Rev 1 to Administrative Procedure AP C-253, Process Control Program
ML20098H492
Person / Time
Site: Diablo Canyon Pacific Gas & Electric icon.png
Issue date: 05/08/1984
From:
PACIFIC GAS & ELECTRIC CO.
To:
Shared Package
ML16341A247 List:
References
AP-C-253, NUDOCS 8409130009
Download: ML20098H492 (11)


Text

l

- NUMBER AP C-253

FGE'E Pacific Gas and Electric Company REVISION 1 A DATE 5/8/84 DEPARTMENT OF NUCLEAR PLANT OPERATIONS

( DIABLO CANYON POWER PLANT UNIT NO(S) 1 AND 2 ADMINISTRATIVE PROCEDURE PROCESS CONTROL PROGRAM l

TITLE:

APPROVED:

PLANT MANAGER DAlt IMFCPit,NT TO SCOPE ENVIRONNENTAL QUAlfrY The purpose of the Process Control Program (PCP) is to define the necessary program guidance used at DCPP to ensure that SOLID RADI0 ACTIVE WASTE MANAGEMENT activities, in packaging radioactive waste for disposal, confonn to the Code of Federal and State Regulations and the Waste Burial Site License Criteria.

RESPONSIBILITIES

1. The Plant Manager has the overall responsibility for the Solid Radioactive Waste activities at DCPP.
2. The Manager of Chemistry and Radiation Protection is responsible

( for the implementation of the requirements of this procedure.

3. The Radwaste Engineer is responsible for the development and implementation of procedures relating to the requirements of this procedure.
4. QC is responsible for verification of compliance with the Quality

, requirements.

PREREQUISITES This procedure with the attachments and any changes thereto requires review by the Plant Staff Review Committee and submission to the U. S.

N. R. C. in the Semi-annual Effluent Report for the period in which the changes were made.

PROCEDURE

1. GENERAL It is the policy of Pacific Gas and Electric Company to conscientiously apply emphasis and attention to those activities associated with generation, processing, packaging, storage and disposal of radioactive waste generated at the Diablo Canyon

(

DC0112 III i

8409130009 840829 PDR ADOCK 05000275 PDR R

DIABLO CANYON POWER PLANT UNIT NO(S) 1 AND 2 h0N

Power Plant and to maintain a high level of assurance that radioactive waste prtducts meet or exceed the applicable Federal and State regulations and the Radioactive Waste Burial Site License Criteria.

2. WET WASTE
a. LIQUID / WET WASTE Liquid / Wet wastes at DCPP are processed to a condition meeting shipping and disposal criteria on Free Standing Water (FSW). Specific instructions on processing and required FSW limits are contained in plant procedures and/or qualified vendor procedures. These procedures are to be approved by the P.S.R.C. prior to implementation,
b. CONTAINERS, SHIPPING CASKS AND PACKAGING Solid radioactive waste is processed, packages and shipped in accordance with DCPP procedures and/or qualified vendor procedures which have been approved by the P.S.R.C. These 1' procedures provide specific instructions which ensure the

. container, shipping casks and packaging methods comply with the applicable Code of Federal Regulations, State Regulations and the Radioactive Waste Burial Site License Criteria,

c. SHIPPING AND DISPOSAL Solid radioactive waste is prepared, loaded and shipped to a Federal and/or State Licensed Radioactive Waste Disposal Facility (Burial Ground) in accordance with DCPP procedures and/or qualified vendor procedures which have been approved by the P.S.R.C. These procedures provide specific

. instructions which ensure the shipments meet the intended Burial Site License Requirements as well as applicable Federal and State Regulations.

d. LABORATORY MIXING OF SAMPLES Qualified vendor procedures approved by the P.S.R.C. provide r written instructions on sampling, processing and handling  ;

for the detennination of process parameters prior to the 1

actual solidification. These procedures contain the description of the laboratory mixing methods used for these samples.

)

DC0112 2II

DIABLO CANYON POWER PLANT UNIT NO(S) 1 AND 2 h DATE ON 5/8/84 TITLE: PROCESS CONTROL PROGRAM

e. SOLIDIFICATION PROCESS Qualified vendors used by DCPP for the radioactive waste solidification are required to provide the Process Control Program and written procedures. Further, the vendors are required to have a topical report, as referenced, on the waste forms which will be solidified at DCPP. This topical report should demonstrate compliance with the NRC requirements for waste fonn. These documents should include:

1 Description of the solidification process 2 Type of solidification used 3 Process control parameters 4 Parameter boundary conditions 5 Proper waste fonn properties

6) Specific instructions to ensure the systems are operated within established process parameters.
f. SAMPLING PROGRAM FOR SOLIDIFICATION Vendors, utilized by DCPP for radioactive waste solidification, are required to include in their approved procedures, requirements to sample at least every tenth batch to ensure solidification and to provide actions to be taken if a sample fails to verify solidification. These procedures and changes thereto must be approved by the P.S.R.C. prior to use,
g. FREESTANDINGWATER(FSW) J Vendors utilized by DCPP to process wet wastes are required to include in their procedures provisions to verify that the FSW Criteria in the Federal and State regulations and the Burial Site License Criteria are met for the specific type of waste being processed. These procedures and changes thereto naust be approved by the P.S.R.C. prior to use.
h. CORRECTIVE ACTIONS OR FREE STANDING WATER Vendors utilized by DCPP to process wet wastes are required  ;

to include in their approved procedures provisions for correcting processed waste in which free standing water in excess of the FSW Criteria is detected. These procedures and changes thereto must be approved by the P.S.R.C. prior to use.

DCOII2 3II

DIABLO CANYON POWER PLANT UNIT NO(S) 1 AND 2 ON i DATE 5/8/84

, PAGE 4 0F 5 )

TITLE: PROCESS CONTROL PROGRAM t

1. EXOTHERMIC PROCESSES Vendors utilized by DCPP for radioactive waste solidification are required to include in their approved procedures specific process control parameters for exothermic solidification methods that must be met before capping the container. These procedures and changes thereto must be approved by the P.S.R.C. prior to use.
3. OILY WASTE l 011y wastes at DCPP are processed in accordance with approved vendor procedures. These procedures specify the proper methods to treat oily wastes to comply with Federal and State regulations and applicable Burial Site License Criteria. These procedures and changes thereto must be approved by the P.S.R.C. prior to use.
4. SPECIAL CASES I

Based upon previous industry experience, DCPP foresees the }

potential for situations arising that may be beyond existing plant capabilities. Anticipating this possibility, provisions

! are made herein to acconnodate such situations in a timely manner by using special techniques or processes. These special cases would be controlled as follows:

a. Implementing procedures would be developed comparable to those used for normal plant solid waste activities based on the guidance of this PCP and incorporating the applicable provisions for process control and testing.
b. The implementing procedure would receive P.S.R.C. approval prior to use. -
c. Use of this provision and supporting infonnation would be included in the next Semi-annual Effluent Report to the NRC, REFERENCES
1. Title 10 Code of Federal Regulations
2. NUREG 0472 and 0473 l 3. NUREG-0800, 11.4 U. S. N. R. C. Standard Review Plan Solid Waste l Management Systems
4. RCP RW-6 Process Control Program Dewatering

)

DC0112 4II '

h DIABLO CANYON POWER PLANT UNIT NO(S) 1 AND 2 ON I

DATE 5/8/84

( PAGE 5 0F 5 TITLE: PROCESS CONTROL PROGRAM ATTACHMENTS

1. C.N.S.I.ProcedureSD-0P-003(PCP) Solidification
2. C.N.S.I. Procedure DM-0P-022 (PCP) Demineralization
3. C.N.S.I. -DW-11118-01 Dewatering Topical Report
4. CNSI - 2(P) & (NP) 4313-01354-01P-A Rev. 2 Mobile Cement Solidification Topical
5. CNSI SD-0P-026 Rev. A Process Control Program for Cement /0il Solidification
6. CNSI SD-0P-053 Rev. A Process Control Program for CNSI Acid Solidification POTE: The above attachments are stored in DCPP Library under CNSI Documents.

k

(

DC0112 E!!

l e

DIABLO CANYON POWER PLANT UNIT NO(S) 1 AND 2 NUMBER AP C-253 REVISION 1

( TITLE:

DATE PAGE 5/8/84 1 0F l PROCESS CONTROL PROGRAM ATTACHMENT 1 CNSI Procedure SD-0P-003 (PCP) Solidification This procedure is withheld froia this copy. Refer to Document Control for most current copy.

(

i 1

_. . ___ . . _ . _ _ _ _ _ . _ _ . . . __.__.._. ___ _ ____. . ~ .,.. _ _ _ _ _.___ _._....___ ._.. _ __.._ __ _______._________ _._ .._._ __ _ ._ _ .. _ .

DIA8LO CANYON POWER PLANT UNIT NO(S) 1 AND 2 NUMBER AP C-253 REVISION 1 DATE 5/8/84 g PAGE 1 0F 1 e TITLE: PROCESS CONTROL PROGRAM ATTACHMENT 2 CNSI Procedure DM-0P-022 (PCP) Demineralization This procedure is is withheld from this copy. Refer to Document Control for most current copy.

)

i l

I s ,_ , . _ . - . .-- . m , _ ~ - - _ - . - - . _ . _ , --.-..----------.__.--..-w- , . _ , , _ , , , . _ - - , -_ _ _ _ _ _ _ _ _

DIA84.0 CANYON POWER PLANT UNIT NO(S) 1 AND 2 NUMBER AP C-253

g REVISION 1 DATE 5/8/84 l( m LE: PROCESS CONTROL PROGRAM PAGE 1 0F 1 ATTACHMENT 3 CNSI DW-11118-01 Dewatering Topical Report This report is withheld from this copy. Refer to Document Control for most current copy. .

/'

t a

l 1

1

DIABLO CANYON POWER PLANT UNIT NO(S) I AND 2 NUMBER AP C-253 REVISION 1 '

DATE 5/8/84 i PAGE 1 0F 1 ')

TITLE: PROCESS CONTROL PROGRAM ATTACHMENT 4 CNSI - 2(P) & (NP) 4313-01354-01P-A Rev. 2 - Mobil Cement Solidification Topical This document is withheld from this copy. Refer to the DCPP Library for most current copy. -

l 1

l l

s DIABLO CANYON POWER PLANT UNIT NO(S) l AND 2 NUMBER AP C-253 REVISION 1 DATE 5/8/84

(- PAGE 1 0F 1 TITLE: PROCESS CONTROL PROGRAM ATTACHMENT 5 1

i CNSI SD-0P-026 Rev. A - Process Control Program for Cement /0il Solidification This document is withheld from this copy. Refer to the DCPP Library for most current copy.

f, j

r.

k

- , .-.,--,w, ,, ,,_,_,,.,,,_,,y.,-,,--.----,__,,n.n,--.,---,,v-,-m-,,,-y,,.,,.,n,,-

DIABLO CANYON POWER PLANT UNIT NO(S) l AND 2 NUPEER AP C-253 REVISION 1 DATE 5/8/84 mLE: PROCESS CONTROL PROGRAM PAGE 10F 1 )

ATTACHMENT 6 CNSI SD-0P-053 Rev. A - Process Centrol Program for CNSI Acid Solidification This document is withheld from this copy. Refer to Document Control I for most current copy.

1

)

l 1

l 1

l l

l l

l