Revised Implementing Procedures,Including Rev 5 to 1.1, Activation of Corporate Emergency Response Organization, Emergency Transportation Instructions Rev 7 to 3.2, Corporate Communications Dept & Rev 4 to 2.1ML20214U376 |
Person / Time |
---|
Site: |
Diablo Canyon |
---|
Issue date: |
07/01/1986 |
---|
From: |
PACIFIC GAS & ELECTRIC CO. |
---|
To: |
|
---|
Shared Package |
---|
ML16341D889 |
List: |
---|
References |
---|
PROC-860701-01, NUDOCS 8609300594 |
Download: ML20214U376 (6) |
|
|
---|
Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML20155C0701998-10-23023 October 1998 Proposed Tech Specs Sections 3.1,3.2,3.4,3.5 & 5.0 Converting to ITS ML20154A4001998-09-25025 September 1998 Proposed Tech Specs Pages Re Sections 3.4 & 5.0 on RCS & Administrative Controls ML20249C4221998-06-25025 June 1998 Proposed Tech Specs Pages Re 980522 RAI on LAR 97-09 for Section 3.6 Conversion to Improved TS ML20217P5921998-05-0101 May 1998 Proposed Tech Specs,Eliminating Requirement for Operations Manager to Hold SRO License ML20216G5961998-04-15015 April 1998 Proposed Tech Specs,Changing Surveillance Frequency from at Least Once Every 18 Months to at Least Once Per Refueling Interval ML20134K0081996-10-11011 October 1996 Fuel Assembly Insp Program ML16342A1671993-07-0707 July 1993 Proposed TS 5.1.3, Map Defining Unrestricted Areas & Site Boundary for Radioactive Gaseous & Liquid Effluents. ML20045D1771993-06-15015 June 1993 Rev 3 to Surveillance Test Procedure STP M-90, Surveillance of Diablo Canyon Breakwaters for 1993 ML20044D8061993-05-0707 May 1993 Proposed TS 3/4.3.3.5, Remote Shutdown Instrumentation. ML20059F8731993-04-30030 April 1993 Public Version of Revised SOP III.06 HP-11, Emergency Worker Exposure Control ML20099B1521992-07-0808 July 1992 Public Version of Revised San Luis Obispo County Nuclear Power Plant Emergency Response Plan Std Operating Procedures,Including III.06, Environ Health & III.06, HP-2, Protective Action Guidelines ML20127C3831992-05-19019 May 1992 Public Version of Revised Emergency Response Plan Std Operating Procedures,Including III.06 HP-3, Emergency Environ Monitoring, & III.6,HP-13, Emergency Equipment Instruments & Supplies ML20092H6841992-01-15015 January 1992 Public Version of Revised Std Operating Procedure III.09, County Dept of Technical Svcs ML20058E7741990-10-18018 October 1990 Proposed Tech Specs Revising Section 3/4.2.4, Quandrant Power Tilt Ratio, to Permit Determination of Quadrant Power Tilt Ratio by Full Incore Flux Map ML20092C3891990-07-31031 July 1990 Public Version of Std Operating Procedure III.09, County Dept of Technical Svcs ML20012C5981990-03-14014 March 1990 Cycle 4 Startup Rept. W/900314 Ltr ML20235H3131987-08-20020 August 1987 Public Version of Revised Emergency Plan Implementing Procedures,Including Rev 12 to EP R-6, Radiological Fire & Rev 14 to EP M-6, Nonradiological Fire ML20237L5611987-08-13013 August 1987 Public Version of Revised Corporate Emergency Response Plan Implementing Procedures,Including,Rev 6 to 1.1, Activation of Corporate Emergency Response Organization & Rev 4 to 1.2, Activation of Corporate Incident Response Ctr ML20215K4891987-04-0303 April 1987 Public Version of Rev 0 to Emergency Procedure EP EF-9, Activation of Back-Up Emergency Response Facilities. W/870508 Release Memo ML20237F9621987-02-27027 February 1987 Rev 5 to CAP A-8, Chemical Analysis Procedure Offsite Dose Calculations ML20212E6071987-01-16016 January 1987 Public Version of Rev 9 to Emergency Plan Implementing Procedure EP G-3, Notification of Offsite Organization. W/ 870302 Release Memo ML20214S5951986-11-24024 November 1986 Public Version of Updated Vol III to Std Operating Procedures,To San Luis Obispo County/Cities Nuclear Power Plant Emergency Response Plan, Including Procedure III.01, Emergency Svcs Director ML20211A2651986-10-0606 October 1986 Proposed Tech Specs,Revising Reporting Requirements Per 10CFR50.72 & 50.73 & Correcting Typos ML20209E1101986-08-18018 August 1986 Public Version of Corporate Emergency Response Plan Updates, Including Rev 5 to IP 1.1, Activation of Corporate Emergency Response Organization & Rev 3 to IP 3.1, Governmental Relations ML20214U3761986-07-0101 July 1986 Revised Implementing Procedures,Including Rev 5 to 1.1, Activation of Corporate Emergency Response Organization, Emergency Transportation Instructions Rev 7 to 3.2, Corporate Communications Dept & Rev 4 to 2.1 ML20212H8801986-06-30030 June 1986 Public Version of Rev 11 to Emergency Plan Implementing Procedure EP R-6, Radiological Fire & Rev 13 to EP M-6, Nonradiological Fire DCL-86-170, Public Version of Revised Emergency Implementing Procedures, Including Rev 15 to EP M-1, Employee Injury or Illness (Nonradiological) & Rev 8 to EP G-4, Personnel Accountability & Assembly. W/860624 Release Memo1986-06-16016 June 1986 Public Version of Revised Emergency Implementing Procedures, Including Rev 15 to EP M-1, Employee Injury or Illness (Nonradiological) & Rev 8 to EP G-4, Personnel Accountability & Assembly. W/860624 Release Memo ML20195B9961986-05-0202 May 1986 Public Version of Emergency Plan Implementing Procedure Updates,Including EP M-2, Nonemployee Injury or Illness (Third Party) & EP RB-7, Emergency Onsite Radiological Environ Monitoring. W/860522 Release Memo ML20207H5341986-04-0808 April 1986 Public Version of Rev 17 to Emergency Procedure EP R-1, Personnel Injury or Illness (Radiologically Related) &/Or Overexposure ML20155B1031986-03-31031 March 1986 Nonproprietary Natural Circulation,Boron Mixing & Cooldown Test,Final Post-Test Rept ML20141N0181986-02-13013 February 1986 Public Version of Emergency Plan Implementing Procedures, Including Table of Contents & Rev 16 to EP R-1 Re Personnel Injury or Illness (Radiologically Related) &/Or overexposure.W/860225 Release Memo ML20142A0171985-12-31031 December 1985 Public Version of Revised Vol III to Emergency Response Plan SOP III.08 ML20137H4471985-12-13013 December 1985 Public Version of Updated Emergency Plan Implementing Procedures,Including Rev 10 to EP R-6, Radiological Fire & Rev 4 to EP M-9, Hazardous Waste Mgt Contingency Plan. W/ 860116 Release Memo ML20137X1931985-11-15015 November 1985 Public Version of Revised Emergency Plan Implementing Procedures,Including Rev 3 to EP G-251 Re Notification of Onsite Emergency Organization & Rev 7 to EP G-3 Re Notification of Offsite Organizations DCL-85-319, Public Version of Revised Emergency Plan Implementing Procedures,Including Rev 9 to EP R-6 Re Radiological Fire & Rev 11 to EP M-6 Re Nonradiological Fire.W/Jm Felton 851015 Transmittal Memo1985-10-0404 October 1985 Public Version of Revised Emergency Plan Implementing Procedures,Including Rev 9 to EP R-6 Re Radiological Fire & Rev 11 to EP M-6 Re Nonradiological Fire.W/Jm Felton 851015 Transmittal Memo ML20137U5281985-10-0101 October 1985 Public Version of Revised Corporate Emergency Response Plan Implementing Procedures,Including Rev 3 to 1.2 Re Activation of Corporate Incident Response Ctr.Jm Felton 851127 Release Memo Encl ML20137Z0941985-09-30030 September 1985 Public Version of Emergency Response Plan Sops,Including III.01, Emergency Svcs Director, III.08, Public Info Officer & III.20 California Highway Patrol DCL-85-264, Public Version of Revised Emergency Plan Implementing Procedures,Including Rev 4 to M-10 Re Fire Protection of Safe Shutdown Equipment & Rev 7 to EF-5 Re Emergency Equipment,Instruments & Supplies.Related Correspondence1985-08-0808 August 1985 Public Version of Revised Emergency Plan Implementing Procedures,Including Rev 4 to M-10 Re Fire Protection of Safe Shutdown Equipment & Rev 7 to EF-5 Re Emergency Equipment,Instruments & Supplies.Related Correspondence ML20133Q1801985-08-0505 August 1985 Public Version of Rev 6 to Emergency Plan Implementing Procedure EP EF-1, Emergency Procedure Activation & Operation of Technical Support Ctr. W/851030 Release Memo ML20214U8571985-07-23023 July 1985 Rev 0 to NCIG-03, Training Manual for Inspectors of Structural Welds at Nuclear Power Plants Using Acceptance Criteria of NCIG-01 ML20133D0311985-07-18018 July 1985 Public Version of Updated Emergency Plan Implementing Procedures,Including Rev 9 to EP M-4, Earthquake & Rev 5 to EP OR-1, Offsite Support & Assistance DCL-85-245, Public Version of Revised Emergency Plan Implementing Procedures,Including Rev 9 to EP M-4, Earthquake & Rev 5 to EP OR-1, Offsite Support & Assistance. W/Revised Tables of Contents1985-07-18018 July 1985 Public Version of Revised Emergency Plan Implementing Procedures,Including Rev 9 to EP M-4, Earthquake & Rev 5 to EP OR-1, Offsite Support & Assistance. W/Revised Tables of Contents DCL-85-276, Public Version of Revised Corporate Emergency Response Plan Implementing Procedures,Including Rev 4 to 1.1 Re Activation of Corporate Emergency Response Organization & Rev 3,Change 5 to Implementing Procedure List1985-07-0101 July 1985 Public Version of Revised Corporate Emergency Response Plan Implementing Procedures,Including Rev 4 to 1.1 Re Activation of Corporate Emergency Response Organization & Rev 3,Change 5 to Implementing Procedure List ML20129F1161985-06-21021 June 1985 Public Version of Revised Emergency Plan Implementing Procedures,Including Rev 7 to EP G-2 Re Onsite Emergency Organization & EP G-251 Re Notification of Onsite Emergency Organization ML20136G7291985-04-30030 April 1985 Public Version of Vol 3 of San Luis Obispo County Nuclear Power Plant Emergency Response Plan Std Operating procedures.W/850814 Release Memo DCL-85-174, Suppl 1 to Startup Test Rept, for Nov 1984 - Jan 19851985-04-29029 April 1985 Suppl 1 to Startup Test Rept, for Nov 1984 - Jan 1985 DCL-85-165, Public Version of Revised Emergency Plan Implementing Procedures,Including Rev 7 to EP M-7 Re Oil Spill Isolation & Cleanup & Rev 6 to EP G-4 Re Personnel Accountability & Assembly1985-04-24024 April 1985 Public Version of Revised Emergency Plan Implementing Procedures,Including Rev 7 to EP M-7 Re Oil Spill Isolation & Cleanup & Rev 6 to EP G-4 Re Personnel Accountability & Assembly ML20117K5181985-04-0808 April 1985 Public Version of Revised Emergency Plan Implementing Procedures,Including Rev 0 to Procedure EP E-0, Reactor Trip or Safety Injection, Rev 0 to EP E-0.1, Reactor Trip Response & Rev 0 to EP E-3, Steam Generator Tube Rupture ML20209J2641985-04-0808 April 1985 Revised Emergency Plan Implementing Procedures,Including Table of Contents,Rev 0 to EP E-0, Reactor Trip or Safety Injection, Rev 0 to EP E-0.1, Reactor Trip Response & Rev 1 to EP E-0.2, Natural Circulation Cooldown ML20132E8441985-04-0101 April 1985 Public Version of Revised Corporate Emergency Response Plan Implementing Procedures,Including Rev 3 to 1.1 Re Activation of Corporate Emergency Response Organization Emergency Radio Pager Instructions 1998-09-25
[Table view] Category:TEST/INSPECTION/OPERATING PROCEDURES
MONTHYEARML20134K0081996-10-11011 October 1996 Fuel Assembly Insp Program ML20045D1771993-06-15015 June 1993 Rev 3 to Surveillance Test Procedure STP M-90, Surveillance of Diablo Canyon Breakwaters for 1993 ML20059F8731993-04-30030 April 1993 Public Version of Revised SOP III.06 HP-11, Emergency Worker Exposure Control ML20099B1521992-07-0808 July 1992 Public Version of Revised San Luis Obispo County Nuclear Power Plant Emergency Response Plan Std Operating Procedures,Including III.06, Environ Health & III.06, HP-2, Protective Action Guidelines ML20127C3831992-05-19019 May 1992 Public Version of Revised Emergency Response Plan Std Operating Procedures,Including III.06 HP-3, Emergency Environ Monitoring, & III.6,HP-13, Emergency Equipment Instruments & Supplies ML20092H6841992-01-15015 January 1992 Public Version of Revised Std Operating Procedure III.09, County Dept of Technical Svcs ML20092C3891990-07-31031 July 1990 Public Version of Std Operating Procedure III.09, County Dept of Technical Svcs ML20235H3131987-08-20020 August 1987 Public Version of Revised Emergency Plan Implementing Procedures,Including Rev 12 to EP R-6, Radiological Fire & Rev 14 to EP M-6, Nonradiological Fire ML20237L5611987-08-13013 August 1987 Public Version of Revised Corporate Emergency Response Plan Implementing Procedures,Including,Rev 6 to 1.1, Activation of Corporate Emergency Response Organization & Rev 4 to 1.2, Activation of Corporate Incident Response Ctr ML20215K4891987-04-0303 April 1987 Public Version of Rev 0 to Emergency Procedure EP EF-9, Activation of Back-Up Emergency Response Facilities. W/870508 Release Memo ML20237F9621987-02-27027 February 1987 Rev 5 to CAP A-8, Chemical Analysis Procedure Offsite Dose Calculations ML20212E6071987-01-16016 January 1987 Public Version of Rev 9 to Emergency Plan Implementing Procedure EP G-3, Notification of Offsite Organization. W/ 870302 Release Memo ML20214S5951986-11-24024 November 1986 Public Version of Updated Vol III to Std Operating Procedures,To San Luis Obispo County/Cities Nuclear Power Plant Emergency Response Plan, Including Procedure III.01, Emergency Svcs Director ML20209E1101986-08-18018 August 1986 Public Version of Corporate Emergency Response Plan Updates, Including Rev 5 to IP 1.1, Activation of Corporate Emergency Response Organization & Rev 3 to IP 3.1, Governmental Relations ML20214U3761986-07-0101 July 1986 Revised Implementing Procedures,Including Rev 5 to 1.1, Activation of Corporate Emergency Response Organization, Emergency Transportation Instructions Rev 7 to 3.2, Corporate Communications Dept & Rev 4 to 2.1 ML20212H8801986-06-30030 June 1986 Public Version of Rev 11 to Emergency Plan Implementing Procedure EP R-6, Radiological Fire & Rev 13 to EP M-6, Nonradiological Fire DCL-86-170, Public Version of Revised Emergency Implementing Procedures, Including Rev 15 to EP M-1, Employee Injury or Illness (Nonradiological) & Rev 8 to EP G-4, Personnel Accountability & Assembly. W/860624 Release Memo1986-06-16016 June 1986 Public Version of Revised Emergency Implementing Procedures, Including Rev 15 to EP M-1, Employee Injury or Illness (Nonradiological) & Rev 8 to EP G-4, Personnel Accountability & Assembly. W/860624 Release Memo ML20195B9961986-05-0202 May 1986 Public Version of Emergency Plan Implementing Procedure Updates,Including EP M-2, Nonemployee Injury or Illness (Third Party) & EP RB-7, Emergency Onsite Radiological Environ Monitoring. W/860522 Release Memo ML20207H5341986-04-0808 April 1986 Public Version of Rev 17 to Emergency Procedure EP R-1, Personnel Injury or Illness (Radiologically Related) &/Or Overexposure ML20141N0181986-02-13013 February 1986 Public Version of Emergency Plan Implementing Procedures, Including Table of Contents & Rev 16 to EP R-1 Re Personnel Injury or Illness (Radiologically Related) &/Or overexposure.W/860225 Release Memo ML20142A0171985-12-31031 December 1985 Public Version of Revised Vol III to Emergency Response Plan SOP III.08 ML20137H4471985-12-13013 December 1985 Public Version of Updated Emergency Plan Implementing Procedures,Including Rev 10 to EP R-6, Radiological Fire & Rev 4 to EP M-9, Hazardous Waste Mgt Contingency Plan. W/ 860116 Release Memo ML20137X1931985-11-15015 November 1985 Public Version of Revised Emergency Plan Implementing Procedures,Including Rev 3 to EP G-251 Re Notification of Onsite Emergency Organization & Rev 7 to EP G-3 Re Notification of Offsite Organizations DCL-85-319, Public Version of Revised Emergency Plan Implementing Procedures,Including Rev 9 to EP R-6 Re Radiological Fire & Rev 11 to EP M-6 Re Nonradiological Fire.W/Jm Felton 851015 Transmittal Memo1985-10-0404 October 1985 Public Version of Revised Emergency Plan Implementing Procedures,Including Rev 9 to EP R-6 Re Radiological Fire & Rev 11 to EP M-6 Re Nonradiological Fire.W/Jm Felton 851015 Transmittal Memo ML20137U5281985-10-0101 October 1985 Public Version of Revised Corporate Emergency Response Plan Implementing Procedures,Including Rev 3 to 1.2 Re Activation of Corporate Incident Response Ctr.Jm Felton 851127 Release Memo Encl ML20137Z0941985-09-30030 September 1985 Public Version of Emergency Response Plan Sops,Including III.01, Emergency Svcs Director, III.08, Public Info Officer & III.20 California Highway Patrol DCL-85-264, Public Version of Revised Emergency Plan Implementing Procedures,Including Rev 4 to M-10 Re Fire Protection of Safe Shutdown Equipment & Rev 7 to EF-5 Re Emergency Equipment,Instruments & Supplies.Related Correspondence1985-08-0808 August 1985 Public Version of Revised Emergency Plan Implementing Procedures,Including Rev 4 to M-10 Re Fire Protection of Safe Shutdown Equipment & Rev 7 to EF-5 Re Emergency Equipment,Instruments & Supplies.Related Correspondence ML20133Q1801985-08-0505 August 1985 Public Version of Rev 6 to Emergency Plan Implementing Procedure EP EF-1, Emergency Procedure Activation & Operation of Technical Support Ctr. W/851030 Release Memo ML20214U8571985-07-23023 July 1985 Rev 0 to NCIG-03, Training Manual for Inspectors of Structural Welds at Nuclear Power Plants Using Acceptance Criteria of NCIG-01 ML20133D0311985-07-18018 July 1985 Public Version of Updated Emergency Plan Implementing Procedures,Including Rev 9 to EP M-4, Earthquake & Rev 5 to EP OR-1, Offsite Support & Assistance DCL-85-245, Public Version of Revised Emergency Plan Implementing Procedures,Including Rev 9 to EP M-4, Earthquake & Rev 5 to EP OR-1, Offsite Support & Assistance. W/Revised Tables of Contents1985-07-18018 July 1985 Public Version of Revised Emergency Plan Implementing Procedures,Including Rev 9 to EP M-4, Earthquake & Rev 5 to EP OR-1, Offsite Support & Assistance. W/Revised Tables of Contents DCL-85-276, Public Version of Revised Corporate Emergency Response Plan Implementing Procedures,Including Rev 4 to 1.1 Re Activation of Corporate Emergency Response Organization & Rev 3,Change 5 to Implementing Procedure List1985-07-0101 July 1985 Public Version of Revised Corporate Emergency Response Plan Implementing Procedures,Including Rev 4 to 1.1 Re Activation of Corporate Emergency Response Organization & Rev 3,Change 5 to Implementing Procedure List ML20129F1161985-06-21021 June 1985 Public Version of Revised Emergency Plan Implementing Procedures,Including Rev 7 to EP G-2 Re Onsite Emergency Organization & EP G-251 Re Notification of Onsite Emergency Organization ML20136G7291985-04-30030 April 1985 Public Version of Vol 3 of San Luis Obispo County Nuclear Power Plant Emergency Response Plan Std Operating procedures.W/850814 Release Memo DCL-85-165, Public Version of Revised Emergency Plan Implementing Procedures,Including Rev 7 to EP M-7 Re Oil Spill Isolation & Cleanup & Rev 6 to EP G-4 Re Personnel Accountability & Assembly1985-04-24024 April 1985 Public Version of Revised Emergency Plan Implementing Procedures,Including Rev 7 to EP M-7 Re Oil Spill Isolation & Cleanup & Rev 6 to EP G-4 Re Personnel Accountability & Assembly ML20209J2641985-04-0808 April 1985 Revised Emergency Plan Implementing Procedures,Including Table of Contents,Rev 0 to EP E-0, Reactor Trip or Safety Injection, Rev 0 to EP E-0.1, Reactor Trip Response & Rev 1 to EP E-0.2, Natural Circulation Cooldown ML20117K5181985-04-0808 April 1985 Public Version of Revised Emergency Plan Implementing Procedures,Including Rev 0 to Procedure EP E-0, Reactor Trip or Safety Injection, Rev 0 to EP E-0.1, Reactor Trip Response & Rev 0 to EP E-3, Steam Generator Tube Rupture ML20132E8441985-04-0101 April 1985 Public Version of Revised Corporate Emergency Response Plan Implementing Procedures,Including Rev 3 to 1.1 Re Activation of Corporate Emergency Response Organization Emergency Radio Pager Instructions ML20116C1381985-03-26026 March 1985 Public Version of Updates to Sops,Vol III of San Luis Obispo County Nuclear Power Plant Emergency Response Plan, Including Rev to SOP III.10, Dept of General Svcs. W/850419 Release Memo DCL-85-112, Public Version of Revised Emergency Plan Implementing Procedures,Including Table of Contents,Rev 4 to EP OR-1 Re Offsite Support & Assistance & Rev 3 to OR-2 Re Release of Info to Public & 850401 Release Memo1985-03-14014 March 1985 Public Version of Revised Emergency Plan Implementing Procedures,Including Table of Contents,Rev 4 to EP OR-1 Re Offsite Support & Assistance & Rev 3 to OR-2 Re Release of Info to Public & 850401 Release Memo DCL-85-196, Public Version of Revised Emergency Plan Implementing Procedures,Including Rev 15 to EP R-1, Personnel Injury or Illness (Radiologically Related) &/Or Overexposure. Related Correspondence1985-02-25025 February 1985 Public Version of Revised Emergency Plan Implementing Procedures,Including Rev 15 to EP R-1, Personnel Injury or Illness (Radiologically Related) &/Or Overexposure. Related Correspondence ML20125A6531985-02-0404 February 1985 Public Version of Revised Emergency Plan Implementing Procedures,Including Rev 1 to EP OP-0.1, Reactor Trip Response & Rev 5 to EP G-3, Notification of Offsite Organizations ML20209J1691985-01-31031 January 1985 Public Version of Revised Emergency Response Plan Sops, Including III.10, SOP Dept of General Svcs & III.24, Disaster Preparedness Plan for Peacetime Emergencies. Related Correspondence ML20215B2591984-11-0101 November 1984 Rev 4 to QC Procedure DCP-2, Silicone Room Installation. Partially Withheld Related Info Encl ML20101J2191984-10-31031 October 1984 Public Version of Revised SOPs for San Luis Obispo County Nuclear Power Plant Emergency Response plan.W/841219 Release Memo ML20100K1371984-10-30030 October 1984 Pg&E,Diablo Canyon Power Plant,1984 Emergency Preparedness Field Exercise DCL-84-336, Revised Emergency Plan Implementing Procedures,Including EP R-1 Re Personnel Injury or Illness,Ep R-6 Re Radiological Fire,Ep M-6 Re Nonradiological Fire & EP G-1 Re Accident Classification.Related Correspondence1984-10-25025 October 1984 Revised Emergency Plan Implementing Procedures,Including EP R-1 Re Personnel Injury or Illness,Ep R-6 Re Radiological Fire,Ep M-6 Re Nonradiological Fire & EP G-1 Re Accident Classification.Related Correspondence DCL-84-330, Rev 3 to, Repair/Replacement Program1984-10-19019 October 1984 Rev 3 to, Repair/Replacement Program ML20101B0721984-10-15015 October 1984 Public Version of Revised Emergency Plan Implementing Procedures,Including 1.1 Re Corporate Emergency response,3.2 Re Corporate Communications dept,4.1 Re Matls & 4.9 Re Qa. W/Jm Felton 841213 Memo DCL-84-302, Revised Emergency Plan Implementing Procedures,Including EPOP-0 Re Reactor Trip or Safety injection,EPOP-0.1 Re Reactor Trip Response & EPOP-0.2 Re Natural Circulation Cooldown.Related Correspondence1984-09-10010 September 1984 Revised Emergency Plan Implementing Procedures,Including EPOP-0 Re Reactor Trip or Safety injection,EPOP-0.1 Re Reactor Trip Response & EPOP-0.2 Re Natural Circulation Cooldown.Related Correspondence 1996-10-11
[Table view] |
Text
e -
pgyggh; 177-Pac! TIC bas and ELECT:IIC Cut.1 ratty t
Cor:POR TE Er.1EnGE::C) P.ESr0:1SE ptA;; RE'll SI0ii: E ;
i
= * "'~' -
. . , . . al . ._. a ,
2.: . '. ,w
- ; ... .a. .-- -. - . : ._ _j 377;ggggg ; g j
...)
DATE: 07 /C '. .~ 56 MLE PAGE 01 0F C4 A:~ I'/ AT IO\. OF THE CORPORATE EMERGENCY RESPONSE ORGANIZATION ___
l EMERGENCY TRANSFORTATION INSTRUCTIONS A. Critical Emergency Resconse Oraanization Personnel .
- 1. Upon receipt of notification of the emergency event, the folicwing cri:ical l emergency response personnel (listed by emergency title) shall be res;:nsible for arranging their own transportation, if required, to the San Luis 0:ispo
] area:
. Recovery Manager
. Operations and Analytical Recovery Manager
. Engineering and Logistics Recovery Manager
. Radiological Emergency Recovery Manager
. Public Information Recovery Manager
. Media Center Representative All other PGandE emercency resconse orcanization personnel travelina to the l
San Luis Obispo area shall arrance transoortation in accordance witn Ine instructions set fortn in cart d. Detow.
- 2. The above-listed individuals may elect to utilize their own ground transportation vehicles or any one of the following transportation services: ~
- a. Corporate Aircraft
- 1) ' 0akl and Ai rport Hange r #S . . . . . . . . . . . . . . . . . . . . . . . . .
- b. Oakland Executive Air Terminal........................
(ask for PGandE Transportation Coordinator) l
- c. 24-hour Fixed Wing Air Charter ~c < ces:
i 4
- 1) Cal-West Aviation (Concord).......................
i
- 2) Coastal Ai r (San Lui s 0bispo) . . . . . . . . . . . . . . . . . . . . .
4
- 3) Gol den Gate Pi per (San Carl os) . . . . . . . . . . . . . . . . . . . .
- 4) Corporate Aviation Services (San Jose)............;
I j .
- 5) Paci fic States Avi ation , Inc. (Ccncord) . . . . . . . . . . .,
Cbispo)....................
- 6) Air San Luis (San Luis !
, 7) Skyway Avi atien ( San Cari cs ) . . . . . . . . . . . . . . . . . . . . . . .
} i i ;
B609300594 860911
} } PCR ADOCK 05000275 ' ~ ~ ~
! F-. PDR
- - 1 - ~i _ , _ _ _ , _ _ ,_ _ _ _
i PACIFIC GAS and ELECimC Cath:1 nW W ID% '
.! conPoRATE E.".EEGENCY CEsPousE PLAM _ .gg g !
, n ' ' ' ,i ~ nr-:.ifja c, ;" ,--,
-'4" 1 n Un a,-.. ,. . ,.-
,J G 12.- ATTI,CHMENT: E TITLE DATE: 07/01/EE i
ACTIVATICN OF THE CORPORATE EMERGEI;CY RESPONSE ORGAN 12A110ti PAGE 02 0F 04 EMERGENCY TRANSFORTATION li;STRUCT10NS A. Critical Emercency Response Orcanization Personnel (Cont'd.)
- d. 24-hour Helicopter Air Charter Services (in order of preference):
r -
- 1) Aris Helicopters, Ltd. (San Jose).................
- 2) Helicopters Unlimited, Inc. (0akland).............
- 3) Astrocopters (0akland)............................
- 4) Crane Helicopter Services (Fremont)...............
- 5) Co = cdore Helicopters (San Francisco).............
- e. The telephone company yellow pages list additional air charter services.
.s
- f. Additionally, the Recovery Manacer may elect to utilize the services of the California Highway Patrol (CHP) in obtaining ~ transportation to the San Luis Obispo area.
To arrar.ge emergency transportation with the CHP, the Recovery Manager shoulc call one of the following numbers, as appropriate:
- 1) During normal office hours Golden Gate Division..........................
- 2) During non-office hours and holidays Oakland Dispatch Center.......................
Cc=unications with CHP personnel should rsference the CHP Golden Gate Division 5.0.P. 3.48 which describes the emergency transportation services the CHP will provide.
- g. Regardless of the mode of transportation used, prior to, departure, each individual shall contact the Corporate Technical and Lcgistical Ccordinater and advise him of the estimated times of departure and arrival, the arrival Iccaticn in the San Luis Obispo area, and any other special requirctents cr information. The 7,orporata T2chnical rc Logistical Ccordina:cr will tnen aavise the Corporata Division Coordinator to ensure that any necessary grounc lecistical supcort u tri piace p.-ior tc :ne arrival of carscnnai in tha 5cr. Luis Obispc area.
b
-I
l
i l
PaciF!c Gt,'; m n:cTa:: cor.m; -
4= IN% '
f ,,. _ . .s co3PoCATE E:. EraIHCY ~".2P0:13: :' L /. -
, r . 1 ,. . , .
', ' " ", ;J ]
! m 'e & "- . , , , . . , , . ,
f . ..!. .' _._ l F.!; ."..J ; ; .2 C . J a _) a 2 - f22 ATT; CH:iE'iT : C l TITLE DATE: 07/01/E5 I FAGE 02 CF Cl A:TIVATICN OF THE CORPORATE EMERGENCY RESPO:iSE CRGAN:ZATION EMEP.GENCY TFANSFORTATION INSTRUCTIONS i i A. Critical Emercency Resconse Orcanizatien Perscnnel (Con't'd.)
- d. 24-hour Helicopter Air Charter Services (in order of preference):
r -
q i
l
- 1) Aris U litcpters, Ltd. (San Jose).................
i l
l
- 2) Helicopters Unlimited, Inc. (0akland)........ ....
t
- 3) Astrocopters (0akland)............................
- 4) Crane Helicopter Services (Fremont)...............
- 5) Cc=cdore Helicopters' (San Francisco) . . . . . . . . . . . . .
- e. The telephone ccmpany yellow pages list additional air charter l services.
s
- f. Additionally, the Recovery Manager may elect to utilize the services of the California Highway Patrol (CHP) in obtaining transportation to the San Luis Obispo area.
To arrange emergency transportation with the CHP, the Recovery Manager should call one of the following numbers, as appropriate:
- 1) During normal office hours Golden Gate Division..........................
- 2) During non-office hcurs and holidays Oakland Dispatch Center....................... __
Cc=unications with CHP personnel should reference the CHP Golden Gate Division S.O.P. 3.48 which describes the emergency transportation services the CHP will provide.
- g. Regardless of the mode cf transportation used, prior to departure, es:h incividual shall contact the Corporate Technical and Legistical Ccorcinater and advise hin of the estimatad timas of caparture ar.d arrival, tha arr' val 1ccrien in tha San Luis Obispo araa, and any othar special raquircrant; cr info,Tatica. 7;12 Corpcra:a T3chnical rc i Locistical Cccrdinatcr will than acvise the Corporata Division ,
Ccordinator tc ensur: that any nac25:ary grounc legistical suppcrt :: ,
in place prior ;c the a: m '. ci par;cr.nei in tha San Luis Obi;;c arla l
i
~
. ,w ~-
, r,v r m u ,, .cmv ~ - . - -
i" "
CoCPCP.ATI ErziEnGE: C7 nESPO:!SE Pt A:! --"
271510'.
'#"*a .,...,_...c.,.-..- ... ~. - - . , . . , . ,
s< 01 :' .. .: ~013.. - : . . ~ .s : . .. .a.: l g g, .
DATE 0D :./gc
- CORFORATE CCM!<C"ICATIONS CEFARTMENT I
PAGE C3 C; C4 l
EMERGD!CY TRANSFORTATION INSTRUCTIONS ,
E. Other Emergency Response Oraanizatien Fersennel
- 1. All other PGandE emergency response organizaticn personnel traveling :: the San Luis Obispo area shall use their own vehicles or transportation services provided by PGandE.
- 2. If PGandE transportation services are to be used, personnel should pr::eed to make transportation arrangements in one of the following manners:
- a. During normal office hours, contact the General Office Travel Desk (Room 1610,77 Beale Street). The primary telephone numbers for the General Office Travel Desk are:
If these lines are busy, the folicwing alternate telephone numbers should be used:
- b. During non-o;Tice hours, .Toi sowing receipt or notificaticn or the emergency event, emergency response personnel should proceed directly to the Executive Air Terminal at the Oakland Airport (L 550 Earhart Roac, Oakland) and contact the FGandE Travel Representative stationed there (see rap on page 04 of these Emergency Transportation Instructions).
NOTE: Personnel are advised to bring only a minimum amount cf baggage,
- c. If arrival time is not critical, personnel should call the Generai Office Travel Desk to verify transportation availability.
- 3. Regardless of the mode of transportation used, prior to departure, each individual shall contact the Recovery Manager or Departmental /Functicrai Group Coordinator to whom (s)he functionally reports and advise him of the estimated times of departure and arrival, the arrival location in the San Luis C:ispo area, and any other special requirements or information.
4 The Transportation Coordinator will coordinate arrangements, as required, with the Corporate Division Coordina:cr for ground transportation and lodgir.; for PGandE cerscnnel in the San Luis Cbisoo area. ,
I i
(([ 's .
[ __
PACIFIC GAS and ELECTRIC COMPANY NUMBER: 3.2 CORPORATE EMERGENCY RESPONSE PLAN ,
PGoE REVISION: 7 IMPIEMENTING PROCEDURE 377xc.g.stn7. s TITLE CORPORATE COMMUNICATIONS DEPARTMENT DATE: 07/01/86 PAGE 04 0F 05 MAP TO OAKLAND INTERNATIONAL AIRPORT EXECUTIVE AIR TERMINAL
- 'hF" n .'MD,
. .<',-(, f.'.' _ F<h. .
h.. , . O
.)y,).f,. w'fohh'kf
..r . . _ _
~.
.- g; _ 1- -
... 3 w . y..
'f.'; 4;./s.
/
i !.,gi'
- ,,',w a.
p- i t
.,.;,,g% , ; c n\r;*i. f, s
~+ .s T. \-ye s'i .t.,s, .% . ,,;. ;..;.'.:- .u' % ; ,.\ .\;..K- .:. n. ,.: ",:
9 q .s., *,. -
\
/ . ~
y,/. v g. a; ,,,; , .. cu..j. .j.* o ,,,. y
. . . .. s .w. < . .
titt*Tleu rsy. E1CT2 TRtr.n ,,, ',.
- 1. Ce seuth on E0EN3ER*IA ROC (of f 17 17)'S *~ I*f,* D ' ' -' '
.ld ,I ~ .-*' "' *i. s*Ys ,
- 2. Tur. rtr taonto DC*'.ITilt ORIVE O s, 2 . . , . . ,. . . a .
e
. #g*' <\ h. ]
- 3. sr. 2.o onto t x:m mm ,. .*
- p. .\'*g }l . . I'g... l. .i{,
- 4. Tur- rt Pt at EAAhAM ROC and park in , y \-
the paratng lot on the torner .'..\. l. ,
[, . .,; :
er <-
.g i
+ e?...
v.= e .A. .
s.<\ '. g -
1 s
-; .x.. .. c .;T .~~!1T ... -
,3.\. s @r.
.t
' >.>.3
,.o :. . ..
r
.\ .
,- >..A ,
-=.
' ' . . .C.~ .~
-v s . .g .~.+ , ? ;:,, /~
~ ~
- =;:. :=. s
- .. e ,
- f "1 r- -
gA'- .5. .' ..
- 1. '. r (.-.- g o. , , u. '
...o
- s. -9 '* - m . .a gc ; .
- : .;. : :. .:: . y .
~4
- --~.-- < .{ .~ s .
14: -".' '.J. y M;..,\\
- EEE i3 % ! ., > . 9, A, ' 'h u ' BW\.-l 74 N . t..' .. .: .-
- :: u. ~.. . -. s.,
.:,. ,, .r *. .. t . <
? : ;
.r/,//.<. , ,
M. :g . , . , 7,-:,. . . .,N, k t -
i.C- f... H:: r
- g ../., .
aar r*= isu e . . s. fp .m .v, ,: , i.*. .
l
- r. ..- - i) ,\
?./ ,i ,
a- . >a, ,!
~ ..n i
.s., ,% . . .
"f .. ....t
. mi ~ ~ ~& s, ' ~.
_\ _,: -i_.. ; l'Y I/ s.. . .
- :9. 5._. \. , - - a-
, ..', r .- t -
- i
- _i J'A.-) J.?..f/, c',;./ ...... ~. '. - / ~~ ) { rt. .: . ; .; -j ~'
5:.;~.: :: . f.'?p'<,.\-y / %;-t *: 7:-'d*q 4 )a % .
e '. w
~ i
- =: ,, r*4 A ,, -s i
Ji _.
,, . . -1
. . r w c.~ , ... ! 1 ... .. ' . .. ;..M: .s .. .
. - -- - -.;. - - J e .
. . . i M. s .e, -- ,, .7._;;*,. .~.u .'.". a . . - . . .
IE*il^ . - V
- ~~ "'-
- =. ,
- -= 0 Qa ..u . .. r.$' W b. - M 4 ,--- --n,.
~[ -....
1 i .-.L
~l.
I
- _ v;s; h: ._ . ,
- .o
- _: ;;_:.:. .. .a - .
- w. - .
- a,.. ; ;
s , l* :*
's
~
- . . _ . t. ..
s 7 , --
nAx:tr n p. .
s'- ./ n:st: ;?.; . s. - ,
,.1[- *
- Q41s>635-73st ' " .-' " ,}. ,*.~
,' # ~ .. .
{' >
/ '
/ { ..=;
'.. m-. vt AIR ::rcu:.
uAM 2:e 7[h s [,,- .
Q l5 . .
' . . ,'.tsso IA. AIRMI "#
( . -,,c. . , -
' - CAT.M'. . ?.* ! *.* *
j Nf n:xt@.im62 3:::! g, s-p ., n,, ,j-. .,. ., g, ,
. s - uQ. , g ,, _. l . - . .
M,. :. . - I. :. .
w n =rc a . . .
.'.{ . *:)~2V'y 44 =:
' .. e ,s f
Cf s .h '(,.-'N. s~~~.I.<-:
s .g j -( tD . ..; - [:'
s; b.g\
., g
?....\....\.%..!.,.fr~~@. .,! . ,U-~
s
. . . 1 ' '~ ! -
i CERP3 32 l -
. - _ - =.
u o
(* ,
6,-C348 (G/921 KEV 01 f' .' PACIFIC gas and ELECTRIC C0ZPANY CORPORA.! ECERGENCY RESPONSE PLAN NUMBER: 2'1 REVISION: 4
- ~
IMPLEMENTING PROCEDURE ATTACHMENT: 1 TITLE PLAN MAINTENANCE DATE: 07/01/86 PAGE 01 0F 03' RESPONSIBILITIES FOR DOCUMENT REVIEW AND APPROVAL Responsibility Preparation Review Approval Item
. Vice President, NPG . Chairman, PNAC Corporate (SeeNote1) . President and Emergency Chief Operating
Response
Plan Officer
. Chairman of the Board and Chief Executive Officer Implementing (SeeNote1) (SeeNote2)
Procedures
. Hgr., Nuclear Operations . President (
1.1 Support 1.2 . Mgr. , Nuclear Operations Support 2.1 Sr. Nuclear . Supervising Nuclear Generation Generation Engineer Engineer . Mgr., Nuclear Operations
- RECE Support 1
2.2 Sr. Nuclear . Supervising Nuclear Generation Generation Engineer Engineer . Mgr. , Nuclear Operations
- RECE Support l
. Mgr., Agency and . Sr VP-Corporate 3.1 Legislative Services Relations
. Mgr., Local Governmental Relations
. VP-Governmental Relations
. Manager, News Services . Sr. VP-Corporate 3.2 Relations
. VP-Corporate Comunications 3.3 . VP and General Counsel
. Executive Vice President 3.4 . Mgr., Insurance
. Vice President, Finance and Treasurer t
t CERP2 9
. f ..
i .1 K t V 02 4 g W PACIFIC GAS and ELECTRIC COMPANY NUMBER: 2.1 CORPORATE EMERGENCY RESPONSE PLAN REVISIO4:, 4, '
IMPLEMENTING PROCEDURE ATTACsMENT: 1 PLAN MAINTENANCE DATE: 07/01/86 PAGE 02 0F 03 RESPONSIBILITIES FOR DOCUMENT REVIEW AND APPROVAL Responsibility Item Preparation Review Approval Implementing Procedures 3.5 . Mgr., Safety. Health and Claims
. VP and General Counsel
. Executive Vice President -
) 3.6 . Director of Security
. VP-General Services
. Sr. VP-Operations 3.7 . Director, Personnel
. Sr. VP-Personnel 4.1 . Mgr., Materials
. VP-General Services
. Sr. VP-Operations 4.2 . Mgr., Telecommunications VP-Electric Operations
. Sr. Td-Operations 4.3 . Mgr., Nuclear Operations . President Support 4.4 . VP-General Construction . President 4.5 . VP-Engineering . President 4.6 . VP-Computer Systems and . Sr. VP-Corporate Services Planning and Information Services 4.7 . Mgr., Nuclear Operations . President D
CERP2 10 _ _ _ _ __ _ _ _ _ _