Forwards Vols 1 & 2 of Inservice Insp Final Rept Third Maint/Refueling Outage (Period 2/Interval 1)
ML20092L473
Person / Time
Site: Vogtle Southern Nuclear icon.png
Issue date: 02/13/1992
From: Mccoy C
GEORGIA POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20092L476 List:
References
MSV-00876, MSV-876, NUDOCS 9202260291
Download: ML20092L473 (2)


Text

  • '

c,w -cm,r

. .o me, ce . nw u ,

PMt Q'.(e Das Ce, D.7a v ;r

- id.. i .a P , ' '

h pn ,s,pt n

c.( uccov, e.r, m - my Geolgia power u . rm m ,% .

February 13, 1992 MSV-00876

  1. 3021 Docket No. 50-424 U. S. Nuclear Regulatory Commission ATTH: Document Control Desk Washington, D. C. 20555 Gentlemen:

V0GTLE ELECTRIC GENERATING PLANT 1![SIRVICE INS?ECTION

SUMMARY

REPORI Enclosed are Volumes 1 and 2 of the Vogtle Electric Generating Plant, Unit 1 (VEGP-1) Inservice Inspection (ISI) Final Report which constitute the

" Owner's Report for Inservice Inspection (Form NIS-1)" required by Subsubarticle IWA-6230 of the Amarican Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code,Section XI, 1983 Edition with Addenda through Summer 1983. Inservice inspection activities which were conducted at VEGP-1 during the Fall 1991 maintenance / refueling outage are discussed therein. Also included therein are "0wner's Reports for Repairs or Replacements (Form N:S-2)" for repairs and/or replacements documented at VEGP-1 from the end of the previous maintenance / refueling outage through the Fall 1991 maintenance / refueling outage. In addition, several NIS-2 reports on repairs and/or replacements which were inadvertently omitted from the previous VEGP-1 inservice inspection summary reports are specifically identified in the enclosed Volume 2. Volumes 3 through 7 of the ISI Final Report contain information not typically provided in the

" Owner's Report for Inservice Inspection (Form N!S-1)"; e.g., personnel certifications, nendestructive examination procedures, etc., and are not included herein. Volumes 3 through 7, however, are available for review upon request at the plant site.

With regard to the NIS-? reports on rept rs and/or replacements, only the completed NIS-2 forms are being submitted. Any attachments, e.g., code data reports, etc., that are referenced in the completed NIS-2 forms will be made available for review upon request at the plant site.

Contained in the VEGP-1 "0wner s Report for Inservice Inspection (Form NIS-1)" is a discussion on the inspection of steam generator tubes performed during the Fall 1991 maintenance / refueling outage. That discussion constitutes the Special Report required by VEGP Technical Specification 4.4.5.5.b to be submitted to the U. S. Nuclear Regulatory Commission (USNRC) within 12 months following completion of the steam generator tube inspection. Accordingly, there will not be a separate submittal made to the USNRC on the inspection of the steam generator tubes performed during the subject outage. By copy of this letter, the appropriate USNRC .7egional Administrator is being provided copies of the L

9202260291 920213 gDR ADOCK 0500 4

(/

[ hh a

- , .. . .~ - .- . . . . . - . - . . . . - . . - - . . - .. - - _- .-

']

, U.' S. Nuclear Regulatory Commission MSV-00876 Page 2 enclosed report volumes; thus, compliance with the requirements of VEGP Technical Specification 6,8.2 for submittal of Special Ecports to the appropriate Regional Administrator is met.

Five copies of Volumes 1 and 2 of the ISI final Report 1or the Fall 1991 maintenance / refueling outage are provided fcr your review. Two copies of the subject report volumes are reing provided to the Regional Administrator for USNRC Region I!.

Should there be any questions in this regard, please contact this office.

Sincerely, C. K. McCoy CKM/JAE/gb h

Enclosures:

Volumes 1 and 2 of VEGP-1 ISI Final Report, Third

  • aintenance/ Refueling Outage (Period 2/ Interval 1) xc: Georaia Power Comcany Mr. S. H. Chesnut (w/o encl.)

Mr..M. Sheibani (w/o' encl.)

.Mr. W. B. Shipman (w/o encl.)

NORMS (w/ericl.)

.U. S. Nuclear Reaulatory Commission Mr. S. D. Ebneter, Regional Administrator (w/ encl.)

Mr. D. S. Hood, Licensing Project Manager, NRR (w/ encl.)

Mr. B. R. Bonser, Senior Resident ~ Inspector, Vogtle (w/ encl.)

.. .