Interim Deficiency Rept DER 84-09 Re CAD Welding for Cathodic Protection Ground Connection.Initially Reported on 840229.Final Rept Will Be Submitted by 840830
ML20094G491
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 07/27/1984
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Bishop T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
ANPP-30060-TDS, DER-84-09, DER-84-9, NUDOCS 8408130332
Download: ML20094G491 (2)


Text

. So -SM

-9.

- FICEIVED NRC

. Arizona Public Service Company GB4 !E -l PH 2: !7 July 27,1984 DDE ANPP-30060-TDS/TRB U. S. Nuclear Regulatory Commission Region V Creekside Oaks Office Park

'1450 Maria Lane - Suite 210 Walnut Creek, CA 94596-5368 Attention: Mr. T. W. Bishop, Director Division of Resident Reactor Projects and Engineering Programs

Subject:

Time Extension For Report - DER 84-09 A 50.55(e) Potentially Reportable Deficiency Relating To CAD Welding For Cathodic Protection Ground Connection.

File: 84-019-026; D.4.33.2

Reference:

(A) Telephone conversation between R. Dodds and T. Bradish on February 29, 1984 (B) ANPP-29142, dated March 23, 1984 (Interim Report)

(C) ANPP-29383, dated April 30, 1984 (Time Extension)

(D) ANPP-29647, dated June 4,1984 (Time Extension)

Dear Sir:

The NRC was notified of a potentially reportable deficiency in

-Reference (A), and an Interim Report was transmitted by Reference (B),

and Time Extensions were requested by Reference (C) and (D). At that time, it was estimated that a Final Report would be available by July 31,1984.

A Final Report has been submitted to APS for review. It is expected the review and submittal of a Final Report will be completed by August 30, 1984.

Very truly yours,

~.

b- -

COL ( \ mL(

E. E. Van Brunt, Jr.

APS Vice President Nuclear Production ANPP Project Director >

EEVB/TRB:db cc See Page Two l

l l

8408130332 840727 gig PDR ADOCK 05000528 l 8 PM L 1627

Mr. T. W. Bishop DER 84-09 Page Two ec: Richard DeYoung, Director Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555 T. G. Woods, Jr.

D. B. Karner W. E. Ide D. B. Fasnacht A. C. Rogers -

L. A. Souza D.-E. Fowler T. D. Shriver C. N. Russo J. Vorees J. R. Bynum J. M. Allen J. A. Brand A. C. Gehr W. J. Stubblefield W. G. Bingham R. L. Patterson R. W. Welcher H. D. Foster D. R. Hawkinson L. E. Vorderbrueggen R. P. Zimmerman S. R. Frost J. Self M. Woods T. J. Bloom Records Center Institute of Nuclear Power Operations 1100 circle 75 Parkway, Suite 1500 Atlanta, GA 30339 L