ML20058E774
| ML20058E774 | |
| Person / Time | |
|---|---|
| Site: | Diablo Canyon |
| Issue date: | 10/18/1990 |
| From: | PACIFIC GAS & ELECTRIC CO. |
| To: | |
| Shared Package | |
| ML16341F853 | List: |
| References | |
| NUDOCS 9011070322 | |
| Download: ML20058E774 (2) | |
Text
l l
l I
8
=
1 1
i Attachment B f
l MARKED-UP TECHNICAL SPECIFICATIONS
[
2 t
Remove Page Insert Pace 3/4 2-20 3/4 2-20 I
l i
r t
r l
3318S/0085K 9o110703,T 901018
~
PDR ADOCK 05000275 p
o POWER DISTRIBUTION LIM 115 SURVEILLANCE REQUIREMENTS 4.2.4.1 The QUADRANT POWER TILT RATIO shall be determined to be within the limit above 50% of RATED THERKAL POWER by:
Calculating the ratio at least once per 7 days when the alarm is a.
OPERABLE, and b.
F ilculating the ratio at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> during steady-state
[
operation when the alarm is inoperable, r
4 ?.4.2 The QUADRANT POWER TILT RATIO shall be determined to be within the limit when above 75% of RATFD THERMAL POWER with one Power Range channel in-operable by using the movable incore detectors to confirm that the normalized symmetric power distribution, obtained from the 4 pairs of symmetric thimble locations, is consistent with the indicated QUADRANT POWER TILT RATIO at least once per 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />.
F cr km s /,,Il inc og.$/u a map fw fye s ifts. hon 3. 3. 3. 2.
t l
I i
l i
l j
OlABLO CANY0H - UNITS 1 & 2 3/4 2-20 Amendment Nos. 37 and 36 Ef fective at end of Unit 1 Cycle 3
)
,,