Public Version of Rev 0 to Emergency Procedure EP EF-9, Activation of Back-Up Emergency Response Facilities. W/870508 Release Memo
ML20215K489
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 04/03/1987
From:
PACIFIC GAS & ELECTRIC CO.
To:
Shared Package
ML16341E202 List:
References
EP-EF-9-01, EP-EF-9-1, NUDOCS 8705110223
Download: ML20215K489 (13)


Text

-

m ,, _ _

PA'CIFIC GAS AND ELECTRIC CtMPANY NUMER EP EF-9 REVISION 0 DEPARTMENT OF NUCLEAR POWER GENERATION PAGE 1 0F 11

{ ~ DIABLO CANYON POWER PLANT UNITS AND 2 EMERGENCY PROCEDURE TITLE: ACTIVATION OF BACK-UP EMERGENCY RESPONSE FACILITIES APPROVED: T. 8 PLANT MANAGER ,) DATE EFFECTIVE DATE SCOPE This procedure describes the on-site back-up facilities that are available in the event it becomes necessary to evacuate, or its not possib1h to activate, an Emergency Response Facility (ERF). This procedure and ,

changes thereto requires PSRC reveiw.

GENERAL The ERF's covered by this procedure are:

b) 1. Control Room. Units 1 and 2 2.TechnicalSupportCenter(TSC)

3. Operational Support Center (OSC)

Back-up facilities have been identified for each of the ERF's and the actions required for their use are described in this procedure. The functions and objectives for each of the ERF's remain the same for their '

assigned back-up facility.

INITIATING CONDITIONS This procedure is in effect upon reaching an Emergency Action Level (EAL) requiring the ERF's to be activated and an ERF cannot be activated or must be evacuated. The ERF may be uninhabitable due to smoke, fire, heat, toxic gas, radiation hazard, or other occurrences.

NOTE: Declaration of a Control Room uninhabitable in itself requires an EAL declaration based upon Appendix Z in OP AP-8.

IMMEDIATE ACTIONS Upon declaration of an ERF being uninhabitable the back-up facility will be activated in accordance with the appropriate attachment and emergency response will be continued from the back-up facility.

( .

X008226a.38 IIII

$705110223e7043o DR l ADOCK 05000275 l PDR

DIABLO CANYON POWER PLANT NUMBER EP EF-9 REVISION 0 EMERGENCY PROCEDURE TITLE: ACTIVATION OF BACK-UP EMERGENCY RESPONSE PAGE 2 0F 11 FACILITIES I SUPPORTING PROCEDURES OP AP-8 " CONTROL ROOM INACCESSIBILITY" EP G-1 " ACCIDENT CLASSIFICATION & EMERGENCY PLAN ACTIVATION" EP G-2 "ESTABLIS M ENT OF THE ONSITE EMERGENCY ORGANIZATION" EP G-3 " NOTIFICATION OF THE OFFSITE EMER3ENCY ORGANIZATION" EP R-6 " RADIOLOGICAL FIRE" EP M-3 " CHLORINE RELEASE" EP M-6 "NONRADIOLOGICAL FIRE" EP EFJ1 " ACTIVATION AND OPERATION OF THE TECHNICAL SUPPORT CENTER" EP EF-2 " ACTIVATION AND OPERATION OF THE OPERATIONAL SUPPORT CENTER" .

EP EF-3 " ACTIVATION AND OPERATION OF THE EMERGENCY OPERATIONS FACILITY" ATTACHMENTS

1. Back-up Control Room Instruction
2. Back-up TSC Instruction
3. Back-up OSC Instruction I

1 l

?

i i

I l

\

,x008226a.38 2LII i

= ,-mm, .~. oa .-

. w ..-_, y . - - - - , - - - - , . , ,w , -*

~ ~~

l

~ I L CANYON POWER PLANT DIAB'O' NUEER EP EF-9 REVISION O f s EMERGENCY PROCEDURE  !

L TITLE: ACTIVATION OF BACK-UP EMERGENCY RESPONSE PAGE 3 0F 11 6 FACILITIES I l

'l 1

ATTACl#4ENT 1: BACKUP CONTROL ROOM INSTRUCTION -

'1 SCOPE ll This instruction is to be used in conjunction with OP AP-8 when the Control Room is determined to be uninhabitable and the TSC is activated. 1 NOTE: An Alert should be declared upon evacuation of the Control Room based upon Appendix Z in GP AP-8. [

i INITIATING CONDITIONS The Control Room is declared uninhabitable and implements Operating l Procedure AP-8. The TSC is activated due to an existing emergency l condition.

IMMEDIATE ACTIONS h

1;

1. In accordance with OP AP-8 the designated operators man the affected f, unit's Hot Shutdown and/or Dedicated Shutdown Panels (locations shown h L,' in Figure 1). Il J

Telephone Numbers I, Hot Shutdown Panel Dedicated Shutdown Panel t i

1k And establish connJnications with the TSC per OP AP-8 section A.

step 3.

f I

FIGURES

[

i 1. LOCATION OF SHUT 00WN PANELS i 1

. I i!

L

' ,l I

i

((

1 x0082264.38 3III '

I I

t DIABLD' CANYON POWER PLANT -

IpeER EP EF-9 REVISION O I EMERGENCY PROCEDURE i TITLE: ACTIVATION OF 8ACK-UP ENERGENCY RESPONSE PAGE 4 0F 11 C FACILITIES

~

l

}

l' FIGURE 1 t LOCATION OF SHUTDOWN PANELS 1

i tMIT 1 (MtT 2 I

., FUEL HAFCLNG BULDNO AUMLIARY BULDNQ REL HAMM.WIO BULDMG f L J

~~

) D.100*-0* D.10tr-O"

%C&li%?

\ l *

  • $&P\ I ,,

W W 4e0 v 4e0 v W W Svttehger Switehger

. .,h ed Room Room h , ,,, ,,

ted Shut I '

Down Panet wn Panel CDPfTA9HNT 1 Het Shut Onm I Het Shut Down CONTAWMNT 2 Remote Cente1 Panet Remote CentelPanel l

l x008226a.38 4!!! ,

l

" ' ' ' - . -_,-.-y., - . , - . - - - - , + _ , - , - , - - . , . .,.,,.T

' ~

DIABLD CANYON POWER PLANT ,

NLDeER EP EF-9 i REVISION O

EMERGENCY PROCEDURE TITLE
ACTIVATION OF BACK-UP EMERGENCY RESPONSE PAGE 5 0F 11 -

FACILITIES }

l ATTACHMENT 2: BACKUPTECHNICALSUPPORTCENTER(TSC) INSTRUCTION l SCOPE l l

This instruction is to be used in conjunction with EP G-1 G-2 G-3 and EF-1 when it becomes necessary to activate the TSC but it has been declared uninhabitable. .

INITIATING CONDITIONS ,

An Alert or greater emergency condition is declared or in progress and the ,

TSC becomes uninhabitable. .

IMMEDIATE ACTIONS

1. The TSC minism staff shall report to the Control Room and set-up the TSC Energency Organization as shown in Figure 1. Back-up TSC.
2. The back-up TSC staffing requirements shall be determined at the discretion of the Site Emergency Coordinator but typical sintasm assignments are:

Shift Foreman's Office Position Desk Ph Number '

Site Emergency coordinator Shif tT6 reman's Emergency Evalcation & Rec. Coord. STA's Emergency Liaison Coordinator Control Room Asst.'s Emergency Liaison Assistant  !

Emergency Operations Advisor PIMS Teminal l Clerk Control Roca Asst.'s i Control Roce l

Position location Phone Number i Emergency Radiologica1' Advisor EARS Terminal EARS Operator EARS Taminal Emergency Liaison Coord. Asst. Unit 1 Radio Rad. Data Processors Unit-2 P250 Room Security Liaison CAS Maintenance Liaisons Unit 1 P250 Roon NRC (MonitorAct1<itiesusingtelephoneonwestwallof a

theControlRoom)

.~

)

x008226a.38 5III -

l

-1 b -%

1 DIABLO' CANYON POWER PLANT IpeER EP EF-9 REVISION 0 I

. EMERGENCY PROCEDURE

. TITLE: ACTIVATION OF BACK-UP EMERGENCY RESPONSE PAGE 6 0F 11

! (/ FACILITIES . i e

i

3. If the E0F is activated and the Recovery Manager has assumed control l of the emergency then the Site Emergency Coordinator (SEC) should inform the Recovery Manager and, if time permits, obtain permission to relocate.

l 4. If in-plant hazards (radiological or otherwise) exist on any of the ',

potential evacuation routes, personnel should be advised of the safest route. Personnel in the TSC that are not immediately required in the back-up TSC shall report to the Security Building Lunchroom.

5. If the TSC EARS terminal is the controlling terminal then, if time permits, prior to evacuating the TSC the EARS operator shall transfer control to the Control Room teminal.
6. The predetermined backup TSC staff shall report to the Control Room via the evacuation route announced by the SEC and re-establish the i TSC per Figure 1.

SUBSEQUENT ACTIONS i

1. Once the backup staff has re-established the TSC and have established i l . , contact with the OSC and EOF, the SEC will declare the backup TSC

! operational and have it resume its functions.

FIGURES

1. BACKUP TSC LAYOUT AND POSITION LOCATIONS ,

i -

l t

I

'1 t

j I

1 l

l l!

i x008226a.38 6III [

,  ?

i

^'~

,__-~,-.-,m.r_,,,_____ _, _ , , . . _,,.g

_ , _ _ _ . _ ,,,y,_. . ~ ;7 7 .... . _ _ , _ _ , ,-

, 1 DIABLO CANYON POWER PLANT -

Nt#GER EPkf-9 l i

REVISION 0 -

ENERGENCY PROCEDURE TITLE: ACTIVATION OF BACK-UP EMERGENCY RESPONSE PAGE 7 0F 11 ..) l FACILITIES i

I FIGURE 1 BACKUP TSC LAYOUT AND POSITION LOCATIONS Typical i Backup TSC i

(Control Room) I

/ '

S

! / -

p

%/ N i I

i netntenance . o usuns s- -

I t

i Etc Ast. [AR$ ERA l i I I I l / nAnoATA

< _[ . ,_ /

s sic j NRC g

.- .- SEC ELC LAISCN I

"C E0A l E CAS .

l N N l-

anc .-

I

. Phone N0mbers


,,w-.-,.,,-,,.r,-weww< wm,,---m-w-,, , n,---,,-,----w_,,,.,-~~7-wg,p----

y,,,wm,--wg-----vw,-+----,-------,----~wwwr=qww www

. 4

. I DIABLO CANYON POWER PLANT NUMER EP EF-9 1:

- REVISION 0 -

),

. EMERGENCY PROCEDURE TITI.E: ACTIVATION OF BACK-UP DIERGENCY RESPONSE PAGE 8 0F 11 FACILITIES  :

ATTACMENT 3: BACKUP OPERATIONAL SUPPORT CENTER (OSC) INSTRUCTION SCOPE l This instruction is to be used in conjvaction with EP 6-1 and EF-2 when it becomes necessary to activate the OSC but it has been declared ,

uninhabitable.

GENERAL  ;

The OSC occupies two closely adjoinin2 facilities. Access Control and W '

Cold Machine Shop. One section or both sections could be declared uninhabitable. Both sections probably would be affected by a radiological hazard while a fi e or toxic gas may affect only one. The decision to declare one or both sections uninhabitable is the responsibility of the '

SiteEmergencyCoordinator(SEC)afterreceivingadvicefromthe i; Maintenance Coordinator, and Emergency Radiological Advisor (ERA).  :.

INITIATING CONDITIONS j An Alert or greater emergency condition is declared or in progress and a h I part or all of the OSC is declared uninhabitable by the SEC. ,

NOTE': If Access Control is declared uninhabitable, the SEC shall ,

inform the Emergency Operations Coordinator who shall '

ensure Auxiliary Operators are informed of the new Access Control arrangement for plant access. .

IMMEDIATE ACTIONS Il

1. If only Access Control is declared uninhabitable then the OSC Access Control personnel, and assembled repair teams shall reassemble in the Cold Machine Shop as shown in Figure 1.

Typical telephone usage will be:

POSITION PHONE f

0.*C SUPERVISOR .

SI E RADIATION PROTECTION COORD SITE CHEMISTRY COORDINATOR ACCESS SENIOR

~

l x008226a.38 8III ,

i i

., _ . _ . _ _ _ _ . _ . , ,____. , . . _ _ _ . _ . _ _ _ _ _ __ _ ,c_ ___ _ , _ - _ _ _ , _ _

9 .*  ;

~

DIABLO CANYON P0tlER PLANT - IRBGER EP EF,9. -

REVISION 0 i DIERGENCY PROCEDURE -

TITLE: ACTIVATION OF SACK-UP DIERGENCY RESPONSE PAGE 9 0F 11 FACILITIES . ) f s

8 0

2. If gly lthe Cold Machine Shop is declared uninhabitable then the Emergency Maintenance Coordinator and his staff shall relocate in the '

Chead stry and Radiation Protection Foreman's office in Access Control. The rest of the personnel assembled in the Cold Machine Shop shall reassemble in the hallways in Access Contr he, Emergency Maintenance Coordinator shall use extensi reestablish communications with the TSC. ,

3. If th Access Control and the Cold Machine Shop are declared 4 uni itable then the Emergency Maintenance Coordinator will have OSC personnel evacuate to the TSC where the TSC staff shall determine the alternate arrangements for the existing plant conditions. -

Typically the TSC will be used as the OSC Coordination point. If habitability pemits, the Administration Building or Security

, Building Lunchroom is preferred for assembly of back-up maintenance '

personnel. Chemistry and Radiation Protection personnel preferably i will assemble In the TSC lab area, with overflow assembly in the same location as the maintenance personnel.

i A. Alternate radiological access control point (s) must be ,l established for operator, emergency repair and radiological assessment activities. If possible, one access point for all personnel is preferred, but more than one may be used.

Alternate access control points, depending on conditions, may be:

1. West stairwell from the Control Room to the Auxiliary I Building. If the 115' level is used, maintenance and i assessment teams may access from the TSC through this 1 I

location. A m ess would traverse the original Access Control area.

2. Turbine Su1Tding exit near the unaffected contalment access an the 140' level.
3. Exits from the TSC and Control Room to the plant.

B. Contamination Control Points shall be set up as needed in the Control Room. TSC and the TSC' lab to prevent the spread of

. contamination.

C. The Emergency Maintenance Coordinator and hi st ff will work from the TSC office area. His extension i j l

h l

l x008226a.38 ~ ~.9III T..

__.,__.---__-.r-.,-,-.....,,.

,---..___--,-.,.-._,_,,m ..,..---,c,,_..,,m.

..-_.-..._____..___-._-__,,,,__m. _ . , . -

~

~

. DIABLO CANYON POWER PUWT '

NINEER EP EF-9 REVISION 0 i EMERGENCY PROCEDURE I TITLE: ACTIVATION OF 8ACK-UP EMERGENCY RESPONSE PAGE 10 0F 11 l FACILITIES I F I D. The OSC Supervisor will work from the new radiological access h control point for maintenance personnel. ,

E. The Site Radiation Protection Coordinator and Site mi try Coordinator will work from the TSC Lab at Extensio

4. Issuance of special work permits and dosimetry for radiological l access will be through the TSC Laboratory.

i FIGURES

1. OSC LRyout and Telephone Numbers. .

i iN F

'i 11' I r~

q,y II v 1 6l dl I

i

,(

1 l

x008226a.3B 10!!! l l

i l

-+y.-- . - , _, .. . , . . . . . - - . + - v , , .___.-.-, . _ .---,.__.-__-__-y _ _ , , _ , . - , _ _ _ _ - _ , _ _ _ _ . -

7 . 7. ,'

i

. ~

IpeER EP EF-9 j DIABLO CMY0W POWER PLMT .

REVISION 0 maEKYMESWE TITLE: ACTIVATION OF 8ACK-UP EMERGENCY RESPONSE PAGE 11 0F 11 ')  ;

/

FACILITIES

)

FIGURE 1 ,

OSC LAYOUT AND TELEPHONE Nt#EER OSC '

t Layout  ; -

essamme

L  ! - .

/ -

, =

t Access .

J Control ,

I I

eammmme y a uma e ae i nummma women s

~

t  ! 1 seursom a j .

' l y

n s gr Equipment i

! Access / l

- Vestible h

' l

(  !

I I

Cold

Machine Tool m \

l .

Shop s ,

/ l x008226a.38 . '/ / -

l .

/ / .. .

,I l

y REGULATORY INFORMATION DISTRIDUTICN SYGTEM (R IDS)

ACCH'95 ION ND8: 8994046+90- DOC.DATE: 97/04/30 NOTAR12ED: NO DOCKET #

FAC IL: 50-273 Diab lo Cany on Nuc lear Poiecr " Plant, Unit 1, Paci fic Ca 05000275 50-323 Diablo Canyon Nuclear Pouer Plant, Unit 2, Paci fic Ca 05000323 AUTH.NANE AUTHOR AFFILIATICN SHIFFER,J.D. Pacific Cas & Electric Co. -

RECIP.NAME RECIPIENT AFFILIATION Document Control Uranch (Document Control Desk)

. SUDJECT: Forwards Central Files version of Rev 0 to E*ergenc y Plan Implementing Procedure EP EF-9, " Activation ch Sckup Emergency Response Facilities." Withheld.

DISTRIDUTION CODE: AX45D COPIES RECEIVED: LTR 1 ENCL __ SIZE: _b I TITLE: Emergency Plan or Implementing Procedures (Proprietary)

NOTES:

RECIPIENT COPIES RECIPIENT COPIE9 ID CODE /NAME LTTR ENCL ID CODE /NAbiE LTTR ENCL PD5 LA gf 1 1 PD5 PD FY 1 1 GCHIERLING,H Sf, 1 1 TRAMNELL,C g i 1 INTERN /DRR 1 1 AEOD/DOA/IRD g4 1 1 NRR/DREP/EPD g 1 1 REO FILE 5/ 1 1 TOTAL NUMDER OF COPIES REQUIRED: LTTR 8 ENCL 0

pf Io,, UNITED STATES 8 o NUCLEAR REGULATORY COMMISSION 5 8 WASHINGTON, D. C. 20555

% ,,,,,* May 8, 1987 50-275/323 Diablo Canyon MEMORANDUM FOR: Chief, Document Management Branch, TIDC FROM: Director, Division of Rules and Records, ADM

SUBJECT:

REVIEW 0F UTILITY EMERGENCY PLAN DOCUMENTATION The Division of Rules and Records has reviewed the attached document and has detemined that it may now be made publicly available.

, {' ,, s // , 'kn:^ )

Donnie H. Grimsley, Director DivisionofRulesandRecords/);f,-

Office of Administration

/k

Attachment:

As stated