. Patterson R. W. Welcher H. D. Foster D. R. Hawkinson L. E. Vorderbrueggen G. A. Fiore111

'S. R. Frost J. Self D. Canady Records Center Institute of Nuclear Power Operations 1100 Circle 75 Parkway, Suite 1500 Atlanta, GA 30339