|
---|
Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML20155C0701998-10-23023 October 1998 Proposed Tech Specs Sections 3.1,3.2,3.4,3.5 & 5.0 Converting to ITS ML20154A4001998-09-25025 September 1998 Proposed Tech Specs Pages Re Sections 3.4 & 5.0 on RCS & Administrative Controls ML20249C4221998-06-25025 June 1998 Proposed Tech Specs Pages Re 980522 RAI on LAR 97-09 for Section 3.6 Conversion to Improved TS ML20217P5921998-05-0101 May 1998 Proposed Tech Specs,Eliminating Requirement for Operations Manager to Hold SRO License ML20216G5961998-04-15015 April 1998 Proposed Tech Specs,Changing Surveillance Frequency from at Least Once Every 18 Months to at Least Once Per Refueling Interval ML20134K0081996-10-11011 October 1996 Fuel Assembly Insp Program ML16342A1671993-07-0707 July 1993 Proposed TS 5.1.3, Map Defining Unrestricted Areas & Site Boundary for Radioactive Gaseous & Liquid Effluents. ML20045D1771993-06-15015 June 1993 Rev 3 to Surveillance Test Procedure STP M-90, Surveillance of Diablo Canyon Breakwaters for 1993 ML20044D8061993-05-0707 May 1993 Proposed TS 3/4.3.3.5, Remote Shutdown Instrumentation. ML20059F8731993-04-30030 April 1993 Public Version of Revised SOP III.06 HP-11, Emergency Worker Exposure Control ML20099B1521992-07-0808 July 1992 Public Version of Revised San Luis Obispo County Nuclear Power Plant Emergency Response Plan Std Operating Procedures,Including III.06, Environ Health & III.06, HP-2, Protective Action Guidelines ML20127C3831992-05-19019 May 1992 Public Version of Revised Emergency Response Plan Std Operating Procedures,Including III.06 HP-3, Emergency Environ Monitoring, & III.6,HP-13, Emergency Equipment Instruments & Supplies ML20092H6841992-01-15015 January 1992 Public Version of Revised Std Operating Procedure III.09, County Dept of Technical Svcs ML20058E7741990-10-18018 October 1990 Proposed Tech Specs Revising Section 3/4.2.4, Quandrant Power Tilt Ratio, to Permit Determination of Quadrant Power Tilt Ratio by Full Incore Flux Map ML20092C3891990-07-31031 July 1990 Public Version of Std Operating Procedure III.09, County Dept of Technical Svcs ML20012C5981990-03-14014 March 1990 Cycle 4 Startup Rept. W/900314 Ltr ML20235H3131987-08-20020 August 1987 Public Version of Revised Emergency Plan Implementing Procedures,Including Rev 12 to EP R-6, Radiological Fire & Rev 14 to EP M-6, Nonradiological Fire ML20237L5611987-08-13013 August 1987 Public Version of Revised Corporate Emergency Response Plan Implementing Procedures,Including,Rev 6 to 1.1, Activation of Corporate Emergency Response Organization & Rev 4 to 1.2, Activation of Corporate Incident Response Ctr ML20215K4891987-04-0303 April 1987 Public Version of Rev 0 to Emergency Procedure EP EF-9, Activation of Back-Up Emergency Response Facilities. W/870508 Release Memo ML20237F9621987-02-27027 February 1987 Rev 5 to CAP A-8, Chemical Analysis Procedure Offsite Dose Calculations ML20212E6071987-01-16016 January 1987 Public Version of Rev 9 to Emergency Plan Implementing Procedure EP G-3, Notification of Offsite Organization. W/ 870302 Release Memo ML20214S5951986-11-24024 November 1986 Public Version of Updated Vol III to Std Operating Procedures,To San Luis Obispo County/Cities Nuclear Power Plant Emergency Response Plan, Including Procedure III.01, Emergency Svcs Director ML20211A2651986-10-0606 October 1986 Proposed Tech Specs,Revising Reporting Requirements Per 10CFR50.72 & 50.73 & Correcting Typos ML20209E1101986-08-18018 August 1986 Public Version of Corporate Emergency Response Plan Updates, Including Rev 5 to IP 1.1, Activation of Corporate Emergency Response Organization & Rev 3 to IP 3.1, Governmental Relations ML20214U3761986-07-0101 July 1986 Revised Implementing Procedures,Including Rev 5 to 1.1, Activation of Corporate Emergency Response Organization, Emergency Transportation Instructions Rev 7 to 3.2, Corporate Communications Dept & Rev 4 to 2.1 ML20212H8801986-06-30030 June 1986 Public Version of Rev 11 to Emergency Plan Implementing Procedure EP R-6, Radiological Fire & Rev 13 to EP M-6, Nonradiological Fire DCL-86-170, Public Version of Revised Emergency Implementing Procedures, Including Rev 15 to EP M-1, Employee Injury or Illness (Nonradiological) & Rev 8 to EP G-4, Personnel Accountability & Assembly. W/860624 Release Memo1986-06-16016 June 1986 Public Version of Revised Emergency Implementing Procedures, Including Rev 15 to EP M-1, Employee Injury or Illness (Nonradiological) & Rev 8 to EP G-4, Personnel Accountability & Assembly. W/860624 Release Memo ML20195B9961986-05-0202 May 1986 Public Version of Emergency Plan Implementing Procedure Updates,Including EP M-2, Nonemployee Injury or Illness (Third Party) & EP RB-7, Emergency Onsite Radiological Environ Monitoring. W/860522 Release Memo ML20207H5341986-04-0808 April 1986 Public Version of Rev 17 to Emergency Procedure EP R-1, Personnel Injury or Illness (Radiologically Related) &/Or Overexposure ML20155B1031986-03-31031 March 1986 Nonproprietary Natural Circulation,Boron Mixing & Cooldown Test,Final Post-Test Rept ML20141N0181986-02-13013 February 1986 Public Version of Emergency Plan Implementing Procedures, Including Table of Contents & Rev 16 to EP R-1 Re Personnel Injury or Illness (Radiologically Related) &/Or overexposure.W/860225 Release Memo ML20142A0171985-12-31031 December 1985 Public Version of Revised Vol III to Emergency Response Plan SOP III.08 ML20137H4471985-12-13013 December 1985 Public Version of Updated Emergency Plan Implementing Procedures,Including Rev 10 to EP R-6, Radiological Fire & Rev 4 to EP M-9, Hazardous Waste Mgt Contingency Plan. W/ 860116 Release Memo ML20137X1931985-11-15015 November 1985 Public Version of Revised Emergency Plan Implementing Procedures,Including Rev 3 to EP G-251 Re Notification of Onsite Emergency Organization & Rev 7 to EP G-3 Re Notification of Offsite Organizations DCL-85-319, Public Version of Revised Emergency Plan Implementing Procedures,Including Rev 9 to EP R-6 Re Radiological Fire & Rev 11 to EP M-6 Re Nonradiological Fire.W/Jm Felton 851015 Transmittal Memo1985-10-0404 October 1985 Public Version of Revised Emergency Plan Implementing Procedures,Including Rev 9 to EP R-6 Re Radiological Fire & Rev 11 to EP M-6 Re Nonradiological Fire.W/Jm Felton 851015 Transmittal Memo ML20137U5281985-10-0101 October 1985 Public Version of Revised Corporate Emergency Response Plan Implementing Procedures,Including Rev 3 to 1.2 Re Activation of Corporate Incident Response Ctr.Jm Felton 851127 Release Memo Encl ML20137Z0941985-09-30030 September 1985 Public Version of Emergency Response Plan Sops,Including III.01, Emergency Svcs Director, III.08, Public Info Officer & III.20 California Highway Patrol DCL-85-264, Public Version of Revised Emergency Plan Implementing Procedures,Including Rev 4 to M-10 Re Fire Protection of Safe Shutdown Equipment & Rev 7 to EF-5 Re Emergency Equipment,Instruments & Supplies.Related Correspondence1985-08-0808 August 1985 Public Version of Revised Emergency Plan Implementing Procedures,Including Rev 4 to M-10 Re Fire Protection of Safe Shutdown Equipment & Rev 7 to EF-5 Re Emergency Equipment,Instruments & Supplies.Related Correspondence ML20133Q1801985-08-0505 August 1985 Public Version of Rev 6 to Emergency Plan Implementing Procedure EP EF-1, Emergency Procedure Activation & Operation of Technical Support Ctr. W/851030 Release Memo ML20214U8571985-07-23023 July 1985 Rev 0 to NCIG-03, Training Manual for Inspectors of Structural Welds at Nuclear Power Plants Using Acceptance Criteria of NCIG-01 ML20133D0311985-07-18018 July 1985 Public Version of Updated Emergency Plan Implementing Procedures,Including Rev 9 to EP M-4, Earthquake & Rev 5 to EP OR-1, Offsite Support & Assistance DCL-85-245, Public Version of Revised Emergency Plan Implementing Procedures,Including Rev 9 to EP M-4, Earthquake & Rev 5 to EP OR-1, Offsite Support & Assistance. W/Revised Tables of Contents1985-07-18018 July 1985 Public Version of Revised Emergency Plan Implementing Procedures,Including Rev 9 to EP M-4, Earthquake & Rev 5 to EP OR-1, Offsite Support & Assistance. W/Revised Tables of Contents DCL-85-276, Public Version of Revised Corporate Emergency Response Plan Implementing Procedures,Including Rev 4 to 1.1 Re Activation of Corporate Emergency Response Organization & Rev 3,Change 5 to Implementing Procedure List1985-07-0101 July 1985 Public Version of Revised Corporate Emergency Response Plan Implementing Procedures,Including Rev 4 to 1.1 Re Activation of Corporate Emergency Response Organization & Rev 3,Change 5 to Implementing Procedure List ML20129F1161985-06-21021 June 1985 Public Version of Revised Emergency Plan Implementing Procedures,Including Rev 7 to EP G-2 Re Onsite Emergency Organization & EP G-251 Re Notification of Onsite Emergency Organization ML20136G7291985-04-30030 April 1985 Public Version of Vol 3 of San Luis Obispo County Nuclear Power Plant Emergency Response Plan Std Operating procedures.W/850814 Release Memo DCL-85-174, Suppl 1 to Startup Test Rept, for Nov 1984 - Jan 19851985-04-29029 April 1985 Suppl 1 to Startup Test Rept, for Nov 1984 - Jan 1985 DCL-85-165, Public Version of Revised Emergency Plan Implementing Procedures,Including Rev 7 to EP M-7 Re Oil Spill Isolation & Cleanup & Rev 6 to EP G-4 Re Personnel Accountability & Assembly1985-04-24024 April 1985 Public Version of Revised Emergency Plan Implementing Procedures,Including Rev 7 to EP M-7 Re Oil Spill Isolation & Cleanup & Rev 6 to EP G-4 Re Personnel Accountability & Assembly ML20117K5181985-04-0808 April 1985 Public Version of Revised Emergency Plan Implementing Procedures,Including Rev 0 to Procedure EP E-0, Reactor Trip or Safety Injection, Rev 0 to EP E-0.1, Reactor Trip Response & Rev 0 to EP E-3, Steam Generator Tube Rupture ML20209J2641985-04-0808 April 1985 Revised Emergency Plan Implementing Procedures,Including Table of Contents,Rev 0 to EP E-0, Reactor Trip or Safety Injection, Rev 0 to EP E-0.1, Reactor Trip Response & Rev 1 to EP E-0.2, Natural Circulation Cooldown ML20132E8441985-04-0101 April 1985 Public Version of Revised Corporate Emergency Response Plan Implementing Procedures,Including Rev 3 to 1.1 Re Activation of Corporate Emergency Response Organization Emergency Radio Pager Instructions 1998-09-25
[Table view] Category:TEST/INSPECTION/OPERATING PROCEDURES
MONTHYEARML20134K0081996-10-11011 October 1996 Fuel Assembly Insp Program ML20045D1771993-06-15015 June 1993 Rev 3 to Surveillance Test Procedure STP M-90, Surveillance of Diablo Canyon Breakwaters for 1993 ML20059F8731993-04-30030 April 1993 Public Version of Revised SOP III.06 HP-11, Emergency Worker Exposure Control ML20099B1521992-07-0808 July 1992 Public Version of Revised San Luis Obispo County Nuclear Power Plant Emergency Response Plan Std Operating Procedures,Including III.06, Environ Health & III.06, HP-2, Protective Action Guidelines ML20127C3831992-05-19019 May 1992 Public Version of Revised Emergency Response Plan Std Operating Procedures,Including III.06 HP-3, Emergency Environ Monitoring, & III.6,HP-13, Emergency Equipment Instruments & Supplies ML20092H6841992-01-15015 January 1992 Public Version of Revised Std Operating Procedure III.09, County Dept of Technical Svcs ML20092C3891990-07-31031 July 1990 Public Version of Std Operating Procedure III.09, County Dept of Technical Svcs ML20235H3131987-08-20020 August 1987 Public Version of Revised Emergency Plan Implementing Procedures,Including Rev 12 to EP R-6, Radiological Fire & Rev 14 to EP M-6, Nonradiological Fire ML20237L5611987-08-13013 August 1987 Public Version of Revised Corporate Emergency Response Plan Implementing Procedures,Including,Rev 6 to 1.1, Activation of Corporate Emergency Response Organization & Rev 4 to 1.2, Activation of Corporate Incident Response Ctr ML20215K4891987-04-0303 April 1987 Public Version of Rev 0 to Emergency Procedure EP EF-9, Activation of Back-Up Emergency Response Facilities. W/870508 Release Memo ML20237F9621987-02-27027 February 1987 Rev 5 to CAP A-8, Chemical Analysis Procedure Offsite Dose Calculations ML20212E6071987-01-16016 January 1987 Public Version of Rev 9 to Emergency Plan Implementing Procedure EP G-3, Notification of Offsite Organization. W/ 870302 Release Memo ML20214S5951986-11-24024 November 1986 Public Version of Updated Vol III to Std Operating Procedures,To San Luis Obispo County/Cities Nuclear Power Plant Emergency Response Plan, Including Procedure III.01, Emergency Svcs Director ML20209E1101986-08-18018 August 1986 Public Version of Corporate Emergency Response Plan Updates, Including Rev 5 to IP 1.1, Activation of Corporate Emergency Response Organization & Rev 3 to IP 3.1, Governmental Relations ML20214U3761986-07-0101 July 1986 Revised Implementing Procedures,Including Rev 5 to 1.1, Activation of Corporate Emergency Response Organization, Emergency Transportation Instructions Rev 7 to 3.2, Corporate Communications Dept & Rev 4 to 2.1 ML20212H8801986-06-30030 June 1986 Public Version of Rev 11 to Emergency Plan Implementing Procedure EP R-6, Radiological Fire & Rev 13 to EP M-6, Nonradiological Fire DCL-86-170, Public Version of Revised Emergency Implementing Procedures, Including Rev 15 to EP M-1, Employee Injury or Illness (Nonradiological) & Rev 8 to EP G-4, Personnel Accountability & Assembly. W/860624 Release Memo1986-06-16016 June 1986 Public Version of Revised Emergency Implementing Procedures, Including Rev 15 to EP M-1, Employee Injury or Illness (Nonradiological) & Rev 8 to EP G-4, Personnel Accountability & Assembly. W/860624 Release Memo ML20195B9961986-05-0202 May 1986 Public Version of Emergency Plan Implementing Procedure Updates,Including EP M-2, Nonemployee Injury or Illness (Third Party) & EP RB-7, Emergency Onsite Radiological Environ Monitoring. W/860522 Release Memo ML20207H5341986-04-0808 April 1986 Public Version of Rev 17 to Emergency Procedure EP R-1, Personnel Injury or Illness (Radiologically Related) &/Or Overexposure ML20141N0181986-02-13013 February 1986 Public Version of Emergency Plan Implementing Procedures, Including Table of Contents & Rev 16 to EP R-1 Re Personnel Injury or Illness (Radiologically Related) &/Or overexposure.W/860225 Release Memo ML20142A0171985-12-31031 December 1985 Public Version of Revised Vol III to Emergency Response Plan SOP III.08 ML20137H4471985-12-13013 December 1985 Public Version of Updated Emergency Plan Implementing Procedures,Including Rev 10 to EP R-6, Radiological Fire & Rev 4 to EP M-9, Hazardous Waste Mgt Contingency Plan. W/ 860116 Release Memo ML20137X1931985-11-15015 November 1985 Public Version of Revised Emergency Plan Implementing Procedures,Including Rev 3 to EP G-251 Re Notification of Onsite Emergency Organization & Rev 7 to EP G-3 Re Notification of Offsite Organizations DCL-85-319, Public Version of Revised Emergency Plan Implementing Procedures,Including Rev 9 to EP R-6 Re Radiological Fire & Rev 11 to EP M-6 Re Nonradiological Fire.W/Jm Felton 851015 Transmittal Memo1985-10-0404 October 1985 Public Version of Revised Emergency Plan Implementing Procedures,Including Rev 9 to EP R-6 Re Radiological Fire & Rev 11 to EP M-6 Re Nonradiological Fire.W/Jm Felton 851015 Transmittal Memo ML20137U5281985-10-0101 October 1985 Public Version of Revised Corporate Emergency Response Plan Implementing Procedures,Including Rev 3 to 1.2 Re Activation of Corporate Incident Response Ctr.Jm Felton 851127 Release Memo Encl ML20137Z0941985-09-30030 September 1985 Public Version of Emergency Response Plan Sops,Including III.01, Emergency Svcs Director, III.08, Public Info Officer & III.20 California Highway Patrol DCL-85-264, Public Version of Revised Emergency Plan Implementing Procedures,Including Rev 4 to M-10 Re Fire Protection of Safe Shutdown Equipment & Rev 7 to EF-5 Re Emergency Equipment,Instruments & Supplies.Related Correspondence1985-08-0808 August 1985 Public Version of Revised Emergency Plan Implementing Procedures,Including Rev 4 to M-10 Re Fire Protection of Safe Shutdown Equipment & Rev 7 to EF-5 Re Emergency Equipment,Instruments & Supplies.Related Correspondence ML20133Q1801985-08-0505 August 1985 Public Version of Rev 6 to Emergency Plan Implementing Procedure EP EF-1, Emergency Procedure Activation & Operation of Technical Support Ctr. W/851030 Release Memo ML20214U8571985-07-23023 July 1985 Rev 0 to NCIG-03, Training Manual for Inspectors of Structural Welds at Nuclear Power Plants Using Acceptance Criteria of NCIG-01 ML20133D0311985-07-18018 July 1985 Public Version of Updated Emergency Plan Implementing Procedures,Including Rev 9 to EP M-4, Earthquake & Rev 5 to EP OR-1, Offsite Support & Assistance DCL-85-245, Public Version of Revised Emergency Plan Implementing Procedures,Including Rev 9 to EP M-4, Earthquake & Rev 5 to EP OR-1, Offsite Support & Assistance. W/Revised Tables of Contents1985-07-18018 July 1985 Public Version of Revised Emergency Plan Implementing Procedures,Including Rev 9 to EP M-4, Earthquake & Rev 5 to EP OR-1, Offsite Support & Assistance. W/Revised Tables of Contents DCL-85-276, Public Version of Revised Corporate Emergency Response Plan Implementing Procedures,Including Rev 4 to 1.1 Re Activation of Corporate Emergency Response Organization & Rev 3,Change 5 to Implementing Procedure List1985-07-0101 July 1985 Public Version of Revised Corporate Emergency Response Plan Implementing Procedures,Including Rev 4 to 1.1 Re Activation of Corporate Emergency Response Organization & Rev 3,Change 5 to Implementing Procedure List ML20129F1161985-06-21021 June 1985 Public Version of Revised Emergency Plan Implementing Procedures,Including Rev 7 to EP G-2 Re Onsite Emergency Organization & EP G-251 Re Notification of Onsite Emergency Organization ML20136G7291985-04-30030 April 1985 Public Version of Vol 3 of San Luis Obispo County Nuclear Power Plant Emergency Response Plan Std Operating procedures.W/850814 Release Memo DCL-85-165, Public Version of Revised Emergency Plan Implementing Procedures,Including Rev 7 to EP M-7 Re Oil Spill Isolation & Cleanup & Rev 6 to EP G-4 Re Personnel Accountability & Assembly1985-04-24024 April 1985 Public Version of Revised Emergency Plan Implementing Procedures,Including Rev 7 to EP M-7 Re Oil Spill Isolation & Cleanup & Rev 6 to EP G-4 Re Personnel Accountability & Assembly ML20209J2641985-04-0808 April 1985 Revised Emergency Plan Implementing Procedures,Including Table of Contents,Rev 0 to EP E-0, Reactor Trip or Safety Injection, Rev 0 to EP E-0.1, Reactor Trip Response & Rev 1 to EP E-0.2, Natural Circulation Cooldown ML20117K5181985-04-0808 April 1985 Public Version of Revised Emergency Plan Implementing Procedures,Including Rev 0 to Procedure EP E-0, Reactor Trip or Safety Injection, Rev 0 to EP E-0.1, Reactor Trip Response & Rev 0 to EP E-3, Steam Generator Tube Rupture ML20132E8441985-04-0101 April 1985 Public Version of Revised Corporate Emergency Response Plan Implementing Procedures,Including Rev 3 to 1.1 Re Activation of Corporate Emergency Response Organization Emergency Radio Pager Instructions ML20116C1381985-03-26026 March 1985 Public Version of Updates to Sops,Vol III of San Luis Obispo County Nuclear Power Plant Emergency Response Plan, Including Rev to SOP III.10, Dept of General Svcs. W/850419 Release Memo DCL-85-112, Public Version of Revised Emergency Plan Implementing Procedures,Including Table of Contents,Rev 4 to EP OR-1 Re Offsite Support & Assistance & Rev 3 to OR-2 Re Release of Info to Public & 850401 Release Memo1985-03-14014 March 1985 Public Version of Revised Emergency Plan Implementing Procedures,Including Table of Contents,Rev 4 to EP OR-1 Re Offsite Support & Assistance & Rev 3 to OR-2 Re Release of Info to Public & 850401 Release Memo DCL-85-196, Public Version of Revised Emergency Plan Implementing Procedures,Including Rev 15 to EP R-1, Personnel Injury or Illness (Radiologically Related) &/Or Overexposure. Related Correspondence1985-02-25025 February 1985 Public Version of Revised Emergency Plan Implementing Procedures,Including Rev 15 to EP R-1, Personnel Injury or Illness (Radiologically Related) &/Or Overexposure. Related Correspondence ML20125A6531985-02-0404 February 1985 Public Version of Revised Emergency Plan Implementing Procedures,Including Rev 1 to EP OP-0.1, Reactor Trip Response & Rev 5 to EP G-3, Notification of Offsite Organizations ML20209J1691985-01-31031 January 1985 Public Version of Revised Emergency Response Plan Sops, Including III.10, SOP Dept of General Svcs & III.24, Disaster Preparedness Plan for Peacetime Emergencies. Related Correspondence ML20215B2591984-11-0101 November 1984 Rev 4 to QC Procedure DCP-2, Silicone Room Installation. Partially Withheld Related Info Encl ML20101J2191984-10-31031 October 1984 Public Version of Revised SOPs for San Luis Obispo County Nuclear Power Plant Emergency Response plan.W/841219 Release Memo ML20100K1371984-10-30030 October 1984 Pg&E,Diablo Canyon Power Plant,1984 Emergency Preparedness Field Exercise DCL-84-336, Revised Emergency Plan Implementing Procedures,Including EP R-1 Re Personnel Injury or Illness,Ep R-6 Re Radiological Fire,Ep M-6 Re Nonradiological Fire & EP G-1 Re Accident Classification.Related Correspondence1984-10-25025 October 1984 Revised Emergency Plan Implementing Procedures,Including EP R-1 Re Personnel Injury or Illness,Ep R-6 Re Radiological Fire,Ep M-6 Re Nonradiological Fire & EP G-1 Re Accident Classification.Related Correspondence DCL-84-330, Rev 3 to, Repair/Replacement Program1984-10-19019 October 1984 Rev 3 to, Repair/Replacement Program ML20101B0721984-10-15015 October 1984 Public Version of Revised Emergency Plan Implementing Procedures,Including 1.1 Re Corporate Emergency response,3.2 Re Corporate Communications dept,4.1 Re Matls & 4.9 Re Qa. W/Jm Felton 841213 Memo DCL-84-302, Revised Emergency Plan Implementing Procedures,Including EPOP-0 Re Reactor Trip or Safety injection,EPOP-0.1 Re Reactor Trip Response & EPOP-0.2 Re Natural Circulation Cooldown.Related Correspondence1984-09-10010 September 1984 Revised Emergency Plan Implementing Procedures,Including EPOP-0 Re Reactor Trip or Safety injection,EPOP-0.1 Re Reactor Trip Response & EPOP-0.2 Re Natural Circulation Cooldown.Related Correspondence 1996-10-11
[Table view] |
Text
-
m ,, _ _
PA'CIFIC GAS AND ELECTRIC CtMPANY NUMER EP EF-9 REVISION 0 DEPARTMENT OF NUCLEAR POWER GENERATION PAGE 1 0F 11
{ ~ DIABLO CANYON POWER PLANT UNITS AND 2 EMERGENCY PROCEDURE TITLE: ACTIVATION OF BACK-UP EMERGENCY RESPONSE FACILITIES APPROVED: T. 8 PLANT MANAGER ,) DATE EFFECTIVE DATE SCOPE This procedure describes the on-site back-up facilities that are available in the event it becomes necessary to evacuate, or its not possib1h to activate, an Emergency Response Facility (ERF). This procedure and ,
changes thereto requires PSRC reveiw.
GENERAL The ERF's covered by this procedure are:
b) 1. Control Room. Units 1 and 2 2.TechnicalSupportCenter(TSC)
- 3. Operational Support Center (OSC)
Back-up facilities have been identified for each of the ERF's and the actions required for their use are described in this procedure. The functions and objectives for each of the ERF's remain the same for their '
assigned back-up facility.
INITIATING CONDITIONS This procedure is in effect upon reaching an Emergency Action Level (EAL) requiring the ERF's to be activated and an ERF cannot be activated or must be evacuated. The ERF may be uninhabitable due to smoke, fire, heat, toxic gas, radiation hazard, or other occurrences.
NOTE: Declaration of a Control Room uninhabitable in itself requires an EAL declaration based upon Appendix Z in OP AP-8.
IMMEDIATE ACTIONS Upon declaration of an ERF being uninhabitable the back-up facility will be activated in accordance with the appropriate attachment and emergency response will be continued from the back-up facility.
( .
X008226a.38 IIII
$705110223e7043o DR l ADOCK 05000275 l PDR
DIABLO CANYON POWER PLANT NUMBER EP EF-9 REVISION 0 EMERGENCY PROCEDURE TITLE: ACTIVATION OF BACK-UP EMERGENCY RESPONSE PAGE 2 0F 11 FACILITIES I SUPPORTING PROCEDURES OP AP-8 " CONTROL ROOM INACCESSIBILITY" EP G-1 " ACCIDENT CLASSIFICATION & EMERGENCY PLAN ACTIVATION" EP G-2 "ESTABLIS M ENT OF THE ONSITE EMERGENCY ORGANIZATION" EP G-3 " NOTIFICATION OF THE OFFSITE EMER3ENCY ORGANIZATION" EP R-6 " RADIOLOGICAL FIRE" EP M-3 " CHLORINE RELEASE" EP M-6 "NONRADIOLOGICAL FIRE" EP EFJ1 " ACTIVATION AND OPERATION OF THE TECHNICAL SUPPORT CENTER" EP EF-2 " ACTIVATION AND OPERATION OF THE OPERATIONAL SUPPORT CENTER" .
EP EF-3 " ACTIVATION AND OPERATION OF THE EMERGENCY OPERATIONS FACILITY" ATTACHMENTS
- 1. Back-up Control Room Instruction
- 2. Back-up TSC Instruction
- 3. Back-up OSC Instruction I
1 l
?
i i
I l
\
,x008226a.38 2LII i
= ,-mm, .~. oa .-
. w ..-_, y . - - - - , - - - - , . , ,w , -*
~ ~~
l
~ I L CANYON POWER PLANT DIAB'O' NUEER EP EF-9 REVISION O f s EMERGENCY PROCEDURE !
L TITLE: ACTIVATION OF BACK-UP EMERGENCY RESPONSE PAGE 3 0F 11 6 FACILITIES I l
'l 1
ATTACl#4ENT 1: BACKUP CONTROL ROOM INSTRUCTION -
'1 SCOPE ll This instruction is to be used in conjunction with OP AP-8 when the Control Room is determined to be uninhabitable and the TSC is activated. 1 NOTE: An Alert should be declared upon evacuation of the Control Room based upon Appendix Z in GP AP-8. [
i INITIATING CONDITIONS The Control Room is declared uninhabitable and implements Operating l Procedure AP-8. The TSC is activated due to an existing emergency l condition.
IMMEDIATE ACTIONS h
1;
- 1. In accordance with OP AP-8 the designated operators man the affected f, unit's Hot Shutdown and/or Dedicated Shutdown Panels (locations shown h L,' in Figure 1). Il J
Telephone Numbers I, Hot Shutdown Panel Dedicated Shutdown Panel t i
1k And establish connJnications with the TSC per OP AP-8 section A.
step 3.
f I
FIGURES
[
i 1. LOCATION OF SHUT 00WN PANELS i 1
. I i!
L
' ,l I
i
((
1 x0082264.38 3III '
I I
t DIABLD' CANYON POWER PLANT -
IpeER EP EF-9 REVISION O I EMERGENCY PROCEDURE i TITLE: ACTIVATION OF 8ACK-UP ENERGENCY RESPONSE PAGE 4 0F 11 C FACILITIES
~
l
}
l' FIGURE 1 t LOCATION OF SHUTDOWN PANELS 1
i tMIT 1 (MtT 2 I
., FUEL HAFCLNG BULDNO AUMLIARY BULDNQ REL HAMM.WIO BULDMG f L J
~~
) D.100*-0* D.10tr-O"
%C&li%?
\ l *
W W 4e0 v 4e0 v W W Svttehger Switehger
. .,h ed Room Room h , ,,, ,,
ted Shut I '
Down Panet wn Panel CDPfTA9HNT 1 Het Shut Onm I Het Shut Down CONTAWMNT 2 Remote Cente1 Panet Remote CentelPanel l
l x008226a.38 4!!! ,
l
" ' ' ' - . -_,-.-y., - . , - . - - - - , + _ , - , - , - - . , . .,.,,.T
' ~
DIABLD CANYON POWER PLANT ,
NLDeER EP EF-9 i REVISION O
- EMERGENCY PROCEDURE TITLE
- ACTIVATION OF BACK-UP EMERGENCY RESPONSE PAGE 5 0F 11 -
FACILITIES }
l ATTACHMENT 2: BACKUPTECHNICALSUPPORTCENTER(TSC) INSTRUCTION l SCOPE l l
This instruction is to be used in conjunction with EP G-1 G-2 G-3 and EF-1 when it becomes necessary to activate the TSC but it has been declared uninhabitable. .
INITIATING CONDITIONS ,
An Alert or greater emergency condition is declared or in progress and the ,
TSC becomes uninhabitable. .
IMMEDIATE ACTIONS
- 1. The TSC minism staff shall report to the Control Room and set-up the TSC Energency Organization as shown in Figure 1. Back-up TSC.
- 2. The back-up TSC staffing requirements shall be determined at the discretion of the Site Emergency Coordinator but typical sintasm assignments are:
Shift Foreman's Office Position Desk Ph Number '
Site Emergency coordinator Shif tT6 reman's Emergency Evalcation & Rec. Coord. STA's Emergency Liaison Coordinator Control Room Asst.'s Emergency Liaison Assistant !
Emergency Operations Advisor PIMS Teminal l Clerk Control Roca Asst.'s i Control Roce l
Position location Phone Number i Emergency Radiologica1' Advisor EARS Terminal EARS Operator EARS Taminal Emergency Liaison Coord. Asst. Unit 1 Radio Rad. Data Processors Unit-2 P250 Room Security Liaison CAS Maintenance Liaisons Unit 1 P250 Roon NRC (MonitorAct1<itiesusingtelephoneonwestwallof a
theControlRoom)
.~
)
x008226a.38 5III -
l
-1 b -%
1 DIABLO' CANYON POWER PLANT IpeER EP EF-9 REVISION 0 I
. EMERGENCY PROCEDURE
. TITLE: ACTIVATION OF BACK-UP EMERGENCY RESPONSE PAGE 6 0F 11
! (/ FACILITIES . i e
i
- 3. If the E0F is activated and the Recovery Manager has assumed control l of the emergency then the Site Emergency Coordinator (SEC) should inform the Recovery Manager and, if time permits, obtain permission to relocate.
l 4. If in-plant hazards (radiological or otherwise) exist on any of the ',
potential evacuation routes, personnel should be advised of the safest route. Personnel in the TSC that are not immediately required in the back-up TSC shall report to the Security Building Lunchroom.
- 5. If the TSC EARS terminal is the controlling terminal then, if time permits, prior to evacuating the TSC the EARS operator shall transfer control to the Control Room teminal.
- 6. The predetermined backup TSC staff shall report to the Control Room via the evacuation route announced by the SEC and re-establish the i TSC per Figure 1.
SUBSEQUENT ACTIONS i
- 1. Once the backup staff has re-established the TSC and have established i l . , contact with the OSC and EOF, the SEC will declare the backup TSC
! operational and have it resume its functions.
FIGURES
- 1. BACKUP TSC LAYOUT AND POSITION LOCATIONS ,
i -
l t
I
'1 t
j I
1 l
l l!
i x008226a.38 6III [
, ?
i
^'~
,__-~,-.-,m.r_,,,_____ _, _ , , . . _,,.g
_ , _ _ _ . _ ,,,y,_. . ~ ;7 7 .... . _ _ , _ _ , ,-
, 1 DIABLO CANYON POWER PLANT -
Nt#GER EPkf-9 l i
- REVISION 0 -
ENERGENCY PROCEDURE TITLE: ACTIVATION OF BACK-UP EMERGENCY RESPONSE PAGE 7 0F 11 ..) l FACILITIES i
I FIGURE 1 BACKUP TSC LAYOUT AND POSITION LOCATIONS Typical i Backup TSC i
(Control Room) I
/ '
S
! / -
p
%/ N i I
i netntenance . o usuns s- -
I t
i Etc Ast. [AR$ ERA l i I I I l / nAnoATA
< _[ . ,_ /
s sic j NRC g
.- .- SEC ELC LAISCN I
"C E0A l E CAS .
l N N l-
- anc .-
I
. Phone N0mbers
,,w-.-,.,,-,,.r,-weww< wm,,---m-w-,, , n,---,,-,----w_,,,.,-~~7-wg,p----
y,,,wm,--wg-----vw,-+----,-------,----~wwwr=qww www
. 4
. I DIABLO CANYON POWER PLANT NUMER EP EF-9 1:
- REVISION 0 -
),
. EMERGENCY PROCEDURE TITI.E: ACTIVATION OF BACK-UP DIERGENCY RESPONSE PAGE 8 0F 11 FACILITIES :
ATTACMENT 3: BACKUP OPERATIONAL SUPPORT CENTER (OSC) INSTRUCTION SCOPE l This instruction is to be used in conjvaction with EP 6-1 and EF-2 when it becomes necessary to activate the OSC but it has been declared ,
uninhabitable.
GENERAL ;
The OSC occupies two closely adjoinin2 facilities. Access Control and W '
Cold Machine Shop. One section or both sections could be declared uninhabitable. Both sections probably would be affected by a radiological hazard while a fi e or toxic gas may affect only one. The decision to declare one or both sections uninhabitable is the responsibility of the '
SiteEmergencyCoordinator(SEC)afterreceivingadvicefromthe i; Maintenance Coordinator, and Emergency Radiological Advisor (ERA). :.
INITIATING CONDITIONS j An Alert or greater emergency condition is declared or in progress and a h I part or all of the OSC is declared uninhabitable by the SEC. ,
NOTE': If Access Control is declared uninhabitable, the SEC shall ,
inform the Emergency Operations Coordinator who shall '
ensure Auxiliary Operators are informed of the new Access Control arrangement for plant access. .
IMMEDIATE ACTIONS Il
- 1. If only Access Control is declared uninhabitable then the OSC Access Control personnel, and assembled repair teams shall reassemble in the Cold Machine Shop as shown in Figure 1.
Typical telephone usage will be:
POSITION PHONE f
0.*C SUPERVISOR .
SI E RADIATION PROTECTION COORD SITE CHEMISTRY COORDINATOR ACCESS SENIOR
~
l x008226a.38 8III ,
i i
., _ . _ . _ _ _ _ . _ . , ,____. , . . _ _ _ . _ . _ _ _ _ _ __ _ ,c_ ___ _ , _ - _ _ _ , _ _
9 .* ;
~
DIABLO CANYON P0tlER PLANT - IRBGER EP EF,9. -
REVISION 0 i DIERGENCY PROCEDURE -
TITLE: ACTIVATION OF SACK-UP DIERGENCY RESPONSE PAGE 9 0F 11 FACILITIES . ) f s
8 0
- 2. If gly lthe Cold Machine Shop is declared uninhabitable then the Emergency Maintenance Coordinator and his staff shall relocate in the '
Chead stry and Radiation Protection Foreman's office in Access Control. The rest of the personnel assembled in the Cold Machine Shop shall reassemble in the hallways in Access Contr he, Emergency Maintenance Coordinator shall use extensi reestablish communications with the TSC. ,
- 3. If th Access Control and the Cold Machine Shop are declared 4 uni itable then the Emergency Maintenance Coordinator will have OSC personnel evacuate to the TSC where the TSC staff shall determine the alternate arrangements for the existing plant conditions. -
Typically the TSC will be used as the OSC Coordination point. If habitability pemits, the Administration Building or Security
, Building Lunchroom is preferred for assembly of back-up maintenance '
personnel. Chemistry and Radiation Protection personnel preferably i will assemble In the TSC lab area, with overflow assembly in the same location as the maintenance personnel.
i A. Alternate radiological access control point (s) must be ,l established for operator, emergency repair and radiological assessment activities. If possible, one access point for all personnel is preferred, but more than one may be used.
Alternate access control points, depending on conditions, may be:
- 1. West stairwell from the Control Room to the Auxiliary I Building. If the 115' level is used, maintenance and i assessment teams may access from the TSC through this 1 I
location. A m ess would traverse the original Access Control area.
- 2. Turbine Su1Tding exit near the unaffected contalment access an the 140' level.
- 3. Exits from the TSC and Control Room to the plant.
B. Contamination Control Points shall be set up as needed in the Control Room. TSC and the TSC' lab to prevent the spread of
. contamination.
C. The Emergency Maintenance Coordinator and hi st ff will work from the TSC office area. His extension i j l
h l
l x008226a.38 ~ ~.9III T..
__.,__.---__-.r-.,-,-.....,,.
,---..___--,-.,.-._,_,,m ..,..---,c,,_..,,m.
..-_.-..._____..___-._-__,,,,__m. _ . , . -
~
~
. DIABLO CANYON POWER PUWT '
NINEER EP EF-9 REVISION 0 i EMERGENCY PROCEDURE I TITLE: ACTIVATION OF 8ACK-UP EMERGENCY RESPONSE PAGE 10 0F 11 l FACILITIES I F I D. The OSC Supervisor will work from the new radiological access h control point for maintenance personnel. ,
E. The Site Radiation Protection Coordinator and Site mi try Coordinator will work from the TSC Lab at Extensio
- 4. Issuance of special work permits and dosimetry for radiological l access will be through the TSC Laboratory.
i FIGURES
- 1. OSC LRyout and Telephone Numbers. .
i iN F
'i 11' I r~
q,y II v 1 6l dl I
i
,(
1 l
x008226a.3B 10!!! l l
i l
-+y.-- . - , _, .. . , . . . . . - - . + - v , , .___.-.-, . _ .---,.__.-__-__-y _ _ , , _ , . - , _ _ _ _ - _ , _ _ _ _ . -
7 . 7. ,'
i
. ~
IpeER EP EF-9 j DIABLO CMY0W POWER PLMT .
REVISION 0 maEKYMESWE TITLE: ACTIVATION OF 8ACK-UP EMERGENCY RESPONSE PAGE 11 0F 11 ') ;
/
FACILITIES
)
FIGURE 1 ,
OSC LAYOUT AND TELEPHONE Nt#EER OSC '
t Layout ; -
essamme
- L ! - .
/ -
, =
t Access .
J Control ,
I I
eammmme y a uma e ae i nummma women s
~
t ! 1 seursom a j .
' l y
n s gr Equipment i
! Access / l
- Vestible h
' l
( !
I I
Cold
- Machine Tool m \
l .
Shop s ,
/ l x008226a.38 . '/ / -
l .
/ / .. .
,I l
y REGULATORY INFORMATION DISTRIDUTICN SYGTEM (R IDS)
ACCH'95 ION ND8: 8994046+90- DOC.DATE: 97/04/30 NOTAR12ED: NO DOCKET #
FAC IL: 50-273 Diab lo Cany on Nuc lear Poiecr " Plant, Unit 1, Paci fic Ca 05000275 50-323 Diablo Canyon Nuclear Pouer Plant, Unit 2, Paci fic Ca 05000323 AUTH.NANE AUTHOR AFFILIATICN SHIFFER,J.D. Pacific Cas & Electric Co. -
RECIP.NAME RECIPIENT AFFILIATION Document Control Uranch (Document Control Desk)
. SUDJECT: Forwards Central Files version of Rev 0 to E*ergenc y Plan Implementing Procedure EP EF-9, " Activation ch Sckup Emergency Response Facilities." Withheld.
DISTRIDUTION CODE: AX45D COPIES RECEIVED: LTR 1 ENCL __ SIZE: _b I TITLE: Emergency Plan or Implementing Procedures (Proprietary)
NOTES:
RECIPIENT COPIES RECIPIENT COPIE9 ID CODE /NAME LTTR ENCL ID CODE /NAbiE LTTR ENCL PD5 LA gf 1 1 PD5 PD FY 1 1 GCHIERLING,H Sf, 1 1 TRAMNELL,C g i 1 INTERN /DRR 1 1 AEOD/DOA/IRD g4 1 1 NRR/DREP/EPD g 1 1 REO FILE 5/ 1 1 TOTAL NUMDER OF COPIES REQUIRED: LTTR 8 ENCL 0
pf Io,, UNITED STATES 8 o NUCLEAR REGULATORY COMMISSION 5 8 WASHINGTON, D. C. 20555
% ,,,,,* May 8, 1987 50-275/323 Diablo Canyon MEMORANDUM FOR: Chief, Document Management Branch, TIDC FROM: Director, Division of Rules and Records, ADM
SUBJECT:
REVIEW 0F UTILITY EMERGENCY PLAN DOCUMENTATION The Division of Rules and Records has reviewed the attached document and has detemined that it may now be made publicly available.
, {' ,, s // , 'kn:^ )
Donnie H. Grimsley, Director DivisionofRulesandRecords/);f,-
Office of Administration
/k
Attachment:
As stated